- BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region Federal contract opportunity
- Solicitation number
- FA890320R0015
About this file
This document outlines requirements for environmental remediation and monitoring services at the former Wurtsmith Air Force Base in Michigan under the Midwest Region BECOS solicitation. Key activities include ongoing operations and maintenance at 16 CERCLA sites, with two sites still requiring decision documents. A supplemental carbon treatment system became operational in 2018 to address PFAS. The scope also includes five-year reviews and land use control monitoring. Meetings with regulators and the restoration advisory board will be held monthly or quarterly. Specific sites will require permits, and memoranda of agreement and well permits will require periodic renewal for work on forest service and state lands. Updates to computer aided design drawings and geographic information systems are also included.
View the file
Other files for this federal contract opportunity
Show all 50
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
FA8903-20-R-0015
Attachment 2 Midwest Region - Wurtsmith 5 December 2019
1.1 Scope
The former Wurtsmith Air Force Base (AFB), located in Iosco County, Charter Township of Oscoda, Michigan, was closed in 1993. The former Wurtsmith AFB is not listed on the National Priorities List (NPL) consequently there is no Federal Facility Agreement. The environmental restoration program is being conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) with the Michigan Department of Environment, Great Lakes, and Energy functioning as the lead regulator. Records of Decision (RODs)/Decision Documents (DDs) have been signed for 16 CERCLA sites with 2 sites requiring ROD/DD remaining to be conducted (SS072 and LF027).
The sites included in this PBR TO that are being addressed following the CERCLA process. The sites are listed in the site list below with ongoing activities that include the performance of routine, preventive, predictive, scheduled, and unscheduled operations and maintenance tasks and/or land use controls (LUCs) monitoring.
In 2018/2019 under the current PBR contract, the Air Force installed a supplemental remedy at site SS057. The Central Treatment System (CTS) became operational on 11 July 2018 and includes a granular-activated carbon (GAC) adsorption unit (a three-bed GAC system) for the primary removal of PFOS and PFOA.
The fourth Five-Year Review will be completed under the current PBR and is due in 2020.
In addition to the requirements presented in this PWS, this scope includes the following:
· No base-specific requirements in addition to those in the PWS.
Contractors are not responsible for the following:
· Investigation and remediation of PFAS, except as noted herein or in Attachment 1.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| FT002 Final ROD for VOCs |
| AR #1262 |
| Nov 2016 |
| 2. |
| FT002 Final RAP/DD |
| AR #929 |
| April 1998 |
| 3. |
| ESD for the Remedial Action Plans/Decision Documents for Sites WP-04 and SS-71 |
| AR#451192 |
| Sep 2014 |
| 4. |
| WP004 Final RAP/DD |
| AR# 1107 |
| March 1998 |
| 5. |
| SS005 Final RAP/DD |
| AR #1112 |
| April 1998 |
| 6. |
| SS006, SS013, ST040, ST046 Final RAP/DD |
| AR #764 |
| February 1998 |
| 7. |
| SS008 Final RAP/DD |
| AR #1116 |
| April 1998 |
| 8. |
| OT016 Final RAP/DD |
| AR #931 |
| April 1998 |
| 9. |
| SS017, SS021, and SS047 Final RAP |
| AR #932 |
| April 1998 |
| 10. |
| SS017/021/047 ESD |
| AR# 1482 |
| October 2005 |
| 11. |
| LF023 Final NARAP DD |
| AR #1111 |
| April 1998 |
| 12. |
| OT024 NFRAP Final DD |
| AR #1120 |
| September 1997 |
| 13. |
| OT024 Final RAP/DD |
| AR #1165 |
| November 1996 |
| 14. |
| LF026 Final NARA/DD |
| AR #1106 |
| March 1998 |
| 15. |
| LF027 Final RAP/DD |
| AR #1114 |
| April 1998 |
| 16. |
| LF030/LF031 Final ROD |
| AR#300140 |
| April 2013 |
| 17. |
| SS051 Final Closure Memo |
| AR 577200 |
| December 1996 |
| 18. |
| SS057 Final RAP/DD |
| AR #1276 |
| September 2002 |
| 19. |
| SS057 ESD |
| AR #1383 |
| August 2004 (signed) |
| 20. |
| ST068 Final RAP/DD |
| AR #1489 |
| November 2003 |
| 21. |
| ST069 Final RAP/DD |
| AR#1488 |
| Dec 2008 |
| 22. |
| WP070 Final RAP/DD |
| AR #1398 |
| September 2002 |
| 23. |
| SS071 Final Closure Memo |
| AR#1460 |
| March 2007 |
| 24. |
| Substantive Requirements Document (SRD) for the Wurtsmith AFB, State of MI DEQ |
| Google Site |
| October 7, 2016 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| Contract GS10F0280V, Order Number FA8903-16-F-0014 |
| PBR, Central Region BRAC Installations |
| 4/27/2021 |
| 6/27/2021 |
2.6.1 Meeting/Teleconference Support
· BCT meetings are generally held monthly. Typically every other month they are held in person at the Michigan Department of Environment, Great Lakes, and Energy office in Lansing, MI and the others are held via PBR contractor-hosted teleconference calls.
2.6.2 Public Meetings and Hearings
· RAB meetings are held quarterly. RAB meetings are typically held at the former base in the Public Library.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· UST permit B5092
· USFS MOA for IRP sites OT024, FT002, OT016 is expired for LUC/ICs and requires AF renewal every 5 years, last renewed in 2013
· USFS well permit for all MWs on USFS lands
· MDNR well permit for one well on MDNR land SS005
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No base-specific requirements in addition to those in the PWS.
6.14 Land Use Controls (LUC)
· No base-specific requirements in addition to those in the PWS.
6.15 Five-Year Reviews
· Non-CERCLA Five-Year Reviews (aka AF Policy Review) is required for non-CERCLA sites per AF policy as applicable. Preparation of the AF Policy Five-Year Review by September 2025 (to be initiated in 2024 with draft submitted by May 2025). A second Five-Year Review will be required in 2030 with initiation date in 2029. Implementation of the 2020 Five-Year Review recommendations and recommendations from subsequent five-year reviews.