RFI_21.pdf

PDF 170 KB Posted

Attached to
REPLACE FIRE STATION
Solicitation number
W50S8R-20-B-0001
Issued by

About this file

This document contains a request for information and response regarding a solicitation to replace a fire station. The solicitation seeks construction of a new aircraft rescue and firefighting station to comply with emergency response standards. Services required include demolition and construction of the new station with emergency management training space. The project duration is estimated at 660 calendar days. Optional items that may be included are concrete paving and apparatus doors. Bids will be evaluated without discussion and awarded in accordance with FAR 14.101. The solicitation is set aside for small businesses with a size standard of $39.5 million average annual revenue. The magnitude is estimated between $10-20 million. The pre-bid conference is scheduled for November 5, 2019 with bid opening on November 26, 2019. Interested parties must register at SAM.gov and access solicitation documents at fbo.gov. The response provides an alternative structural steel truss design for consideration.

View the file

Other files

File Type Posted
Abstract_FIRE_pg3.pdf PDF
Abstract_FIRE_signed.pdf PDF
bid opening attendees.pdf PDF
RFI_15.pdf PDF
RFI_17.pdf PDF
RFI_19.pdf PDF
A-601 - DOOR-WINDOW SCHEDULES.pdf PDF
RFI_20.pdf PDF
RFI_21_attachment.pdf PDF
RFI_13.pdf PDF
RFI_18.pdf PDF
RFI_16.pdf PDF
A-602 - INTERIOR FINISH-COLOR SCHEDULE.pdf PDF
RFI_14.pdf PDF
RFI_08.pdf PDF
RFI_07.pdf PDF
RFI_12.pdf PDF
RFI_08 attach.pdf PDF
RFI_07 attach.pdf PDF
RFI_11.pdf PDF
RFI_09.pdf PDF
RFI_10_attachment.pdf PDF
RFI_10.pdf PDF
RFI_06.pdf PDF
RFI_2.pdf PDF
RFI_4.pdf PDF
RFI_3.pdf PDF
RFI_1.pdf PDF
RFI_5.pdf PDF
Pre-Bid_minutes,_data.pdf PDF
RFI_3_attachment.pdf PDF
Attach6_Telecommunications.pdf PDF
Attach6_Civil_6b.pdf PDF
Attach6_Civil_6a.pdf PDF
Attach6_Mechanical.pdf PDF
Attach6_Civil_8b.pdf PDF
Attach6_Architectural.pdf PDF
Attach6_Plumbing.pdf PDF
Attach6_Fire_Protection.pdf PDF
W50S8R-20-B-0001.pdf PDF
Attach6_Civil_5d.pdf PDF
Attach7_Geotechnical_Report.pdf PDF
Attach6_General.pdf PDF
Attach6_Civil_4c.pdf PDF
Attach6_Civil_4a.pdf PDF
Attach6_Electrical.pdf PDF
Attach6_Civil_3.pdf PDF
Attach6_Structural.pdf PDF
Attach6_Civil_7.pdf PDF
Attach6_Civil_9.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From:

Date: 20 Nov 2019

To: Contracting Officer

1. Solicitation Number:

W50S8R-20-B-0001

2. Location of Project:

Fire Station - Mansfield Ohio ANG

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

After looking at this project and running truss designs, we have come to the conclusion that loads

(including the 140 PSF blast loading per note #4 under CFS trusses on sheet S-003) and the spacing of the trusses is too much for LGS trusses. The main problem it the clear span stepdown girder at the top of the layout (closest to gridline 3).

We have tried to use up to 12 GA. material (maximum gauge) and 3-ply (maximum number of plies per engineers) trusses, and also tried to drop the spacing of the trusses to 24.0” on center. We are unable to get all the trusses to work.

If there is any possibility of interior bearings, please let us know.

Attachments:

Date Response Required:

By:

Title:

Requestor's FAX Number:

Requestor's Telephone Number:

R E

S P

O N

S E

To:

Date:

Response:

Attached is a structural steel truss we designed as part of a comparative study. The required steel sections aren’t that large so we believe a comparable truss built from cold-formed steel is viable. However, we recognize the heavier sections may preclude some truss manufacturers due to local material availability, in-house engineering, and/or limits on proprietary systems.

The attached structural steel truss is an acceptable alternative to the cold-formed girder trusses.

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

File details come from the government source that posted it. Updated .