This solicitation notice is for the replacement of a fire station at Mansfield Air National Guard Base in Ohio. The project includes construction of a new aircraft rescue and firefighting station to provide emergency response capabilities. It must meet Uniform Facility Criteria standards for fire stations and Air Force emergency vehicle requirements. Additional space is required for emergency management training.

The construction duration is estimated at 660 calendar days. Optional items to be included are: concrete paving to the flightline in minimum or full width; four-fold apparatus doors; and a five-ton bridge crane. The solicitation will be evaluated without discussions and awarded in accordance with FAR 14.101(e). The project is set aside for small businesses with an NAICS code of 236220 and size standard of $39.5 million average annual revenue. The estimated value is between $10-20 million. The pre-bid conference is November 5, 2019 and bids are due November 26, 2019. The soliciting agency is the Department of the Army Ohio Army National Guard.

Volume 6 - CIVIL

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE FIRE STATION, newest first.
File Type Posted
Abstract_FIRE_signed.pdf PDF
bid opening attendees.pdf PDF
RFI_17.pdf PDF
A-601 - DOOR-WINDOW SCHEDULES.pdf PDF
RFI_15.pdf PDF
RFI_19.pdf PDF
A-602 - INTERIOR FINISH-COLOR SCHEDULE.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_14.pdf PDF
RFI_16.pdf PDF
RFI_12.pdf PDF
RFI_08 attach.pdf PDF
RFI_08.pdf PDF
RFI_07.pdf PDF
RFI_09.pdf PDF
RFI_10_attachment.pdf PDF
RFI_10.pdf PDF
RFI_11.pdf PDF
RFI_06.pdf PDF
Pre-Bid_minutes,_data.pdf PDF
RFI_4.pdf PDF
RFI_3.pdf PDF
RFI_3_attachment.pdf PDF
RFI_2.pdf PDF
Attach6_Civil_6a.pdf PDF
Attach6_Civil_8a.pdf PDF
Attach6_Civil_5d.pdf PDF
Attach6_Civil_9.pdf PDF
Attach6_Civil_8b.pdf PDF
Attach6_Telecommunications.pdf PDF
Attach6_Architectural.pdf PDF
Attach6_Civil_6b.pdf PDF
Attach6_Civil_7.pdf PDF
Attach6_Civil_4c.pdf PDF
Attach6_Civil_5b.pdf PDF
Attach6_Plumbing.pdf PDF
Attach6_Mechanical.pdf PDF
Attach4_Vol_4_Specifications.pdf PDF
Attach1_Vol_1_BOD.pdf PDF
Attach8_RFI_template.doc DOC document
Attach6_Civil_1b.pdf PDF
EXHIBIT_A-Communications_Equipment.xlsx XLSX spreadsheet
EXHIBIT_B_Sealed_Bid_Reminders.pdf PDF
Attach3_Vol_3_Specifications.pdf PDF
Attach5_Vol_5_Specifications.pdf PDF
Attach6_Civil_5a.pdf PDF
Attach6_Civil_2.pdf PDF
Attach6_Civil_5c.pdf PDF
Attach6_Fire_Protection.pdf PDF
Show all 50

REPLACE FIRE STATION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FILENAME: PLOT DATE: PLOT TIME:

C H

2M H

IL

L

AL

L R

IG

H

TS

R

ES

ER

VE

D

C

H 2M

H

IL

L

AN

D

IS

N O

T

TO

B E

U

SE

D , I

N W

H O

LE

O

R

IN

P

AR

T, F

O R

A N

Y O

TH

ER

P R

O

JE

C T

W

IT

H O

U T

TH

E

W R

IT

TE

N A

U

TH

O R

IZ

AT

IO

N

O F

C H

2M H

IL

L.

TH

IS

D O

C U

M

EN

T, A

N D

T H

E

ID

EA

S

AN

D

D

ES

IG

N

S

IN

C O

R

PO

R

AT

ED

H

ER

EI

N , A

S

AN

IN

ST

R U

M

EN

T O

F

PR

O

FE

SS

IO

N

AL

S

ER

VI

C

E, IS

T H

E

PR

O

PE

R

TY

O F

R

EU

SE

O

F D

O C

U M

EN

TS

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D

AT

E N

O

D

SG

N D

R R

EV

IS

IO

N

C H

K

AP

VD

BY

AP

VD

SHEET

DWG

A of

CH

2M

H

ILL

HD

R

JV

FI

R

E

ST

AT

IO

N

M

AN

SF

IE

LD

L

AH

M

A N

G B

AS

E

AI

R

N

AT

IO

N

AL

G

U

AR

D

M

AN

SF

IE

LD

, O

H

IO

TA

YL

O R

S

TR

EE

T, S U

IT

E

D

AY

TO

N

, O H

IO

TE

LE

3)

-0

F

AX

0)

-9

8/3/2019 3:15:55 PM

AUGUST 2019

C

IV

IL

G

EN

ER

AL

N O

TE

S, L

EG

EN

D

AN

D

A

BB

R

EV

IA

TI

O N

S A

TH

O

M

PS

O N

H J

O H

N

SO

N L

G

AN

D

IA

G A

C-001

AS SHOWN

5 203 TY

PE

B -3

F

IN

AL

D

P

EA

R

SO

N

-0 8-

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

P D

P

684448_C-001.dwg

684448CH

FL

FH

E

N

CO

AC

MH

LF

PSI POUNDS PER SQUARE INCH

NTS NOT TO SCALE

MANHOLE

LINEAR FEET

FLOWLINE

FIRE HYDRANT

NORTH, NORTHING

CLEAN OUT

MAX MAXIMUM

PAVEMENT

ASPHALT CONCRETE

CONC CONCRETE

MIN MINIMUM

SST STAINLESS STEEL

RCP REINFORCED CONCRETE PIPE

SIM SIMILAR

TYP TYPICAL

ELEVATION

INV INVERT

DIA, Ø DIAMETER

CL, C CENTERLINEL

STA STATION

APPROX APPROXIMATE

EX EXISTING

ABBREVIATIONS

PIV POST INDICATOR VALVE

BLG OR BLDG BUILDING

CI CAST IRON

AWWA AMERICAN WATER WORKS ASSOCIATION

DWG DRAWING

ELECTRICAL

ELB ELBOW

FDC

F FLANGE

FIRE DEPARTMENT CONNECTION

MISC MISCELLANEOUS

MJ MECHANICAL JOINT

PED

PE POLYETHYLENE

PEDESTRIAN

PVMNT

RADIUSR, RAD

SD

VERT VERTICAL

ADA AMERICANS WITH DISABILITIES ACT

SANITARY SEWER

ABND

CMP CORRUGATED METAL PIPE

CONST CONSTRUCT

EAST, EASTING, ELECTRICAL

ELEC

EP EDGE OF PAVEMENT

FFE FINISHED FLOOR ELEVATION

G GAS

HC HEATING/COOLING

OVERHEAD

PCCP

TBC TOP BACK OF CURB

TG TOP OF GRATE

W WATER

SIDEWALKSW

STND STANDARD

STRUCT STRUCTURAL

ABA

~ APPROXIMATELY

AND

ABANDONED

COORD COORDINATE

DEMO

CB CATCH BASIN

GB GRADE BREAK

BURIEDBUR

BM BENCH MARK

C.O., CO

SPEC'D SPECIFIED

TOP OF CONCRETETOC

EQUIP EQUIPMENT

BMP BEST MANAGEMENT PRACTICE

IE INVERT ELEVATION

PLS PURE LIVE SEED

DI

TOP OF SLABTOS

TOW TOP OF WALL

POINT OF CURVATURE

STANDARD DETAIL / STORM DRAIN

DEMOLISH OR DEMOLITION

MUTCD MANUAL ON UNIFORM TRAFFIC

CONTROL DEVICES

DUCTILE IRON/DROP INLET

W/ WITH

ELEV

FG FINISHED GRADE

HP HIGH POINT

L LENGTH

LOG LIP OF GUTTER

LP LOW POINT

LT LEFT

PC

PCC POINT OF COMPOUND CURVE

PVC POLYVINYL CHLORIDE OR

POINT OF VERTICAL CURVATURE

PT POINT OF TANGENCY

PVI POINT OF VERTICAL INTERSECTION

PVT POINT OF VERTICAL TANGENCY

REQ'D REQUIRED

RT RIGHT

SF SECURITY FORCES

S, SS

CIVIL LEGEND

GENERAL NOTE:

THIS IS A STANDARD LEGEND SHEET;

THEREFORE, NOT ALL OF THE INFORMATION

SHOWN MAY BE USED ON THIS PROJECT.

GENERAL NOTES:

CONSTRUCTION NOTES:

CONTRACTING OFFICER

A.

B.

C.

D.

E.

BC BACK OF CURB

EOS EDGE OF SLAB/SIDEWALK

FT FEET

FOW FACE OF WALL

PORTLAND CEMENT CONC PAVEMENT

SOG SLAB ON GRADE

SIGN

CENTER LINE, BUILDING, ROAD, ETC.

GUY ANCHOR

STRUCTURE, BUILDING OR FACILITYOR

DEMOLITIONOR

CATCH BASIN OR INLET

ELECTRIC HANDHOLE

CURB

CURB AND GUTTER

ELECTRICAL JUNCTION BOX

POST OR BOLLARD

ELECTRICAL TRANSFORMER

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

C

TELECOM MANHOLE

EDGE OF PAVEMENT

POTABLE WATER LINE

NATURAL GAS LINE

STORM DRAIN LINE

SANITARY SEWER LINE

ELECTRICAL MANHOLE

W

NG

SD

SS

COMM TELECOMMUNICATION

OR

CONCRETE

UTILITY POLE

LIGHT POLE

FIRE HYDRANT

CLEANOUT

POST INDICATOR VALVE

W WATER VAULT

TREE

SHRUB

VALVE AND VALVE BOX

BURIED ELECTRICAL

OHE OVERHEAD ELECTRICAL

EXISTING SITE FEATURES AND UTILITIES SHOWN WERE OBTAINED FROM SURVEY PERFORMED ON JUNE 27, 2017 AND BASE MAPPING. EXISTING CONDITIONS MAY VARY FROM THOSE SHOWN ON THESE PLANS. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND ADJUST WORK PLAN ACCORDINGLY PRIOR TO

BEGINNING CONSTRUCTION.

MAINTAIN, RELOCATE OR REPLACE EXISTING MONUMENTS WHICH ARE DISTURBED OR DESTROYED DURING CONSTRUCTION. PERFORM THE WORK TO PRODUCE THE SAME LEVEL OF ACCURACY AS THE ORIGINAL

MONUMENT(S) IN A TIMELY MANNER AND AT THE CONTRACTOR'S EXPENSE.

MEASUREMENTS SHOWN ARE FROM TOP BACK OF CURB OR EDGE OF PAVING UNLESS OTHERWISE NOTED.

HORIZONTAL DATUM: COORDINATES ARE BASED ON THE OHIO STATE PLANE COORDINATE SYSTEM, NAD83 (2011), NORTH ZONE ORIGINATING ON THE OHIO DEPARTMENT OF TRANSPORTATION (ODOT) CONTINUOUSLY

OPERATING REFERENCE STATION (CORS) NETWORK.

VERTICAL DATUM: NAVD88

PROJECT TESTING: ALL TESTING REQUIRED WILL BE CONDUCTED BY THE CONTRACTOR, AS SPECIFIED.

ALL DISTURBED SURFACES SHALL BE RETURNED TO ORIGINAL OR BETTER CONDITION. AREAS NOT IDENTIFIED AS CONCRETE OR ASPHALT SHALL BE TREATED WITH SOD. NO EXPOSED SOIL IS ALLOWED ON BASE.

CONTRACTOR SHALL FIELD VERIFY DEPTH AND LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATION AND SHALL PROTECT ALL EXISTING UTILITIES NOT IDENTIFIED FOR REMOVAL DURING CONSTRUCTION. UTILITIES SHOWN ON THE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION, AND MAY NOT REFLECT THE ACTUAL FIELD CONDITIONS OR LOCATIONS OF UNDERGROUND STRUCTURES OR EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGE TO

EXISTING UTILITIES.

THE CONTRACTOR SHALL NOTIFY MANSFIELD ANG FOURTEEN (14) FULL BUSINESS DAYS PRIOR TO

PLANNED EXCAVATION, AND OBTAIN A DIG PERMIT BEFORE BEGINNING WORK.

THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES MARKED OR UNMARKED BEFORE COMMENCING CONSTRUCTION. THE CONTRACTOR SHALL USE EXTREME CARE IN ALL EXCAVATIONS TO AVOID CONFLICTS WILL ALL UTILITIES MARKED OR UNMARKED. THE CONTRACTOR AGREES TO PRESERVE ANY AND ALL UTILITIES AND STRUCTURES WITHIN TWO FEET OF FIELD MARKED UNDERGROUND UTILITIES.

CONTRACTOR MUST NOTIFY THE COMMUNICATIONS SQUADRON PRIOR TO REMOVING ANY

COMMUNICATIONS EQUIPMENT (FIBER OPTIC, COPPER CABLE, ETC.) OR IF ANY TYPE OF COMMUNICATIONS

EQUIPMENT SHOULD NEED TO BE RELOCATED BECAUSE OF CONSTRUCTION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE NORMAL OPERATING FUNCTIONS OF ALL UTILITY SYSTEMS THROUGH THE CONSTRUCTION SITE DURING THE ENTIRE DURATION OF THE PROJECT.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR GROUNDS MAINTENANCE WITHIN THE PROJECT AREA

THROUGHOUT THE DURATION OF THE PROJECT.

BORE HOLE AND TEST PIT LOCATIONS ARE SHOWN ON C-004. PLEASE SEE "GEOTECHNICAL DRILLING AND TESTING INVESTIGATION", MAY 2017, BY TTL ASSOCIATES INC. FOR DETAILED INFORMATION AND

RECOMMENDATION.

ELEVATIONS GIVEN ARE TO FINISHED GRADE UNLESS OTHERWISE NOTED.

SLOPE UNIFORMLY BETWEEN CONTOURS OR SPOT ELEVATIONS SHOWN.

ALL PIPING SHALL HAVE A MINIMUM OF 3 FEET OF COVER AND CONDUITS SHALL HAVE 2 FEET OF COVER

UNLESS OTHERWISE SHOWN.

PROVIDE THRUST BLOCKS AT ALL UNRESTRAINED (PUSH-ON) WATER PIPING FITTINGS PER CONTRACT

DOCUMENTS.

ALL NEW UTILITIES SHALL HAVE A CONSTANT UNIFORM SLOPE BETWEEN INVERT ELEVATIONS UNLESS A FITTING

IS SHOWN.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

GOV GOVERNMENT OWNED VEHICLES

ABN ABANDON

ARCHITECTURAL BARRIERS ACT

AT ANTI-TERRORISM

LAFB LUKE AIR FORCE BASE

CCSD CONVENTIONAL CONSTRUCTION

STANDOFF DISTANCE

OH, OVH

ESC EROSION AND SEDIMENT CONTROL

UG UNDERGROUND

UST UNDERGROUND STORAGE TANK

STRAW WATTLE

INLET PROTECTION

ATO ANTI-TERRORISM OFFICER

COR CONTRACTING OFFICER'S REPRESENTATIVE

LEV LOW EMISSION VEHICLE

SWPPP STORMWATER POLLUTION

PREVENTION PLAN

STAGING AREA

PAVEMENT MARKINGS REMOVAL

SOD

ABANDON PIPE IN PLACE

CHAIN LINK FENCE

E

BOW BOTTOM OF WALL

OIL/WATER SEPARATOROWS

ABI ADDITIVE BID ITEM

ANG AIR NATIONAL GUARD

C&G CURB AND GUTTER

EPA ENVIRONMENTAL PROTECTION AGENCY

HYD FIRE HYDRANT

NOI NOTICE OF INTENT

SILT FENCE

E

JJ

H

TEST PIT

BORE HOLE

T

GRAVEL

WV WATER VALVE

SQ FT OR SF SQUARE FOOT OR FEET

PJF POLYUREA JOINT FILLER

OCCUPATIONAL HEALTH ANDOSHA

SAFETY ADMINISTRATION

OUTSIDE DIAMETEROD

ON CENTEROC

NG NATURAL GAS

MA MATCH

LB POUNDS

ECO ECOLOGY

CTR CENTER

CRNR CORNER

COMM COMMUNICATIONS

AWG AMERICAN WIRE GAUGE

ABC AGGREGATE BASE COURSE

FILENAME: PLOT DATE: PLOT TIME:

C H

2M H

IL

L

AL

L R

IG

H

TS

R

ES

ER

VE

D

C

H 2M

H

IL

L

AN

D

IS

N O

T

TO

B E

U

SE

D , I

N W

H O

LE

O

R

IN

P

AR

T, F

O R

A N

Y O

TH

ER

P R

O

JE

C T

W

IT

H O

U T

TH

E

W R

IT

TE

N A

U

TH

O R

IZ

AT

IO

N

O F

C H

2M H

IL

L.

TH

IS

D O

C U

M

EN

T, A

N D

T H

E

ID

EA

S

AN

D

D

ES

IG

N

S

IN

C O

R

PO

R

AT

ED

H

ER

EI

N , A

S

AN

IN

ST

R U

M

EN

T O

F

PR

O

FE

SS

IO

N

AL

S

ER

VI

C

E, IS

T H

E

PR

O

PE

R

TY

O F

R

EU

SE

O

F D

O C

U M

EN

TS

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D

AT

E N

O

D

SG

N D

R R

EV

IS

IO

N

C H

K

AP

VD

BY

AP

VD

SHEET

DWG

A of

CH

2M

H

ILL

HD

R

JV

FI

R

E

ST

AT

IO

N

M

AN

SF

IE

LD

L

AH

M

A N

G B

AS

E

AI

R

N

AT

IO

N

AL

G

U

AR

D

M

AN

SF

IE

LD

, O

H

IO

TA

YL

O R

S

TR

EE

T, S U

IT

E

D

AY

TO

N

, O H

IO

TE

LE

3)

-0

F

AX

0)

-9

8/3/2019 4:34:19 PM

AUGUST 2019

C

IV

IL

SI

TE

A C

C

ES

S, S

TA

G

IN

G

A N

D H

AU

L

R O

U

TE

A

TH

O M

PS

O

N H

J O

H N

SO

N

L G

AN

D

IA

G

A

C-002

AS SHOWN

6 203 TY

PE

B -3

F

IN

AL

D

P

EA

R

SO

N

-0 8-

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

P D

P

684448_C-002.dwg

684448CH

GENERAL SHEET NOTES

A. STAGING AREA SHALL BE FOR STOCKPILES AND

MATERIAL STORAGE, CONTRACTOR'S EMPLOYEE

PARKING AND TRAILERS. FINAL LOCATION TO BE

COORDINATED WITH CONTRACTING OFFICER.

B. ALL MATERIALS TO BE STOCKPILED FOR 24 HOURS

OR MORE SHALL BE COVERED UNLESS OTHERWISE

DIRECTED OR APPROVED IN WRITING BY

CONTRACTING OFFICER.

C. COORDINATE ACCESS, VEHICLE INSPECTING, AND

ESCORTING REQUIREMENTS TO THE SITE AND

FLIGHTLINE WITH CONTRACTING OFFICER PRIOR

TO CONSTRUCTION.

0 200 400 600

1"=200'

N

H

AR

R

IN

G

TO

N M

EM

O

R

IA

L R

O

ADAD

R

IN

G

TO

N M

EM

O

R

IA

L R

OO

AD

O A

R

RR

OO

EM

O R

IA

L

R O

R R

IN

G

TO

N

M H

ARR

DADDAA

O A

O A

MM

EE

S AIRPORT ROADS AIRPORT RS AIRPORT ROAD

INTERNATIONAL DRIVEINTERNATIONAL DRIVEEINTERNATIONAL D

CAIRNS ROADCAIRNS ROADCAIRNS ROAD

INTERNATIONALERNATIONALERNATIONALEENTEE LLLL

DRIVE NDRIVE NDRIVE NDDDD

CAIRNS ROADCAIRNS ROADCAIRNS ROAD

INTERNATIONALERERNATIONALINTEEINTEE LL

DRIVE SDRIVE SDRIVE S

H

AR

R

IN

G

TO

N M

EM

O

R

IA

L R

O

AD

H R

IN

G

T H

AR

R

IN

G

TO

N

M

EM

O R

IA

L

R O

AD

R

R

HH

B414 B4155 B412B410

B4080800

B525BBB

B5000000B50000000000000000000000000BB500B50000

B403BBBBBBBB 0333333333303333BB

B409

B601 B600B60BBBBBBBBBBB

B60266666

B603B66036666 33330060BBBB6B6

B522BBBBBBBBBBBBB 2BBBBBBBB

B52020BB5B5BB5B

B420 B422

B421

B300

B416

B207B2 77

B203

B203A2033A3

B164

B407 B4055555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555550444444400000

B108

B1100B1

B112B

B114B 444BB

B104B

B102

B1201111111111111111BBBBBBBB 2020201121112B1B121111B 22222222222B1211BBBBB12111B 21B12111BB121111111111111111B 211111112222222222222BBBBBBBBBBBBB

CONTRACTOR STAGINGT CTOCTCCCTCTT

AREA, SEE NOTE ASEE NOA SSEEEEEEEEEEREEAA

PRIMARY HAUL ROUTEPPP

MANSFIELD ANG

MAIN GATE

SECONDARY HAUL ROUTE,

COORDINATE ACCESS WITH

CONTRACTING OFFICER

MANSFIELD ANG SECONDARY GATE,

COORDINATE ACCESS WITH

CONTRACTING OFFICER

PROJECTPPRPRPR

SITE

File details come from the government source that posted it. Updated .