Attach6_Civil_8b.pdf

PDF 8 MB Posted

Attached to
REPLACE FIRE STATION Federal contract opportunity
Solicitation number
W50S8R-20-B-0001
Issued by
Department of the Army Ohio Army National Guard

About this file

This solicitation package includes plans and specifications for a federal construction project to replace an existing fire station at Mansfield Air National Guard Base in Ohio. Key details include the scope of work such as demolition of the existing station and new construction to provide aircraft rescue and firefighting services. The project is estimated to take 660 days to complete. Optional line items include concrete paving and equipment. The solicitation is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million. The magnitude is estimated between $10-20 million. The pre-bid conference is scheduled for November 5, 2019 with bids due on November 26, 2019. Plans and specifications are available through the Federal Business Opportunities website. Interested parties should register in the System for Award Management and monitor the website for any amendments.

Volume 6 - CIVIL

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE FIRE STATION, newest first.
File Type Posted
Abstract_FIRE_signed.pdf PDF
bid opening attendees.pdf PDF
RFI_17.pdf PDF
A-601 - DOOR-WINDOW SCHEDULES.pdf PDF
RFI_15.pdf PDF
RFI_19.pdf PDF
A-602 - INTERIOR FINISH-COLOR SCHEDULE.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_14.pdf PDF
RFI_16.pdf PDF
RFI_12.pdf PDF
RFI_08 attach.pdf PDF
RFI_08.pdf PDF
RFI_07.pdf PDF
RFI_09.pdf PDF
RFI_10_attachment.pdf PDF
RFI_10.pdf PDF
RFI_11.pdf PDF
RFI_06.pdf PDF
Pre-Bid_minutes,_data.pdf PDF
RFI_4.pdf PDF
RFI_3.pdf PDF
RFI_3_attachment.pdf PDF
RFI_2.pdf PDF
Attach6_Civil_6a.pdf PDF
Attach6_Civil_8a.pdf PDF
Attach6_Civil_5d.pdf PDF
Attach6_Civil_9.pdf PDF
Attach6_Telecommunications.pdf PDF
Attach6_Architectural.pdf PDF
Attach6_Civil_6b.pdf PDF
Attach6_Civil_7.pdf PDF
Attach6_Civil_4c.pdf PDF
Attach6_Civil_5b.pdf PDF
Attach6_Plumbing.pdf PDF
Attach6_Mechanical.pdf PDF
Attach4_Vol_4_Specifications.pdf PDF
Attach1_Vol_1_BOD.pdf PDF
Attach8_RFI_template.doc DOC document
Attach6_Civil_1b.pdf PDF
Attach6_Civil_1a.pdf PDF
EXHIBIT_A-Communications_Equipment.xlsx XLSX spreadsheet
EXHIBIT_B_Sealed_Bid_Reminders.pdf PDF
Attach3_Vol_3_Specifications.pdf PDF
Attach5_Vol_5_Specifications.pdf PDF
Attach6_Civil_5a.pdf PDF
Attach6_Civil_2.pdf PDF
Attach6_Civil_5c.pdf PDF
Attach6_Fire_Protection.pdf PDF
Show all 50

REPLACE FIRE STATION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL SHEET NOTES

KEY PLAN

CC

A B

DCCC

B

10 20 30

Scale in Feet

FILENAME: PLOT DATE: PLOT TIME:

C H

2M H

IL

L

AL

L R

IG

H

TS

R

ES

ER

VE

D

C

H 2M

H

IL

L

AN

D

IS

N O

T

TO

B E

U

SE

D , I

N W

H O

LE

O

R

IN

P

AR

T, F

O R

A N

Y O

TH

ER

P R

O

JE

C T

W

IT

H O

U T

TH

E

W R

IT

TE

N A

U

TH

O R

IZ

AT

IO

N

O F

C H

2M H

IL

L.

TH

IS

D O

C U

M

EN

T, A

N D

T H

E

ID

EA

S

AN

D

D

ES

IG

N

S

IN

C O

R

PO

R

AT

ED

H

ER

EI

N , A

S

AN

IN

ST

R U

M

EN

T O

F

PR

O

FE

SS

IO

N

AL

S

ER

VI

C

E, IS

T H

E

PR

O

PE

R

TY

O F

R

EU

SE

O

F D

O C

U M

EN

TS

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D

AT

E N

O

D

SG

N D

R R

EV

IS

IO

N

C H

K

AP

VD

BY

AP

VD

SHEET

DWG

A of

CH

2M

H

ILL

HD

R

JV

FI

R

E

ST

AT

IO

N

M

AN

SF

IE

LD

L

AH

M

A N

G B

AS

E

AI

R

N

AT

IO

N

AL

G

U

AR

D

M

AN

SF

IE

LD

, O

H

IO

TA

YL

O R

S

TR

EE

T, S U

IT

E

D

AY

TO

N

, O H

IO

TE

LE

3)

-0

F

AX

0)

-9

8/3/2019 3:57:20 PM

AUGUST 2019

C

IV

IL

SI

TE

U

TI

LI

TY

P

LA

N

AR

EA

C

A

TH

O M

PS

O

N H

J O

H N

SO

N

L G

AN

D

IA

G

A

CU103

AS SHOWN

31 203 TY

PE

B -3

F

IN

AL

D

P

EA

R

SO

N

-0 8-

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

P D

P

684448_CU103.dwg

684448CH

MATCH LINE - SEE CU101

M

AT

C H

L

IN

E

- S

EE

C

U

SHEET KEYNOTES

1. ELECTRICAL CONDUIT, SEE E-100

2. 4"x8"x8" TEE AND ISOLATION VALVE, SEE 8/CU501

3. THRUST BLOCK, SEE 3/CU502

4. CLEANOUT, SEE 6/CU501

5. TIE INTO EXISTING SANITARY SEWER LATERAL

WITH SERVICE TAPPING SLEEVE, SEE 4/CU502

6. BENCHED UTILITY TRENCH, SEE 2/CU503

7. SEE T-111 FOR CONTINUATION OF PIPING

8. TIE INTO EXISTING GAS MAIN

9. CORE DRILL EXISTING COMM VAULT, SEE 1/CU502

10. SEE P-101 FOR CONTINUATION OF PIPING

11. ELECTRICAL MH OR PULLBOX, SEE E-503

12. RELOCATED LIGHT, SEE E-100

13. CATCH BASIN, SEE 6/CU502

14. EXTERIOR ROOF DRAIN CONNECTION, SEE 5/CU502

15. GENERATOR AND TRANSFORMER, SEE E-100

16. COMMUNICATIONS TOWER

17. AREA INLET, SEE 1/CU503

18. CATCH BASIN, SEE 6/CU502

19. STORM DRAIN MANHOLE WITH SOLID COVER, SEE

4/CU502

20. CURB INLET, SEE 8/CU502

A. CONTRACTOR TO FIELD VERIFY LOCATION OF ALL

UTILITIES PRIOR TO CONSTRUCTION.

B. CONTRACTOR TO RETAIN AND PROTECT ALL

EXISTING UTILITIES TO REMAIN.

C. CONTRACTOR SHALL PROVIDE ADEQUATE

SUPPORT OF EXISTING UTILITIES WHERE NEW

UTILITIES PASS BELOW THEM, SEE DETAIL 2/CU501.

D. WATER MAINS CROSSING SEWERS SHALL BE LAID

AS CLOSE TO PERPENDICULAR AS POSSIBLE AND

HAVE A MINIMUM VERTICAL DISTANCE OF 18"

BETWEEN OUTSIDE OF PIPES. ONE FULL LENGTH

OF WATER PIPE SHALL BE LOCATED SO BOTH

JOINTS ARE AS FAR FROM SEWER AS POSSIBLE. IF

NOT POSSIBLE, THE SEWER MATERIALS SHALL BE

150 PSI PRESSURE-RATED PIPE MEETING AWWA

STANDARDS.

E. TRENCH UTILITIES PER DETAIL 1/CU501, UNLESS

OTHERWISE SHOWN.

F. REUSE EXISTING ELECTRICAL CONDUIT AS MUCH

AS POSSIBLE BETWEEN LIGHT POLES AND

PULLBOXES.

MATCH LINE - SEE BELOW RIGHT

MATCH LINE - SEE INSET ABOVE LEFT

101010

6"SS @ 1.4%

2" NG

3" W

33322

SEE NOTE DN

AREA DRAINA RAAAA RRAAAAA DDDRDR

RIM: 1295.0M

N: 34822.1421244 224444 2222

E: 163692.8510 .1 .8.E: 2..EEE

INV OUT (SE): 1292.90)TT T I T (

SUMP: 1292.44PP 44M 44SSSSU

CATCH BASINCATC NNASBAAHCCHTTCCAAC

RIM: 1294.8: 1294.884 882991MR MR

N: 34819.0030030000148833NN

E: 163692.5735557335592696316E:E

INV IN (NE): 1292.50050922291) NE(NNNVVNV

INV OUT (SW): 1292.393939222:WW)SWT (UTOOVV ONN

SUMP: 1291.8988991291P:MMUUS

STORM DRAIN MANHOLET D A ETT R A ESTTT DD MA LE

RIM: 1294.8

N: 34819.40618 1818 118888 1111 E: 163685.1425: 5 .1E:: 5

INV IN (S): 1291.95

INV OUT (NW): 1291.89O W) 8U W):W) 898OOOO WWW)W) 8888

SUMP: 1291.4SU 2U 9S 2

1414 141414

CURB INLETU EU T

TBC: 1294.914444

N: 34819.75788188888 8 E: 163688.009333393.

INV OUT (S): 1292.20111112VVVVVVVVVV SSSVVVVVVVVVVVV (SSSS

SUMP: 1291.707.7.7. 0PPPP:PPPPPPP

EXST SS MH-2X

RIM: 1296.16 (EXST)RIM: 1296.16 (EXST)R 9 XRR 99 XXRRRR 9999 XXXXRIM: 1296.16 (EXST)RIM: 1296.16 (EXST)

INV IN (NE): 1289.21 (EXST)INV IN (NE): 1289.21 (EXST)

INV IN (NW): 1288.66 (EXST)

INV OUT (SW): 1288.59 (EXST)

6"SS INV: 1288.44

4 - 4" COMMC

12"SD @ 0.5%5%%0 5@ 0@@DD "S22

12"SD @ 0.5%

12"SD @ 1.0%0%.0%

TYPTTTTTTTT INV: 1293.38INV 129 .38 INV: 1292.6929

4"SS @ 1.4%SSSSSSSS %@ %@@ 1 4%%

4"SS"4

INV: 1290.42N 000129292999 4N 1290 420001VVV 292299 4N

6" SDS

INV: 1292.771

6"SD @ 1.0%%@ @ 1@ 1SDSSSDSDSD @@@@ 1.

6"SS @ 1.0%%0%1@@S @SS6 S

12"SD @ 0.5%12"SD @ 5%5@ 0@@DD"SS2

12"SD @ 0.5%%5%0 5@@@SD2 SS12

6"SS INV: 1289.6559 68892VVVNSS "S6

2-4" COMMMMMOMCOC42

111111

SEE NOTE F

111111

TYP

7171717

4 - 4" COMM

2" NG

3" W

2 - 4" COMM

GENERAL SHEET NOTES

KEY PLAN

C

A B

DDCC

B

10 20 30

Scale in Feet

FILENAME: PLOT DATE: PLOT TIME:

C H

2M H

IL

L

AL

L R

IG

H

TS

R

ES

ER

VE

D

C

H 2M

H

IL

L

AN

D

IS

N O

T

TO

B E

U

SE

D , I

N W

H O

LE

O

R

IN

P

AR

T, F

O R

A N

Y O

TH

ER

P R

O

JE

C T

W

IT

H O

U T

TH

E

W R

IT

TE

N A

U

TH

O R

IZ

AT

IO

N

O F

C H

2M H

IL

L.

TH

IS

D O

C U

M

EN

T, A

N D

T H

E

ID

EA

S

AN

D

D

ES

IG

N

S

IN

C O

R

PO

R

AT

ED

H

ER

EI

N , A

S

AN

IN

ST

R U

M

EN

T O

F

PR

O

FE

SS

IO

N

AL

S

ER

VI

C

E, IS

T H

E

PR

O

PE

R

TY

O F

R

EU

SE

O

F D

O C

U M

EN

TS

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D

AT

E N

O

D

SG

N D

R R

EV

IS

IO

N

C H

K

AP

VD

BY

AP

VD

SHEET

DWG

A of

CH

2M

H

ILL

HD

R

JV

FI

R

E

ST

AT

IO

N

M

AN

SF

IE

LD

L

AH

M

A N

G B

AS

E

AI

R

N

AT

IO

N

AL

G

U

AR

D

M

AN

SF

IE

LD

, O

H

IO

TA

YL

O R

S

TR

EE

T, S U

IT

E

D

AY

TO

N

, O H

IO

TE

LE

3)

-0

F

AX

0)

-9

8/3/2019 3:58:01 PM

AUGUST 2019

C

IV

IL

SI

TE

U

TI

LI

TY

P

LA

N

AR

EA

D

A

TH

O M

PS

O

N H

J O

H N

SO

N

L G

AN

D

IA

G

A

CU104

AS SHOWN

32 203 TY

PE

B -3

F

IN

AL

D

P

EA

R

SO

N

-0 8-

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

P D

P

684448_CU104.dwg

684448CH

MATCH LINE - SEE CU102

M

AT

C H

L

IN

E

- S

EE

C

U

SHEET KEYNOTES

1. ELECTRICAL CONDUIT, SEE E-100

2. 8"x8"x8" TEE AND ISOLATION VALVE, SEE 8/C-501

3. THRUST BLOCK, SEE 3/CU502

4. SANITARY SEWER CLEANOUT, SEE B1/P-502

5. OWS, SEE 3/CU-503

6. FIRE HYDRANT, SEE 3/F-503

7. POST INDICATOR VALVE, SEE 1/F-503

8. FIRE DEPARTMENT CONNECTION, 3/F-503

9. 2" VENT, SEE P-101

10. SEE P-101 FOR CONTINUATION OF PIPING

11. AREA INLET, SEE 1/CU-503

12. CATCH BASIN, SEE 6/CU-502

13. ADJUST GRATED COVER TO NEW RIM ELEVATION

14. CLEANOUT, SEE 6/CU-501

15. SEE F-301 FOR CONTINUATION OF PIPING

16. EXTERIOR ROOF DRAIN CONNECTION, SEE

5/CU-502

17. 3"x8"x8" TEE AND ISOLATION VALVE, SEE 8/CU-501

18. RELOCATED LIGHT POLE, SEE E-100

19. ELECTRICAL MH OR PULLBOX, SEE E-503

A. CONTRACTOR TO FIELD VERIFY LOCATION OF ALL

UTILITIES PRIOR TO CONSTRUCTION.

B. CONTRACTOR TO RETAIN AND PROTECT ALL EXISTING

UTILITIES TO REMAIN.

C. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORT OF

EXISTING UTILITIES WHERE NEW UTILITIES PASS BELOW

THEM, SEE DETAIL 2/CU501.

D. WATER MAINS CROSSING SEWERS SHALL BE LAID AS

CLOSE TO PERPENDICULAR AS POSSIBLE AND HAVE A

MINIMUM VERTICAL DISTANCE OF 18" BETWEEN

OUTSIDE OF PIPES. ONE FULL LENGTH OF WATER PIPE

SHALL BE LOCATED SO BOTH JOINTS ARE AS FAR FROM

SEWER AS POSSIBLE. IF NOT POSSIBLE, THE SEWER

MATERIALS SHALL BE 150 PSI PRESSURE-RATED PIPE

MEETING AWWA STANDARDS.

E. TRENCH UTILITIES PER DETAIL 1/CU501, UNLESS

OTHERWISE SHOWN.

F. REUSE EXISTING ELECTRICAL CONDUIT AS MUCH AS

POSSIBLE BETWEEN LIGHT POLES AND PULLBOXES.

28" WWW"

EX SDMHS MHMMSSDX SEXE

RIM: 1295.2M 25 22912M:RR

CATCH BASINATC ASSSB S

RIM: 1295.0RI 9599 0

N: 34824.79594828288822882 7778 9599 E: 163698.799316 3698.

INV OUT: 1293.25IN OUTUUTOUOUUIININNN 1INV OI

AREA DRAIN INLETR

RIM: 1295.00MM 00MMMM 0000

N: 34824.860422428222 4 E: 163695.9026

INV OUT: 1293.25V 1VV 2VVVV 1111

INV: 1294.25V

NV: 1293.9699NI V: 1293V: NV: 1293V: 129329 999

161616

6" SDSD" S6

INV: 1294.444444494.291V:NI

6" SS

INV: 1291.33

6" SS @ 1%@@@@

6" SS @ 1%S

6" SD @ 1%D %6 DD

6" SD @ 1%"6

6" SD @ 1%

INV: 1293.13321V 39INV: 1293 132V

6" SD @ 0.5%%5%%0@ 0@@SDD S6

6" SS @ 1%%%%@S @@SSS" S66

6" SD

INV: 1293.63

6" SS

INV: 1291.0492299291V

6" SSSS" S6

INV: 1290.400400221VVIN

19191

EX SS MHMH

RIM EL: 1296.31 (EX)(EEL

INV EL (SW): 1290.87 (EX)87 NV

INV EL (SE): 1291.31 (EX)(EXININI

INV EL (E): 1291.18 (EX)NV

INV EL (N): 1290.93 (EX)EL (N

INV EL (N): 1292.21 (EX)L (N

SEE NOTE F

INV: 1294.90

13131

14141

TYPPTY

File details come from the government source that posted it. Updated .