Attach6_Civil_5d.pdf

PDF 3 MB Posted

Attached to
REPLACE FIRE STATION Federal contract opportunity
Solicitation number
W50S8R-20-B-0001
Issued by
Department of the Army Ohio Army National Guard

About this file

This solicitation notice is for the replacement of the fire station at Mansfield Air National Guard Base in Mansfield, Ohio. The project includes construction of a new aircraft rescue and firefighting station to provide emergency response services to the airfield and installation aircraft. Optional bid items include extending concrete paving to the flight line at either a minimum or full width, installing four-fold apparatus doors, and supplying a 5-ton bridge crane. The construction duration is estimated at 660 calendar days. The solicitation is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million average annual revenue. The project magnitude is between $10-20 million. The pre-bid conference is scheduled for November 5, 2019 and bids are due November 26, 2019. The solicitation and plans are available on FedBizOpps. Questions should be directed to the point of contact listed.

Volume 6 - CIVIL

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE FIRE STATION, newest first.
File Type Posted
Abstract_FIRE_pg3.pdf PDF
RFI_17.pdf PDF
RFI_20.pdf PDF
RFI_21.pdf PDF
RFI_21_attachment.pdf PDF
A-601 - DOOR-WINDOW SCHEDULES.pdf PDF
RFI_15.pdf PDF
RFI_19.pdf PDF
RFI_12.pdf PDF
RFI_08 attach.pdf PDF
RFI_07 attach.pdf PDF
RFI_08.pdf PDF
RFI_07.pdf PDF
RFI_09.pdf PDF
RFI_10_attachment.pdf PDF
RFI_10.pdf PDF
RFI_11.pdf PDF
Pre-Bid_minutes,_data.pdf PDF
RFI_4.pdf PDF
RFI_3.pdf PDF
Attach6_Civil_6a.pdf PDF
Attach6_Civil_8a.pdf PDF
Attach6_Civil_9.pdf PDF
Attach6_Civil_8b.pdf PDF
Attach6_Telecommunications.pdf PDF
Attach2_Vol_2_Specifications.pdf PDF
Attach6_General.pdf PDF
Attach6_Electrical.pdf PDF
Attach6_Fire_Alarm.pdf PDF
Attach6_Civil_4a.pdf PDF
Attach6_Civil_4b.pdf PDF
Attach6_Structural.pdf PDF
Attach6_Civil_3.pdf PDF
Attach7_Geotechnical_Report.pdf PDF
Attach6_Architectural.pdf PDF
Attach6_Civil_6b.pdf PDF
Attach6_Civil_7.pdf PDF
Attach6_Civil_4c.pdf PDF
Attach6_Civil_5b.pdf PDF
Attach6_Plumbing.pdf PDF
Attach6_Mechanical.pdf PDF
Attach4_Vol_4_Specifications.pdf PDF
Attach1_Vol_1_BOD.pdf PDF
Attach8_RFI_template.doc DOC document
Attach6_Civil_1b.pdf PDF
Attach6_Civil_1a.pdf PDF
EXHIBIT_A-Communications_Equipment.xlsx XLSX spreadsheet
EXHIBIT_B_Sealed_Bid_Reminders.pdf PDF
Attach3_Vol_3_Specifications.pdf PDF
Attach5_Vol_5_Specifications.pdf PDF
Show all 50

REPLACE FIRE STATION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL SHEET NOTES

SHEET KEYNOTES

1. 9" PCCP, SEE 3/C-501

2. STORM DRAIN MANHOLE WITH GRATED LID, SEE

4/CU-501

3. TIE INTO STORM DRAIN MANHOLE, SEE 2/CU502

4. REPLACE GRATED LID WITH SOLID LID, ADJUST TO

NEW GRADE

5. CONCRETE TO ASPHALT TRANSITION, SEE 9/C-501

6. CATCH BASIN, SEE DETAIL 9/CU-502

7. BOLLARD, SEE 2/C-502

8. PROVIDE EXPANSION JOINT AT INTERFACE OF

BUILDING OR FLIGHT LINE PAVEMENT AND CONCRETE

APRON, SEE DETAIL 7/C-503

9. MATCH EXISTING GRADE

10. CLEAN OUT SEE 6/CU-501

11. CONSTRUCTION JOINT, SEE 5/C-503

12. EXTENT OF BID OPTION #1 PAVING

KEY PLAN

C

A BB

DCC

B

10 20 30

Scale in Feet

FILENAME: PLOT DATE: PLOT TIME:

C H

2M H

IL

L

AL

L R

IG

H

TS

R

ES

ER

VE

D

C

H 2M

H

IL

L

AN

D

IS

N O

T

TO

B E

U

SE

D , I

N W

H O

LE

O

R

IN

P

AR

T, F

O R

A N

Y O

TH

ER

P R

O

JE

C T

W

IT

H O

U T

TH

E

W R

IT

TE

N A

U

TH

O R

IZ

AT

IO

N

O F

C H

2M H

IL

L.

TH

IS

D O

C U

M

EN

T, A

N D

T H

E

ID

EA

S

AN

D

D

ES

IG

N

S

IN

C O

R

PO

R

AT

ED

H

ER

EI

N , A

S

AN

IN

ST

R U

M

EN

T O

F

PR

O

FE

SS

IO

N

AL

S

ER

VI

C

E, IS

T H

E

PR

O

PE

R

TY

O F

R

EU

SE

O

F D

O C

U M

EN

TS

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D

AT

E N

O

D

SG

N D

R R

EV

IS

IO

N

C H

K

AP

VD

BY

AP

VD

SHEET

DWG

A of

CH

2M

H

ILL

HD

R

JV

FI

R

E

ST

AT

IO

N

M

AN

SF

IE

LD

L

AH

M

A N

G B

AS

E

AI

R

N

AT

IO

N

AL

G

U

AR

D

M

AN

SF

IE

LD

, O

H

IO

TA

YL

O R

S

TR

EE

T, S U

IT

E

D

AY

TO

N

, O H

IO

TE

LE

3)

-0

F

AX

0)

-9

8/3/2019 3:23:35 PM

AUGUST 2019

C

IV

IL

EX

TE

N D

S

IN

G

LE

L

AN

E

PA

VI

N

G (B

ID

O

PT

IO

N

1) T

O F

U

LL

B U

IL

D

IN

G

W

ID

TH

A

TH

O

M

PS

O N

J H

ES

S

L G

AN

D

IA

G

A

C-108

AS SHOWN

21 203 TY

PE

B -3

F

IN

AL

D

P

EA

R

SO

N

-0 8-

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

P D

P

684448_C-108.dwg

684448CH

M

AT

C H

L

IN

E

- S

EE

C

-1

1296.25+ +1296.25

+1296.25

+1296.25

+1296.25

1296.25 +

296.252525

1296.25+

121292969

S OS OFIRE STATION

FFE: 1296.25

+ 1295.01

+ 1+ 12+ 1++++++++++++++++

+ 1295.23

+ 1295.75 ++++++++++ 12+++++++++++++++++++++++++++++++ 1295.70

++++++++++++++++++++++++ 1++++++++ 755 7755.55

+ 1296.256.2 +++ 1+++++++ 1+ 1+++++++++++++

+ 1295.655 55565555

+++ 1+ 1++ 1+ 1+++ 1+++++

+ 1295.5050055559521+++ 1++ + 1295.75

+ 1296.156.1 + 1

666.1.16666 + 1+++ + 1295.757555 7955921

++ + 1296.00

+ 1295.75

+ 129 +++++ 22222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222122212121212222222222212121222222222222222222121212121212121212222221212122222222122122122121212222212121222221212122222121212121212121212122222221221221222221222121222221212212222222221212212222222122122121212121212121212121212121212122212121212121212121212121212121212121212121212121222121212121212121212121212121212222121212221212121212222221212122221212122212121222121212122212121212121212121212121212121212121212121212121212122122121222121212221212121212222122122121212212222121212122122221212121212121212121212121212121212121212121212121212121221212121221222121212122121212122122212121212212212121212121212121212121212212121212121212121212121292922929222292929292929292929222929222922929292922292229292922222922292929292929292929292929292929292922929292929292929292929292292929292929292929292929229292929229292929292929292222922222222222222922222222222222222212212222222222222122122222121212212222212212212212212222121212121212121221212121212121222221212121212121212122212121212222212121212121212121222121212122222121212121212121212221212121222221212121212121212122121212122121212121212121212121212121212121212121212121212112121212121211121212121212121111121121121121121121112112112112112112111211211211211211211121121121121121112112112112112112111211211112111121111121121121121121121112112112112112112121212121121212121121212112121121211211212111111111111+ 1295.33

12+ 1 333595229112++

+ 1296.15 (TBC)C)

C)BCB(TT5 (156 19629

+ 12121212+++ 2121212++++

(TBC))

TB

+ 1296.15 (TBC)

+ 1

12111111

C)

+ 1++ 1++

2.

1.0%%1.0%

1.68%1.68%

1.75%11.75%

0.83%%0.83%

20.54'

25.21'1215522

EXST 10" SD

EXST 12" SD

EXST 10" SD

1 0% 1.0%

1.

2%

1.

2%

1.0%%%%%%

+ 1295.63

+ 1295.29

+ 1+ 1+ 1++++

A. ALL SURFACES DISTURBED DURING CONSTRUCTION SHALL

BE RESTORED TO THEIR ORIGINAL OR BETTER CONDITION.

EXTENT OF RESTORATION IS APPROXIMATE AND IS

DEPENDENT UPON CONSTRUCTION ACTIVITIES.

B. ALL NEW SURFACES ARE TO MATCH EXISTING GRADES

EXCEPT WHERE ELEVATIONS OR CONTOURS ARE SHOWN.

C. ALL NEW IMPERVIOUS SURFACES SHALL SLOPE AWAY

FROM THE BUILDING AT 2% MINIMUM UNLESS OTHERWISE

SHOWN.

D. SEE SHEETS C-101 THROUGH C-104 AND CU-101 THROUGH

CU-104 FOR BASE BID DESIGN.

E. THIS SHEET SHOWS WORK INCLUDED IN BID OPTION #2

WHICH INCLUDES EXTENDING SINGLE LANE PAVING (BID

OPTION #1) TO FULL BUILDING WIDTH.

F. JOINTS NEAR CURVED PAVEMENT EDGES SHALL BE

TURNED TO MEET CURVED EDGE AT 90 DEGREES.

IRREGULAR OR ODD SHAPED PAVEMENT SHALL BE

REINFORCED WITH

11.77'7

(TYP)( Y

12.27'7

(TYP))))))TY

1.0

1.0 %0%

+ 1295.00

+ 1++ 1+ 1+ 1++++++++ 1295.00

+ 1121++ 1+ 1+ 1111

2.0%00000

2.4

2.4 %%42 4

33.

%5

2 4% 2.4%%%

2.0%% 2 0%2.0%2 + 1295.00 +++ 9 02+ + 1295.00

29+ 9595951

21+ + 1295.00

1 0% 1.0%

1.

2%

1.

2%

1.0

1.0 %%0%%0%0%

2.4

22222

33.

22222

%5

2 4% 2.4%444%

2.0%% %2.0%

6"SD @ 0.5%

CATCH BASIN

RIM: 1294.3

N: 34840.6719 E:163692.1576

INV OUT (SE): 1293.62

6"SD @ 0.5%

CATCH BASIN

RIM: 1294.3

N: 34836.6255 E:163687.8282

INV OUT (SE): 1292.92

STORM DRAIN MANHOLE

RIM: 1294.8

INV OUT (SW): 1291.536"SD @ 1.0%

6"SD INV: 1293.356"SD INV: 1292.65

11.0

2 4% 2.4%%

2 0%2.0%

( )(TYP)( )(TYP)

(TYP)(TYP)

File details come from the government source that posted it. Updated .