Construct Aircraft Support Equipment (ASE) and Vehicle Maintenance (VM) Facility, Bradley Air National Guard Base, CT
Solicitation number
W50SC2-23-R-0001
Issued by

About this file

This solicitation seeks proposals for the construction of an Aircraft Support Equipment and Vehicle Maintenance facility at Bradley Air National Guard Base in East Granby, Connecticut. The project magnitude is estimated between $10-25 million. Proposals are due no later than January 23, 2023 at 10:00 AM Eastern Time. The work will be performed according to the contract drawings and technical specifications. A single award fixed price construction contract is contemplated. Offerors must submit proposals for all items. The North American Industry Classification code is 236220 and the size standard for small businesses is average annual revenue of $39.5 million for the past three years. Funds are not presently available but are expected to be obligated before award as the project has been identified as a priority by the National Guard.

View the file

Other files

File Type Posted
CEKT179200 Geotechnical Report - CTANG - Final.pdf PDF
C-304 - Civil Details_Amendment 002.pdf PDF
122413 - Roller Window Shades_Amendment 002.pdf PDF
104416 FL - Fire Extinguishers_Amendment 002.pdf PDF
FS001_Amendment 002.pdf PDF
W50SC223R0001 RFI Log 20230118.pdf PDF
CTANG ASE-VMXS _ RPF Building Survey Report October 2019_Amendment 002.pdf PDF
024119 FL - Selective Demolition_Amendment 002.pdf PDF
W50SC2-23-R-0001 Amendment 0001 SF 30.pdf PDF
Small Business Participation Plan Form.pdf PDF
329300 - Plants_Amendment 001.pdf PDF
A-130 - A-137 - RCPs_ Amendment 001.pdf PDF
A-610 - Door Schedule_Amendment 001.pdf PDF
101400 - Signage_Amendment 001.pdf PDF
C-304 - Civil Details_Amendment 001.pdf PDF
329113 - Soil Preparation_Amendment 001.pdf PDF
311000 - Site Clearing_Amendment 001.pdf PDF
334200 - Stormwater Conveyance_Amendment 001.pdf PDF
093013 Ceramic Tiling_Amendment 001.pdf PDF
C-306 - Civil Details_Amendment 001.pdf PDF
W50SC223R0001 RFI Log 20230112.pdf PDF
A-601 - Finish Schedule - Amendment 001.pdf PDF
Pre-Proposal Conference Attendance Sheet 20230105.pdf PDF
CE Pre-Proposal Slides.pdf PDF
Contracting Pre-Proposal Slides.pdf PDF
W50SC223R0001 RFI Log 20221228.pdf PDF
W50SC223R0001 RFI Log 20221222.pdf PDF
W50SC223R0001 RFI Log 20221201.pdf PDF
Brand Name JA CEKT179200 signed.pdf PDF
W50SC2-23-R-0001.pdf PDF
Mandatory Signs 2.pdf PDF
Manadatory Door Hardware.pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
EXHIBIT D - Letter of Commitment ok Key Personnel.docx DOCX document
Mandatory Signs 1.pdf PDF
EXHIBIT A - Performance Relevancy Questionnaire.docx DOCX document
Mandatory Sign Part Numbers.pdf PDF
EXHIBIT C - Reference_Questionnaire_Package.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to accomplish the follow ing:

1. RFI #s 1-67, the Responses to RFI #s 1-67, and all associated/referenced documents/attachments in the RFI Responses are hereby incorporated into the solicitation documents.

2. The Wage Determination has been updated.

Proposal due date/time remains unchanged, 23 January 23 (Monday) at 10:00 AM ET.

Reminder that proposals being hand delivered shall be delivered to: Camp Hartell, Attn: Lt Eric Hoss, Building P-123, 580 North Street, WindsorLocks, CT 06096.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 18

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jan-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50SC223R0001

X 9B. DATED (SEE ITEM 11)

28-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jan-2023

CODE

USPFO CT 103 MISSION SUPPORT CONTRACTING

161 RAINBOW ROAD

BRADLEY ANGB

EAST GRANBY CT 06026-9309

W50SC2 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50SC223R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

RFIS AND RESPONSES

Connecticut Air National Guard

103 AW at Bradley ANGB, East Granby, CT

Solicitation: W50SC2-23-R-0001

Requests for Information (RFIs)

Item RFI Response

Thursday, December 1, 2022

1 Solicitation references Exhibit C at p.21, para

2.5.3.2. Can we submit completed CPARS

evaluation in lieu of Exhibit C?

No, the Government will pull and review CPARS evaluations seperately from what is submitted as part of the proposal package.

2 Section 00100 of the solicitation, para 14 on page 18 references Brand Name Justification and Approval (J&A), Control No. 22-39. Where can we find this J&A.

The J&A has been posted to SAM.gov at the same time as this RFI Log.

Thursday, December 22, 2022

3 019113 states “The Government shall hire an Independent Commissioning Authority…” Do I understand that the GC is not required to carry Commissioning in their cost?

The A-E is the Commissioning Authority and the GC will not incur the cost of the A-E for their commissioning efforts.

4 Please confirm that UFC 3-520-01 and UFGS Section 26 05 19.10.10 shall apply to this project.

Specifically, please confirm that bidders are permitted to utilize the type(s) of material(s) described in UFC 3-520-01 and UFGS Section 26 05 19.10.10 applicable to their scope of work despite any potentially contradictory provisions in the design plans and specifications.

The building design complies with UFC requirements, however, UFGS specs are not part of the project.

The contractor shall provide materials as specified in specification 260519 FL - Low-Voltage Electrical Power Conductors and Cables in the construction documents. Also, see FAR clause 52.236-5 and DFARS clause 252.236-7001.

Wednesday, December 28, 2022

5 Please provide a signage schedule. The Government will supply an initial draft of a signage schedule during construction in the preliminary submittal phase according to 101400 3.3.A. The door schedule (Sheet A-610) and room finish schedule (Sheet A-601) will be the initial basis for the first draft of the signage schedule (in accordance with 101400 3.3.C), but those schedules may not be all inclusive, and may not be accurate or adequately descriptive for signage purposes. The Contractor shall submit the final message schedule in the form of a submittal from the Manufacturer (according to 101400 2.4) for Government approval prior to fabrication (according to 101400 3.3.B).

101400 3.3.B For all sign types requiring message schedules, Contractor is required to meet with the Government prior to production and fabrication, to verify final messages…. (Continued)

5 Continued 101400 3.3.C Sign Type Schedule:

1. Type RI:

a. Rooms: All rooms with doors from circulation corridors [refer to Sheet A-601 Room Finish Schedule for list of room names, refer to Sheet A-610 Door Schedule for list of doors]

2. Type [LR, typo]:

a. Rooms: 111A and 112A

101400 2.4 Sign Types [sign specifications according to identified type]

Thursday, January 12, 2023

6 Solicitation references Key Personnel Description on page 99, para 36. An individual Key Team Member may not hold more than one key role.

Which Key Personnel Member are required to be on site full time?

A. Project Manager?

B. Site Superintendent?

C. Quality Control Manager?

D. Safety Representative?

CTANG will require the Site Superintendent and Quality Control Manager to be on site full time.

7 Please provide a Geotechnical Report. CTANG to issue Geotechnical report.

8 Specification Section 311000, 3.5.C.2. says "Surplus topsoil shall not be removed from the Base. Coordinate offsite surplus topsoil stockpile location with Owner". Where will topsoil be stockpiled? What will be required for erosion control measures at the stockpile location? How will the stockpile be permanently stabilized?

Coordinate stockpile location with owner's representative.

For stockpile requirements, refer to revised specification section 311000 - SITE CLEANING issued as part of AMENDMENT 001.

9 Please provide Specification Section 012200 "Unit Prices".

Specification section 012200 - UNIT PRICES is not required. Refer to the revised specification section 329113 – SOIL PREPERATION and 329300 – PLANTS issued as part of AMENDMENT 001

10 Refer to Detail 5/C-304. What is the thickness of the Engineered Structural Fill?

Refer to the revised detail 5 on C-304 issued as part of AMENDMENT 001.

11 Refer to the Apron Edge Marking Detail 8/C-310.

Where does this detail get installed?

The apron edge marking shall be placed along the edge of the apron at Building 25. Refer to B4/C-104, Keynote 029.

12 Refer to the ASE Covered Storage Slab Detail 1/C-304. Please provide specs for the trench drains.

Refer to the revised specification section 334200 - STORMWATER CONVEYANCE issued as part of

AMENDMENT 001.

13 Detail A3-A510 shows a trim piece capping the ACT against the exterior window shade. Is this the typical detail at each exterior window? Is a standard piece of white steel break metal acceptable?

White steel brake metal is acceptable at this location.

14 Does Detail B3-A510 apply to this project? If so, please specify location.

B3/A-510 applies in LOBBY 101, refer to revised drawing A-133 issued as part of AMENDMENT 001.

15 ACT Material specs do not appear to be listed in plans and specs. Please provide acoustical ceiling specs or clarify where they are in bid documents.

For acoustical ceilings requirements, refer to specification section 095113 - ACOUSTICAL PANEL

CEILINGS.

Drawing references to ACOUSTICAL CEILING TILE (ACT) ASSEMBLY have been revised to ACOUSTICAL PANEL CEILING (ACP) ASSEMBLY. Refer to revised drawings A-130, A-131, A-132, A-133, A-134, A-135, A-136, A-137, and A-601 issued as part of

AMENDMENT 001

16 Please clarify spec for wood slat wall in lobby. Spec book references a T-bar suspension system that reads like a suspended ceiling system instead of a wall finish. Also, no manufacturer spec is provided.

Provide wood slat wall as specified in specification section 095000 - WOOD PANEL WALL SYSTEM.

Provide a wood slat wall that meets the dimensional requirements and design intent as indicated by details on drawing A-511.

17 Section 018113 – Sustainable Design Requirements provides requirements and procedures associated with GBCI guiding principles for the Project. It is our understanding that this section is applicable to all respective trades and that the Prime will coordinate the effort to fulfill requirements as set forth. However, we did not see any requirements for LEED certification. It is our understanding that the Government may seek for a Compliance Certificate only. Please clarify.

LEED certification is not required.

18 Is the project registered with GBCI or the Prime is required to pay and register the project?

The project has been registered with GBCI and will seek Guiding Principles Assessment Compliance.

Project Title: ANG Composite ASE/Vehicle MX Facility Project case number: 1000123464 Registration Date: 06 September 2019

19 Refer to drawing A601- finish schedule. Items are missing manufacturers / contacts. Example: LVT-1 says Ash Limestone 12x18.

For the style, color, size, and location of finish materials, refer to the A-601 INTERIOR MATERIALS INDEX. Refer to the specifications for additional finish material requirements.

20 Please provide specifications on the boom arms and hose reel.

a. Length of the arm.. pivoting and articulating?

b. Anything over 10’ usually articulates

c. Sizes available: 7’ , 10’, 15’, 20’

Refer to VEHICLE EXHAUST FAN SCHEDULE on M-602 and specification section 233516 - VEHICLE EXHAUST

SYSTEMS.

22 Please confirm that Polished Concrete is the required finish for outdoor concrete slab @ ASE Storage 124 and COVERED VEHICLE OPS

PARKING S102.

Provide sealed concrete. Refer to ROOM FINISHED SCHEDULE on revised A-601 issued as part of

AMENDMENT 001.

23 Please confirm that we should include the epoxy resin finish @ Wash Rack 123 in OLI #5 and not

OLI#3.

Add cost for all building components, materials, equipment, labor, and incidentals to construct ASE Wash Bay and Equipment in WASH RACK 123 as shown on drawings. Include resinous flooring for WASH RACK 123 as part of Optional Line Item No. 05. Refer to specification section 012300 - Optional Line Items, paragraph 3.1, E.

24 Please provide drawings to reflect the locations and dimensions of the cast aluminum Dimensional Characters on specs section 101400.

Cast aluminum dimensional characters are not required.

Refer to revised specification 101400 - Signage issued as part of AMENDMENT 001

25 Please advise where is static-control resilient flooring specified on spec section 09 65 36 to be used.

Provide static-control resilient flooring in room 107

DISTRIBUTION.

Refer to revised drawing A-601 issued as a part of Amendment 001.

26 Please provide specification for the wall & floor porcelain tile specified on room finish schedule.

Refer to specification 093013 - CERAMIC TILING issued as part of Amendment 001.

27 Drawing E-001 states outlets must be wall mounted. Are no outlets allowed to be "recessed" into the walls? Or do all conduit and outlets need to be surface mount?

Where walls are exposed CMU, wall outlets shall be surface mounted. Where walls are GYP, wall outlets shall be recessed.

29 Is manual transfer switch provided with generator (by others)?

Contractor shall provide the MTS. Refer to specifications 262816 for the double-throw safety switch.

30 Location not shown on drawings for manual transfer switch.

Refer to note 7 on EP103 for location of MTS and generator receptacle.

31 The drawings have overhead door widths of 14', 16' or 20' and then the schedule has all widths at 8'. The heights in the schedule check out based on the scale in the details. Can we have clarification on the widths and whether the drawings or schedule are correct?

Refer to the DOOR SCHEDULE on the revised A-610 as issuesd as part of AMENDMENT 001.

32 What size Sewer Pipe are called for? Refer to the revised detail 2 on C-306 issued as part of AMENDMENT 001.

33 Is there a specific brand/model of down spout shoe for drainage?

Refer to detail 1/C-302 for stormwater boot requirements. No brand name or model will be provided.

34 Who is the water company providing service to the site?

The water service is provided by Connecticut Water.

35 Is a logistic plan going to be provided showing the access route to the site?

A logistic plan will not be provided. Coordinate access/haul route to site with Owner's representative.

36 Is an antimicrobial coating on the ductwork required for this project? If it is required where would it be applied the specs are unclear?

Antimicrobial coating is required as noted in specification section 233113, paragraph 2.4F for all single wall round and rectangular ductwork and fittings.

37 Is ductwork within the wash bays to be welded or standard SMACNA construction?

The ductwork within the wash bay is to be welded stainless steel construction as indicated in specification 233113 Section 3.3. Refer to section

3.2 for additional information on welding.

38 Are flame – retardant or non – combustible flex connections required on this project, if so please identify where the specs do not mention a specific location.

Flexible equipment connectors are specified in specification 233300 section 2.9. Please refer to this section for all requirements for flex connections.

39 What is the duct construction for exposed ductwork, they are not mentioned in SPEC section 233113?

The exposed ductwork within the bays and refueling shop are to meet the requirements of section 233113 for single wall, galvanized ductwork. The exception is the wash bay, which all ductwork is to be stainless steel and welded as indicated in response to question 37.

40 What is the duct construction for the pressure washer flue?

This ductwork is to be double wall flue vent type duct. Refer to keynote 103 on sheet M-115 and detail B2/M-507.

41 What division is responsible to furnish and install the swivel boom arms?

All equipment and accessories associated with the vehicle exhaust system is to be provided and installed under Division 23 and specification 233516.

The vehicle exhaust system is to be provided as a complete package by a single vendor as indicated in section 1.2B of the specification.

42 What division is responsible to furnish and install the hose reel? If div 23 is responsible please provide an approved manufacturer.

Refer to response to question 41. Per Federal requirements we are not able to list a basis of design manufacturer. The vehicle exhaust system is to meet all requirements of section 233516 and the mechanical schedules on sheet M-602.

43 What material is to be used for exhaust ductwork within the locker rooms, the locker room duct is not referenced in the specs.

The locker room exhaust ductwork is the same as the restroom and other general exhaust ductwork in the facility. There is no need to provide a separate material for the locker room.

44 Can the Self performance on site presently set at 15% be waved for Clause 52.236-1?

No. However, as the clause states, the GC may requests a reduction during performance of the work. Also, see FAR 36.501(a).

45 Is an antimicrobial coating on the ductwork required for this project? If it is required where would it be applied the specs are unclear?

Antimicrobial coating is required as noted in specification section 233113, paragraph 2.4F for all single wall round and rectangular ductwork and fittings.

46 The toilet accessories spec 102800 refers to the toilet accessories schedule which is on drawing A-601. Some of the toilet accessories have descriptions and some don’t. The paper towel dispenser, robe hook, shower curtain, waste receptacle, and utility shelf do not have descriptions. Can you please provide a manufacturer and model number for each toilet accessory on the toilet accessories schedule.

Refer to TOILET ACCESSORIES SCHEDULE onrevised drawing A-601 issued as part of AMENDMENT 001.

49 Detail A3-A510 shows a trim piece capping the ACT against the exterior window shade. Is this the typical detail at each exterior window? Is a standard piece of white steel break metal acceptable?

White steel brake metal is acceptable at this location.

50 Does Detail B3-A510 apply to this project? If so, please specify location.

B3/A-510 applies in LOBBY 101, refer to revised drawing A-133 issued as part of AMENDMENT 001.

51 ACT Material specs do not appear to be listed in plans and specs. Please provide acoustical ceiling

For acoustical ceilings requirements, refer to specification section 095113 - ACOUSTICAL PANEL

CEILINGS.

specs or clarify where they are located in bid documents.

Drawing references to ACOUSTICAL CEILING TILE (ACT) ASSEMBLY have been revised to ACOUSTICAL PANEL CEILING (ACP) ASSEMBLY. Refer to revised drawings A-130, A-131, A-132, A-133, A-134, A-135, A-136, A-137, and A-601 issued as part of

AMENDMENT 001

52 Please clarify spec for wood slat wall in lobby.

Spec book references a T-bar suspension system that reads like a suspended ceiling system instead of a wall finish. Also, no manufacturer spec is provided.

Provide wood slat wall as specified in specification section 095000 - WOOD PANEL WALL SYSTEM.

Provide a wood slat wall that meets the dimensional requirements and design intent as indicated by details on drawing A-511.

Wednesday, January 18, 2023

21 Please provide specification for the polished concrete finish.

Revised 18 JAN 23: Provide sealed concrete. Refer to ROOM FINISHED SCHEDULE on revised A-601 issued as part of AMENDMENT 001.

28 Please allow for allowance for Eversource work, as we do not know the cost that we will charge us for their scope of work.

$9,500 allowance shall be included. This is based on correspondence between Mike Cahill, Electrical Engineer with Jacobs, and John Karvandi of Eversource on 4/9/21.

47 On spec 104416 which is the fire extinguishers spec, it mentions carbon dioxide fire extinguishers. All of the drawings call for ABC multipurpose dry chemical fire extinguishers.

Please confirm if carbon dioxide fire extinguishers are needed on this project and which location of the fire extinguisher are to be carbon dioxide if there are.

Provide ABC multipurpose dry chemical fire extinguishers. Carbon dioxide extinguishers are not required. Refer revised specification section 104416

- Fire Extinguishers issued as part of AMENDMENT 002.

48 There is spec section 122113 for horizontal louver blinds, but on the drawings they call for manual roller shades as well as manual blackout roller shades. Please confirm if we should go based off of the specs or drawings. If we are to go based off of the drawings, can you please send a spec for the shades.

Refer to specification section 12 24 13 – ROLLER SHADES issued as part of AMENDMENT 002.

53 Please provide Hazardous Material Reports for the Buildings being demolished.

See attached October 2019 Building Survey Findings report by RPF Environmental. Refer to specification 02 41 19 - SELECTIVE DEMOLITION issued as part of

AMENDMENT 002.

54 Please provide an approved manufacturer or model numbers for the hose reels.

Refer to specification 23 35 16 for requirements of hose storage reel.

55 Section 102239, Section 2.6/A states a full height tackable work surface covered with vinyl.

Location and quantity not found, please supply location of trackable surfaces.

The "tackable, vinyl-coated fabric wall covering" referred to is located within the spec section for Folding Panel Partitions. The operable panel partition should have a tackable, vinyl-coated fabric finish.

56 Section 102239, vinyl is not recommended for tackable surfaces. Normally fabric is used. Is vinyl or fabric desired?

Yes, vinyl is desired.

57 Section 102239, Section 1.7/A states to furnish extra material but not the amount. Please supply amount (2-panels 2-sides is what we have seen in the past).

4 panel widths of vinyl covering should be provided.

58 Detail B5 on drawing A-510 shows the operable wall soffit being supported by the track. Soffit must be self-supported not supported by the track.

Detail B5/A-510 refers to the soffit framing being braced back to structure as required.

59 Section 024119. Para 2.1 Performance Requirements requires compliance to EPA notification prior to start of selective demolition. Please clarify if the project requires hazardous remedial work. Also, please identify sources.

Yes the project requires hazardous material abatement work. Refer to specification 02 41 19 - SELECTIVE DEMOLITION issued as part of AMENDMENT 002 and the referenced hazardous materials report by RPF Environmental.

60 Section 024119. Para 3.1.C requires engineering survey. Since the project requires complete demolition of buildings at different locations, the extent to which the requirement is applicable is not clear. Please define boundary of such engineering survey work. Additionally please provide hazardous material survey and testing report.

The boundary is the building envelope of all 4 structures to be removed. The specification is requiring the contractor to understand the structural system to no cause damage to other properties, people and equipment. Refer to specification 02 41 19 - SELECTIVE DEMOLITION issued as part of AMENDMENT 002 and the referenced hazardous materials report by RPF Environmental.

61 Please provide location of the generator’s manual transfer switch.

Refer to note 7 on EP103 for location of MTS and generator receptacle.

62 Reference ES101 Note “CONTRACTOR IS

RESPONSIBLE TO PAY EVERSOURCE FOR THEIR

SCOPE OF WORK”. Eversource will not provide costs for their work prior to a request for permit and job number has been established. The request for service is to be by the licensed electrical contractor, who is yet to be determined. Please provide a value for contractor to carry in their bid as an allowance for the Eversource scope of work.

See RFI #28

63 Sitework: Page 304 detail 5 shows the concrete slab/apron detail but the thickness of gravel needed isn’t stated. Also, a spec for the Engineered structural fill is not provided. So, we are looking for the thickness and type of material.

See revised plan C-304 issued as part of

AMENDMENT 002.

64 Also, the gravel thicknesses for the floor is only 6” as shown on detail A2 page s-501. This seems low compared to the other gravel requirements on the project, so I wanted to double check that.

Detail A2/S-501 refers to gravel under the foundation. Not the 'floor'. The 6" gravel under the foundation is a recommendation of the project Geotechnical engineer.

65 Reference C-307, Detail 1, the plan shows a 3” copper water line. 3” copper is not available.

What size should be used in its place. The closest options are 4” DI or 2”copper.

Provide 3" diamater copper water line as shown. If a 3" diameter copper water line is not available, provide a 4" diameter copper water line.

66 Interior fall protection scope, 112429: Please confirm that a single fall protection track is acceptable for the three users, or if bypass is required (necessitating three tracks)

Refer to specification 11 24 29 - Fall Protection System. Paragraph 2.1.B states, "Single track or dual track fall arrest system...." Three track is not required. Single track or dual track acceptable as long as the system will support three users simultaneously. Bypass is not required.

67 Fire protection drawing FS001 shows area A as extra hazard. On drawing FS101 it shows area A as ordinary hazard, please advise.

See revised plan FS001 issued as part of

AMENDMENT 002.

The following have been modified:

WAGE DETERMINATION

"General Decision Number: CT20230021 01/13/2023

Superseded General Decision Number: CT20220021

State: Connecticut

Construction Type: Building

County: Hartford County in Connecticut.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is |

| | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 01/13/2023

ASBE0033-002 06/01/2022

Rates Fringes

HEAT & FROST INSULATOR

(Includes Duct, Pipe and Mechanical Systems)..............$ 44.57 31.79

BRCT0001-001 01/03/2022

Rates Fringes

BRICKLAYER.......................$ 37.75 34.62

BRCT0001-002 01/03/2022

Rates Fringes

BRICK POINTER/CAULKER/CLEANER....$ 37.75 34.62

BRCT0001-005 01/03/2022

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 37.75 34.62

CARP0326-024 05/02/2022

Rates Fringes

FLOOR LAYER: Carpet Only.........$ 36.07 26.15

CARP0326-025 05/02/2022

Rates Fringes

FLOOR LAYER: Hardwood Floors Only.............................$ 36.07 26.15

CARP0326-027 05/02/2022

Rates Fringes

CARPENTER (Scaffold Builder).....$ 36.07 26.15

CARP0326-028 05/02/2022

Rates Fringes

CARPENTER (Includes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation)...............$ 36.07 26.15

ELEC0035-014 06/01/2022

Rates Fringes

ELECTRICIAN (Including Low Voltage Wiring)..................$ 41.75 3%+31.47

* ELEV0091-002 01/01/2023

Rates Fringes

ELEVATOR MECHANIC................$ 61.42 37.335+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0478-004 04/03/2022

POWER EQUIPMENT OPERATOR

(Backhoe/Excavator/Trackhoe).....$ 44.86 26.80

PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.

ENGI0478-005 04/03/2022

Rates Fringes

POWER EQUIPMENT OPERATOR

(Bulldozer) Finegrade (Slopes, Shaping, laser or GPS, etc.).......................$ 44.86 26.80 Rough Grade Dozer...........$ 43.38 26.80

PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.

ENGI0478-012 04/03/2022

Rates Fringes

POWER EQUIPMENT OPERATOR

(Crane under 100 ton rated capacity)).......................$ 49.06 26.80

PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.

ENGI0478-016 04/03/2022

POWER EQUIPMENT OPERATOR

(Loader - 7 cubic yards or over)............................$ 46.07 26.80

PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.

IRON0015-010 06/06/2022

Rates Fringes

IRONWORKER (Reinforcing, Structural, Ornamental)..........$ 39.70 38.77

LABO0230-001 04/03/2022

Rates Fringes

LABORER

Common or General...........$ 32.00 24.40 Mason Tender- Cement/Concrete.............$ 32.50 24.40

PAIN0011-014 06/01/2022

Rates Fringes

GLAZIER..........................$ 40.78 23.40

PAIN0011-021 06/01/2022

Rates Fringes

PAINTER (Brush and Roller).......$ 37.22 23.55

PAIN0011-023 06/01/2022

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 37.97 23.55

PLUM0777-001 06/01/2021

Rates Fringes

PLUMBER..........................$ 45.83 33.50

PLUM0777-003 06/01/2021

PIPEFITTER.......................$ 45.83 33.50

PLUM0777-004 06/01/2021

Rates Fringes

PLUMBER (HVAC Pipe Installation)....................$ 45.83 33.50

ROOF0009-001 06/01/2021

Rates Fringes

ROOFER

Composition.................$ 38.90 21.85 Slate and Tile..............$ 39.40 21.85

* SFCT0669-002 01/01/2023

Rates Fringes

SPRINKLER FITTER.................$ 47.55 29.94

SHEE0040-001 07/01/2021

Rates Fringes

SHEET METAL WORKER (Including HVAC Unit Installation)..........$ 40.08 40.53

SHEE0040-002 07/01/2021

Rates Fringes

SHEET METAL WORKER (Metal Flashing and HVAC Duct Installation Only)...............$ 40.08 40.53

SHEE0040-008 07/01/2021

Rates Fringes

SHEET METAL WORKER (Metal Roofs Installation)..............$ 40.08 40.53

TEAM0677-001 04/03/2022

Rates Fringes

TRUCK DRIVER (Dump Truck)........$ 31.39 28.78

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"