EXHIBIT C - Reference_Questionnaire_Package.docx

DOCX document 81 KB Posted

Attached to
Construct Aircraft Support Equipment (ASE) and Vehicle Maintenance (VM) Facility, Bradley Air National Guard Base, CT
Solicitation number
W50SC2-23-R-0001
Issued by

About this file

This document contains a past performance reference questionnaire package and information on a related federal contract opportunity to construct an Aircraft Support Equipment and Vehicle Maintenance facility. The package includes instructions for contractors to send past performance reference questionnaires to previous clients for completion. The questionnaires collect ratings and feedback on quality, schedule, customer satisfaction, management, cost, safety, and performance on a scale of Exceptional to Unsatisfactory. Contractors must return the completed questionnaires directly to the contracting office by the stated due date for evaluation. The related federal contract opportunity is a solicitation to construct the Aircraft Support Equipment and Vehicle Maintenance facility at Bradley Air National Guard Base for between $10-25 million. The work will be performed in accordance with contract drawings and specifications. The North American Industry Classification Code is 236220 and small business size standard is $39.5 million average annual revenue.

View the file

Other files

File Type Posted
CEKT179200 Geotechnical Report - CTANG - Final.pdf PDF
W50SC2-23-R-0001 Amendment 0002 SF 30.pdf PDF
C-304 - Civil Details_Amendment 002.pdf PDF
122413 - Roller Window Shades_Amendment 002.pdf PDF
104416 FL - Fire Extinguishers_Amendment 002.pdf PDF
FS001_Amendment 002.pdf PDF
W50SC223R0001 RFI Log 20230118.pdf PDF
CTANG ASE-VMXS _ RPF Building Survey Report October 2019_Amendment 002.pdf PDF
024119 FL - Selective Demolition_Amendment 002.pdf PDF
W50SC2-23-R-0001 Amendment 0001 SF 30.pdf PDF
Small Business Participation Plan Form.pdf PDF
329300 - Plants_Amendment 001.pdf PDF
A-130 - A-137 - RCPs_ Amendment 001.pdf PDF
A-610 - Door Schedule_Amendment 001.pdf PDF
101400 - Signage_Amendment 001.pdf PDF
C-304 - Civil Details_Amendment 001.pdf PDF
329113 - Soil Preparation_Amendment 001.pdf PDF
311000 - Site Clearing_Amendment 001.pdf PDF
334200 - Stormwater Conveyance_Amendment 001.pdf PDF
093013 Ceramic Tiling_Amendment 001.pdf PDF
C-306 - Civil Details_Amendment 001.pdf PDF
W50SC223R0001 RFI Log 20230112.pdf PDF
A-601 - Finish Schedule - Amendment 001.pdf PDF
Pre-Proposal Conference Attendance Sheet 20230105.pdf PDF
CE Pre-Proposal Slides.pdf PDF
Contracting Pre-Proposal Slides.pdf PDF
W50SC223R0001 RFI Log 20221228.pdf PDF
W50SC223R0001 RFI Log 20221222.pdf PDF
W50SC223R0001 RFI Log 20221201.pdf PDF
Brand Name JA CEKT179200 signed.pdf PDF
W50SC2-23-R-0001.pdf PDF
Mandatory Signs 2.pdf PDF
Manadatory Door Hardware.pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
EXHIBIT D - Letter of Commitment ok Key Personnel.docx DOCX document
Mandatory Signs 1.pdf PDF
EXHIBIT A - Performance Relevancy Questionnaire.docx DOCX document
Mandatory Sign Part Numbers.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation W50SC2-23-R-0001 CEKT179200 Construct ASE/VM Facility

EXHIBIT C

PAST PERFORMANCE REFERENCE QUESTIONNAIRE

Instructions to Offeror for sending Reference Questionnaire Forms:

Prepare and submit to the owners of the projects listed in your Exhibit A “Performance Relevancy Questionnaires”, a Past Performance Reference Questionnaire (Exhibit C). For Government contracts, send to the Contracting Officer. For commercial references, send to personnel with duties similar to those for Government contracts. Offerors should follow-up and encourage references to return completed questionnaires in a timely manner. If you have multiple references at one location (i.e. at a military base), send one cover letter and questionnaires for each contract for which you need a reference. Your questionnaire package should contain the following:

· Cover Letter (See SAMPLE on the next page)

· Respondent Info Rating Sheets (Exhibit C) (the following 4 pages). Offeror should put name in spaces indicated and ensure it is on every page for identification purposes.

· Suggested – Pre-addressed stamped envelope.

OFFEROR SHOULD PLACE THEIR NAME ON TOP OF EACH QUESTIONNAIRE PAGE In accordance with SECTION 00120 – PROPOSAL EVALUATIONS AND BASIS FOR AWARD, completed questionnaires should be sent directly to the Contracting Office.

OFFEROR SHOULD DELETE THESE INSTRUCTIONS BEFORE SENDING OUT QUESTIONNAIRES

SAMPLE TRANSMITTAL LETTER AND PAST PERFORMANCE EVALUATION QUESTIONNAIRE

Your Company Letterhead

Date:

To:

We have listed your firm as a reference for the work we have performed for you as listed below. Our firm will be submitting a proposal under a project advertised by the USPFO-CT P&C. In accordance with Federal Acquisition Regulations (FAR), they will evaluate our firm's past performance. Your candid response to the attached questionnaire will assist the government evaluation team in this process. We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments. Only one response from each office is required. Understand that while the responses to this questionnaire may be released to the offeror, FAR 15.306(e)(4) prohibits the release of the names of the persons providing the responses. Complete confidentiality will be maintained. Only one response from each firm is required.

Please return your completed questionnaire via United States Postal Service (USPS) ONLY to the following address:

2d Lt Eric M. Hoss, 103 MSC Bradley Air National Guard Base 161 Rainbow Road East Granby, CT 06026

This documentation must arrive NOT LATER THAN [Contractor to enter date] , so that it can be evaluated with our proposal.

If you have questions regarding the attached questionnaire, or require assistance, please contact the USPFO Contracting Officer at eric.m.hoss.mil@army.mil via email (preferred) or alternatively by telephone at 860-386-4075. Thank you for your assistance.

Signature and Title

National Guard PAST PERFORMANCE QUESTIONNAIRE (Exhibit C)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information
Firm Name:CAGE Code:
Address:DUNs Number:

Phone Number: Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify): Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy): Actual Completion Date (mm/dd/yy): Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable): Explain Differences:

4. Project Description:
Complexity of WorkHighMedRoutine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name: Title:

Phone Number: Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: THE NATIONAL GUARD REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY TO THE CONTRACTING OFFICER. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts
EVGSMUN

b) Ability to meet quality standards specified for technical performance

E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
EVGSMUN
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
EVGSMUN

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
EVGSMUN
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
EVGSMUN

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project?
EVGSMUN
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
EVGSMUN
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
EVGSMUN
d) Overall customer satisfaction
EVGSMUN

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
EVGSMUN
b) Ability to hire, apply, and retain a qualified workforce to this effort
EVGSMUN
c) Government Property Control
EVGSMUN
d) Knowledge/expertise demonstrated by contractor personnel
EVGSMUN
e) Utilization of Small Business concerns
EVGSMUN
f) Ability to simultaneously manage multiple projects with multiple disciplines
EVGSMUN

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
EVGSMUN

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?
EVGSMUN

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
YesNo

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
YesNo

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.
EVGSMUN

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues)
EVGSMUN
c) Would you hire or work with this firm again? (If no, please explain below)
YesNo
d) In summary, provide an overall rating for the work performed by this contractor.
EVGSMUN

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .