Attach6_Civil_3.pdf
PDF 8 MB Posted
- Attached to
- REPLACE FIRE STATION Federal contract opportunity
- Solicitation number
- W50S8R-20-B-0001
About this file
This solicitation package includes plans for the demolition and reconstruction of a fire station at Mansfield Air National Guard Base in Ohio. The project scope involves demolishing the existing station and constructing a new facility that will provide aircraft rescue, firefighting, and emergency response services. Key requirements include complying with UFC 4-730-10 standards for fire station design and response times. The project duration is estimated at 660 calendar days with an optional scope of concrete paving additions.
The solicitation is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million average annual revenue. The estimated value is between $10-20 million. The pre-bid conference is scheduled for November 5, 2019 with bids due on November 26, 2019. The solicitation and plans are available electronically through the Federal Business Opportunities website. The contracting agency is the Department of the Army Ohio Army National Guard.
Volume 6 - CIVIL
View the file
Other files for this federal contract opportunity
Show all 50
REPLACE FIRE STATION has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL SHEET NOTES
A. CONTRACTOR TO RETAIN AND PROTECT ALL EXISTING
UTILITIES AND SURFACES NOT SCHEDULED FOR
DEMOLITION.
B. CONCRETE DEMOLITION TO OCCUR AT NEAREST EXISTING
JOINT.
SHEET KEYNOTES
1. RETAIN AND PROTECT
2. OBLITERATE PAVEMENT MARKINGS
3. SAWCUT AND DEMOLISH AC PAVEMENT AND
STOCKPILE ON SITE AGGREGATE BASE COURSES
FOR REUSE
4. SAWCUT AND DEMOLISH CONCRETE SIDEWALK
5. DEMOLISH CHAIN LINK FENCE
6. RETAIN AND PROTECT EXISTING AC PAVEMENT
7. REMOVE CONCRETE ECOLOGY BLOCKS
8. ABANDON PIPE IN PLACE
9. CUT AND CAP STORM DRAIN PIPE
10. SAWCUT AND DEMOLISH CONCRETE CURB OR CURB
AND GUTTER
11. DEMOLISH PIPE
12. REPAIR STORM DRAIN MANHOLE PIPE PENETRATION
13. DEMOLISH CONDUIT
KEY PLAN
C
AA B
DCC
B
10 20 30
Scale in Feet
C
IV
IL
D
EM
O
LI
TI
O
N P
LA
N
AR
EA
A
A
TH
O M
PS
O
N H
J O
H N
SO
N
L G
AN
D
IA
G
A
CD101
AS SHOWN
10 203 TY
PE
B -3
F
IN
AL
D
P
EA
R
SO
N
-0 8-
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
P D
P
684448_CD101.dwg
684448CH
MATCH LINE - SEE CD103
M
AT
C H
L
IN
E
- S
EE
C
D
SD PIPE
C&G
HYD
SD MH W/
GRATED LID
SD PIPE
SD PIPE
CURB
SW
C&G
C&G
SIGN
SOD
SW
SW
FENCE
CONC ECO
BLOCKS
SD PIPE
LIGHT POLE
ELEC
CONDUIT
SD MH W/
GRATED LID
ELEC CONDUIT
UTILITIES AND SURFACES NOT SCHEDULED FOR
DEMOLITION.
B. CONCRETE DEMOLITION TO OCCUR AT NEAREST EXISTING
JOINT.
SHEET KEYNOTES
1. RETAIN AND PROTECT
2. DEMOLISH BOLLARD
3. SAWCUT AND DEMOLISH AC PAVEMENT AND
STOCKPILE ON SITE AGGREGATE BASE COURSES
FOR REUSE
4. SAWCUT AND DEMOLISH CONCRETE PAD & SIDEWALK
5. DEMOLISH CHAIN LINK FENCE
6. REMOVE AND RETAIN FOR RE-INSTALLATION
7. REMOVE CONCRETE ECOLOGY BLOCK
8. SAWCUT AND DEMOLISH CONCRETE CURB OR CURB
AND GUTTER
9. DEMOLISH CONDUIT
KEY PLAN
C
A BB
DCC
B
10 20 30
Scale in Feet
C
IV
IL
D
EM
O
LI
TI
O
N P
LA
N
AR
EA
B
A
TH
O M
PS
O
N H
J O
H N
SO
N
L G
AN
D
IA
G
A
CD102
AS SHOWN
11 203 TY
PE
B -3
F
IN
AL
D
P
EA
R
SO
N
-0 8-
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
P D
P
684448_CD102.dwg
684448CH
MATCH LINE - SEE CD104
M
AT
C H
L
IN
E
- S
EE
C
D
FENCE
BOLLARD
SD PIPE
W PIPEW P PE
C&G
CONC ECO
BLOCKS
SD PIPE
SD MH W/
GRATE LID
LIGHT
ELEC CONDUITLIGHT POLE
SW
FILENAME: PLOT DATE: PLOT TIME:
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
SHEET
DWG
A of
8/3/2019 3:52:01 PM
AUGUST 2019
UTILITIES AND SURFACES NOT SCHEDULED FOR
DEMOLITION.
B. CONCRETE DEMOLITION TO OCCUR AT NEAREST EXISTING
JOINT.
SHEET KEYNOTES
1. RETAIN AND PROTECT
2. DEMOLISH STORM DRAIN PIPE AND CATCH BASIN
3. SAWCUT AND DEMOLISH AC PAVEMENT (AND
STOCKPILE ON SITE AGGREGATE BASE COURSES FOR
REUSE) AS NEEDED FOR SITE IMPROVEMENTS
AND/OR UTILITY PIPE INSTALLATION, SEE C-103 &
CU-103
4. SAWCUT AND DEMOLISH CONCRETE CURB AND
GUTTER
5. OBLITERATE PAVEMENT MARKINGS
6. RETAIN AND PROTECT EXISTING ASPHALT PAVEMENT
7. REMOVE AND RETAIN FOR RE-INSTALLATION
8. DEMOLISH CONCRETE PAVEMENT & AGGREGATE
BASE COURSES AS NEEDED FOR UTILITY
INSTALLATION, SEE C-103 & CU-103
KEY PLAN
CC
A B
DCCC
B
10 20 30
Scale in Feet
C
IV
IL
D
EM
O
LI
TI
O
N P
LA
N
AR
EA
C
A
TH
O M
PS
O
N H
J O
H N
SO
N
L G
AN
D
IA
G
A
CD103
AS SHOWN
12 203 TY
PE
B -3
F
IN
AL
D
P
EA
R
SO
N
-0 8-
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
P D
P
684448_CD103.dwg
684448CH
MATCH LINE - SEE CD101
M
AT
C H
L
IN
E
- S
EE
C
D
SS PIPE
W PIPE
C&G&CCCCCCC GGGGG
SD PIPE
SD CATCH
BASIN
C&G
C&G
GATE
HYD,
MATCH LINE - SEE BELOW RIGHT
MATCH LINE - SEE INSET ABOVE LEFT
TYP
TYP
C&G
SS MH
ELEC
CONDUITS
ELEC
CONDUITS
LIGHT POLE
SS
E
C&G
C&G
CONCCCCCCCCO COO CCCCOO
PVMTPVPVPVPP TTTTTTTP TMPVMVV
LIGHT
POLE
C&G
C&G
C&G
FILENAME: PLOT DATE: PLOT TIME:
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
SHEET
DWG
A of
8/3/2019 3:53:07 PM
AUGUST 2019
TYP
TYP
TYP
C&G
SIGNSIGN
SW
SD, SS, WW
UTILITIES AND SURFACES NOT SCHEDULED FOR
DEMOLITION.
B. CONCRETE DEMOLITION TO OCCUR AT NEAREST EXISTING
JOINT.
SHEET KEYNOTES
1. RETAIN AND PROTECT
2. DEMOLISH STORM DRAIN PIPE AND CATCH BASIN
3. SAWCUT AND DEMOLISH AC PAVEMENT (AND
STOCKPILE ON SITE AGGREGATE BASE COURSES
FOR REUSE) AS NEEDED FOR SITE IMPROVEMENTS
AND/OR UTILITY PIPE INSTALLATION, SEE C-104 &
CU-104
4. SAWCUT AND DEMOLISH CONCRETE CURB AND
GUTTER
5. OBLITERATE PAVEMENT MARKINGS
6. RETAIN AND PROTECT EXISTING AC PAVEMENT
7. REMOVE AND RETAIN FOR RE-INSTALLATION
KEY PLAN
C
A B
DDCC
B
10 20 30
Scale in Feet
C
IV
IL
D
EM
O
LI
TI
O
N P
LA
N
AR
EA
D
A
TH
O M
PS
O
N H
J O
H N
SO
N
L G
AN
D
IA
G
A
CD104
AS SHOWN
13 203 TY
PE
B -3
F
IN
AL
D
P
EA
R
SO
N
-0 8-
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
P D
P
684448_CD104.dwg
684448CH
MATCH LINE - SEE CD102
M
AT
C H
L
IN
E
- S
EE
C
D
W PIPE
SS PIPE
SD PIPE AND
CATCH BASIN
CONC
SW
STRIPING
TYP
LIGHT POLE
ELEC
CONDUIT
ELEC
CONDUITS
LIGHT POLE
W PIPE
LIGHT POLE &&
PULLBOX
FILENAME: PLOT DATE: PLOT TIME:
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
SHEET
DWG
A of
8/3/2019 3:53:46 PM