This document contains a Request for Information and the related federal contract solicitation notice. The Request for Information seeks clarification on cabling solutions, public address systems, camera manufacturers, and security systems for a new fire station construction project at Mansfield Air National Guard Base in Ohio. The response provides guidance on cabling and security system specifications and notes existing manufacturers.
The federal contract solicitation notice is for the replacement of the fire station at Mansfield Air National Guard Base in Ohio. The project scope includes construction of a new aircraft rescue and firefighting station and emergency management training space. The estimated construction duration is 660 days. Optional items include concrete paving and apparatus doors. Bids will be evaluated without discussions and awarded to the responsible bidder. The solicitation is set aside for small businesses. The pre-bid conference is scheduled for November 5, 2019 and bids are due November 26, 2019. The solicitation and amendments are available on FedBizOpps.
RFI 04
View the file
Other files for this federal contract opportunity
Show all 50
REPLACE FIRE STATION has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
R E
Q U
E S
T O
R S
E C
T
IO
N
From:
Date: 01 November 2019
To: Contracting Officer
1. Solicitation Number:
W50S8R-20-B-0001
2. Location of Project:
Fire Station - Mansfield Ohio ANG
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
REFERENCE SPEC. SECTION’S: 27 10 00, 27 51 16, & 28 10 05
1) 27 10 00: What cabling solution is preferred for all Cat6 cabling on this project?
2) 27 51 16: There is no public address system reflected on the Technology drawings. What is the technology scope of work for this, if any?
3) 28 10 05: Who is the preferred camera manufacturer?
4) 28 10 05: Is there a spec for a certain security system preferred by the National Guard? Is there a system that is used in the existing building that would be recommended for the new building?
Attachments:
Date Response Required:
By:
Title:
Requestor's FAX Number:
Requestor's Telephone Number:
R E
S P
O N
S E
To:
Date:
Response:
1. Cabling Solution: Must meet Paragraph 1.6.2.3 and 1.6.4. CAT6 Cabling shall meet requirements of NFPA 70 and TIA-568. Since materials shall be indoors, contractor shall be cognizant of NFPA requirements to have cabling meet "plenum" rated cables.
2. Existing systems on the installation are Simplex Grinnell. Any proposed systems must meet referenced specifications and compatible with existing.
3. Existing cameras used on base are from Pelco.
4. Intrusion Detection System (IDS) being utilized at the installation is ADVANTOR v.6.2.
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.