MAXIMO Initial Equipment Inventory and Replacement.pdf

PDF 95 KB Posted

Attached to
Buildings 15, 326, DD48, G770, NH180, NH200 Clean HVAC Systems
Solicitation number
N4008526R9042
Issued by

About this file

This is a MAXIMO Initial Equipment Inventory and Replacement/Update Form used to document heating, ventilation, air conditioning (HVAC), and related mechanical equipment installations and replacements within buildings.

The form functions as a data collection template requiring basic information including the data collector's name, phone number, date, building designation, and specific location. It provides an extensive checklist of equipment types spanning generators, various compressors, chillers, heat pumps, pumps, cooling towers, air handlers, and boilers. For demolished or removed equipment, the form captures the MAXIMO number, serial number, and location. For new or replacement equipment, it requires manufacturer details, model number, serial number, and energy type (electric, oil, LP gas, natural gas, steam, or hot water). Motor specifications are documented including horsepower, voltage, phase, running load amperage (RLA), revolutions per minute (RPM), and frame size. Additional technical data fields include tons capacity, number of motors, number of belts, kilowatt consumption, and refrigerant type. The form serves as an inventory management tool for facilities maintenance and asset tracking purposes rather than as a federal contract solicitation document.

View the file

Other files

File Type Posted
Amend 0011.pdf PDF
FINAL Lejeune buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW --10 AUG 2026.pdf PDF
326 Drawings.pdf PDF
Amendment 0010.pdf PDF
FINAL Lejeune buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW --4 AUG 2026.pdf PDF
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
LEJU 00015 1997 MAJOR INTERIOR EXTERIOR REPAIRS.pdf PDF
LEJU NH180 2012 NATIONAL INTREPID CENTER OF EXCELLENCE.pdf PDF
LEJU 0G770 REPLACE HVAC BUILDING G-770.pdf PDF
Amend 0005.pdf PDF
LEJU NH200 2009 MEDICAL CLINIC REPLACEMENT.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
UFGS 23 01 30.41.pdf PDF
ICRA 2.0 DHA Fillable Final (1).pdf PDF
26-0709 CLEAN HVAC SYSTEMS - ICRA 2.0 Clarifications.pdf PDF
Mech MACC RFP.pdf PDF
26-0709 CLEAN HVAC SYSTEMS - SUBMITTAL REGISTER.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
26-0709 CLEAN HVAC SYSTEMS - SOW.pdf PDF
ufc_4_510_01_2023_c4.pdf PDF
FINAL Lejeune buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW --5 Jun 2026.pdf PDF
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
26-0709 CLEAN HVAC SYSTEMS - PROJECT DESCRIPTION.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAXIMO Initial Equipment Inventory and Replacement/Update Form

Data Collector: Phone: Date: / / Bldg: Specific Location:

Type of Equipment:

Generator (Pad Mounted) AC, Package AC, Package Terminal

Assembly, Trap line Backflow Preventer (Size,Type) Chiller, Air Cooled Recip Chiller, Air Cooled Screw Chiller, Air Cooled Scroll Chiller, Water Cooled Recip Chiller, Water Cooled Screw Compressor, Control Air Compressor, Air (Recip) __ Compressor, Air (Screw) Dryer, Refrigerated Air Exchanger, Heat (plate, barrel) Fan, Exhaust (Belt or direct) __ Furnace, Oil

Heater, Space (Unit) Heat Pump, Geo-Thermal (Tons) Heat Pump, Indoor Unit (tons) Heat Pump, Outdoor Unit (tons)

__ Heat Pump, Package __Heat Pump, Package Terminal

Pump, Circulating Chilled Water Circulating, Domestic Water Pump, Circulating, Dual Temp Water Pump, Circulating, Heating Water Pump, Condensate Pump, Condenser (Cooling tower) Pump, Sump Regulator, Temperature Tank, Hot Water Storage Tower, Cooling Air Handler A: 0-24 tons Air Handler B: 25-50tons Air Handler C: = or >50 tons Computer room AHU Unit AC Condensing Unit, Freezer/Walk-in Condenser Unit, Refrigerator Condensing Unit, Fan Coil Unit, TAB (Attach Room No. List) Unit, VAV (Attach Room No. List) Valve, Pressure Reducing Valve, Steam Pilot Water Heater Boiler (input BTU)

Demolished/Removed Equipment

Maximo no: ______ Ser no: Location: _____

New/Replacement Equipment:

Manufacturer:

Model no:

Ser no:

Type: Elec Oil LP Gas Nat Gas Steam Hot Water

Motor Data: HP Volts Phase RLA RPM Frame

Tons No. of Motors no. of Belts

KW Refrig type

File details come from the government source that posted it. Updated .