This document provides details for a federal contract solicitation to construct an Aircraft Support Equipment (ASE) and Vehicle Maintenance (VM) facility at Bradley Air National Guard Base in East Granby, Connecticut. The solicitation seeks construction services in accordance with contract drawings and technical specifications. The project magnitude is between $10 million and $25 million. The North American Industry Classification code is 236220 for commercial and institutional building construction, with a small business size standard of $39.5 million average annual revenue. The solicitation will be posted on sam.gov and issued unrestricted. Instructions for obtaining drawings and specifications are in Section 00100. Funds have not been appropriated but are anticipated to become available prior to award, as this project is on the National Guard's priority list. No contract will be awarded without available funding.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 31, 2019
John Gorham, PE Jacobs Engineering Group Inc.
Project Manager 2 Executive Park Drive, Suite 205 Bedford, NH 03110
Re: Buildings 27, 28, 31, and 16 Connecticut Air National Guard, 100 Nicholson Road, East Granby, CT Building Survey Findings RPF File No. 199476
Dear Mr. Gorham:
On October 17, 2019 and October 18, 2019, RPF Environmental, Inc. (RPF) conducted a survey at the Connecticut Air National Guard located at 100 Nicholson Road in East Granby, CT. The survey was performed in the interior portions of the building, as designated by you or your site representative, for accessible hazardous building material as indicated herein. Below is a summary of findings, discussion of the results and preliminary recommendations for proper management of the identified hazardous building material. Attached to this report are the survey data tables, laboratory results, survey methodologies and limitations.
This report is not intended to be used as an abatement specification or work plan. To proceed with abatement work, the following important steps are necessary:
1. A work plan or project design documents must be prepared prior to abatement by a certified abatement project designer. As part of the design, additional site testing and analysis may be required as discussed in this report.
2. The abatement specification or work plan should then be used to solicit bids from qualified abatement contractors. Only properly licensed contractors should be used for asbestos abatement and disposal.
3. A qualified industrial hygiene/testing consultant should conduct sufficient testing and inspections of the work, independent of the abatement contractor. The consultant should also prepare final abatement reports for the work.
Jacobs Engineering Connecticut Air National Guard, East Granby, CT Building Survey Findings Page 2
Summary of Findings
The scope of this survey included interior areas within buildings 27, 28, 16, and 31. Buildings 16 and 27 are 1-story, masonry structures that house various offices, common areas and garages.
Building 28 is a 1-story, masonry and metal storage area that is used as an open garage. Building 31 is a 1-story, masonry building that is made up of five (5) garage bays. Accessible exterior portions of each building were inventoried only, sampling these materials and surveying the roofs of these buildings were outside the scope of this survey.
The scope of the survey included accessible asbestos-containing building material in accordance with the initial asbestos inspection requirements prior to renovation or demolition work as stated in the State regulations and applicable federal regulations. In addition, the survey included screening for lead paint (LP), polychlorinated biphenyls (PCB) light ballasts, mercury switches, refrigerants, suspect PCB caulking, universal wastes, building system hydraulics, and fluorescent light bulbs.
Asbestos
Several types of suspect asbestos-containing building material (ACBM) were observed by RPF, including friable and nonfriable suspect material. No asbestos was detected in the accessible materials sampled in buildings 27, 28, and 31. Based on the testing performed by RPF, asbestos was detected in the following materials collected in building 16:
Tan Black Floor Tile Mastic
Exterior portions of the buildings were inventoried only. Sampling was not performed of exterior suspect ACBM in order not to damage the integrity of the materials at this time.
As such, the door caulking, window caulking, and built-up roofing material is assumed to be ACBM for the purposes of this inspection. When feasible and prior to demolition or disturbance, the door caulking, window caulking, and built-up roofing should be tested including representative core samples and analysis of the different suspect materials.
Lead Paint
Based on the year of construction and extent of renovation conducted over the years, it is reasonable to assume that some lead paint (LP) is present. RPF conducted limited spot testing of paint and LP was confirmed to be present on various interior building components in Buildings 27, 28, and 16. The intent of the lead testing was for potential lead hazardous waste disposal screening purposes only.
Building Survey Findings Page 3
Polychlorinated Biphenyls, Mercury, Refrigerants, Building System Hydraulics, Universal Wastes
Based on the RPF visual observations, polychlorinated biphenyl (PCB) containing light ballasts, universal wastes, and fluorescent light bulbs are present throughout Buildings 27, 16, and 31. Mercury switches and building system hydraulics were not observed in any of the buildings surveyed. In addition, RPF observed refrigerators in Buildings 27 and 16 which are assumed to contain Freon or other CFCs.
PCB in Caulking
Based on the RPF visual observations, six (6) composite samples were collected of suspect PCB caulking present in Buildings 27, 16, and 31. Two samples were collected from Building 27, three samples were collected from Building 16, and one sample was collected from Building 31. PCBs were not detected in the composite samples collected during this site visit.
Depending on the extent of renovation and final construction plans, proper abatement and/or management of the materials will be required in accordance with applicable State and federal regulations. Renovation and demolition plans should be reviewed by a certified industrial hygienist and a licensed project designer for possible asbestos impact issues. Based on the impact assessment and planned usage, technical specifications should be prepared for abatement, as applicable. A management plan should also be prepared to address any asbestos or other hazardous material scheduled to remain after construction.
Discussion of Findings
Asbestos-Containing Building Material
Asbestos is the name for a group of naturally occurring minerals that separate into strong, very fine fibers. The adverse health effects associated with asbestos exposure have been extensively studied for many years. Results of these studies and epidemiological investigations have demonstrated that inhalation of asbestos fibers may lead to increased risk of developing one or more diseases. In all cases, extreme care must be used not to disturb asbestos-containing materials or to create fiber release episodes.
In the accessible locations surveyed, RPF identified eighty (80) homogeneous groups of accessible suspect asbestos-containing building material. Suspect materials were identified based on current industry standards, EPA, and other guideline listings of potential suspect ACBM.
The following is a summary list of the suspect ACBM identified and sampled during this survey:
Building Survey Findings Page 4
Building 27 2x2 Pitted Suspended Ceiling Tile Yellow Carpet Adhesive Grey Cove Base with Yellow Adhesive White Door Caulking White Leveler Black Cove Base and Beige Adhesive Grey Laminate Countertop with Adhesive Black Window Caulking 2x2 Spotted Suspended Ceiling Tile Gray Ceramic Floor Tile Grout and Mortar Gray Ceramic Wall Tile Grout and Yellow Mastic Grey Caulking 2x4 Suspended Ceiling Tile
White Caulking
Mastic Brown Laminate Countertop with Adhesive Gypsum Board and Joint Compound Grey Duct Caulking Brown Expansion Joint Filler White Expansion Joint Caulking Blue Putty Red Putty Grey Putty Brown Putty Grey Flue Cement Red Caulking Grey Building Seam Caulking
Building 28 White Textured Paint Brown Caulking
Blue Flue Cement
Building 16 2x2 Dotted Suspended Ceiling Tile 2x4 Grey Pitted Suspended Ceiling Tile 2x4 Grey Squiggle Suspended Ceiling Tile 2x4 White Dotted Suspended Ceiling Tile Black Cove base with Brown Mastic Grey Cove base with Yellow Mastic
Mastic Gypsum board and Joint Compound White Sink Basin Undercoating Tan Granite Laminate Countertop with Adhesive Black Window Caulking White Building Seam Caulking White Door Caulking
Grey Flue Cement White Ceramic Wall Tile Grout with Gray Mortar Gray Ceramic Floor Tile Grout and Mortar Solid White Suspended Ceiling Tile White Ceramic Cove base Grout with Gray Mortar Red Putty Brown Pegboard Blue Putty Grey Putty White Patch Caulking Grey Duct Tape White Ceramic Cove Base Grout with Brown Mortar White Ceramic Wall Tile Grout with Yellow Mortar
Building Survey Findings Page 5
Building 31 White Textured Surfacing Brown Expansion Joint Filler
Grey Building Seam Caulking White Caulking
A total of one hundred and sixty-seven (167) samples were extracted from the different groups of suspect material in accordance with EPA sampling protocols. Of the samples collected by RPF, asbestos was detected in three (3) groups of suspect ACBM.
Based on the survey findings, accessible ACBM was not identified in Buildings 27, 28, and 31.
Care should be used during demolition to inspect for possible concealed suspect material that was not accessible at the time of this inspection.
Table 1 below includes a list of interior ACBM identified in building 16, EPA category listings, and asbestos content. A listing of the different homogenous groups of suspect material identified, samples collected, and analytical results is included in Appendix A.
TABLE 1
SUMMARY OF INTERIOR ACBM IDENTIFIED
Building Material Location Approximate
Quantity EPA Category Asbestos
Results with Black Mastic Building 16, Throughout Office area section of the building
1,300 square feet Category I Nonfriable
3-6% Chrysotile
Black Mastic Building 16, Break room, 35 square feet Category I Nonfriable
6% Chrysotile
Notes: All quantities are approximate only and should be confirmed during abatement project design and abatement bidding.
The ACBM identified during this survey consists of nonfriable material. The nonfriable ACBM was observed to be in good to fair condition and, left undisturbed and properly managed, is unlikely to cause any major fiber release episodes.
Although the standard polarized light method of analysis was completed pursuant to current state and federal regulations, it is recommended that some of the collected in buildings 16 and 27 that were found to be non-detect for asbestos, as detailed on the attached results, be confirmed using gravimetric preparation methods for nonfriable ACBM for more definitive results. If you would like to arrange for this additional lab work, please contact our office as soon as possible.
It should be noted that exploration of the masonry wall cavities for the presence of suspect vermiculite in each of the buildings was not part of the scope of work. The buildings were occupied at the time of the survey and it was not feasible to explore the walls without causing damage to the structure. The walls cavities in each of the buildings should be investigated prior to any demolition or renovation activities.
Building Survey Findings Page 6
The exterior building materials of Buildings 16, 27, 28, and 31 were inventoried only at this time and sampling was outside the scope of work for this survey. As such, the exterior building materials are assumed to be ACBM for the purposes of this inspection. When feasible and prior to demolition or disturbance, the exterior building materials should be tested including representative core samples of the roofing and analysis of the different suspect materials. The following is a list of accessible suspect exterior building materials RPF observed and inventoried at each of the buildings.
Building 27 Rubber roof system Black seam sealant White roof caulking Black vibration cloth Black flashing Grey flashing White patch caulking Black pitch pocket sealer
Brown window caulking Grey Building seam caulking Dark grey door caulking Hard grey caulking White caulking Light grey door caulking Red putty
Building 28 Silver coating on metal roof
Building 16 Rubber roof system on both the upper and lower roofs Silver roof coating White flashing White roof caulking Black roof caulking Black flashing
Black pitch pocket sealer Grey roofing tar Light grey door caulking Light grey building seam caulking Dark grey caulking Brown window caulking Dark grey building seam caulking
Building 31 Rubber roof system Black seam sealant Black adhesive around perimeter in spots
Grey building seam caulking Brown expansion joint filler Electrical putty Textured surfacing
The structures were in current use at the time of the survey and full destructive or exploratory survey methods were not feasible. Suspect materials encountered at the site subsequent to this survey, which are not included on the enclosed listings of suspect material sampled, should be assumed to be ACBM until proper testing proves otherwise (for example prior to any disturbance due to maintenance, renovation or demolition activity). Please notify RPF in this event to arrange for proper testing and assessments. Please reference the attached methodology and limitations.
Building Survey Findings Page 7
Lead Paint Screening
Based on the type and age of buildings construction, it is reasonable to assume that various painted surfaces contain some lead. It is not uncommon in buildings such as these and that have had various renovation and upgrades to have both lead containing paint and non-lead containing paint.
Lead is a toxic metal that was used for many years in paint and other products found in and around buildings and homes. Exposure to lead may cause a range of health effects, from behavioral problems and learning disabilities, to seizures and death. Children six years old and under are most at risk; however, adults are also susceptible to the effects of lead over exposure.
For the purposes of this survey, RPF extracted a total of twenty-three (23) representative suspect paint samples from building components in these buildings. Six (6) samples were collected from Building 27, and lead was detected in 3 of the samples: in the mechanical room (black), room 9 (beige), and room G1 (beige and white). Five (5) samples were collected from Building 28, and lead was detected in one of the samples: white textured paint. Eight (8) samples were collected from Building 16, and lead was detected in 3 of the samples: rooms 003 and 009 (white) and room 016 (brown). Four (4) samples were collected from Building 31, and there was no lead detected.
The results for the paint chip testing completed during this survey are included in Tables 6 through 9 of Appendix A. Based on this limited testing, it should be assumed that other painted surfaces at the site may also contain lead.
Current State of Connecticut Lead Poisoning regulations consider any paint that contains greater than 0.5 percent by weight to be lead-based paint. However, the intent of this survey was for construction purposes only and preliminary demolition waste stream implications, not for compliance with CT Lead Poisoning regulations, HUD, or any regulatory abatement order.
Any surfaces with lead present should be managed in accordance with current rules and guidelines, including but not limited to OSHA worker safety rules and State and EPA waste handling and disposal regulations. U.S. Occupational Safety and Health Administration (OSHA) construction rules do not specify any "safe" or acceptable levels of lead within paint for the purposes of occupational exposures. Therefore, construction work involving paint found to contain lead must be completed in accordance with OSHA regulations, not limited to the lead standard, 29 CFR
1926.62. Contractors completing work in areas found to contain lead, or where it is reasonable to assume lead may be present, should be notified of the presence (and potential presence) of lead and proper work protocols should be used.
As lead was found to be present in the screening, proper waste testing with TCLP extraction for lead and potentially other toxic materials should also be completed prior to disposal of any waste generated in accordance with current EPA requirements. Often times it is recommended that pre-demolition TCLP testing be completed such that waste can be segregated as required during demolition activity. Construction/demolition waste that is found to contain lead greater or equal to 5.0 milligrams per liter (mg/L) by TCLP analysis must be handled and treated as hazardous waste.
Building Survey Findings Page 8
Please also note that construction and renovation work involving lead paint in housing and child-occupied facilities built before 1978 is also regulated under the EPA Renovation, Repair, and Painting (RRP) rule. Any contractors conducting such work must be properly certified and must use lead safe work methods pursuant to the EPA RRP rule. In addition, pursuant to Title X requirements landlords and sellers are required to disclose the results of lead inspections to tenants and purchasers, and to provide the warning notice and pamphlets in accordance with Title X and State requirements.
PCB Light Ballasts and Fluorescent Lamp Inventory
For this survey, RPF inventoried the fluorescent lamps throughout Buildings 27 and 16.
Fluorescent lamps were not observed in Buildings 28 and 31. Visual spot checks of fixture ballasts could not be conducted during this preliminary survey due to the systems being energized. RPF observed approximately 68 fluorescent lamp fixtures in Building 27 and approximately 55 fixtures in Building 16.
During demolition of the lights, inspections should be performed label and have any unmarked ballasts or ballasts without date stamp be assumed to be PCB containing. PCB and non-PCB ballasts should be segregated and packaged for waste disposal in accordance with State and federal requirements. There is a substantial cost difference for disposal of PCB ballasts versus non-PCB ballasts. It is also recommended that prior to proceeding with site work, it be requested that the Client or Building Owner provide documentation of PCB ballasts removed and replaced in the building, if available.
PCBs have been shown to cause chronic toxic effects and are a human carcinogen. PCBs are toxic according to the U.S. EPA and are a regulated material. The two primary federal laws that affect the handling of PCBs are the Toxic Substance Control Act and the Superfund Law (CERCLA).
Other regulations include various State requirements, Department of Transportation, U.S. OSHA, and the Resource Conservation and Recovery Act. The regulations establish various requirements for the removal, handling, storage and disposal of PCBs.
With regard to light ballasts, approximately half were manufactured prior to 1979 and nearly all pre-1979 ballasts contain PCBs. Ballasts manufactured after July 1, 1978 and that do not contain PCBs are required Please note that is possible that post 1979 ballasts may contain some PCBs in the capacitor oils and more information should be requested if needed for applicable State and federal agencies. PCBs may also be present in common household appliances with small capacitors and as dielectric fluids; other electric equipment such as transformers, switches and voltage regulators; and recent studies have shown PCB content in caulk and some paints. Documentation of current conditions and in-depth hazard assessments, and laboratory testing for these other PCB usages, is beyond the scope-of-work for this initial survey.
PCB in Caulking
A total of six (6) composite samples of building caulking were collected and submitted for analysis to determine PCB content. These samples were comprised of discrete caulking materials collected
Building Survey Findings Page 9 from various interior window trim, door trim, building seams, expansion joints in Buildings 27, 16, and 31. No suspect PCB caulking was observed in Building 28.
The samples were analyzed by Eastern Analytical, Inc. using EPA Method 8082. No detectable concentrations of PCBs were present in the interior caulking samples collected. PCB-containing caulk is considered PCB bulk product waste if the concentration of PCBs in the caulk is greater than or equal to (>) 50 ppm pursuant to 40 CFR § 761.3. PCB bulk product waste includes waste derived from manufactured products containing PCBs in a non-liquid state where the concentration at the time of designation for disposal is >50 ppm PCBs. The results of the PCB analysis are included in Appendix A. It should be noted that sampling of exterior caulking was outside the scope of work for this survey. Prior to any renovation or demolition activities in buildings 27, 28, 16, and 31, the exterior caulking should be sampled and analyzed for PCBs.
Visual Observations for Mercury Switches, Refrigerants, Building System Hydraulics, and Fluorescent Light Bulbs
Based on the spot checks by RPF, no mercury switches or thermostats were observed in Buildings 16, 27, 28, and 31. It is possible that additional switches, thermostats or heat detection devices may be encountered during renovation or demolition work and care should be used to properly handle such materials. In addition, fluorescent and high intensity discharge lamps contain a small quantity of mercury that may pose a hazard to human health or the environment if the materials are not managed properly. The lamps may also contain lead solder material. The following table depicts the approximate quantities of bulbs observed in each building.
Location Fluorescent Bulbs High Intensity Bulbs Building 27 132 9 Building 28 0 0 Building 16 158 0 Building 31 0 10
Based on the visual observations performed, RPF did not identify any building system hydraulics in the buildings surveyed. RPF observed one refrigerator in Building 27 and one refrigerator in Building 16. It is possible that additional refrigeration, cooling units, and related equipment could be present in these buildings that may contain Freon or other CFCs. These units should be handled and disposed of properly by trained personnel.
Visual Observations of Universal Wastes
Based on the spot checks performed by RPF, containers of various chemicals were observed in Buildings 16, 27, and 31. Buildings 31 and 27 had a few garage bays devoted to storing drums and large containers of various chemicals and spill kits. Building 27 also has a portion of garage bay 1 that has a hazardous chemical closet with a safety data sheet (SDS) binder present. It should also be noted that containers of cleaning products and automotive supplies were present in Buildings 27 and 16. These two buildings are service garages that not only stores vehicles but also
Building Survey Findings Page 10 perform routine maintenance and repairs on them. It is assumed that all these items would be removed from the buildings prior to demolition.
Conclusions
Based on the survey findings, the building was found to contain ACBM, LP and other hazardous building material.
In accordance with current regulatory requirements, ACBM that may be impacted or disturbed (such that asbestos fiber release occurs) by renovation, demolition or other such activity must be removed by qualified, licensed firms. Although regulations for removal of nonfriable ACBM are somewhat less stringent than the requirements for friable ACBM, it should be noted that nonfriable ACBM that is subjected to grinding, abrasion, and other forces, could be rendered friable. In this event, the nonfriable ACBM would be re-categorized friable ACBM.
ACBM that will not be impacted by renovation or demolition activity may be left in place if managed properly and if the materials are maintained in good condition. ACBM to remain in the building should be included in an asbestos management plan and operations and maintenance (O&M) program detailing the measures to be used to safely occupy the building until the ACBM is fully removed. An accredited Management Planner should prepare the O&M Program in accordance with the guidelines set forth in 40 CFR Part 763 (AHERA).
Work impacting LP, fluorescent light bulbs, mercury (and potential PCB ballasts) must be performed in accordance with current State and federal standards, including but not limited safe work practices, engineering controls, proper waste packaging, and proper disposal. Work involving LP may require notification of tenants, if rented or leased space, prior to start of work.
Sufficiently in advance of the start of renovation and/or remediation work, abatement project design should be completed. As part the initial design steps any planned renovation and demolition activity should be reviewed for potential impact on ACBM. Asbestos removal is highly regulated at the State and federal level, and in some cases, at the local level also. Notification to CT Department of Public Health is required 10-days prior to the start of interior abatement work and demolition. Only qualified, trained, and licensed firms, as applicable, should be engaged to complete asbestos removal or other abatement activity. Asbestos abatement work must be designed (abatement specifications or work plan prepared) by accredited personnel.
All employees and contractors that may access or otherwise disturb areas with suspect ACBM present should be notified of the presence of ACBM and possible hidden ACBM, and the need to use caution when proceeding with work. Appropriate notifications, labeling and other hazard communications should be completed to all employees, contractors and others in accordance with US OSHA regulations and other applicable requirements (including asbestos labeling in accordance with 29 CFR Part 1926). The scope of RPF services for this survey did not include labeling of ACBM or hazard communications to other employees, building occupants, contractors, or subcontractors.
Building Survey Findings Page 11
Documentation of current ACBM conditions and in-depth hazard assessment is beyond the scope-of-work for this initial survey. With the exception of the specific testing and analysis detailed herein, no other samples of materials, oil, water, ground water, air, or other suspect hazardous materials were collected in the course of this inspection that supports or denies these conclusions.
No additional services beyond those explicitly stated herein were performed and none should be inferred or implied. The summary and conclusions are based on reasonably ascertainable information as described in this report. RPF Environmental, Inc. makes no guarantees, warranties, or references regarding this property or the condition of the property after the period of this report.
If you have any questions at this time, or if you would like to discuss the remediation process, please call our office.
Sincerely, RPF ENVIRONMENTAL, INC.
Brianna Ham, CMI EH&S Consultant CT Licensed Inspector
Enclosures:
Appendix A: Data and Analytical Tables Appendix B: Laboratory Results Appendix C: Picture Form Appendix D: Floor Plans Appendix E: Summary of Methodology and Limitations
199476 CTANG 31, 28, 27, 16 Survey Report
APPENDIX A
TABLE 2
JACOBS ENGINEERING
Building 27, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
Polarized Light Microscopy EPA 600/R-93/116 Method
Samples Collected: October 17, 2019
Notes:
SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample.
Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description Asbestos Content 101719-HG1a Suspended Ceiling Tile, 2x2, Pitted - Women's Restroom None Detected 101719-HG1b Suspended Ceiling Tile, 2x2, Pitted - Main Entry None Detected 101719-HG2a Carpet Adhesive, Yellow - Hallway By Room 4 None Detected 101719-HG2b Carpet Adhesive, Yellow - Room 3 None Detected 101719-HG3a - A Cove base, Grey - Room 3 None Detected 101719-HG3a - B Adhesive, Yellow - Room 3 None Detected 101719-HG3b - A Cove base, Grey - Hallway None Detected 101719-HG3b - B Adhesive, Yellow - Hallway None Detected 101719-HG4a Door Caulking, White - Main Entry Door To Hallway 6b None Detected 101719-HG4b Door Caulking, White - Room 4 None Detected 101719-HG5a Leveler, White - Room 10a/10b None Detected 101719-HG5b Leveler, White - Room 3 None Detected 101719-HG6a - A Cove base, Black - Room 10a/10b None Detected 101719-HG6a - B Adhesive, Beige - Room 10a/10b None Detected 101719-HG6a - A Cove base, Black - Main Entry None Detected 101719-HG6a - B Adhesive, Beige - Main Entry None Detected 101719-HG7a - A Laminate Countertop, Grey - Main Entry Windowsill None Detected 101719-HG7a - B Mastic, yellow - Main Entry Windowsill None Detected 101719-HG7b - A Laminate Countertop, Grey - Room 2 Windowsill None Detected 101719-HG7b - B Mastic, yellow - Room 2 Windowsill None Detected 101719-HG8a Window Caulking, Black - Room 10a/10b None Detected 101719-HG8b Window Caulking, Black - Room 10a/10b None Detected 101719-HG9a Suspended Ceiling Tile, 2x2 Spotted - Room 10a/10b None Detected 101719-HG9b Suspended Ceiling Tile, 2x2 Spotted - Room 9 None Detected 101719-HG10a - A Ceramic Floor Tile Grout, gray - Men's Restroom None Detected 101719-HG10a - B Ceramic Floor Tile Mortar, gray - Men's Restroom None Detected 101719-HG10b - A Ceramic Floor Tile Grout, gray - Women's Restroom None Detected 101719-HG10b - B Ceramic Floor Tile Mortar, gray - Women's Restroom None Detected 101719-HG11a - A Ceramic Wall Tile Grout, gray - Men's Restroom None Detected 101719-HG11a - B Ceramic Wall Tile Mastic. yellow - Men's Restroom None Detected
Building 27, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
Polarized Light Microscopy EPA 600/R-93/116 Method
Samples Collected: October 17, 2019
Notes:
SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample.
Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description Asbestos Content 101719-HG11b - A Ceramic Wall Tile Grout, gray - Women's Restroom None Detected 101719-HG11b - B Ceramic Wall Tile Mastic, yellow - Women's Restroom None Detected 101719-HG12a Caulking, Grey - Room 10a/10b None Detected 101719-HG12b Caulking, Grey - Room 10a/10b None Detected 101719-HG13a Suspended Ceiling Tile, 2x4 - Women's Restroom None Detected 101719-HG13b Suspended Ceiling Tile, 2x4 - Men's Restroom None Detected 101719-HG14a Caulking, White - Men's Restroom None Detected 101719-HG14b Caulking, White - Women's Restroom None Detected 101719-HG15a - A Floor Tile 12", White Room 9 None Detected 101719-HG15a - B Mastic, Yellow Room 9 None Detected 101719-HG15b - A Floor Tile 12", White - Hallway 6b None Detected 101719-HG15b - B Mastic, Yellow - Hallway 6b None Detected 101719-HG16a - A Laminate Countertop, Brown Granite - Room 9 None Detected 101719-HG16a - B Mastic, yellow - Room 9 None Detected 101719-HG16b - A Laminate Countertop, Brown Granite - Room 9 None Detected 101719-HG16b - B Mastic, yellow - Room 9 None Detected
101719-HG17a Gypsum and Joint Compound Garage Bay G6, North wall By Filters None Detected
101719-hG17b Gypsum and Joint Compound - Women's Restroom, Ceiling Above Shower None Detected
101719-HG17c Gypsum and Joint Compound Hallway 6B, By Room 9 None Detected 101719-HG18a Duct Caulking, Grey Garage Bay G5 On Air Duct None Detected 101719-HG18b Duct Caulking, Grey Garage Bay G1 None Detected
101719-HG19a Expansion Joint Filler, Brown - Garage Bay G1 By Door to Garage Bay G2, along east wall None Detected
101719-HG19b Expansion Joint Filler, Brown Garage Bay G2 By Door to Garage Bay G1, along south wall None Detected
101719-HG20a Expansion Joint Caulking, White Garage Bay G1 By Door to Garage Bay G2, along east wall None Detected
101719-HG20b Expansion Joint Caulking, White Garage Bay G2 By Door to Garage Bay G1, along south wall None Detected
101719-HG21a Putty, Blue Garage Bay G1, around pipe penetration None Detected
Building 27, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
Polarized Light Microscopy EPA 600/R-93/116 Method
Samples Collected: October 17, 2019
Notes:
SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample.
Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description Asbestos Content 101719-HG21b Putty, Blue Garage Bay G2, around pipe penetration None Detected 101719-HG22a Putty, Red Garage Bay G5, Around Pipe penetration None Detected 101719-HG22b Putty, Red Garage Bay G1, around pipe penetration None Detected
101719-HG23a Cementitious Putty, Grey - Mechanical Room, Above Door, around pipe penetration None Detected
101719-HG23b Cementitious Putty, Grey Garage Bay G1, around pipe penetration None Detected
101719-HG24a Putty, Brown Garage Bay G3, around pipe penetration None Detected 101719-HG24b Putty, Brown Garage Bay G3, around pipe penetration None Detected
101719-HG25a Flue Cement, Grey - Mechanical Room, around vent pipe penetration None Detected
101719-HG25b Flue Cement, Grey - Mechanical Room, around vent pipe penetration None Detected
101719-HG26a Caulk, Red Mechanical Room, furnace, On Vent Pipe None Detected 101719-HG26b Caulk, Red Mechanical Room, furnace, On Vent Pipe None Detected
101719-HG27a Building Seam Caulk, Grey - Main Entryway, by door to hallway 6B None Detected
101719-HG27b Building Seam Caulk, Grey - Main Entryway, by door to hallway 6B None Detected
199476
TABLE 3
Building 28, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
Polarized Light Microscopy EPA 600/R-93/116 Method
Samples Collected: October 17, 2019
Notes:
SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample.
Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description Asbestos Content 101719-HG101a Textured Paint, White - Center Of North Wall None Detected 101719-HG101b - A Textured Paint, White - Center Of North Wall None Detected 101719-HG101b - B Textured Paint, Gray - Center Of North Wall None Detected
101719-HG101c Textured Paint, White - Center of North wall, West side None Detected
101719-HG101d Textured Paint, White - North Wall, East Side None Detected 101719-HG101e Textured Paint, White - North Wall, West Side None Detected 101719-HG102a Caulking, Brown Floor, Center strip None Detected 101719-HG102b Caulking, Brown Floor, west side strip None Detected
101719-HG103a Flue Cement, Blue Exterior side, north wall West Side None Detected
101719-HG103b Flue Cement, Blue Exterior site, north wall, Center East None Detected
TABLE 4
Building 16, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
Polarized Light Microscopy EPA 600/R-93/116 Method
Samples Collected: October 18, 2019
Notes:
SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample.
Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description Asbestos Content 101819-HG201a Suspended Ceiling Tile, 2x2 Dotted - Breakroom 003 None Detected 101819-HG201b Suspended Ceiling Tile, 2x2 Dotted - Classroom 004 None Detected 101819-HG202a Suspended Ceiling Tile, 2x4 Grey Pitted - Hallway 002 None Detected 101819-HG202b Suspended Ceiling Tile, 2x4 Grey Pitted Classroom 004 None Detected
101819-HG203a Suspended Ceiling Tile, 2x4 Grey Squiggle Hallway 002 None Detected
101819-HG203b Suspended Ceiling Tile, 2x4 Grey Squiggle - Breakroom 003 None Detected
101819-HG204a Suspended Ceiling Tile, 2x4, White Dotted Hallway 002 None Detected
101819-HG204b Suspended Ceiling Tie, 2x4, White Dotted Breakroom 003 None Detected
101819-HG205a - A Cove base, Black - Vestibule 001 None Detected 101819-HG205a - B Mastic, Brown - Vestibule 001 None Detected 101819-HG205b - A Cove base, Black - Hallway 010 None Detected 101819-HG205b - B Mastic, Brown - Hallway 010 None Detected 101819-HG206a - A Cove base, Grey Breakroom 003 None Detected 101819-HG206a - B Mastic, yellow Breakroom 003 None Detected 101819-HG206b - A Cove base, Grey - Main Control 007 None Detected 101819-HG206b - B Mastic, yellow - Main Control 007 None Detected 101819-HG207a - A Floor Tile, 12" Tan Vestibule 006 3% Chrysotile 101819-HG207a - B Mastic, Black - Vestibule 006 6% Chrysotile 101819-HG207b - A Floor Tile, 12" Tan Vestibule 001 *SFP 101819-HG207b - B Mastic, Black - Vestibule 001 *SFP 101819-HG208a - A Floor Tile, 12" White Breakroom 003 None Detected 101819-HG208a - B Mastic, Black - Breakroom 003 6% Chrysotile 101819-HG208b - A Floor Tile, 12" White Breakroom 003 None Detected 101819-HG208b - B Mastic, Black - Breakroom 003 *SFP 101819-HG209a Gypsum and Joint Compound Hallway 002 None Detected 101819-HG209b Gypsum and Joint Compound Vestibule 001 None Detected 101819-HG209c Gypsum and Joint Compound Breakroom 003 None Detected
Building 16, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
Polarized Light Microscopy EPA 600/R-93/116 Method
Samples Collected: October 18, 2019
Notes:
SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample.
Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description Asbestos Content 101819-HG209d Gypsum and Joint Compound Vestibule 006 None Detected 101819-HG209e Gypsum and Joint Compound - Main Control 007 None Detected 101819-HG-210a Sink Basin Undercoating, White Breakroom 003 None Detected 101819-HG-210b Sink Basin Undercoating, White Breakroom 003 None Detected 101819-HG211a - A Laminate Countertop, Tan Granite Breakroom 003 None Detected 101819-HG211a - B Laminate Countertop Mastic, yellow Breakroom 003 None Detected 101819-HG211b - A Laminate Countertop, Tan Granite Breakroom 003 None Detected 101819-HG211b - B Laminate Countertop Mastic, yellow Breakroom 003 None Detected 101819-HG212a Window Caulk, Black Breakroom 003 None Detected 101819-HG212b Window Caulk, Black Classroom 004 None Detected 101819-HG213a Building Seam Caulk, White Hallway 002 None Detected 101819-HG213b Building Seam Caulk, White Breakroom 003 None Detected 101819-HG214a Building Seam Caulk, White - Vestibule 001 None Detected 101819-HG214b Building Seam Caulk, White - Vestibule 006 None Detected 101819-HG215a Door Caulking, White - Men's Restroom 013 None Detected
101819-HG215b Door Caulking, White - 002 Hallway by door to Classroom 004 None Detected
101819-HG216a Flue Cement, Grey - 009 None Detected 101819-HG216b Flue Cement, Grey - 009 None Detected
101819-HG217a - A Ceramic Wall Tile Grout, white - Men's Restroom 013 None Detected
101819-HG217a - B Ceramic Wall Tile Mortar, gray - Men's Restroom 013 None Detected
101819-HG217b - A Ceramic Wall Tile Grout, white - Men's Restroom 013 None Detected
101819-HG217b - B Ceramic Wall Tile Mortar, gray - Men's Restroom 013 None Detected
101819-HG218a - A Ceramic Floor Tile Grout + Mortar, 1" Tile, gray - Men's Restroom 013 None Detected
101819-HG218a - B Ceramic Floor Tile Grout + Mortar, 1" Tile, gray - Men's Restroom 013 None Detected
Building 16, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
Polarized Light Microscopy EPA 600/R-93/116 Method
Samples Collected: October 18, 2019
Notes:
SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample.
Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description Asbestos Content
101819-HG218b - A Ceramic Floor Tile Grout + Mortar, 1" Tile, gray - Women's Restroom 011 None Detected
101819-HG218b - B Ceramic Floor Tile Grout + Mortar, 1" Tile, gray - Women's Restroom 011 None Detected
101819-HG219a Suspended Ceiling Tile, Solid White - Men's Restroom 013 None Detected
101819-HG219b Suspended Ceiling Tile, Solid White - Women's Restroom 011 None Detected
101819-HG220a - A Ceramic Cove base Grout, white - Men's Restroom 013 None Detected
101819-HG220a - B Ceramic Cove base Mortar, gray - Men's Restroom 013 None Detected
101819-HG220b - A Ceramic Cove base Grout, white - Men's Restroom 013 None Detected
101819-HG220b - B Ceramic Cove base Mortar, gray - Men's Restroom 013 None Detected
101819-HG221a Putty, Red Parts and Issue Room 015, around pipe penetration None Detected
101819-HG221b Putty, Red Shop area 016, around pipe penetration None Detected 101819-HG222a Pegboard, Brown Shop area 016, north wall None Detected 101819-HG222b Pegboard, Brown Shop area 016, north wall None Detected
101819-HG223a Putty, Blue - Maintenance area 017, around red electrical box None Detected
101819-HG223b Putty, Blue Wash/Paint Bay 019, around red electrical box None Detected
101819-HG224a Putty, Grey Maintenance area 017, around pipe penetration None Detected
101819-HG224b Putty, Grey - Maintenance area 017, around pipe penetration None Detected
101819-HG225a Caulk, Patch White - Maintenance area 017, on north wall by door to hallway 010 None Detected
101819-HG225b Caulk, Patch White - Maintenance area 017, on north wall by door to hallway 010 None Detected
101819-HG226a Duct Tape, Grey Refueling Vehicle Bay 018, on exhaust pipe along south wall None Detected
Building 16, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
Polarized Light Microscopy EPA 600/R-93/116 Method
Samples Collected: October 18, 2019
Notes:
SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample.
Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description Asbestos Content
101819-HG226b Duct Tape, Grey - Refueling Vehicle Bay 018, on exhaust pipe along south wall None Detected
101819-HG227a - A Ceramic Cove base Grout, white - Women's Restroom 011 None Detected
101819-HG227a - B Ceramic Cove base Mortar, Brown - Women's Restroom 011 None Detected
101819-HG227b - A Ceramic Cove base Grout, white - Women's Restroom 011 None Detected
101819-HG227b - B Ceramic Cove base Mortar, - Women's Restroom 011 None Detected
101819-HG228a - A Ceramic Wall Tile Grout, white - Women's Restroom 011 None Detected
101819-HG228a - B Ceramic Wall Tile Mortar, - Women's Restroom 011 None Detected
101819-HG228b - A Ceramic Wall Tile Grout, white - Women's Restroom 011 None Detected
101819-HG228b - B Ceramic Wall Tile Mortar, - Women's Restroom 011 None Detected
TABLE 5
Building 31, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
Polarized Light Microscopy EPA 600/R-93/116 Method
Samples Collected: October 18, 2019
Notes:
SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample.
Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description Asbestos Status 101819-HG301a Textured Surfacing, White Garage Bay 1 None Detected 101819-HG301b Textured Surfacing, White Garage Bay 1 None Detected 101819-HG301c Textured Surfacing, White Garage Bay 1 None Detected 101819-HG302a Expansion Joint Filler, Brown Garage Bay 2 None Detected 101819-HG302b Expansion Joint Filler, Brown Garage Bay 4 None Detected 101819-HG303a Building Seam Caulk, Grey Garage Bay 5 None Detected 101819-HG303b Building Seam Caulk, Grey Garage Bay 1 None Detected
101819-HG304a Caulking, White Garage Bay 1, Around Electrical Box None Detected
101819-HG304b Caulking, White Garage Bay 1, Around Electrical Box None Detected
Note: OSHA does not currently establish an acceptable concentration of lead in paint.
The purposes of this test is for construction/demolition waste only and does not include LBP inspection or risk assessment.
TABLE 6
JACOBS ENGINEERING
Building 27, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
SUMMARY OF BULK SAMPLE RESULTS
Lead Analysis in Paint by Flame AAS (SW 846 3050B and 7420)
Sample Collected: October 17, 2019
Sample ID Description Lead Result (Concentration % by weight)
101719-LP1 Black, Plywood - Mechanical Room 0.0099
101719-LP2 White, Concrete Block & Gypsum - Room G6 <0.0068
101719-LP3 Beige, Concrete Block & Brick - Main Office <0.0070
101719-LP4 Beige, Concrete Block & Brick - Room 9 0.012
101719-LP5 Beige & White, Concrete Block & Brick - Room G1 0.0052
101719-LP7 Blue Speckle, Concrete Floor - Room G1 <0.0047
The purposes of this test is for construction/demolition waste only and does not include LBP inspection or risk assessment.
TABLE 7
JACOBS ENGINEERING
Building 28, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
SUMMARY OF BULK SAMPLE RESULTS
Lead Analysis in Paint by Flame AAS (SW 846 3050B and 7420)
Sample Collected: October 17, 2019
Sample ID Description Lead Result (Concentration % by weight)
101719-LP101 White, Textured Paint North wall, west side <0.0070
101719-LP102 White, Textured Paint North wall, west side 0.0045
101719-LP103 White, Flat Wall North wall, east side <0.0065
101719-LP104 White, Flat Wall North wall, east side <0.0038
101719-LP105 Red, Metal Speed Bump Center of floor <0.0047
The purposes of this test is for construction/demolition waste only and does not include LBP inspection or risk assessment.
TABLE 8
JACOBS ENGINEERING
Building 16, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
SUMMARY OF BULK SAMPLE RESULTS
Lead Analysis in Paint by Flame AAS (SW 846 3050B and 7420)
Sample Collected: October 18, 2019
Sample ID Description Lead Result (Concentration % by weight)
101819-LP201 White, Concrete Block Men s Restroom 013/Locker room 014 <0.0071
101819-LP202 White, Concrete Block Breakroom 003 0.0099
101819-LP203 White/Blue, Gypsum - Classroom 004 <0.0069
101819-LP205 White, Concrete Block Janitor s Closet 009 0.0045
101819-LP207 Black, Wood Mechanical Room 012 <0.0056
101819-LP208 Beige, Concrete Parts and Issue room 015 <0.0058
101819-LP209 Brown, Concrete Shop area 016 0.0079
101819-LP210 Brown, Cove Base Wash/paint Bay 019 <0.0044
The purposes of this test is for construction/demolition waste only and does not include LBP inspection or risk assessment.
TABLE 9
JACOBS ENGINEERING
Building 31, Connecticut Air National Guard
100 Nicholson Road, East Granby, CT
SUMMARY OF BULK SAMPLE RESULTS
Lead Analysis in Paint by Flame AAS (SW 846 3050B and 7420)
Sample Collected: October 18, 2019
Sample ID Description Lead Result (Concentration % by weight)
101819-LP301 White, On Concrete Block Wall Garage Bay 1 <0.0070
101819-LP302 White, On Foundation Garage Bay 1 <0.0079
101819-LP303 White, On Concrete Block Garage Bay 3 <0.0043
101819-LP304 White, On Lights Garage Bay 5 <0.0071
APPENDIX B
APPENDIX C
EXAMPLE PICTURES
Site Address: Connecticut Air National Guard 100 Nicholson Road East Granby, CT www.airpf.com
888-SAFE AIR
File No. 199476
1. Building 27, CTANG, East Granby CT. 2. Building seam caulking present in the main entry area, no asbestos detected.
3. Main entry and hallway 6b in building 27. 4. Mechanical Room, grey putty around pipe penetration above door. No asbestos detected.
5. Mechanical Room, red caulking on furnace vent pipe. No asbestos detected.
6. Mechanical Room, grey flue cement around vent penetrations. No asbestos detected.
100 Nicholson Road East Granby, CT www.airpf.com
888-SAFE AIR
File No. 199476
7. Garage Bay G5, red putty around pipe penetration. No asbestos detected. 8. Garage Bay G1, grey duct caulking. No asbestos detected.
9. Building 27 roof, exterior portions of the buildings were not included in the scope of this survey.
10. Building 28, textured paint and caulking, no asbestos detected.
11. Building 28, blue flue cement, no asbestos detected. 12. Building 28, silver compound present on the roof. Exterior building materials was outside the scope of work.
100 Nicholson Road East Granby, CT www.airpf.com
888-SAFE AIR
File No. 199476
13. Building 16, CTANG, East Granby, CT. 14. Building 16, room 016, example of a garage room.
15.
breakroom 003.
16. Breakroom 003, brown window caulking. No asbestos detected.
17. Breakroom 003, various types of suspended ceiling tiles present. No asbestos detected.
18.
around ceramic tile. No asbestos detected.
100 Nicholson Road East Granby, CT www.airpf.com
888-SAFE AIR
File No. 199476
19. Maintenance area 017, white patch caulking along north wall. No asbestos detected.
20. Vestibule 006, building seam caulking between gypsum wall and CMU block. No asbestos detected.
21. Maintenance area 017, grey putty around pipe penetrations. No asbestos detected.
22. Maintenance area 017, blue putty around red electrical boxes. No asbestos detected.
23. Building 16, sampling the roof was outside the scope of work for this survey. 24. Building 31, CTANG, East Granby, CT.
100 Nicholson Road East Granby, CT www.airpf.com
888-SAFE AIR
File No. 199476
25. Building 31, exterior view of the platform and ramp.
Exterior materials were inventoried only.
26. Building 31 includes 5 garage bays that open on either side.
One of the bays was used to store chemicals.
27. The other four bays were empty for the most part.
APPENDIX D
H G
1a
, H G
3b
H
G
4b
H G
1b
, H G
2b
H G
2a
, H G
3a
H
G
4a
H G
5a
, H G
7b
H
G
9b
H G
5b
H G
6a
, H G
9c
H G
6b
, H G
9e
H G
7a
, H G
9d
H G
8a
+b
H G
0a
+b
H G
1a
+b
H G
9a
, H G
4a
H G
2a
, H G
3b
H G
2b
H G
3a
H G
4b
H G
5a
H
G
9a
H G
5b
H G
6a
+b
H G
7a
+b
H G
8a
H G
8b
, H G
9b
H G
0a
+b
H G
1a
H G
1b
H G
2a
+b
H G
3a
H G
3b
H G
4a
+b
H G
5a
+b
H G
6a
+b
H G
7a
+b
H G
8a
+b
LP
LP
LP
3 LP
LP
LP
LP
LP
M ai n En try a/ b
1b
6b 7
G
G
G
G
15 G
G
H G
1a , H
G b, H
G b, H
G a
H G
1b
H G
2a , H
G 4b
H G
2b , H
G 3a
, H G
5b
H G
3b , H
G 4a
H G
5a , H
G 6a
, H G
9a
H G
6b
H G
7a
H G
7b
H G
8a +b
H
G a+ b
H G
9b
H G a, H G a
H G b
H G b
H G b
H G a
H G a
H G b
H G a+ b
H G a
H G c
H G b
H G a
H G a, H G a, H G a, H G b
H G b, H G b
H G b
H G a
H G b
H G a
H G a+ b H
G a+ b
H G a+ b
H G a+ b
LP
LP
LP
LP
LP
LP
1a
, H G
3b
H G
1b
H G
1c
H G
1d
H G
1e
, H G
3a
H G
2a
H G
2b
LP
an d
LP
LP
an d
LP
1a
H G
1b
H G
1c
H G
2a
H G
2b
H G
3a
H G
3b
H
G
4a +b
LP
an d
LP
LP
LP
APPENDIX E
Summary of Methodology: Asbestos-Containing Building Materials Survey
EPA accredited inspector(s) surveyed accessible space in the building or site areas included within the RPF Scope of Work (SOW) to identify suspect asbestos-containing building material (ACBM). Suspect ACBM was inventoried and categorized into homogeneous groups of materials. To the extent indicated in the report, samples were then extracted from the different groups of homogeneous materials in accordance with applicable State and federal rules and regulations.