This file is a Veterans Affairs Acquisition Regulation (VAAR) clause document, specifically VAAR 852.219-75, which appears to be a template provision related to federal contracting requirements rather than a substantive statement of work or solicitation details.

The document itself is a regulatory clause template and does not contain specific product or service requirements, pricing terms, response dates, or award information directly related to the Z1DA--VANJHCS Demolition and Abatement IDIQ solicitation. To properly evaluate this contract opportunity, the actual Statement of Work, solicitation provisions, and contracting requirements contained in other primary documents would need to be reviewed. Based on the related federal contract opportunity metadata provided, the underlying solicitation is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2, valued between $10,000 minimum and $2,000,000 maximum, for demolition and abatement services at VA Medical Centers in East Orange and Lyons, New Jersey, with a five-year term and compliance required with New Jersey asbestos abatement regulations.

View the file

Other versions and copies of VAAR 852.219-75

File Revision Posted Attached to
ATTACHMENT VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING - OCT 2026 - DEVIATON.docx Oct 2026 J063--Fire Alarm and Testing Inspection FY 2027 Services Procurement - 541 Engineering - VAMC CLEVELAND
Attachment VII VAAR 852.219-75 VA NOTICE OF LIMITATION ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE.docx Revision not stated Z2DA--FY27 NRM | 557-23-104 | Replace Boiler Plant Steam Boilers | Construction (VA-27-00003633)
Attachment VII VAAR 852.219-75 VA NOTICE OF LIMITATION ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE.docx Revision not stated Z2DA--FY27 NRM | 557-23-104 | Replace Boiler Plant Steam Boilers | Construction (VA-27-00003633)
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx Revision not stated Z2NE--FY26 INSPECTION OF WATER TANK SERVICES (B+OPT4)
D.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx Revision not stated J046--IDIQ | Deionization Water System Maintenance and Support
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.pdf Revision not stated Y1DA--Project620-22-110 Replace and Upgrade Fire alarm System at Montrose VAMC
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.pdf Revision not stated Y1DA--Project620-22-110 Replace and Upgrade Fire alarm System at Montrose VAMC
Attachment D - VAAR 852.219-75.pdf Revision not stated S206--Unarmed Security Guards at Sarasota National Cemetery
VAAR 852.219-75.pdf Revision not stated Z2NZ-- 658-23-108 Correct Stormwater Drainage
ATTACHMENT 4-VAAR 852.219-75 SDVOSB Certification-36C26227Q0062.pdf Revision not stated On-Site Document Destruction Services-Multi-Site
ATTACHMENT 4-VAAR 852.219-75 SDVOSB Certification-36C26227Q0074.pdf Revision not stated Surgical Laser Equipment Rental Services
ATTACHMENT 4-VAAR 852.219-75 SDVOSB Certification-36C26227Q0100.pdf Revision not stated Preventative Maintenance, Inspection, & Repair Services For Gov-Owned Fume Hoods/Equipment
VAAR 852.219-75.docx Revision not stated H945--Boiler Controls Inspection and Testing
ATTACHMENT II - VAAR 852.219-75.docx Revision not stated J012--Fire Suppression System Maintenance and
852.219-75 VA Notice of Limitations on Subcontracting_Certificate of Compliance for Services and Construction. .docx Revision not stated Z1DA--528A8-22-814 Consolidate Primary Care Reception
852.219-75 Attachment.docx Revision not stated H399--36C242-27-AP-0524| 528-27-1-6893-0009 Elevator Inspections, VA Medical Center (VAMC) & Bath VA Medical Center (VAMC)
Attachment IV - VAAR 852.219-75.pdf Revision not stated Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.
Attachment IV - VAAR 852.219-75.pdf Revision not stated Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.
VAAR 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.docx Revision not stated Radiant Heating Panel Replacement
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated F108--620-26-206 Asbestos Abatement
Show all 20

Who attaches VAAR 852.219-75

Other files

File Type Posted
WD Essex.docx DOCX document
36C24226Q0857_1.docx DOCX document
WD Somerset.docx DOCX document
LINE ITEM PRICING SHEET LYN-EO DEMOLITION AND ABATEMENT.xlsx XLSX spreadsheet
EXHIBIT C - Past Performance Questionnaire.docx DOCX document
EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4:Determination and Findings

MODIFICATION (EXCLUDING OPTIONS)

DETERMINATION AND FINDINGS

Department of Veterans Affairs/Veterans Health Administration Network Contracting Office: NCO2 Contract Number: 36C24226C0084 Modification Number: P00001 Modification TYPE Chosen: Supplemental (Change Order or Supplemental Agreement) Modification REASON Chosen: extend POP to 11/30 Modification FAR AUTHORITY: FAR 52.243-4 and VAAR 852.243-70 Contractor Name: WATSON ENGINEERING, PC Original Cost of Contract: $3,672,651.00 Modification Cost: $0.00 Total cost of Modifications to Date: $180,958.80 Number of days added by modification: 76 Number of days taken away by modification: 0 Original Period of Performance: 05/13/2026– 09/15/2026 Total number of days added by other modifications to date: 0 Total number of days taken away by other modifications to date: 0

FINDINGS

1. Describe in detail the need for the changed work, time, or cost.

The reason for this modification is a no cost time extension that increases the period of performance by 76 days from 09/15/2026 to 11/30/2026 to allow for completion of the arc flash study.

2. A statement addressing whether the proposed modification is within the original scope of the contract and specifically addressing the facts considered in reaching the conclusion.

This modification is within scope of the contract, as this modification only extends the period of performance in order for the contractor to complete the required study.

3. A statement analyzing the pricing factors considered in reaching a fair and reasonable price determination and identifying each Line Item Number affected, including but not limited to, IGCE, market research, and any other price analysis information.

This is a no cost modification

4. Were technical and legal reviews conducted based on IOP requirements? If not, attach HCA approved exemption, if applicable.

N/A

5. Checklist and attachments when appropriate:

X SF30 created in eCMS Documents tab

· Modification contains statement of release

· Changes to Statement of Work on file

· Changed drawings and specifications on file

· Contractor written request including all required documents to recognize a successor in interest to its contracts or a name change FAR 42.1202-1204

· Novation or Change of Name documents on file

· Contractor revised pricing on file

· A&E only: List fees awarded in the original contract and previous modifications

· HCA approved exemption for IOP review on file

· Obligated Funding Document on file

· 2237 or Finance certification that funds are available on file

· COR document change in best interest of Government on file

· Legal Review Completed (See Acquisition Policy Flash! 17-19 for thresholds)

· Other ________________________________________________________

DETERMINATION

Based on the above findings this modification is determined to be fair and reasonable and in the best interest of the U.S. Government.

___________
Michael Spivack, Contracting OfficerDate