This is Amendment 0005 to Solicitation N40085-26-R-9042, issued by NAVFAC Mid-Atlantic on July 3, 2026, for clean HVAC systems at Camp Lejeune, North Carolina. The amendment provides answers to 19 Requests for Information (RFIs) previously submitted by potential contractors regarding the cleaning of air handling units (AHUs) in Buildings 15, 326, DD48, G770, NH180, and NH200. The receipt deadline for proposals remains unchanged, and contractors must acknowledge receipt of this amendment with their proposals or risk rejection.

Key clarifications provided in the RFI responses include: mechanical drawings are available for all buildings except DD48; acceptance standards require visual inspection confirming units are "visibly clean" per NADCA ACR-2021 Section 5.2, without requiring removal of adhered corrosion or staining; HVAC cleaning workers shall be classified as general laborers per wage determinations if their duties align; Building 15 AHUs 1-8 are internally insulated with limited sound attenuators; contractors must use the June 5, 2026 scope of work document; sound attenuators that cannot be cleaned to "visibly clean" standards must be replaced via change order; contractors are responsible for electrical connections, spot cooler placement, and providing all new air filters with specified MERV ratings; fan belt replacement is incidental to required bearing replacement; buildings NH200 and G770 require continuous day/evening cleaning schedules to minimize business downtime; sticky walk-off mats are required at mechanical room entrances; and contractors may perform their own microbial testing at their expense, with any confirmed active mold growth requiring immediate COR notification and separate contract modification for remediation per ANSI/IICRC S520 standards.

View the file

Other files

File Type Posted
FINAL Lejeune buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW --10 AUG 2026.pdf PDF
Amend 0011.pdf PDF
326 Drawings.pdf PDF
FINAL Lejeune buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW --4 AUG 2026.pdf PDF
Amendment 0010.pdf PDF
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
LEJU NH180 2012 NATIONAL INTREPID CENTER OF EXCELLENCE.pdf PDF
LEJU 0G770 REPLACE HVAC BUILDING G-770.pdf PDF
LEJU NH200 2009 MEDICAL CLINIC REPLACEMENT.pdf PDF
LEJU 00015 1997 MAJOR INTERIOR EXTERIOR REPAIRS.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
26-0709 CLEAN HVAC SYSTEMS - SUBMITTAL REGISTER.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
26-0709 CLEAN HVAC SYSTEMS - SOW.pdf PDF
ufc_4_510_01_2023_c4.pdf PDF
MAXIMO Initial Equipment Inventory and Replacement.pdf PDF
FINAL Lejeune buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW --5 Jun 2026.pdf PDF
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
26-0709 CLEAN HVAC SYSTEMS - PROJECT DESCRIPTION.pdf PDF
UFGS 23 01 30.41.pdf PDF
ICRA 2.0 DHA Fillable Final (1).pdf PDF
26-0709 CLEAN HVAC SYSTEMS - ICRA 2.0 Clarifications.pdf PDF
Mech MACC RFP.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 4

AMENDMENT NO. 0005 07/03/26 26-0709

N40085

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

See Item 6

✘ N40085-26-R-9042

06/09/26

26-0709, Buildings 15, 326, DD48, G770, NH180, NH200 Clean HVAC Systems Amendment 0005, Answer RFIs

The time and date for receipt of proposals remains unchanged.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

N40085-26-R-9042 Amendment 0005

CONTINUATION SHEET

1. QUESTION: Are mechanical drawings of the AHUs and areas to be cleaned available?

ANSWER: Yes, drawings attached for all buildings except building DD48.

2. QUESTION: What will the clearance protocol be for cleanliness? Is any testing required or will visual inspection be sufficient?

ANSWER: The acceptance standard shall be a visual inspection confirming the unit is 'visibly clean' per NADCA ACR-2021 Section 5.2. This is defined as being free from all non-adhered substances and debris. It does not require the removal of adhered corrosion or staining. The contractor shall be required to submit their internal QC checklist and photos demonstrating cleanliness prior to requesting a formal Government inspection.

3. QUESTION: Will HVAC cleaning workers be classified as general laborers in the wage determination?

ANSWER: Is the job duties of the HVAC cleaning workers aligns with the general labor job duties, then yes.

4. QUESTION: What percentage of duct is internally lined? This will allow us to estimate the amount of encapsulating paint (Fiberlock IAQ 8000) that will be required for the project.

ANSWER: Building 15 AHU’s 1-8 are internally insulated. There are no known sound attenuators or internally lined duct except in the OA duct work of building 15. If sound attenuators are found, then they will need to be cleaned IAW NADCA.

5. QUESTION: There are 2 Scope of Works included. Are we to use the latest dated June 5, 2026?

ANSWER: Yes, use the scope of work titled “Final Lejeune Buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW – 5 Jun 2026”. The other SOW has been removed from sam.gov.

7. QUESTION: Can the Brand Name, Model and serial number be given for the 21 AHUs?

ANSWER: This information is not readily available. Contractor may make an additional site visit to determine.

8. QUESTION: Can the drawings be provided to include existing duct layout and the outside air duct that has to be cleaned?

ANSWER: Yes, see attached drawings.

9. QUESTION: Can the equipment schedule be provided for all existing AHUs, and outdoor air damper?

ANSWER: Yes, see attached drawings.

10. QUESTION: Cleaning of the Sound Attenuators based on the age of the sound attenuators, cleaning them may be impossible due to the amount of dirt and/or rust that will be in them. If the acoustic material is damaged, friable, heavily contaminated, or waterlogged, the attenuator will have to be replaced. This is unknown, we suggest replacing the attenuators rather than cleaning them otherwise we may run into issues with a replacement being required and a long lead time.

The attenuators will have to be removed from the duct system to clean them. Please advise.

ANSWER: Encapsulating dirty or contaminated sound attenuators is not permitted. If an attenuator cannot be successfully cleaned to a 'visibly clean' standard, it must be replaced. The contractor shall notify the COR immediately if they encounter an attenuator they believe cannot be cleaned, and a joint inspection will determine the path forward (e.g., replacement via change order).

11. QUESTION: Will building’s maintenance be providing the breaker, wire/conduit, & junction box for the electrical connections for the spot coolers? Please advise

ANSWER: No, the contractor is responsible for this. The Government will assist with making terminations in electric panels not providing materials.

12. QUESTION: On Building 15 All mechanical rooms have very limited space and have no room to install temporary spot cooler and connect them to the duct. Please advise where to install the spot coolers? And where can we get power for them?

ANSWER: It is the contractor’s responsibility to develop a plan on where they can install the spot coolers and if they have enough electrical to power them.

13. QUESTION: Can the government provide a list and schedule of attenuators that required cleaning and or replacement?

ANSWER: This information is not readily available. Contractor may make an additional site visit to determine.

14. QUESTION: Would the maintenance be shutting down all the equipment associated with the AHUHVAC system?

ANSWER: Yes, to be coordinated with Facilities through the NAVFAC ET.

15. QUESTION: Are the air filters to be replaced by the owner supplied? If not, need filter sizes, Type, MERV ratings for each unit.

ANSWER: The contractor shall provide and install all new air filters. The filters shall meet the following minimum requirements: [Specify MERV rating, filter type (e.g., pleated, bag), and sizes if known, or require the contractor to match the existing MERV rating of the filters currently installed].

16. QUESTION: Is the fan belt need to be replaced?

ANSWER: The scope requires removal of the fan assembly and replacement of the bearings. As the fan belts must be removed to perform this work, the contractor shall include the cost to replace the fan belts with new ones as part of this process. This will be considered incidental to the required bearing replacement.

17. QUESTION: Will there be an issue with the AHUs down time for sensitive/critical areas?

ANSWER: NH200 and G770 have areas that will need to have the AHU’s cleaned on a continuous day/evening schedule to minimize business downtime.

18. QUESTION: Will clean mats need to be provided at the mechanical room entrances?

ANSWER: All mechanical rooms being worked in will require sticky walk-off mats.

19. QUESTION: Several mechanical rooms show signs of microbial growth on the AHU’s, we request the ability to perform testing of these areas prior to entering the AHU’s if we deem necessary. Will this be permitted, who will be responsible for providing testing, this will result in scheduling implications in regards to starting work to further support the need of additional time.

ANSWER: The contractor is permitted to perform their own testing for microbial growth at their own expense. However, if testing confirms the presence of active mold growth (NADCA Condition 3), the contractor shall immediately notify the COR. The current scope of work for 'cleaning' does not cover mold remediation, which must be performed IAW ANSI/IICRC S520.

Any required remediation will be handled via a separate contract modification.