26-0709 CLEAN HVAC SYSTEMS - PROJECT DESCRIPTION.pdf

PDF 97 KB Posted

Attached to
Buildings 15, 326, DD48, G770, NH180, NH200 Clean HVAC Systems
Solicitation number
N4008526R9042
Issued by

About this file

This is a Project Description document for a federal construction contract at MCB Camp Lejeune. The scope of work requires cleaning of twenty-one (21) HVAC Air Handling Units located in six buildings: Buildings 15, 326, DD48, G770, NH180, and NH200. The facility will remain operational throughout the construction period, and the Contractor must conduct all operations to minimize interference with normal facility operations. Supervision requirements allow for a single qualified individual to serve concurrently as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all qualifications as defined in the project specification.

View the file

Other files

File Type Posted
FINAL Lejeune buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW --10 AUG 2026.pdf PDF
Amend 0011.pdf PDF
326 Drawings.pdf PDF
FINAL Lejeune buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW --4 AUG 2026.pdf PDF
Amendment 0010.pdf PDF
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
LEJU NH200 2009 MEDICAL CLINIC REPLACEMENT.pdf PDF
LEJU 00015 1997 MAJOR INTERIOR EXTERIOR REPAIRS.pdf PDF
LEJU NH180 2012 NATIONAL INTREPID CENTER OF EXCELLENCE.pdf PDF
LEJU 0G770 REPLACE HVAC BUILDING G-770.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
ufc_4_510_01_2023_c4.pdf PDF
MAXIMO Initial Equipment Inventory and Replacement.pdf PDF
FINAL Lejeune buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW --5 Jun 2026.pdf PDF
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
UFGS 23 01 30.41.pdf PDF
ICRA 2.0 DHA Fillable Final (1).pdf PDF
26-0709 CLEAN HVAC SYSTEMS - ICRA 2.0 Clarifications.pdf PDF
Mech MACC RFP.pdf PDF
26-0709 CLEAN HVAC SYSTEMS - SUBMITTAL REGISTER.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
26-0709 CLEAN HVAC SYSTEMS - SOW.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DESCRIPTION

This scope of work consist of cleaning twenty one (21) HVAC Air Handling Units within buildings 15, 326, DD48, G770, NH180, NH200 at MCB Camp Lejeune.

SPECIAL SCHEDULING

The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity.

SUPERVISION

One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.

File details come from the government source that posted it. Updated .