This is a Line Item Pricing Sheet for an Indefinite Delivery Indefinite Quantity (IDIQ) contract for demolition and abatement services at VA New Jersey Health Care System facilities in East Orange and Lyons, New Jersey. The contract has a five-year term with a minimum value of $10,000 and maximum value of $2,000,000. The pricing sheet establishes unit costs for 55 line items covering general demolition activities and asbestos/lead-based paint abatement work, with base-year unit costs reflected as 20% increases over a baseline estimate and option-year prices escalating 3% annually, compounded across four option years. All prices in the provided sheet currently display as $0.00, indicating this is a working estimate template requiring completion.
The line items are categorized into three divisions: Demolition (Division D) covering removal of flooring, partitions, drywall, doors, fixtures, furniture, and other non-hazardous building components; Abatement Activities (Division AB) covering removal, cleanup, and disposal of asbestos-containing materials (ACM), lead-based paint, and Transite-type materials in accordance with 12 NYCRR Part 56 and New Jersey Administrative Code requirements; and Emergency Call-In Services (Division CI) with 30-minute response and two-hour onsite mobilization requirements. The contract requires compliance with Infection Control Risk Assessment (ICRA) Level 4 standards for hospital work, includes mobilization/demobilization fees, performance bonds for projects exceeding $35,000, and accommodates off-hours and weekend work with applicable rate multipliers. The contractor is responsible for all labor, materials, equipment, tools, transportation, supervision, safety, and quality control, while material testing and air monitoring services for asbestos removal are provided by VANJHCS at no cost to the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VAAR 852.219-75.docx | DOCX document | |
| WD Essex.docx | DOCX document | |
| EXHIBIT C - Past Performance Questionnaire.docx | DOCX document | |
| EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx | DOCX document | |
| WD Somerset.docx | DOCX document | |
| 36C24226Q0857_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New IDIQ
| VHANJHS DEMOLITION AND ABATEMENT ID INDEPENDENT GOVERNMENT COST ESTIMATE. | ||||
| WORKING ESTIMATE: Base-year unit costs reflect the available baseline increased by 20%. Option-year unit prices escalate 3% annually, compounded. Review and revise individual line items as needed. | ||||
| Item | ||||
| No.: | Description of Tasks: | Units: | Div.: | Est. |
Annual Quantity: Price Per Unit (Year 1) Price Per Unit (Year 2) Price Per Unit (Year 3) Price Per Unit (Year 4) Price Per Unit (Option Year IV) Extended Price (Base Year) Extended Price (Option Year I) Extended Price (Option Year II) Extended Price (Option Year III) Extended Price (Option Year IV)
| GENERAL DEMOLITION ACTIVITIES ARE REQUIRED TO MEET INFECTION CONTROL RISK ASSESSMENT (ICRA) LEVEL 4 FOR WORK INSIDE OF THE HOSPITAL | |||||||||||
| 1.0 | Removal of existing flooring and associated adhesives (• | Subfloor to be free of all residue and ground to a flat, smooth finish) | SF | D | 120.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 2.0 | Removal of partition metal stud and drywall with or without plaster skim coat and flattened expanded metal fastened to metal studs, including demountable partitions and repair damage to other wall surfaces. Remove all debris from Government property. | SF | D | 35.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 3.0 | Removal of drywall with or without plaster skim coat on one side of partition or wall. Remove all debris from Government property. | SF | D | 150.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 4.0 | Removal of wall protection, including but not limited to IPC rigid vinyl sheets and removal of all debris from Government property. | LF | D | 40.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 5.0 | Removal of masonry style wall, including removal of all debris from Government property. | EA | D | 9.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 6.0 | Removal of existing ceramic, porcelain, or quarry tile (wall and floor) and associated thinset/mortar | SF | D | 3.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 7.0 | Removal of existing flooring and associated adhesives (• Subfloor to be free of all residue and ground to a flat, smooth) | SF | D | 4.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 8.0 | Remove wall covering, vinyl or fabric, including cleaning of the wall surface and remove from the Government property. | SF | D | 20.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 9.0 | Remove door and frame from masonry type wall. Door and frame shall be removed from Government property unless requested to be returned to the Government. | SF | D | 2.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 10.0 | Remove door and frame from drywall and/or demountable partition. Door and frame shall be removed from Government property unless requested to be returned to the Government. | SF | D | 3.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 11.0 | Remove lockset from existing door and return to the Government. | LF | D | 7.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 12.0 | Remove ceiling tile and suspension system, any type, and remove from the Government property. | LF | D | 20.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 13.0 | Remove ceiling tile only and remove from the Government property. | SF | D | 20.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14.0 | Remove plaster style or solid ceiling, any type, and remove from Government property | SF | D | 2.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 15.0 | Remove light fixture any type including exit, emergency light. | SF | D | 5.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 16.0 | Remove electrical switch, any type. Remove electrical wall receptacle, any type including wiring up to 50'-0". | SF | D | 2.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 17.0 | Remove rigid style conduit, including installed feeders (not powered) up to 2 inches in diameter and remove from the Government property. | EA | D | 4.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 18.0 | Remove rigid style conduit, including installed feeders (not powered) larger than 2 inches in diameter and remove from the Government property. | EA | D | 2.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 19.0 | Remove electrical floor/wall receptacle flush or pedestal and provide cap and plug assembly. Remove telephone floor/wall, data, or communication outlet and provide cover when needed. | SF | D | 1.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 20.0 | Removal of furniture, remove from Government property unless requested to be returned to the Government. Price shall be determined by the number of items. | CY | D | 3.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 21.0 | Remove carpet tack-less method, glued down, or carpet tile including cleaning of the floor surface to remove residual glue and remove from the Government property. | EA | D | 10.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 22.0 | Remove carpet pad any type and remove all debris from Government property, including cleaning of the floor surface. | SF | D | 10.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 23.0 | Remove cove base molding or carpet base and remove from the Government property. | LF | D | 5.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 24.0 | Remove resilient floor tile, including cleaning of the floor surface and remove all debris from Government property. | SF | D | 3.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 25.0 | Removal of plumbing fixtures, including but not limited to toilets, sinks, urinals, restroom partitions, etc. | JB | D | 3.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 26.0 | Removal of abandoned or isolated plumbing supply or return lines smaller than 2 inches in diameter. | LF | D | 3.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 27.0 | Removal of abandoned or isolated plumbing supply or return lines greater than 2 inches in diameter. | LF | D | 3.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 28.0 | Mobilization/Demobilization fee for all demolition activities. | JB | D | 3.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| ABATEMENT DEMOLITION ACTIVITIES ARE REQUIRED TO MEET INFECTION CONTROL RISK ASSESSMENT (ICRA) | |||||||||||
| 29.0 | Removal, clean-up and disposal of asbestos containing material (ACM) and asbestos/waste related contaminated elements or debris of flooring and mastic (multiple layers will double the SF). | SF | AB | 200.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 30.0 | Removal, clean-up and disposal of asbestos containing material (ACM) and asbestos/waste related contaminated elements or debris of only flooring (multiple layers will double the SF). | SF | AB | 25.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 31.0 | Removal, clean-up and disposal of asbestos containing material (ACM) and asbestos/waste related contaminated elements or debris of only mastic (multiple layers will double the SF). | SF | AB | 55.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 32.0 | Removal, clean-up and disposal of asbestos containing material (ACM) and asbestos/waste related contaminated elements or debris of carpet. | SF | AB | 30.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 33.0 | Glovebag removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of pipe insulation up to 2 inches in diameter. | LF | AB | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 34.0 | Glovebag removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of pipe insulation between 2 inches - 6 inches in diameter. | LF | AB | 75.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 35.0 | Glovebag removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of pipe insulation larger than 6 inches in diameter. | LF | AB | 20.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 36.0 | Glovebag removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of fittings, saddle blocks, valves, T's or other mechanical appurtenances 2 inches to 6 inches in diameter. | JB | AB | 40.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 37.0 | Removal and disposal of lead-based paint from Government property. | SF | AB | 5.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 38.0 | Removal, clean-up and disposal of asbestos containing material (ACM) and asbestos/waste related contaminated elements of Transite-type materials. | SF | AB | 9.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 39.0 | Removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of Transite-type pipe up to 2 inches in diameter. | LF | AB | 10.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 40.0 | Removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of Transite-type pipe between 2 inches - 6 inches in diameter. | LF | AB | 10.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 41.0 | Removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of Transite-type pipe larger than 6 inches in diameter. | LF | AB | 10.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 42.0 | Removal (above glovebag limit), clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of pipe insulation up to 2 inches in diameter. | LF | AB | 10.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 43.0 | Removal (above glovebag limit), clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of pipe insulation between 2 inches - 6 inches in diameter. | LF | AB | 10.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 44.0 | Removal (above glovebag limit), clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of pipe insulation larger than 6 inches in diameter. | LF | AB | 10.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 45.0 | Removal (above glovebag limit), clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of fittings, saddle blocks, valves, T's or other mechanical appurtenances 2 inches to 6 inches in diameter. | JB | AB | 5.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 46.0 | Removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of duct insulation. | SF | AB | 5.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 47.0 | Removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of radiator insulation and mastic. | SF | AB | 20.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 48.0 | Removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of plaster ceiling/wall. | SF | AB | 5.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 49.0 | Removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of drywall and/or drywall joint compound. | SF | AB | 13.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 50.0 | Removal, clean-up and disposal of asbestos containing material and asbestos/waste related contaminated elements of miscellaneous material. | SF | AB | 50.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 51.0 | Mobilization/Demobilization fee for all Abatement Activities at above the glovebag limit. | JB | AB | 2.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 52.0 | Mobilization/Demobilization fee for all Abatement Activities at or below the glovebag limit. | JB | AB | 2.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 53 | Emergency Call-In Service shall respond to that call within thirty (30) minutes and be onsite within two (2) hours ready to mobilize associated with any of the above services. | EA | CI | 2.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 55 | Performance Bonds (individual projects above $35,000.00)(LEAVE BLANK) | ||||||||
| OFF-HOURS AND WEEKEND WORK | |||||||||
| 54 | Rate multiplier for any of the above services to be performed off-hours or during the weekend.(ENTER RATE MULTIPLER ONLY) | ||||||||
| Yearly Subtotal: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| UNITS/Division Key | Total Evaluated Price: | ||||||||
| D | Demolition Line Items | $0.00 | |||||||
| AB | Abatement Activity - Includes removal, encapsulation, enclosure, clean-up and disposal of ACM and record keeping as requested by the VA. Contract to follow all requirements detailed in "12 NYCRR part 56". | ||||||||
| CI | Emergency Call-In | ||||||||
| OH | Off-Hour and Weekend Work Multiplier | ||||||||
| UK | Units Key: | ||||||||
| SF | Square Feet | ||||||||
| LF | Linear Feet | ||||||||
| JB | Job | ||||||||
| PB | Performance Bonds (individual projects above $35,000.00) | ||||||||