This document comprises two federal healthcare facility construction and renovation assessment tools: a Pre-Construction Risk Assessment (PCRA/ICRA) form and an Infection Control Risk Assessment (ICRA 2.0) matrix with supporting compliance monitoring forms.
The PCRA form (EC.02.06.05, LS.01.02.01) is designed for healthcare project managers to identify and coordinate construction risks before work begins. It requires assessment of initial coordination needs including off-site construction, confined space entry permits, hazardous materials abatement, and system lock-out/tag-out requirements for electrical, HVAC, domestic water, medical gases, steam, security alarms, and fire/life safety systems. The form mandates contractor briefings on infection control requirements, fire safety measures, and interim life safety measures (ILSM) when construction activities alter exit access, compromise building compartmentalization, impair fire/sprinkler systems for more than four hours within 24 hours, or involve ignition sources. All construction projects must implement specified precautions including negative pressure exhaust, dust control mats, daily cleaning, smoke-tight barriers, firefighting equipment placement, proper storage of flammable materials, and no-smoking policies. Upon completion, work surfaces must be disinfected, areas wet-mopped, HVAC systems restored, and barrier materials removed carefully.
The ICRA 2.0 matrix provides a risk-stratification system matching construction activity types (A through D, ranging from non-invasive inspection to major demolition) with patient risk groups (1 through 4, from low-risk non-patient areas to highest-risk procedural and sterile support areas) to determine required infection control precautions (Classes I through V). Class I requires noninvasive work without dust creation; Class II involves limited dust work; Class III requires active dust prevention and containment; Class IV mandates critical barriers per NFPA 241, negative pressurization, and HEPA filtration; and Class V adds anteroom requirements and mandatory coveralls for personnel. The document includes surrounding area assessment tables identifying potential impacts on units above, below, laterally, behind, and in front of construction sites, with mitigation strategies for noise, vibration, dust, ventilation, pressurization, and other system impacts. Completion requirements vary by class, ranging from basic cleaning and HVAC restoration for Classes I-III to comprehensive barrier removal protocols and particulate sampling for Classes IV-V. Supporting compliance monitoring forms address daily construction site inspection standards and infection prevention rounds, requiring documentation of cleanliness, barrier integrity, negative pressure maintenance, and fire safety compliance. An Infection Control Construction Notice to Proceed form formalizes the class of precautions and authorization before work commences, requiring signatures from project manager, NMCCL project manager, and NMCCL safety manager.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-CONSTRUCTION RISK
ASSESSMENT PCRA/ICRA
EC.02.06.05, LS.01.02.01
Project Title: Project Manager:
Location: Phone Number:
Start Date: End Date:
Description of Work:
Initial Coordination of Spaces, Systems and Departments
Yes No
Off-site construction or assembly required necessary?
Permit required for confined space entry necessary?
Cutting, burning or welding services necessary?
Asbestos, lead or other hazardous materials abatement required?
Will the project effect pressure relationships, humidity, ACH, or temperature in adjacent areas?
Schedule work that may create high noise, vibration, and others hazards to minimize affect on patient care, treatment, and services.
Lock-out/tag-out of the following systems will be required:
Electrical Systems HVAC Systems
Domestic Water Medical Gases Steam Systems Security Alarms Fire/Life Safety Alarms
Comments about affected systems:
Required coordination with the following departments or disciplines:
Patient Safety BIOMED MID Facilities OPMAN Security Safety Infection Control
Others:
Project Manager conducted contractor briefings & training Date
Ensuring free and unobstructed access to emergency department/services and for emergency response personnel
Ensuring fire alarm, detection, and suppression systems are not impaired, a temporary, but equivalent system shall be provided when any fire system is impaired Contractor will schedule work to minimize time systems are impaired and to notify safety section prior to fire systems being impaired Ensuring temporary construction partitions are smoke tight and built to noncombustible or limited combustible materials that will not contribute to the development or spread of fire
Providing additional fire-fighting equipment and use training for personnel
Developing and enforcing storage, housekeeping, and debris removal practices that reduce the flammable and combustible fire load of the building to the lowest necessary level for daily operations
Project Manager conducted contractor briefings & training Date
Met with Services/Sections surrounding the construction site to inform them of impact/precautions to be taken and to instruct them in basic I/C requirements Informed the Project Coordinator that barriers are not to be removed from work area until the completed project is inspected by the Safety and Infection Control Representative and thoroughly cleaned Met with the Construction Manager, Construction Crews, and Sub-Contractors to inform them of the impact/precautions to be taken and to instruct them in Basis I/C requirements
All construction projects must adhere to the following Yes
Negative pressure exhaust will be in place, unused doors sealed with duct tape, air supply/exhaust vents are to be sealed off “Sticky” dust mats & carpeting remnants will be installed at all construction entrances & exits to reduce dust
Contractors thoroughly sweep/clean construction & entrances/exits areas daily or more often if needed
Construction area is broom-cleaned at end of the day; no trash is left on site (to prevent vermin)
Project manager to check site daily and log in project folder
Appropriate safety and project signage will be posted
All doors into area are smoke tight, self closing and self locking
Temporary partitions separating construction from occupied areas will be smoke tight, all penetrations will be maintained in a smoke tight condition by the use of approved/rated materials (separate “Above Ceiling Permit” may be required)
Firefighting equipment will be in place and accessible
Ceiling tiles are replaced as soon as possible
All power equipment is UL listed, outlets are GFCI, equipment is properly grounded, extension cords and wiring is protected, open conductors are secured at 10 foot intervals, and temporary lighting, heating or electrical devices are in accordance with the NEC Flammable and combustible liquids/gases/solids shall be used / stored properly
No smoking policy will be enforced
Smoke detectors will be covered to prevent dust contamination - covers to be removed at end of each workday
Trailers, sheds, and dumpsters will be no closer than 10 feet from building
Gang boxes and tool carts will be secured at all times whenever accessible
Hard hats will be required for this project when appropriate
Upon completion:
• Wipe work surfaces with disinfectant
• Wet mop entire area
• Remove isolation of HVAC system in areas where work is being performed
• Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction
This project will require interim life safety measures if any of the following are checked "Yes" Yes No
The issue alters or compromises exit access, exiting, or exit discharge building elements.
compromise of building compartmentalization including fire or smoke walls, floor/ceiling assemblies, corridor walls, use area doors or other defend in place elements.
The issue impairs the building fire alarms or sprinkler systems for more than 4 hours in a 24-hour period.
The activity includes ignition sources such as cutting, welding, or other operations using flame or producing sparks.
This project will require interim life safety measures if any of the following are checked "Yes"
Yes No
The activity includes large quantities of combustible materials, flammable materials, or generation of a large amount of debris.
When ILSM's are in place Safety Department staff have conducted notifications and training Yes No
Duty crew has been notified to conduct a fire watch at least once per shift during non-business hours whenever any portion of the alarm, detection, or suppression system is impaired for more than four hours within a 24-hour period.
If exits are obstructed, then personnel in building were trained on alternate routes and exits
Construction areas will have designated and marked exits, maps delineating new exits pathways are in place
Staff in affected areas will receive 1 additional fire drill per shift per quarter
Contract Project Manager
NMCCL Project Manager
NMCCL Safety Manager
Date
Date
Infection Control Risk Assessment 2.0 Matrix of Precautions for Construction, Renovation and Operations
April 2022 based on most current information
Construction or renovation projects can introduce unique risks to the healthcare environment which can obstruct infection control plans and create risks for patients, visitors and healthcare workers. A multi-disciplinary team, to include facility IP’s, is critical to each phase of activity to mitigate and prevent risk factors. The ICRA is signed by the contractor or supervisor of the project. Once barrier is placed the IP inspects and then post on barrier. A copy is maintained in the IPC Office
Step One:
Using Table 1, identify the Construction Project Activity Type (A-D).
Table 1 - Construction Project Activity Type:
Type A
Inspection and non-invasive activities.
Includes but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type B
Small-scale, short duration activities that create minimal dust and debris.
Includes but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Type C
Large-scale, longer duration activities that create a moderate amount of dust and debris.
Includes but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Non-existing cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Type D
Major demolition and construction activities.
Includes but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
April 2022 based on most current information
Step Two:
Using Table 2, identify the Patient Risk Group(s) that will be affected. If more than one risk group will be affected, select the higher risk group.
Table 2 - Patient Risk Group:
Low Risk/Group 1
Non-patient care areas such as:
Medium Risk/Group 2
Patient care support areas such as:
High Risk/Group 3
Patient care areas such as:
Highest Risk/Group 4
Procedural, invasive, sterile support and highly compromised patient care areas such as:
• Public hallways and gathering areas not on clinical units.
• Office areas not on clinical units.
• Breakrooms not on clinical units.
• Bathrooms or locker rooms not on clinical units.
• Mechanical rooms not on clinical units.
• EVS closets not on clinical units.
• Medical and Dental Waiting areas.
• Clinical engineering.
• Materials management.
• Sterile processing department - dirty side.
• Kitchen, cafeteria, gift shop, coffee shop, and food kiosks.
• Patient care rooms and areas.
• Dental treatment rooms (DTR’s) and dental areas.
• All acute care units
• Emergency department.
• Employee health
• Pharmacy - general work zone.
• Medication rooms and clean utility rooms
• Imaging suites:
diagnostic imaging.
• Laboratory.
• All transplant and intensive care units.
• All oncology units.
• OR theaters and restricted areas.
• Procedural suites.
• Pharmacy compounding.
• Sterile processing department - clean side medical and dental locations.
• Transfusion services.
• Dedicated isolation wards/units.
• Imaging suites: invasive imaging.
Step Three:
Match the Patient Risk Group (Low, Medium, High, Highest) from Step Two with the planned Construction Activity Project Type (A, B, C, D) from Step One using Table 3 to find the Class of Precautions (I, II, III, IV or V) or level of infection control activities required. The activities are listed in Table 5 – Minimum Required Infection Control Precautions by Class.
Table 3 - Class of Precautions (I-IV):
Construction Project Type Patient Risk Group TYPE A TYPE B TYPE C TYPE D Group 1 I II II III Group 2 I II III IV Group 3 I III IV V Group 4 III IV V V
April 2022 based on most current information
Infection control permit and approval will be required when Class of Precautions III (Type C) and all Class of Precautions IV or V are necessary.
Environmental conditions that could affect human health, such as sewage, mold, asbestos, gray water and black water will require Class of Precautions IV for LOW and MEDIUM Risk Groups and Class of Precautions V for HIGH and HIGHEST Risk Groups.
Step Four:
Assess potential risk to areas surrounding the project. Using Table 4, identify the surrounding areas that will be affected and the type of impact that will occur. If more than one risk group will be affected, select the higher risk group using Table 2 - Patient Risk Group.
Table 4 - Surrounding Area Assessment Unit Below: Unit Above: Unit Lateral: Unit Behind: Unit in Front:
Risk Group: Risk Group: Risk Group: Risk Group: Risk Group:
Contact: Contact: Contact: Contact: Contact:
Phone: Phone: Phone: Phone: Phone:
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Impact to other systems, such as:
Data Mechanical Med Gases
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Impact to other systems, such as:
Data Mechanical Med Gases
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Impact to other systems, such as:
Data Mechanical Med Gases
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Impact to other systems, such as:
Data Mechanical Med Gases
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Impact to other systems, such as:
Data Mechanical Med Gases
Noise & Vibration Mitigation Strategies Use diamond drills instead of powder-actuated fasteners.
Schedule noise-making periods with adjacent spaces.
Use beam clamps instead of shot.
Prefab where possible.
Use tin snips to cut metal studs instead of using a chop saw.
Install metal decking with vent tabs, then use cellular floor deck hangers.
Consider pro-press instead of soldering, brazing or welding.
Wet core drill instead of dry core or percussion.
Instead of jackhammering concrete, use wet diamond saws.
Use HEPA vacuums instead of standard wet/dry vacuums.
Use mechanical joining system sprinkler fittings instead of threaded.
Where fumes are tolerated, use chemical adhesive remover (flooring glue) instead of mechanical.
To remove flooring, shot blast instead of using a floor scraper.
Use electric sheers instead of reciprocating saw for ductwork cutting.
Install exterior man/material lifts.
Ventilation & Pressurization Mitigation Strategies HEPA to exterior.
Install temporary ductwork.
Utilize temporary HVAC equipment.
Vacate the area.
Install temporary partitions.
Use carbon filtration to filter odors.
Impact to Other Systems Mitigation Strategies Schedule outages.
Provide temporary systems.
Back-feed electricity or medical gases.
shane.j.wilkens Highlight shane.j.wilkens Highlight
April 2022 based on most current information
Table 5 - Minimum Required Infection Control Precautions by Class | Before and During Work Activity
Class of Precautions
Mitigation Activities (Performed Before and During Work Activity)
Class I 1. Perform noninvasive work activity as to not block or interrupt patient care.
2. Perform noninvasive work activities in areas that are not directly occupied with patients.
3. Perform noninvasive work activity in a manner that does not create dust.
4. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
Class II 1. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
2. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
3. This Class of Precautions must never be used for construction or renovation activities.
Class III 1. Provide active means to prevent airborne dust dispersion into the occupied areas.
2. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
3. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
4. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
5. If work area is contained, then it must be neutrally to negatively pressurized at all times.
6. Seal all doors with tape that will not leave residue.
7. Contain all trash and debris in the work area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
Class IV 1. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
3. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
4. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
5. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
7. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
8. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
9. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
10. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
11. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
12. Contain all trash and debris in the work area.
13. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
14. Worker clothing must be clean and free of visible dust before leaving the work area. HEPA vacuuming of clothing or use of cover suites is acceptable.
April 2022 based on most current information
15. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
16. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
17. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Class V 1. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
3. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
4. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
5. Personnel will be required to wear coveralls at all times during Class V work activities. Coveralls must be removed before leaving the anteroom.
6. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
7. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
8. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
9. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
10. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
11. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
12. Install device (e.g., magnehelic manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
13. Contain all trash and debris in the work area.
14. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
15. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
16. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
17. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
18. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
April 2022 based on most current information
Table 6 - Minimum Required Infection Control Precautions | Upon Completion of Work Activity
Class of Precautions
Mitigation Activities (Performed upon Completion of Work Activity)
Classes I, II and III
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Classes III, IV and V
Class III (Type C Activities only), IV, and V precautions require inspection and documentation for downgraded ICRA precautions.
Construction areas must be inspected by an infection preventionist, safety or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release.
Use the following precautions when removing hard barriers:
i. Carefully remove screws and painter tape.
ii. If dust will be generated during screw removal, use hand-held HEPA vacuum.
iii. Drywall cutting is prohibited during removal process.
iv. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
v. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
April 2022 based on most current information
Infection Control Construction Notice to Proceed Project: Permit No:
Location of Construction: Project Start Date:
Project Manager: Estimated Duration:
Contractor Performing: Telephone:
Supervisor: Telephone:
YES NO CONSTRUCTION ACTIVITY YES NO INFECTION CONTROL RISK GROUP
TYPE A: Inspection, non-invasive activity GROUP 1: Low Risk TYPE B: Small scale, short duration, Moderate to high levels GROUP 2: Medium Risk
TYPE C: Activity generates moderate to high levels of Dust, requires greater 1 work shift to complete
GROUP 3: High Risk
TYPE D: Major duration and construction activities Requiring consecutive work shifts
GROUP 4: Highest Risk
CLASS I 1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace any ceiling tile displaced for visual inspection.
3. Minor Demolition for Remodeling
CLASS II 1. Provides active means to prevent air-borne dust from dispersing into atmosphere
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Wipe surfaces with disinfectant.
6. Contain construction waste before transport in tightly covered containers.
7. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
8. Place dust mat at entrance and exit of work area.
9. Remove or isolate HVAC system in areas where work is being performed.
CLASS III
1. Obtain infection control permit before construction begins.
2. Isolate HVAC system in area where work is being done to prevent contamination of the duct system.
3. Complete all critical barriers or implement control cube method before construction begins.
6. Vacuum work with HEPA filtered vacuums.
7. Wet mop with disinfectant
8. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
9. Contain construction waste before transport in
Date 4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
5. Do not remove barriers from work area until complete project is thoroughly cleaned by Env. Services Dept.
tightly covered containers.
10. Cover transport receptacles or carts. Tape covering.
11. Remove or isolate HVAC system in areas where work is being performed
Initial
Class IV
1. Obtain infection control permit before construction begins.
2. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
3. Complete all critical barriers or implement control cube method before construction begins.
4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
5. Seal holes, pipes, conduits, and punctures appropriately.
6. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
7. All personnel entering work site are required to wear shoe covers
8. Do not remove barriers from work area until completed project is thoroughly cleaned by the Environmental Service Dept.
9. Vacuum work area with HEPA filtered vacuums.
10. Wet mop with disinfectant.
11. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
12. Contain construction waste before transport in tightly covered containers.
13. Cover transport receptacles or carts. Tape covering.
14. Remove or isolate HVAC system in areas where is being done.
Initial
April 2022 based on most current information
Class V
1. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
3. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
4. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
5. Personnel will be required to wear coveralls at all times during Class V work activities. Coveralls must be removed before leaving the anteroom.
6. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
7. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
8. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
9. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
10. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
11. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
12. Install device (e.g., magnehelic manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
13. Contain all trash and debris in the work area.
14. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
15. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
16. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
17. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy.
Sticky mats must be changed routinely and when visibly soiled.
18. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Date
Initials
Exceptions/Additions to this permit date and initials are noted by attached memoranda
Permit Request By: Date:
Permit Authorized/ IP: Date:
Date: Initials:
April 2022 based on most current information
Infection Prevention and Control Program Construction Rounds Compliance Monitor
Review Date: ________________ Observed by: ______________________
LOCATION STANDARDS
NOT
MET
RESPONSIBLE PERSON and
COMMENTS
Air Pressure Barriers Active (e.g., negative pressure maintained, exhaust fans functioning, air quality adequate, no excess fumes/vapors) as required
Walk-Off Mats Clean & Adequate to contain Construction Dust)
Construction Barriers Appropriate for Patient Population (sealed plastic with overlay, plywood barrier with door, sealed doors with tape as required, closed patient doors etc.)
Construction Area Secure (e.g., barriers adequate to prevent entry of unauthorized persons, vermin, etc.)
Patient Care Equipment & Items Removed from Construction Area
Construction entry & Adjacent Areas Free of Dust & Debris
Construction Personnel & Materials Transported on Dedicated Elevators (e.g., non-patient use elevators)
April 2022 based on most current information
LOCATION STANDARDS
NOT
MET
RESPONSIBLE PERSON and
COMMENTS
Ceiling Tiles Replaced When space Above Ceiling Not Being Accessed (if occupied area, adjacent patient room doors are closed)
Additional Comments and Observations
Area cleaned daily with an approved disinfectant
Reference: ©2021 American Society for Health Care Engineering of the American Hospital Association.
Facilities
Infection Control Daily Inspection Form
Construction Site Monitoring
Worksite Location________________________________________________
Date/Time___________________________________________________________
Reviewer_________________________________________
Item Met Not Met
Corrective Action
General cleanliness of work area
Work areas separated from patient areas
Work barriers intact and seam sealed
Doors and openings closed
All holes and penetrations covered
Vents blocked or filtered
Ceiling tiles intact
Negative pressure machines running
Clean dust mats/sticky mats in work areas
Clean dust mats/sticky mats at entrance areas
Adjacent areas clean (i.e., no dust tracks)
No debris or unsecured tools
Construction debris removed from site
Debris removed in covered container
Fire detection and suppression equipment operable
Exits and corridors clear and unobstructed
Fire extinguishers accessible in construction area
Temporary access and egress routes identified and clear
Signage in place (Not an Exit, Construction Area, etc.)
| Construction or renovation projects can introduce unique risks to the healthcare environment which can obstruct infection control plans and create risks for patients, visitors and healthcare workers. A multi-disciplinary team, to include facility IP’... |
| Step One: |
| Using Table 1, identify the Construction Project Activity Type (A-D). |
| Step Two: |
| Using Table 2, identify the Patient Risk Group(s) that will be affected. If more than one risk group will be affected, select the higher risk group. |
| Assess potential risk to areas surrounding the project. Using Table 4, identify the surrounding areas that will be affected and the type of impact that will occur. If more than one risk group will be affected, select the higher risk group using Table ... |
| Template ICRA.PCRA 2.0 Sept2023.pdf |
| PRE-CONSTRUCTION RISK ASSESSMENTPCRA/ICRA |
Blank Page
| Unit Below: |
| Unit Above: |
| Unit Lateral: |
| Unit Behind: |
| Unit in Front: |
| Risk Group: |
| Risk Group_2: |
| Risk Group_3: |
| Risk Group_4: |
| Risk Group_5: |
| Contact: |
| Contact_2: |
| Contact_3: |
| Contact_4: |
| Contact_5: |
| Phone: |
| Phone_2: |
| Phone_3: |
| Phone_4: |
| Phone_5: |
| Noise: Off |
| Vibration: Off |
| Dust control: Off |
| Ventilation: Off |
| Pressurization: Off |
| Impact to other: Off |
| Noise_2: Off |
| Vibration_2: Off |
| Dust control_2: Off |
| Ventilation_2: Off |
| Pressurization_2: Off |
| Impact to other_2: Off |
| Noise_3: Off |
| Vibration_3: Off |
| Dust control_3: Off |
| Ventilation_3: Off |
| Pressurization_3: Off |
| Impact to other_3: Off |
| Noise_4: Off |
| Vibration_4: Off |
| Dust control_4: Off |
| Ventilation_4: Off |
| Pressurization_4: Off |
| Impact to other_4: Off |
| Noise_5: Off |
| Vibration_5: Off |
| Dust control_5: Off |
| Ventilation_5: Off |
| Pressurization_5: Off |
| Impact to other_5: Off |
| Data: Off |
| Mechanical: Off |
| Med Gases: Off |
| Data_2: Off |
| Mechanical_2: Off |
| Med Gases_2: Off |
| Data_3: Off |
| Mechanical_3: Off |
| Med Gases_3: Off |
| Data_4: Off |
| Mechanical_4: Off |
| Med Gases_4: Off |
| Data_5: Off |
| Mechanical_5: Off |
| Med Gases_5: Off |
| Use diamond drills instead of powderactuated fasteners: Off |
| Schedule noisemaking periods with adjacent spaces: Off |
| Use beam clamps instead of shot: Off |
| Prefab where possible: Off |
| Use tin snips to cut metal studs instead of using a chop saw: Off |
| Install metal decking with vent tabs then use cellular floor deck hangers: Off |
| Consider propress instead of soldering brazing or welding: Off |
| Wet core drill instead of dry core or percussion: Off |
| Instead of jackhammering concrete use wet diamond saws: Off |
| Use HEPA vacuums instead of standard wetdry vacuums: Off |
| Use mechanical joining system sprinkler fittings instead of threaded: Off |
| Where fumes are tolerated use chemical adhesive remover flooring glue instead of mechanical: Off |
| To remove flooring shot blast instead of using a floor scraper: Off |
| Use electric sheers instead of reciprocating saw for ductwork cutting: Off |
| Install exterior manmaterial lifts: Off |
| HEPA to exterior: Off |
| Install temporary ductwork: Off |
| Utilize temporary HVAC equipment: Off |
| Vacate the area: Off |
| Install temporary partitions: Off |
| Use carbon filtration to filter odors: Off |
| undefined: Off |
| undefined_2: Off |
| undefined_3: Off |
| Project: |
| Location of Construction: |
| Project Manager: |
| Estimated Duration: |
| Contractor Performing: |
| Telephone: |
| Supervisor: |
| Telephone_2: |
| Initial: |
| Initial_2: |
| Initials: |
| Area cleaned daily with an approved disinfectantRow1: |
| Area cleaned daily with an approved disinfectantRow2: |
| Area cleaned daily with an approved disinfectantRow3: |
| Area cleaned daily with an approved disinfectantRow4: |
| Area cleaned daily with an approved disinfectantRow5: |
| Area cleaned daily with an approved disinfectantRow6: |
| Area cleaned daily with an approved disinfectantRow7: |
| Area cleaned daily with an approved disinfectantRow8: |
| Area cleaned daily with an approved disinfectantRow9: |
| Area cleaned daily with an approved disinfectantRow10: |
| Dropdown1: [Choose One] |
| Dropdown2: [Choose One] |
| Dropdown3: [Choose One] |
| Date5_af_date: |
| Text10: |
| Date11_af_date: |
| Date12_af_date: |
| Date13_af_date: |
| Text16: |
| Group7: Off |
| Permit No: |
| 0: |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Date27_af_date: |
| Check Box28: Off |
| Date29_af_date: |
| Check Box30: Off |
| Date31_af_date: |
| Group8: Off |
| Text1: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box27: Off |
| Check Box29: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Check Box46: Off |
| Text47: |
| Text48: |
| Text49: |
| Text50: |
| Text51: |
| Text52: |
| Text53: |
| Text54: |
| Text55: |
| Text56: |
| Text57: |
| Text58: |
| Text59: |
| Text60: |
| Text61: |
| Text62: |
| Check Box63: Off |
| Check Box64: Off |
| Check Box65: Off |
| Check Box66: Off |
| Check Box67: Off |
| Check Box68: Off |
| Check Box69: Off |
| Check Box70: Off |
| Check Box71: Off |
| Check Box72: Off |
| Check Box73: Off |
| Check Box74: Off |
| Check Box75: Off |
| Check Box76: Off |
| Check Box77: Off |
| Check Box78: Off |
| Check Box79: Off |
| Check Box80: Off |
| Check Box81: Off |
| Check Box82: Off |
| Check Box83: Off |
| Check Box86: Off |
| Check Box87: Off |
| Check Box88: Off |
| Check Box89: Off |
| Check Box90: Off |
| Check Box91: Off |
| Check Box92: Off |
| Check Box93: Off |
| Check Box94: Off |
| Check Box95: Off |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box100: Off |
| Text101: |
File details come from the government source that posted it. Updated .