About this file

This document contains a Request for Information and the related federal contract solicitation notice. The Request for Information seeks clarification on ceramic floor and wall tile sizes and patterns, responsibility for Basis of Design items, and whether the bid date will be extended. The response provides updated finish schedules, clarifies that the Basis of Design is not bidable, and confirms the bid closing date.

The federal contract solicitation notice is for the replacement of a fire station at Mansfield Air National Guard Base in Ohio. The project scope includes construction of a new aircraft rescue and firefighting facility in compliance with UFC standards. Optional items include concrete paving and a bridge crane. The contract duration is estimated at 660 calendar days. The solicitation is set aside for small businesses and the NAICS code is 236220 with a $39.5 million size standard. The pre-bid conference is November 5th and bids are due November 26th. The estimated value is $10-20 million. The solicitation and amendments will be posted to FBO and questions should be directed to the specified contracting officer.

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE FIRE STATION, newest first.
File Type Posted
Abstract_FIRE_signed.pdf PDF
bid opening attendees.pdf PDF
RFI_17.pdf PDF
A-602 - INTERIOR FINISH-COLOR SCHEDULE.pdf PDF
RFI_13.pdf PDF
RFI_14.pdf PDF
RFI_16.pdf PDF
RFI_20.pdf PDF
RFI_21.pdf PDF
RFI_12.pdf PDF
RFI_08 attach.pdf PDF
RFI_07 attach.pdf PDF
RFI_09.pdf PDF
RFI_10_attachment.pdf PDF
RFI_10.pdf PDF
RFI_11.pdf PDF
RFI_06.pdf PDF
RFI_3_attachment.pdf PDF
RFI_2.pdf PDF
RFI_1.pdf PDF
RFI_5.pdf PDF
Attach6_Civil_6a.pdf PDF
Attach6_Civil_8a.pdf PDF
Attach6_Civil_5d.pdf PDF
Attach6_Civil_9.pdf PDF
Attach6_Civil_8b.pdf PDF
Attach6_Telecommunications.pdf PDF
Attach4_Vol_4_Specifications.pdf PDF
Attach1_Vol_1_BOD.pdf PDF
Attach8_RFI_template.doc DOC document
Attach6_Civil_1b.pdf PDF
Attach6_Civil_1a.pdf PDF
EXHIBIT_A-Communications_Equipment.xlsx XLSX spreadsheet
EXHIBIT_B_Sealed_Bid_Reminders.pdf PDF
Attach3_Vol_3_Specifications.pdf PDF
Attach5_Vol_5_Specifications.pdf PDF
Attach6_Civil_5a.pdf PDF
Attach6_Civil_2.pdf PDF
Attach6_Civil_5c.pdf PDF
Attach6_Fire_Protection.pdf PDF
W50S8R-20-B-0001.pdf PDF
Attach2_Vol_2_Specifications.pdf PDF
Attach6_General.pdf PDF
Attach6_Electrical.pdf PDF
Attach6_Fire_Alarm.pdf PDF
Attach6_Civil_4a.pdf PDF
Attach6_Civil_4b.pdf PDF
Attach6_Structural.pdf PDF
Attach6_Civil_3.pdf PDF
Attach7_Geotechnical_Report.pdf PDF
Show all 50

REPLACE FIRE STATION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From:

Date:

11/19/2019

To: Contracting Officer

1. Solicitation Number:

W50S8R-20-B-0001

2. Location of Project:

Fire Station - Mansfield Ohio ANG

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

1. Specification Section 09 30 10 Ceramic, Quarry, and Glass Tiling.

Drawing A-602 Finish Schedule.

Please provide size of Ceramic floor and wall tiles. Please provide pattern for wall accent tiles.

2. Specification Section Basis of Design.

Is General Contractor responsible for all Basis of Design including FF&E items?

3. Will the Bid Date for this project be extended?

Attachments:

Date Response Required:

By:

Title:

Requestor's FAX Number:

Requestor's Telephone Number:

R E

S P

O N

S E

To:

Date:

Response:

1. See new finish schedule (attachments “A-601-Door-Window Schedules” and “A-602-Interior Finish-Color Schedule”).

Tile pattern for wall accents shall be a single band of accent tile running on all walls.

2. Basis of Design is not a biddable section (and technically not a “specification”/not labeled as such in solicitation. The Basis of

Design was simply provided to give contractors a full background as to what was used to develop the Drawings and Specifications. With that said, ensure you are developing bid based on the Specifications and Drawings (and any clarifications or additional information provided through responses to these RFI’s).

3. Bid closing date has not changed, and is still 26 Nov (1:00pm EST).

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.