- Attached to
- REPLACE FIRE STATION Federal contract opportunity
- Solicitation number
- W50S8R-20-B-0001
About this file
This document contains a request for information and response regarding a solicitation to replace a fire station. The solicitation seeks construction of a new aircraft rescue and firefighting station to comply with emergency response standards. Services required include demolition and construction of the new station with emergency management training space. The project duration is estimated at 660 calendar days. Optional items that may be included are concrete paving and apparatus doors. Bids will be evaluated without discussion and awarded in accordance with FAR 14.101. The solicitation is set aside for small businesses with a size standard of $39.5 million average annual revenue. The magnitude is estimated between $10-20 million. The pre-bid conference is scheduled for November 5, 2019 with bid opening on November 26, 2019. Interested parties must register at SAM.gov and access solicitation documents at fbo.gov. The response provides an alternative structural steel truss design for consideration.
View the file
Other files for this federal contract opportunity
Show all 50
REPLACE FIRE STATION has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
R E
Q U
E S
T O
R S
E C
T
IO
N
From:
Date: 20 Nov 2019
To: Contracting Officer
1. Solicitation Number:
W50S8R-20-B-0001
2. Location of Project:
Fire Station - Mansfield Ohio ANG
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
After looking at this project and running truss designs, we have come to the conclusion that loads
(including the 140 PSF blast loading per note #4 under CFS trusses on sheet S-003) and the spacing of the trusses is too much for LGS trusses. The main problem it the clear span stepdown girder at the top of the layout (closest to gridline 3).
We have tried to use up to 12 GA. material (maximum gauge) and 3-ply (maximum number of plies per engineers) trusses, and also tried to drop the spacing of the trusses to 24.0” on center. We are unable to get all the trusses to work.
If there is any possibility of interior bearings, please let us know.
Attachments:
Date Response Required:
By:
Title:
Requestor's FAX Number:
Requestor's Telephone Number:
R E
S P
O N
S E
To:
Date:
Response:
Attached is a structural steel truss we designed as part of a comparative study. The required steel sections aren’t that large so we believe a comparable truss built from cold-formed steel is viable. However, we recognize the heavier sections may preclude some truss manufacturers due to local material availability, in-house engineering, and/or limits on proprietary systems.
The attached structural steel truss is an acceptable alternative to the cold-formed girder trusses.
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.