ufc_4_510_01_2023_c4.pdf
PDF 4 MB Posted
- Solicitation number
- N4008526R9042
About this file
This is the Unified Facilities Criteria (UFC) 4-510-01 document dated 03 February 2023 with Change 4 effective 15 July 2025, which provides comprehensive technical guidance and mandatory requirements for the design and construction of Department of Defense (DoD) medical, dental, and medically-related facilities. The document applies to Category Code series 500 hospital and medical facilities and Category Code series 310 medically-related research laboratories in the Defense-Wide Military Construction (MILCON) program.
The UFC 4-510-01 establishes performance and quality requirements across all facility life-cycle phases, including planning, design, construction, sustainment, restoration, and modernization. Key design disciplines addressed include architectural standards (interior/exterior design, finishes, flooring, doors, hardware, mock-ups), structural requirements (seismic design, equipment securing, hazardous materials storage), plumbing and medical gas systems (potable water, drainage, medical gas installation per NFPA 99), heating, ventilation, and air conditioning (HVAC design for critical care and sensitive equipment areas), electrical systems (essential power, generator requirements, receptacles, lighting), and communications infrastructure (telecommunications, nurse call systems, security systems). Additional chapters cover antiterrorism and physical security, fire protection and life safety, accessibility provisions, behavioral health design, temporary construction facilities, building information modeling, and commissioning requirements. The document mandates compliance with UFC 1-200-01 (DoD Building Code), applicable federal codes and standards, and The Joint Commission (TJC) accreditation requirements. Design and Construction Agents include U.S. Army Corps of Engineers (USACE), Naval Facilities Engineering Systems Command (NAVFAC), and Air Force Civil Engineer Center (AFCEC), with the Defense Health Agency Facilities Enterprise (DHA-FE) designated as the Functional Authority responsible for medical facility standards and project-specific waiver approvals.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UFC 4-510-01
03 February 2023
Change 4, 15 July 2025
UNIFIED FACILITIES CRITERIA (UFC)
APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED
DESIGN: MILITARY MEDICAL
FACILITIES
This Page Intentionally Left Blank
Change 4, 15 July 2025
UNIFIED FACILITIES CRITERIA (UFC)
DESIGN: MILITARY MEDICAL FACILITIES
Any copyrighted material included in this UFC is identified at its point of use.
Use of the copyrighted material apart from this UFC must have the permission of the copyright holder.
Indicate the Military Department Preparing Activity responsible for the document.
U.S. ARMY CORPS OF ENGINEERS
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (Preparing Activity)
AIR FORCE CIVIL ENGINEER CENTER
Record of Changes (changes are indicated by \1\ ... /1/)
Change No. Date Location 1 6 Sep 23 Metric conversions, adds acronyms for metric units, and miscellaneous clerical changes.
1-3, 2-3.1.1, 3-3.3, 3-3.3.2.5a, 5-4.11.1, 5-5.3.3, 6-5.2, 7-6.1, 9-2.4, 9-2.4.1, 9-2.4.2, 9-2.4.2.1, 9-3.1.4, 9-5.18, 9-5.20.2, 9-5.27, 9-5.27.1, 10-2.1, 10-2.7, 10-2.9, 10- 7.1.2b, 10-8.8.3, 10-9.4, 10-11.1, 11-3.5, 11-3.7, 11- 4.1.3.1, 11-4.9, 11-4.12.3, 11-4.14.2, 11-4.14.2d, 11- 4.14.2g, 11-4.14.2j, 11-5.2.3.1, 11-5.2.5, 11-5.3, 11- 5.4.3i, 11-5.8.2, 11-5.9, 11-5.9.3, 11-5.9.9, 11-6.1.3, 12- 2.1, 12-2.1a, 12-2.1 d, 12-2.1h, 12-2.2, Table 12-1, 12- 2.3, 12-2.5, 12-2.6, 12-4.3, 12-5.1, 12-7.5, 12-9.5.5.1, 12-9.6.2, 12-11.1, 12-18.1, 19-2, B-3.1, B-7.1, and B-8.
Includes changes in Table B-1: changes to room codes
DNTB1, DNTC1, DNTE1, DNTG1, DNTG2, DNTG3,
DNTG4, DNTP1, DNTP2, NBCD1, and NBCD2; and adds room codes PHHR1 and SHRM2.
Adds definitions for Ambulatory Care Center and Hospital and eliminates third unnumbered paragraphs.
2 25 Oct 23 Correct captions for Table B-1, change med gas for DNTE1, and provide missing Table B-1 page (room codes OFA03 through OPD01).
3 30 Nov 23 Corrections in Table B-1 - Task lighting.
4 15 Jul 25 Critical edits to include requirements for corridor floor finishes, mock-ups, door hardware, receptacles, lighting control, telecomm rooms, replace Table B-1 (finishes, lighting, and miscellaneous changes), and temporary facility requirements in support of construction.
Other changes to address code changes and construction requirements, such as cybersecurity, camera locations, solid surface requirements, supplemental disinfection, receptacle counts, transformer, generator and breaker changes, reduce fluorescent lighting and radio paging systems.
Miscellaneous corrections to references, metric conversions, and extraneous text.
This UFC supersedes UFC 4-510-01, dated 30 May 2019, with Change 2 dated 4 December 2019.
FOREWORD
The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD (AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and work for other customers where appropriate. All construction outside of the United States, its territories, and possessions is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA). Therefore, the acquisition team must ensure compliance with the most stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable.
UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Military Department’s responsibility for providing technical criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Systems Command (NAVFAC), and Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Technical content of UFC is the responsibility of the cognizant DoD working group. Defense Agencies should contact the respective DoD Working Group for document interpretation and improvements. Recommended changes with supporting rationale may be sent to the respective DoD working group by submitting a Criteria Change Request (CCR) via the Internet site listed below.
UFC are effective upon issuance and are distributed only in electronic media from the following source:
• Whole Building Design Guide website https://www.wbdg.org/dod.
Refer to UFC 1-200-01, DoD Building Code, for implementation of new issuances on projects.
AUTHORIZED BY:
PETE G. PEREZ, P.E., SES
Chief, Engineering and Construction U.S. Army Corps of Engineers
R. DAVID CURFMAN, P.E., SES
Chief Engineer Naval Facilities Engineering Systems Command
DAVID H. DENTINO, SES
Deputy Director of Civil Engineers DCS/Logistics, Engineering & Force Protection (HAF/A4C) HQ United States Air Force
MICHAEL McANDREW, SES Deputy Assistant Secretary of Defense (Construction) Office of the Secretary of Defense http://www.wbdg.org/pdfs/ufc_implementation.pdf https://www.wbdg.org/dod i
TABLE OF CONTENTS
CHAPTER 1 INTRODUCTION
1-1 PURPOSE AND SCOPE
1-2 REISSUES AND CANCELS
1-3 APPLICABILITY
1-4 GENERAL BUILDING REQUIREMENTS
1-5 POLICY
1-5.1 Supplemental Technical Criteria
1-6 FUNCTIONAL AUTHORITY
1-7 ROLES & RESPONSIBILITIES
1-7.1 Project Sponsor
1-7.2 Design and Construction Agents
1-8 CYBERSECURITY
1-9 GLOSSARY
1-10 REFERENCES
CHAPTER 2 PREDESIGN
2-1 GENERAL
2-2 PREDESIGN PROJECT DOCUMENTATION
2-2.1 Documents Prior to DA
2-2.2 Functional Program
2-2.3 Program for Design (PFD) and Project Room Contents (PRC)
2-2.4 Existing Facilities Surveys
2-2.5 Site Information
2-2.6 National Environmental Policy Act (NEPA) Documentation
2-2.7 Force Protection/Security Requirements/Cybersecurity
2-2.8 Mission Essential Facilities and Related Requirements
2-2.9 Contingency Mode Functional Program (where applicable)
2-2.10 Fire Protection and Life Safety Considerations
2-2.11 Electrical
2-2.12 Communications
2-2.13 Commissioning
2-2.14 Parking Requirement Calculation ii
2-2.15 Addition-Alteration Facility & Demo Information
2-2.16 Safety Risk Assessment (SRA)
2-3 SCOPE AND COST CONSIDERATIONS
2-3.1 Improvement/Alteration/Additions
2-3.2 Site Investigation
2-3.3 Interstitial Building System (IBS)
2-3.4 Parking Facilities
2-3.5 Future Expansion
2-3.6 Special Environmental Conditions
2-3.7 Emergency Power
2-3.8 Antiterrorism/Force Protection (AT/FP)
2-3.9 Demolition of Vacated Facilities
2-3.10 Sustainability Considerations
2-3.11 Special Studies
2-3.12 Temporary Spaces Supporting Construction Phasing
CHAPTER 3 DESIGN
3-1 GENERAL
3-2 DESIGN CODES AND CRITERIA
3-3 DESIGN PARAMETERS
3-3.1 Scope and Cost
3-3.2 Gross Building Area Calculation
3-3.3 Departmental Building Area Calculation
3-3.4 Design to Cost
3-4 DESIGN SEQUENCE AND RESPONSIBILITIES
3-4.1 Title 10 U.S.C. Section 2807 Action
3-4.2 Design Authorization (DA)
3-4.3 Authorization to Advertise Construction
3-4.4 Authorization to Award Construction
3-5 REVIEW OF DESIGN DELIVERABLES, ROLES, AND
RESPONSIBILITIES
3-5.1 Design and Construction Agent
3-5.2 Installation Manager
3-5.3 DoD Project Sponsor iii
3-6 REPORTING REQUIREMENTS
3-7 DESIGN CONSIDERATIONS
3-7.1 General
3-7.2 World-Class Checklist
3-7.3 Functional Program During Design
3-7.4 Parking
3-7.5 Future Expansion
3-7.6 Alterations and Additions to Existing Facilities
3-7.7 Safety Risk Assessment
3-7.8 NFPA 99 Risk Assessment
3-8 PROJECT COST ESTIMATES
3-9 FUNDS MANAGEMENT POLICY
3-9.1 Title 10 U.S.C. Section 2853 Action
3-9.2 Return of Excess Funds
3-10 HISTORICAL ANALYSIS GENERATOR (HAG) DATA
CHAPTER 4 SUSTAINABLE DESIGN PRINCIPLES
4-1 GENERAL
4-2 DESIGN PROCESS
4-3 SUPPORTING DOCUMENTS
CHAPTER 5 ANTITERRORISM (AT) AND PHYSICAL SECURITY
5-1 GENERAL
5-2 ADDITIONAL CRITERIA
5-3 DESIGN CRITERIA PLANNING TEAM
5-4 ELECTRONIC SECURITY SYSTEMS (ESS)
5-4.1 Purpose
5-4.2 Systems Considerations
5-4.3 ESS Components and Funding Restrictions
5-4.4 System Configuration and Major Functional Components
5-4.5 ESS Network
5-4.6 Intrusion Detection and Duress Alarm
5-4.7 Door Access Control
5-4.8 ESS: Video Surveillance System (VSS) iv
5-4.9 ESS: Infant Protection Alarm System (IPAS)
5-4.10 ESS: Behavioral Health Staff Assist (BHSA) Alarm System
5-4.11 Basic Design Requirements
5-5 SPECIAL CONSIDERATIONS FOR SECURITY SENSITIVE AREAS
AND ROOMS
5-5.1 Safes
5-5.2 Vaults
5-5.3 Pharmacies
5-5.4 Medical Supply Storage Areas or Facilities
5-5.5 Other Security Sensitive Areas and Rooms
CHAPTER 6 ARCHITECTURAL
6-1 GENERAL
6-2 EXTERNAL DESIGN
6-3 EXTERIOR WALL DESIGN
6-4 FENESTRATION AND WINDOWS
6-5 INTERIOR CONSTRUCTION
6-5.1 Aseptic Environments
6-5.2 Interior Design
6-6 FRONT DESK AND RECEPTION AREAS
6-7 FLOORS
6-7.1 Primary and Public Spaces and Corridors
6-7.2 Departmental Corridors
6-7.3 Service and Staff Only (Back-of House/Off-Stage) Corridors
6-8 WALL AND PARTITION SYSTEMS
6-8.1 Use of Full Height Partitions
6-8.2 Barriers
6-8.3 Protection and Safety Features
6-8.4 Toilet Facilities
6-8.5 Toilet Partitions
6-9 CEILINGS
6-9.1 Support
6-9.2 Utility Access
6-10 VESTIBULES
v
6-11 DOORS
6-11.1 Automatic Doors
6-12 SUSTAINABLE DESIGN
6-13 WAYFINDING PLAN
6-14 BEHAVIORAL HEALTH
6-15 INTERIOR MOCK-UPS
6-15.1 Drawing Mock-Up Spaces and Rooms
6-15.2 Physical Mock-Up Spaces and Rooms
6-15.3 Virtual Reality Mock-Up Spaces and Rooms
6-15.4 Timing of Interior Mock-Up
6-16 HARDWARE CONSULTANT
6-16.1 Professional Certification
6-16.2 Verifiable Experience
CHAPTER 7 STRUCTURAL
7-1 GENERAL
7-2 DESIGN CRITERIA
7-3 DESIGN LOADINGS
7-4 POST-EARTHQUAKE EMERGENCY STATUS
7-5 CONCEPT DESIGN DEVELOPMENT
7-6 DESIGN OF NON-STRUCTURAL SYSTEMS
7-6.1 Equipment and Furniture
7-6.2 Hazardous Materials – Special Storage Provisions
7-6.3 Hazardous Materials – Fuel Gas Piping
7-6.4 Electrical Systems – Vibration Isolation
7-6.5 Emergency Generators
7-6.6 Medical Systems and Equipment – Stationary equipment
7-6.7 Medical Systems and Equipment – Fragile equipment
7-6.8 Medical Systems and Equipment – Wheeled equipment
7-6.9 Supply Storage
7-6.10 Medical Gas Bottles
7-7 EVALUATION OF EXISTING FACILITIES
7-7.1 Seismic Hazards Evaluation Considerations vi
7-8 ADDITIONAL DESIGN CONSIDERATIONS
7-8.1 Vibration
7-8.2 Vibration Limits
7-8.3 Magnetic Resonance Equipment (MRI) Foundations
CHAPTER 8 - NOT USED
CHAPTER 9 PLUMBING AND MEDICAL GASES
9-1 GENERAL
9-1.1 Supplemental Criteria and Standards
9-1.2 Plumbing Systems
9-1.3 Medical Gas and Vacuum Systems
9-1.4 Seismic Requirements
9-1.5 Corrosion Protection
9-1.6 NFPA 99 Risk Assessment
9-1.7 Piping Coordination
9-2 POTABLE WATER SUPPLY SYSTEM
9-2.1 Quality
9-2.2 Continuity of Service
9-2.3 Backflow Prevention
9-2.4 Water Treatment
9-2.5 Waterborne Pathogens Control
9-2.6 Domestic Hot Water Systems
9-2.7 Plumbing Fixtures and Other Equipment
9-2.8 Coordination with Medical and Dental Equipment
9-3 DRAINAGE SYSTEMS
9-3.1 Sanitary Drainage System
9-3.2 Storm Drainage System
9-4 FUEL GAS SERVICE
9-5 MEDICAL GAS SYSTEMS
9-5.1 Application of NFPA 99 to Dental Systems
9-5.2 Application of NFPA 99 to Veterinary Care
9-5.3 Systems for Medical Clinics
9-5.4 Systems for Dental Clinics vii
9-5.5 Medical Gas Designer
9-5.6 Pipe Sizing
9-5.7 Corrugated Medical Tubing
9-5.8 Medical Gas Equipment Rooms
9-5.9 Underground Piping
9-5.10 System Control Valves
9-5.11 Alarm Systems
9-5.12 Gas System Sources (Storage)
9-5.13 Color Coding and Labeling
9-5.14 Medical Gas Systems Outlets
9-5.15 Power Source for Medical Gas Systems
9-5.16 Medical Compressed Air (MA)
9-5.17 Dental Compressed Air (DA)
9-5.18 Laboratory Air (LA)
9-5.19 Instrument Air (IA)
9-5.20 Process Air (PA)
9-5.21 Medical Surgical Vacuum (MV) System
9-5.22 Dental Surgical Vacuum (DSV)
9-5.23 Oral Evacuation (OE)
9-5.24 High-Volume Laboratory Dust Evacuation (LDE)
9-5.25 Waste Anesthesia Gas Disposal (WAGD)
9-5.26 Oxygen (O)
9-5.27 Nitrous Oxide (NO)
9-5.28 Nitrogen (N)
9-5.29 Carbon Dioxide (CO2)
9-5.30 Process Gas
CHAPTER 10 HEATING, VENTILATION, AND AIR CONDITIONING
10-1 GENERAL
10-1.1 Applicability
10-1.2 Supporting Documents
10-2 DESIGN CONDITIONS
10-2.1 Weather Data viii
10-2.2 Interior Design Conditions
10-2.3 Space Ventilation
10-2.4 Ambient Outdoor Design Conditions
10-2.5 Critical Care Spaces
10-2.6 Laboratories
10-2.7 Temperature during Smoke Control Operation
10-2.8 Mechanical Equipment Rooms
10-2.9 Humid Climate Definition
10-2.10 NFPA 99 Risk Assessment
10-3 REFRIGERANTS
10-4 LIFE-CYCLE COST AND ENERGY ANALYSIS
10-5 ELIGIBILITY FOR AIR CONDITIONING
10-5.1 Total Air Conditioning
10-5.2 Food Service Area
10-5.3 Medical Warehouses
10-6 MECHANICAL EQUIPMENT SPACE
10-6.1 Mechanical Room
10-6.2 Energy Plant
10-7 HVAC SYSTEM DESIGN FOR FUNCTIONAL AREAS
10-7.1 Critical Care Spaces
10-7.2 Sensitive Equipment Areas
10-7.3 Patient Bedrooms
10-7.4 Temporary and Deployable Facilities
10-7.5 Rooms with Critical Pressurization Requirements
10-8 GENERAL DESIGN CONSIDERATIONS
10-8.1 Plant Sizing and Optimization
10-8.2 Contaminant Removal
10-8.3 Interdepartmental Air System Restriction
10-8.4 Air Filtration
10-8.5 Balancing Ports and Features
10-8.6 Additions and Alterations to Existing Facilities
10-8.7 Cooling and Heating Load Calculations ix
10-8.8 Piping Systems
10-8.9 Insulation for Mechanical Systems
10-9 HVAC SYSTEM CONTROLS
10-9.1 Energy Conservation
10-9.2 Temperature Control
10-9.3 Control Precision
10-9.4 Humidity Control
10-9.5 Direct Digital Controls (DDC)
10-9.6 Air Handling Equipment Control
10-10 STEAM SYSTEMS
10-10.1 Humidification Steam Source
10-10.2 Sterilizer Steam Source
10-11 AIR HANDLING AND DISTRIBUTION
10-11.1 AHU Requirements
10-11.2 Energy/Heat Recovery Systems
10-11.3 System Shutdown Capability
10-11.4 Outdoor Air Intakes
10-11.5 Noise Control
10-11.6 Duct Design
10-11.7 Cleanliness of Air Handling and Distribution Equipment
10-12 MAINTENANCE PROVISIONS
10-12.1 General Personnel Access
10-12.2 Equipment Clearances
10-12.3 Suspended and Mounted Mechanical Equipment
10-12.4 Air Distribution System Components
10-12.5 HVAC System Balancing Provisions
10-13 VIBRATION CONTROL
10-14 INTERDISCIPLINARY COORDINATION
10-14.1 Architectural Coordination for Rooms with Critical Pressurization Requirements
10-14.2 Fire Protection Features
10-14.3 Essential Electrical Service
10-14.4 Seismic Design Requirements x
10-14.5 Design Coordination
10-15 FUEL STORAGE REQUIREMENTS
10-16 VENTILATION DESIGN
10-16.1 Ventilation Air Changes
10-16.2 General Exhaust Provisions
10-16.3 Space Pressurization
10-16.4 Laboratory Ventilation
10-16.5 Exhaust Canopies
10-16.6 Laminar Flow Clean Benches
10-16.7 Bench-Back Slot Hoods
10-16.8 Portable Bench-Top Hoods
10-16.9 Medical Equipment
10-16.10 Kitchen Hoods
10-16.11 Pharmaceutical Admixture Rooms
10-16.12 MRI Quench Exhaust
10-17 AIRBORNE INFECTION ISOLATION AND PROTECTIVE
ENVIRONMENT ROOM DESIGN
10-17.1 Airborne Infection Isolation Bedrooms
10-17.2 Protective Environment Rooms
10-17.3 Airborne Infection Isolation Exam or Waiting Rooms
CHAPTER 11 ELECTRICAL
11-1 GENERAL
11-1.1 Scope
11-1.2 Supplemental Criteria and Standards
11-1.3 OCONUS Criteria
11-1.4 Campus and Other Large Facilities
11-2 AREA DESIGNATIONS
11-2.1 Patient Care Space
11-2.2 Wet Locations
11-2.3 Wet Procedure Locations
11-3 EXTERIOR ELECTRICAL
11-3.1 Primary Voltage
11-3.2 Normal Source Site Investigation xi
11-3.3 Hospital Normal System
11-3.4 Ambulatory Care Clinics Normal System
11-3.5 Medical and Dental Clinics Normal System
11-3.6 Medical Research Facilities and Laboratories Normal System. .. 146
11-3.7 Veterinary Facilities Normal System
11-3.8 Other Medical Facilities Normal System
11-4 ESSENTIAL ELECTRICAL SYSTEM
11-4.1 Facility
11-4.2 General
11-4.3 Alternate Power Source
11-4.4 Generator Sets
11-4.5 Location of Generator Sets
11-4.6 Engine Starting
11-4.7 Manual Test Switches
11-4.8 Generator Set Operation
11-4.9 Automatic Transfer Switch (ATS)
11-4.10 Ground Fault Protection Equipment
11-4.11 Remote Alarm Annunciator
11-4.12 Fuel Storage System
11-4.13 Loads on the Alternate Source
11-4.14 Essential Loads
11-4.15 Alternate Source Testing
11-5 INTERIOR ELECTRICAL SYSTEMS
11-5.1 System Voltage
11-5.2 Interior Distribution
11-5.3 Short Circuit, Selective Coordination, and Arc Flash
11-5.4 Electrical Rooms
11-5.5 Isolation Power System
11-5.6 Conduit, Cable Tray, and Wire
11-5.7 Branch Circuits
11-5.8 Radiology Provisions
11-5.9 Receptacles xii
11-5.10 Receptacle Identification
11-5.11 Patient Care Grounding
11-5.12 Inhalation Anesthetizing Location
11-5.13 Electromagnetic Shielding for Medical Instrumentation
11-6 LIGHTING
11-6.1 Design
11-6.2 Battery-Operated Lighting
11-6.3 Patient Bedrooms
11-6.4 Special Location Requirements
11-6.5 Corridors
11-6.6 Dental Clinic
11-6.7 Eye LASIK/PRK Rooms
11-6.8 Exterior Signage
11-6.9 Exterior Lighting
11-6.10 Dimming
11-6.11 Ultraviolet (UV) Filters
11-6.12 Maintenance Area Lighting
11-6.13 Auditorium
11-6.14 Continuity of Service
11-6.15 Accessibility
11-7 HELIPAD LIGHTING, MARKING, AND CONTROLS
11-8 LIGHTNING PROTECTION
CHAPTER 12 COMMUNICATIONS
12-1 GENERAL
12-1.1 Design Criteria
12-1.2 Approved Product Lists (APLs)
12-2 COMMUNICATIONS SPACES
12-2.1 Telecommunication Rooms (TRs) (COMC1)
12-2.2 Communications Radio Equipment Room (COM04)
12-2.3 Integrated Monitor and Alarm Room
12-2.4 Refrigerator Monitoring
12-2.5 Server Room (CMP01) xiii
12-2.6 Service Entrance Facility (EF) (COMC2)
12-3 OUTSIDE PLANT INFRASTRUCTURE AND CABLING
12-3.1 Outside Plant Purpose
12-3.2 Outside Plant Duct Work
12-3.3 Outside Plant FO Cable
12-3.4 Outside Plant Twisted Pair Copper Cable
12-3.5 Outside Plant CATV Cable
12-4 RMF AUTHORIZATION PROCESS REQUIREMENTS
12-4.1 Information Technology Systems
12-4.2 Stand-alone Information Systems
12-4.3 MIL-STD 1691
12-5 NETWORK TIME SYNCHRONIZATION (NTS) SYSTEM
12-5.1 Purpose
12-5.2 Date and Time Properties
12-5.3 Electrical Power
12-6 TELEPHONE SYSTEM CRITERIA
12-6.1 Type of Service
12-6.2 Central Telephone Equipment
12-6.3 Integrated Intercommunication (Intercom) System
12-6.4 Patient Bedside Telephones
12-7 TELECOMMUNICATIONS INFRASTRUCTURE SYSTEM (TIS)
12-7.1 UTP Copper Backbone Cable
12-7.2 FO Backbone Cable
12-7.3 Horizontal Copper Cable
12-7.4 Horizontal FO Cable
12-7.5 Work Area Outlets (WAO)
12-7.6 Data Communications Wireless Access Points (WAPs)
12-7.7 Cable Tray
12-7.8 Grounding
12-8 DEDICATED INTERCOM SYSTEM
12-9 NURSE CALL (NC) SYSTEM
12-9.1 Purpose xiv
12-9.2 Capabilities and Typical Locations
12-9.3 Procurement
12-9.4 UL 1069
12-9.5 Common Criteria
12-9.6 Networked NCAV System
12-9.7 NCTV System
12-9.8 Enhanced Supplemental Operations
12-10 INTERNAL CELLULAR ANTENNA SYSTEMS (IRES)
12-11 RADIO PAGING SYSTEM
12-11.1 Radio Paging (RP)
12-11.2 Page System Interfaces
12-11.3 System Function
12-11.4 Emergency Response Team Pagers
12-11.5 Antennae Type and Mounting
12-11.6 Power Requirements
12-11.7 Transmitter and Encoder
12-12 INTERACTIVE TELEVISION (ITV) SYSTEM
12-12.1 Electrical Power
12-12.2 Empty Conduit and Boxes and Cable Trays
12-12.3 Structural Support
12-12.4 Equipment Space Support
12-13 TV BROADBAND DISTRIBUTION NETWORK
12-13.1 Purpose
12-13.2 Procurement
12-13.3 Commercial TV Service
12-13.4 Broadband Distribution Network
12-13.5 TV Outlets and Signal Level
12-13.6 Flat-Panel HDTVs and Connecting and Mounting Items Configuration
12-13.7 Electrical Power
12-14 ELECTRONIC SECURITY SYSTEM (ESS)
12-15 RADIO AND PUBLIC ADDRESS (PA) SYSTEM
12-15.1 System Purpose xv
12-15.2 System Components
12-15.3 System Configuration
12-15.4 System Performance
12-15.5 Electrical Power
12-16 SOUND REINFORCEMENT SYSTEM
12-16.1 Purpose
12-16.2 Inputs
12-16.3 Headroom
12-17 INTEGRATED AUDIO VIDEO SYSTEMS (AV)
12-18 PHYSIOLOGICAL PATIENT MONITORING SYSTEM
12-18.1 System Requirements
12-18.2 Fetal Monitoring
12-18.3 Neonatal Monitoring
12-18.4 Anesthesia and Respiratory Gas Analysis System
12-19 EMERGENCY MEDICAL SERVICE (EMS) COMMUNICATIONS
12-19.1 Electrical Power
12-19.2 Empty Conduit and Boxes
12-19.3 Structural Support
12-20 EMS RECORDER SYSTEM
12-20.1 EMS Recorder Function and Features
12-20.2 System Inputs and Mounting
12-21 OTHER PROVIDED SYSTEMS
12-21.1 Empty Conduit and Boxes and Cable Trays
12-21.2 Structural Support
12-21.3 Equipment Space Support
CHAPTER 13 ACCESSIBILITY PROVISIONS FOR THE DISABLED
13-1 GENERAL
13-2 GENERAL EXCEPTIONS
13-3 DOD EXCEPTIONS/EXCLUSIONS
13-4 SPECIFIC MILITARY MEDICAL FACILITY REQUIREMENTS
13-4.1 Parking
13-4.2 Patient Sleeping Rooms xvi
13-4.3 Patient Dressing Rooms
13-4.4 Telephones
13-5 WAIVERS
CHAPTER 14 FIRE PROTECTION AND LIFE SAFETY
14-1 GENERAL
14-2 FACILITY FIRE PLAN
14-3 LIFE SAFETY COMPLIANCE FOR BUILDING REHABILITATION
14-3.1 Life Safety Assessment
14-3.2 Health Care and Ambulatory Health Care Occupancies
14-3.3 Interim Life Safety Measures
14-4 AUTOMATIC SPRINKLER PROTECTION
14-4.1 Components and Hardware
14-4.2 Audiometric Booths
14-4.3 Defend in Place
14-5 FIRE ALARM, FIRE DETECTION, AND MASS NOTIFICATION
14-5.1 Autonomous Control Unit and Local Operating Console
14-5.2 Occupant Notification
14-5.3 Smoke Detection Used in Conjunction with Smoke Compartmentation
14-5.4 Behavioral Health
14-6 MANAGEMENT OF SMOKE
14-6.1 New Smoke Control Systems
14-6.2 Existing Smoke Control Systems
14-7 WATER SUPPLY
14-8 INTERSTITIAL BUILDING SYSTEM (IBS)
14-9 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND
OCCUPANCY
14-9.1 Dental Treatment
14-9.2 Research Facilities
14-9.3 Veterinary Care and Animal Research Facilities
14-9.4 Pharmacy Storage
14-9.5 Areas with Heat-Producing Appliances
CHAPTER 15 FURNITURE, FIXTURES AND EQUIPMENT
xvii
15-1 GENERAL
15-1.1 IDENTIFICATION of FF&E
15-1.2 APPROVAL of SUBSTITUTIONS
15-2 PROCUREMENT
15-3 FUNDING SOURCE
15-4 LOGISTICAL RESPONSIBILITY
15-5 DESIGN
15-5.1 Casework
15-5.2 Technically Complex Equipment and Medical System
15-5.3 Equipment Connectivity
15-5.4 Automatic External Defibrillator (AED)
15-5.5 Hyperbaric Medicine
CHAPTER 16 TRANSPORTATION AND LOGISTICS
16-1 GENERAL
16-1.1 Scope
16-1.2 Transportation Systems Evaluation
16-1.3 Medical Transportation and Logistics Consultant
16-2 TRANSPORTATION AND LOGISTIC ANALYSIS REQUIREMENTS. . 252
16-2.1 Transportation Logistic Analysis
16-2.2 Elevator Traffic Study and Analysis
16-2.3 Material Management Analysis (MMA)
16-2.4 Waste Management Analysis (WMA)
16-3 FACILITY DESIGN
16-3.1 Traffic Separation
16-3.2 Transportation Systems
16-3.3 Vertical Automation
16-3.4 Equipment/Materials Separation
16-3.5 Clean and Soiled Material Separation
16-3.6 Escalators
16-4 ELEVATOR DESIGN
16-4.1 Codes
16-4.2 Elevator Selection xviii
16-4.3 Elevator Location and Travel Distances
16-4.4 Elevator Location, Lobbies, and Groupings
16-4.5 Passenger and Service Elevator Features
16-5 MATERIAL MANAGEMENT DESIGN
16-5.1 AGV Systems
16-5.2 Pneumatic Tubes
16-5.3 Mobile Robots
16-5.4 Dumbwaiters and Cart Lifts
16-6 WASTE MANAGEMENT DESIGN
16-6.1 Waste Categories
16-6.2 Waste Collection and Transport
16-6.3 Regulations, Codes, and Standards
16-6.4 Gravity Chutes
16-6.5 Pneumatic Trash/Linen
CHAPTER 17 CONSTRUCTION
17-1 CONTRACT AWARD
17-2 COMMISSIONING DURING CONSTRUCTION
17-3 CONSTRUCTION CONTRACT CHANGES
17-3.1 Process for Reporting Changes
17-3.2 Process for Approving Funds
17-4 CONSTRUCTION FUNDS
17-4.1 Funds Management
17-4.2 Funds Availability
17-5 NOTIFICATION OF CONTRACTOR CLAIMS
17-6 LIFE SAFETY ASSESSMENT
17-7 DEMOLITION OF VACATED FACILITIES
CHAPTER 18 BUILDING INFORMATION MODELING (bim)
18-1 GENERAL
18-1.1 MHS BIM Objectives
18-1.2 Corresponding Project Model Uses
18-1.3 Applicability
CHAPTER 19 COMMISSIONING
xix
19-1 GENERAL
19-2 SUPPLEMENTAL CRITERIA
19-3 PRELIMINARY COMMISSIONING REQUIREMENTS
19-3.1 Level of Commissioning
19-3.2 Roles and Responsibilities
19-4 TOTAL BUILDING COMMISSIONING
19-4.1 Process Overview
19-4.2 Commissioning Leadership Structure
19-4.3 Commissioning During Design
19-4.4 Commissioning During Construction
19-5 SMALL PROJECT COMMISSIONING
19-5.1 Process overview
19-5.2 Oversight of the testing
19-5.3 Requirements during construction
19-6 SPECIFIC SYSTEM REQUIREMENTS
19-6.1 Interoperability
19-6.2 Addition and Alteration Considerations
APPENDIX A BEHAVIORAL HEALTH DESIGN
A-1 GENERAL
A-2 SCOPE OF BEHAVIORAL HEALTH SERVICES
A-2.1 Inpatient Functions
A-2.2 Outpatient Functions
A-3 BEHAVIORAL HEALTH PROGRAM
A-3.1 Concept
A-3.2 Behavioral Health Design Guide
A-3.3 Functional Program and Safety Risk Assessment
A-4 CONSULTING SERVICES
A-5 DESIGN CRITERIA
A-5.1 Environment
A-6 EQUIPMENT SPECIFICATIONS
APPENDIX B ARCHITECTURAL AND ENGINEERING DESIGN REQUIREMENTS 301
B-1 GENERAL
xx
B-2 LEGEND & NOTES
B-2.1 Room Code
B-2.2 Room Function
B-2.3 Space Parameter Notes
B-3 ARCHITECTURAL
B-3.1 Materials and Finishes
B-3.2 CEILING HEIGHT
B-3.3 DOOR SIZE
B-3.4 NOISE
B-4 ARCHITECTURAL NOTES
B-5 STRUCTURAL
B-6 ELECTRICAL
B-6.1 LIGHTING
B-6.2 ESSENTIAL POWER
B-7 MEDICAL GASES
B-7.1 MEDICAL GAS NOTES
B-8 HVAC
B-8.1 HVAC Notes
APPENDIX C DESIGN SUBMITTALS AND DOCUMENTATION
C-1 GENERAL
C-2 APPLICATION
C-3 GENERAL REQUIREMENTS
C-3.1 Design Analysis
C-3.2 Drawings and Format
C-3.3 Specifications
C-3.4 Cost Estimates
C-3.5 Building Systems Risk Assessment
C-4 5 PERCENT SUBMITTAL
C-4.1 5 Percent Submittal Design Analysis
C-4.2 5 Percent Submittal Drawings
C-4.3 5 Percent Submittal Cost Estimates
C-5 20 PERCENT SUBMITTAL
xxi
C-5.1 Scope Changes
C-5.2 Record Copy
C-5.3 20 Percent Design Analysis
C-5.4 20 Percent Submittal Design Drawings
C-5.5 20 Percent Submittal Calculations
C-6 35 PERCENT SUBMITTAL
C-6.1 35 Percent Submittal Design Analysis
C-6.2 35 Percent Submittal Design Drawings
C-6.3 35 Percent Submittal Calculations
C-6.4 35 Percent Design Drawing Record Copy
C-7 65 PERCENT DESIGN SUBMITTAL
C-8 100 PERCENT AND FINAL DESIGN SUBMITTAL
C-9 REQUEST FOR PROPOSAL (RFP) FOR DESIGN-BUILD (DB)
PROJECTS
C-10 RFP DEVELOPMENT SUBMITTALS
C-11 AFTER CONTRACT AWARD
APPENDIX D UNIVERSAL X-RAY ROOM
D-1 GENERAL
D-1.1 Applications
D-2 SPECIFIC REQUIREMENTS
D-2.1 Electrical Raceway System
D-2.2 Floor Trench
D-2.3 Core Drilling
D-2.4 Wall Ducts
D-2.5 Electrical Service Requirements
D-3 WARNING LIGHTS
D-4 OTHER REQUIREMENTS
D-4.1 Walls
D-4.2 Ceiling Support System
D-4.3 Floors
D-4.4 Radiology Shielding
D-4.5 Fire Protection
APPENDIX E INTERSTITIAL BUILDING SYSTEM (IBS)
xxii
E-1 GENERAL
E-2 IBS DESIGN CONCEPT
E-2.1 DoD Systems Module Concept
E-2.2 Alternate Non-Modular Concept
E-2.3 IBS Design Concept Approval
E-3 IBS DESIGN
E-3.1 DoD Systems Module Design
E-3.2 Alternate (Non-DoD) IBS Design
E-3.3 General IBS Design Requirements
E-3.4 General IBS Mechanical and Plumbing Requirements
E-3.5 General IBS Electrical and Communications Equipment
E-3.6 General IBS Fire Protection Design
E-3.7 Documentation and Construction Considerations
APPENDIX F FOOD SERVICE
F-1 GENERAL
F-2 CONSULTING SERVICES
F-3 FOOD SERVICE DESIGN OBJECTIVES
F-3.1 Environment
F-3.2 Design Elements
F-3.3 Design Flexibility
F-3.4 Equipment
F-3.5 Energy Efficiency and Sustainability
F-3.6 Food Service Systems
F-4 DESIGN CRITERIA
F-4.1 Design
F-4.2 Configuration
F-4.3 Staging
F-4.4 Refrigerator and Freezer
F-4.5 Patient Tray Assembly
F-4.6 Dishwashing and Ware Washing
F-4.7 Communications
F-4.8 Waste Handling xxiii
F-4.9 Emergency Power
F-4.10 Steam
F-4.11 Shelving
F-4.12 Plumbing
F-4.13 Compliance Standards
F-4.14 Exhaust Hoods
F-4.15 Interior Finishes
F-4.16 Data Processing Equipment and Security
F-4.17 Grease Traps
F-4.18 Sealants
F-4.19 Franchised/Leased Food Services
F-5 SEISMIC CRITERIA
F-6 FOOD SERVICE EQUIPMENT SPECIFICATIONS
APPENDIX G PARKING REQUIREMENTS
G-1 GENERAL
G-2 PARKING AUTHORITY
G-2.1 Facilities and Location
G-3 PARKING CONSIDERATIONS
G-3.1 General
G-3.2 Off-Street Parking Design
G-3.3 Parking Garages
G-3.4 Parking Wayfinding
APPENDIX H TEMPORARY SPACES SUPPORTING CONSTRUCTION PHASING 417
H-1 GENERAL
H-2 APPLICATION
H-3 EXCEPTIONS
H-3.1 Chapter 5
H-3.2 Chapter 6
H-3.3 Chapter 9
H-3.4 Chapter 10
H-3.5 Chapter 11
H-3.6 Chapter 12 xxiv
H-3.7 Chapter 16
H-3.8 Chapter 19
H-3.9 Appendix B
APPENDIX I GLOSSARY
I-1 ACRONYMS
I-2 DEFINITION OF TERMS
APPENDIX J REFERENCES
FIGURES
Figure 3-1 Instructions for Preparing Gross Area Tabulation
Figure 3-2 Instructions for Preparing Departmental Gross Area Calculations .. 25
Figure 9-1 Simultaneous Use Factors for Medical Vacuum
Figure 11-1 Hospital One-line Traditional Diagram
Figure 11-2 Multi-Ended Network Substation System Diagram
Figure 11-3 Expandable Dual-Ended Substation
Figure D-1 Universal X-ray Room Floor Plan
Figure D-2 Universal X-ray Room Above Ceiling Plan
Figure D-3 Universal X-ray Room Elevations
Figure E-1 DoD IBS Systems Module (Typical)
Figure E-2 Interstitial Design Elements
Figure E-3 Interstitial Access-Egress (Typical)
Figure E-4 DoD Systems Module Typical Two Floor Section – Fire Protection .. 397 xxv
TABLES
Table 1-1 Responsibility Matrix
Table 3-1 Gross Area Accounting Rules
Table 5-1 Intrusion Detection and Duress Alarm Locations and Sensor Types 39
Table 9-1 Water Testing Parameters
Table 9-2 Potential Backflow Preventer Discharge Rates
Table 9-3 Floor Drain Flow Rates
Table 9-4 Hot Water Demand per Fixture
Table 9-5 Medical Gas Systemsa
Table 9-6 Medical Compressed Air (MA) System Demand
Table 9-7 Compressor Grouping
Table 9-8 Receiver Size
Table 9-9 Medical Laboratory Air (LA) System Demand
Table 9-10 Medical Vacuum Source Sizing
Table 9-11 DSV Demand Factors
Table 9-12 LDE System Utilization Factors
Table 9-13 Oxygen System Utilization Factors
Table 9-14 Cylinder Manifold Systems
Table 9-15 Oxygen Bulk Tank Sizes
Table 9-16 Process Gas Utilization Factors
Table 11-1 Sample Nonlinear Load Analysis Matrix
Table 11-2 Equipment Design
Table 11-3 Medical Helipad Visual Facilities Requirements
Table 11-4 Luminaire Factors
Table 12-1 Essential Electrical System Branch Assignment for Communication Systems ………………………………………………………………………………….195
Table 12-2 Call Annunciation Priorities
Table 15-1 Logistical Responsibility (LOGCAT)
Table 16-1 Analysis Requirements
Table 16-2 Elevator Performance Guide
Table 16-3 Elevator Traffic Separation Guide
Table 16-4 Elevator Selection Guide xxvi
Table 16-5 Elevator Dimension – Front Openings Guide
Table 16-6 Elevator Dimension – Front and Rear Openings Guide
Table 16-7 Dumbwaiter and Cart Lift Parameters
Table 19-1 Commissioning Lead Personnel Qualifications
Table B-1 Architectural and Engineering Design Criteria
Table G-1 Required Parking Spaces for Medical Facilities
Change 4, 15 July 2025
CHAPTER 1 INTRODUCTION
1-1 PURPOSE AND SCOPE.
This Unified Facilities Criteria (UFC) 4-510-01 provides technical guidance and mandatory requirements to implement laws, regulations, executive orders, and policies to sustain, operate, plan, design, and construct DoD medical, dental and all other medically related facilities authorized by Title 10, United States Code (Reference (k)) and policies. This document defines performance and quality requirements as defined in MIL-STD-3007 for Military Medical Facilities supporting Health Service Support as defined in Joint Publication 4-02 (JP 4-02) throughout the life cycle. Federal legislation, Executive Orders (EOs), DoD Directives, DoD Instructions, and selected technical data, publications, and standards are referenced in the text by basic designation only and form a part of these criteria to the extent required by these references.
1-2 REISSUES AND CANCELS.
This UFC reissues and cancels UFC 4-510-01, dated 30 May 2019, with Change 2 dated 04 December 2019.
1-3 APPLICABILITY.
\4\ In addition to the applicability of UFC 1-200-01, APPLICABILITY, this UFC applies to /4/ Category Code series 500 hospital and medical facilities and Category Code series 310 medically related research laboratories in the Defense-Wide Military Construction (MILCON) program, or other medically specific appropriations as provided by Congress.
These requirements apply to \1\ Medical Treatment Facility (MTF) projects /1/ and to veterinary, medical-related research, medical training facilities, and other projects which require conformance with UFC 4-510-01. \4\ /4/
1-4 GENERAL BUILDING REQUIREMENTS.
Comply with UFC 1-200-01, DoD Building Code. UFC 1-200-01 provides applicability of model building codes and government unique criteria for typical design disciplines and building systems, as well as for accessibility, antiterrorism, security, high performance and sustainability requirements, and safety. Use this UFC in addition to UFC 1-200-01 and the UFCs and government criteria referenced therein. The requirements of this UFC take precedence over conflicts between this UFC and UFC 3- Series requirements.
1-5 POLICY.
As stated in DoD Instruction (DoDI) 6015.17, it is DoD policy to design efficient, economical, and safe facilities that sustain an effective combat force, support the DoD medical mission, and comply with the provisions of Title 10 U.S. Code (U.S.C.).
Detailed instructions and procedures, which may be developed and issued by the Design and Construction Agents must be consistent with the policy statements and criteria contained herein. Projects must:
a. Meet the current established operating requirements of the DoD Project Sponsor.
b. Provide reasonable flexibility in the design to accommodate future changes.
c. Meet applicable Federal legislation, codes, standards, and criteria.
d. Ensure that The Joint Commission (TJC), Accreditation Association for
Ambulatory Health Care (AAAHC), or other applicable accreditations are achieved for Medical Treatment Facilities.
e. Meet certification requirements for Centers for Disease Control and Prevention (CDC), DoD Project Sponsor, Association for Assessment & Accreditation of Laboratory Animal Care (AAALAC), and Biosafety in Microbiological and Biomedical Laboratories (BMBL), or other applicable entities for laboratories.
f. Provide functional facilities at the most economical and practical life-cycle cost (LCC).
g. Be aesthetically compatible with the local environs and published Installation Design Guidelines.
1-5.1 Supplemental Technical Criteria.
The Design and Construction Agent(s) may maintain supplemental technical criteria to execute their organization’s established design and construction regulations and procedures. Design and Construction Agents must produce designs for a complete and usable facility within the DoD Project Sponsor approved programmed scope and programmed authority.
1-6 FUNCTIONAL AUTHORITY.
The program functional and regulatory authority for applicable facilities is the Defense Health Agency.
Requests for project-specific waivers and exemptions to any UFC criteria or this document will be submitted in accordance with MIL-STD-3007. Regardless of DoD Project Sponsor, requests must have concurrence/nonconcurrence from the Defense Health Agency Facilities Enterprise (DHA-FE), as the Functional Authority for medical facilities, before final approval authority decisions are pursued.
1-7 ROLES & RESPONSIBILITIES.
1-7.1 Project Sponsor.
The DoD Project Sponsor is the DoD Agency or Service Component that provides the funding for the project. In most projects the DoD Project Sponsor will be the DHA-FE;
however, other DoD Agencies can utilize these criteria for their medical projects.
The DoD Project Sponsor provides clinical and functional input on all aspects of facility sizing, functional requirements, and facility-essential or critical-use requirements such as, utility, sewer, water, and operational needs, and must work in partnership with the Design and Construction Agents throughout the design and construction process.
1-7.2 Design and Construction Agents.
The Design and Construction Agents are listed below.
1-7.2.1 U.S. Army Corps of Engineers (USACE).
The Headquarters USACE Program Integration Division (CEMP-II) is the primary USACE point of contact with the Functional Authority and DoD Project Sponsor for non-medically specific design and construction aspects of applicable facility projects and is responsible for all non-medically related program management issues and resolution between the Functional Authority, the DoD Project Sponsor, and USACE. The USACE Medical Facilities Mandatory Center of Expertise and Standardization, Huntsville Engineering and Support Center (CEHNC-EDX), has multi-disciplinary expertise in medical design criteria, standards, and policy, and has sole USACE responsibility for oversight, decision, and technical review of medically unique aspects of applicable projects. USACE’s geographical District Offices must closely coordinate with CEHNC- EDX for all medically specific aspects of project design, construction, management, and execution of design and construction projects located within their respective geographical regions, including quality assurance (QA) and oversight of design and construction. CEHNC-EDX is responsible for assisting USACE geographical District Offices with project-specific design instructions to supplement the Architect/Engineer Firm (A/E) Scope of Work (SOW), for interfacing with the Functional Authority and DoD Project Sponsor regarding technical issues and mandatory submissions during both design and construction.
1-7.2.2 Naval Facilities Engineering Systems Command Headquarters (NAVFAC HQ) Medical Facilities Program Office (MFPO).
NAVFAC HQ MFPO is the Navy’s point of contact with the Functional Authority and DoD Project Sponsor to provide the technical expertise for medical design and construction. NAVFAC HQ MFPO is the Navy’s technical authority regarding project management and for providing project-specific design instructions to supplement the A/E SOW. NAVFAC HQ MFPO is responsible for technical issues, mandatory design and construction submissions, technical guidance, criteria, and all project standards, from project initiation to beneficial occupancy.
1-7.2.3 Air Force Civil Engineer Center (AFCEC).
AFCEC is the primary point of contact with the DoD Project Sponsor for all applicable facility design and construction projects in the United Kingdom and provides project management, technical reviews, and guidance for the Air Force.
Table 1-1 Responsibility Matrix
PROCESS GROUPS FUNCTIONAL
AUTHORITY
DoD
PROJECT
SPONSOR
DESIGN &
CONSTRUCTION
AGENTS
GROUP 1: STRATEGIC FACILITIES
MANAGEMENT
R C C
1.1 Establish Program Policy
1.2 Authorize, Conduct, and Administer
Research and Innovation Efforts Related to MHS Facilities
1.3 Integrate Inter-Agency Market Based
Planning
GROUP 2: REQUIREMENTS PLANNING
C R C
2.1 Local Planning, Requirements
Development and Gap Analysis
2.2 Analysis and Evaluation of Potential
Solutions/Options
2.3 Business Planning, Market Solution
Planning and Facility Requirements Planning
GROUP 3: DESIGN/CONSTRUCTION
EXECUTION
C C R 3.1 Project Sponsor Representatives Coordination
3.2 Project Delivery and Contract
Management
GROUP 4: FACILITY ACTIVATION AND
OPERATIONS
C R C
4.1 Facility Transition and Activation
4.2 Facility Operations, Repairs, Maintenance, Sustainment, Restoration, and Modernization
4.3 Facility Specific Operations and
Maintenance
4.4 Facility De-commissioning and Disposal
Key:
R = Responsible; owns the problem or project C = To be consulted; has information or capability needed to complete the work
1-8 CYBERSECURITY.
All facility-related control systems (including systems separate from a utility monitoring and control system) must be planned, designed, acquired, executed, and maintained in accordance with UFC 4-010-06, and as required by individual Service Implementation Policy.
1-9 GLOSSARY.
\4\ Appendix I /4/ contains acronyms, abbreviations, and terms.
1-10 REFERENCES.
\4\ Appendix J /4/ contains a list of references used in this document. The publication date of the code or standard is not included in this document. Unless otherwise specified, the most recent edition of the referenced publication applies.
CHAPTER 2 PREDESIGN
2-1 GENERAL.
This chapter and its references provide requirements for predesign information required by the Design and Construction Agents to execute the design of applicable facilities.
Predesign information includes requirements from the planning processes as defined and described in this chapter. Ensure that projects submitted contain sufficient planning, accurate scope, adequate documentation, and a valid cost estimate and realistic schedule for successful execution.
2-2 PREDESIGN PROJECT DOCUMENTATION.
Projects under consideration for budget submission must undergo additional detailed planning to include additional project documentation; collection of relevant site, environmental, and Installation specific information; and development of other guidance essential for subsequent project design. The DoD Project Sponsor must prepare this information that is used by the Design and Construction Agent as the basis of design.
Within 30 days of initial project Design Authorization (DA) release, this information/documentation must be submitted electronically to the Design and Construction Agent.
2-2.1 Documents Prior to DA.
Prior to release of the initial project DA, the DoD Project Sponsor must update and prepare this basic project documentation.
2-2.2 Functional Program.
The DoD Project Sponsor will develop the strategic objectives and the facility and operational requirements for the project (the Functional Program) in written narrative form as part of the project documentation. The DoD Project Sponsor will issue the Functional Program in a standard format with standardized content for consistency across all projects. This narrative must be coordinated with the Program for Design.
The DHA-FE current form for this narrative is titled the “Facility Planning Functional Program”.
2-2.3 Program for Design (PFD) and Project Room Contents (PRC).
The DoD Project Sponsor will develop the PFD facility space allocation and PRC requi
File details come from the government source that posted it. Updated .