This document package includes a selective demolition specification and related federal contract opportunity. The selective demolition specification outlines requirements for the removal of selected portions of an existing building in preparation for new construction. Key aspects include hazardous material abatement, protection of existing structures, and disposal of demolished materials.
The related federal contract opportunity is a solicitation to construct an Aircraft Support Equipment and Vehicle Maintenance facility at Bradley Air National Guard Base in East Granby, Connecticut. The project magnitude is between $10-25 million. The North American Industry Classification code is 236220 and the size standard for small businesses is average annual revenue of $39.5 million for the past three years. The solicitation will be posted on sam.gov. Instructions for drawings and specifications are in section 00100. Funds have been identified but are not presently available, with no contract award until funds are appropriated.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Connecticut Air National Guard 31 March 2022 Construct Composite ASE/VMXS Facility - CEKT179200 AMENDMENT 002 JANUARY 2023 Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SELECTIVE DEMOLITION 024119 - 1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
4. Abatement of hazardous materials.
B. Related Requirements:
1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.
2. Section 017300 "Execution" for cutting and patching procedures.
3. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade improvements not part of selective demolition.
4. RPF Environmental, Buildings 27, 28, 31 and 16, Building Survey Findings, RPF File No. 199476, October 19, 2019 for hazardous material findings and abatement requirements.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.
C. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
D. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
E. Abatement: The process of permanently removing hazardous materials.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Remove and Salvage Items:
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SELECTIVE DEMOLITION 024119 - 2
1. Remove (2) pole mounted security cameras and front end equipment and turn over to Government.
2. Remove existing site sign and keep safe for reinstallation by Contractor.
C. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.4 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at the Project Site so that specific items may be observed and discussed. This may occur as part of the Pre-Construction Conference.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
5. Review areas where existing construction is to remain and requires protection.
6. Review hazardous material abatement status and procedures.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For refrigerant recovery technician, hazardous material abatement contractor and 3rd party qualified industrial hygiene/testing consultant.
B. Engineering Survey: Submit engineering survey of condition of building.
C. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property for hazardous materials abatement (if required) and dust control. Indicate proposed locations and construction of barriers.
D. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
E. Pre-demolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SELECTIVE DEMOLITION 024119 - 3
by salvage and demolition operations. Comply with Section 013233 "Photographic Documentation." Submit before Work begins.
F. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.
G. Hazardous Materials Abatement Work Plans: Work plans of the abatement contractor and 3rd party qualified industrial hygiene/testing consultant demonstrating work to be performed in accordance with all state and federal requirements. The 3rd party qualified industrial hygiene/testing consultant shall review and approve the work plan of abatement contractor.
H. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.6 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
B. 3rd party qualified industrial hygiene/testing consultant abatement report.
1.7 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
B. Abatement Contractor: Certified in the jurisdiction having authority.
C. 3rd party qualified industrial hygiene/testing consultant: Certified in the jurisdiction having authority.
1.8 FIELD CONDITIONS
A. Owner will require intermittent access to the on-site garage to remain. Owner will make every effort to provide twenty-four (24) hours advance notice prior to accessing the garage. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
1. Before selective demolition, Owner will remove the following items:
B. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SELECTIVE DEMOLITION 024119 - 4
1. Hazardous materials will be removed by Owner before start of the Work.
2. If suspected hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
D. Hazardous Materials: Present in buildings and structures to be selectively demolished. A 2019 report prepared by RPF Environmental on the presence of hazardous materials is on file for review and use. is provided. Examine report to become aware of locations where hazardous materials are present.
1. Hazardous material remediation abatement is required. specified elsewhere in the Contract Documents.
2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.
3. Owner will provide material safety data sheets for suspected hazardous materials, such as oils and lubricants, that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.
1.9 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
Refer to 1.8(A) FIELD CONDITIONS above.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SELECTIVE DEMOLITION 024119 - 5
C. Performance engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
D. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
E. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video.
1. Inventory and record the condition of items to be removed and salvaged.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.
B. Hazardous Materials: Before starting demolition, abate and dispose of off-site hazardous materials in accordance with all state and federal requirements.
1. The Contractor shall prepare a work plan prior to abatement by a certified abatement project designer and submit to the Owner for approval at least fourteen (14) calendar days before abatement work begins. Additional site testing and analysis may be required as discussed in the RPF Environmental “Building Survey Findings” report provided.
2. The Contractor shall hire a 3rd party qualified industrial hygiene/testing consultant shall conduct sufficient testing and inspections of the work, independent of the abatement contractor. The consultant shall review and approve the abatement contractor’s work plan before submitting to the Owner. The consultant and the consultants work plan shall be approved by the Owner at least fourteen (14) calendar days before abatement work begins. The consultant shall prepare final abatement reports and submit to the Owner for approval.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SELECTIVE DEMOLITION 024119 - 6
1. Owner will arrange to shut off indicated services/systems when requested by Contractor.
2. Arrange to shut off utilities with utility companies.
3. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
3.4 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SELECTIVE DEMOLITION 024119 - 7
1. Strengthen or add new supports when required during progress of selective demolition.
C. Remove temporary barricades and protections where hazards no longer exist.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level.
Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required.
Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 8 hours after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
10. Dispose of demolished items and materials promptly. Comply with requirements in Section 017419 "Construction Waste Management and Disposal.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area as designated by Owner.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SELECTIVE DEMOLITION 024119 - 8
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.
3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch (19 mm) at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.
B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.
C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.
D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and recycle or dispose of them according to Section 017419 "Construction Waste Management and Disposal."
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Section 017419 "Construction Waste
Management and Disposal."
B. Burning: Do not burn demolished materials.
Connecticut Air National Guard 31 March 2022
Bradley Air National Guard Base, East Grandby, Connecticut B-3 Final Design
SELECTIVE DEMOLITION 024119 - 9
3.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
3.9 SELECTIVE DEMOLITION SCHEDULE
A. Remove and Salvage: Exterior pole mounted security cameras and front end equipment, site sign.
B. Remove and Reinstall: Site Sign
END OF SECTION 024119