This document outlines requirements for environmental remediation and monitoring services at the former Wurtsmith Air Force Base in Michigan under the Midwest Region BECOS solicitation. Key activities include ongoing operations and maintenance at 16 CERCLA sites, with two sites still requiring decision documents. A supplemental carbon treatment system became operational in 2018 to address PFAS. The scope also includes five-year reviews and land use control monitoring. Meetings with regulators and the restoration advisory board will be held monthly or quarterly. Specific sites will require permits, and memoranda of agreement and well permits will require periodic renewal for work on forest service and state lands. Updates to computer aided design drawings and geographic information systems are also included.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region, newest first.
File Type Posted
20200518_Midwest TO2 Price Model_Amendment_02.xlsx XLSX spreadsheet
20200518_TO2 PWS Attch1 Midwest Base Site List BECOS_Amendment_02.xlsx XLSX spreadsheet
05182020_Amendment 02_Additional Question and Response 20R0015 Midwest.xlsx XLSX spreadsheet
20-R-0015 Midwest RFP QAs 2 of 2.xlsx XLSX spreadsheet
20200501_FA890320R0015_BECOS_Midwest_Section_M_Amendment_01.docx DOCX document
20200501_Midwest TO2 Price Model_Amendment_01.xlsx XLSX spreadsheet
TO 2 PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Richards-Gebaur Base Spec Req Midwest BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Gentile Base Spec Req Midwest BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 Chanute Base Spec Req Midwest BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Midwest BECOS vf1.pdf PDF
Midwest IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
TO 1 PWS MidWest BECOS vf3.docx DOCX document
IN20190006 1Nov2019 Cass Heavy.pdf PDF
OH20190086 22Nov2019 Licking Building.pdf PDF
IL20190009 6Dec2019 Cook Building Heavy.pdf PDF
20200131_FA890320R0015_BECOS_Relevancy_Matrix v2.docx DOCX document
20200203_FA890320R0015_Midwest_BECOS_Section_M v4.docx DOCX document
OH20190001 25Oct2019 Statewide Heavy.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Grissom Base Specific Req Midwest BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Midwest BECOS vf1.pdf PDF
TO 2 PWS Midwest BECOS vf3.docx DOCX document
TO 2 PWS Attch 2 Newark Base Spec Req Midwest BECOS vf2.docx DOCX document
OH20190096 22Nov2019 Pickaway Building.pdf PDF
20201217_Compensation Plan Model.xlsx XLSX spreadsheet
MI20190048 1Nov2019 Marquette Heavy.pdf PDF
MO20190001 8Nov2019 Statewide Missouri.pdf PDF
TO 2 PWS Attch 1 Midwest Base Site List BECOS vf9.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Midwest BECOS vf1.pdf PDF
MI20190135 1Nov2019 Marquette Building.pdf PDF
MO20190038 8Nov2019 Cass Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN) Midwest BECOS vf1.pdf PDF
IDIQ PWS Attch 4 Midwest Perf Obj Def and Req BECOS vf2.docx DOCX document
TO 1 CDRLs Exhibit A B Midwest BECOS vf1.docx DOCX document
OH20190093 25Oct2019 Montgomery Building.pdf PDF
IDIQ PWS Attch 3 Midwest Del Rev Process BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 General Mitchell Base Spec Req Midwest BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Midwest BECOS vf1.pdf PDF
IL20190002 6Dec2019 Champaign Building.pdf PDF
MI20190042 27Sep2019 Heavy Iosco.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Midwest BECOS vf1.pdf PDF
MI20190116 1Nov2019 Delta Building.pdf PDF
MI20190047 1Nov2019 Delta Heavy.pdf PDF
20200203_FA890320R0015_BECOS_Midwest_Section_L v5.docx DOCX document
IDIQ PWS Midwest BECOS vf4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ PWS Attch 1 Midwest Base Site List BECOS vf6.xlsx XLSX spreadsheet
Show all 50

BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

FA8903-20-R-0015

Attachment 2 Midwest Region - Wurtsmith 5 December 2019

1.1 Scope

The former Wurtsmith Air Force Base (AFB), located in Iosco County, Charter Township of Oscoda, Michigan, was closed in 1993. The former Wurtsmith AFB is not listed on the National Priorities List (NPL) consequently there is no Federal Facility Agreement. The environmental restoration program is being conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) with the Michigan Department of Environment, Great Lakes, and Energy functioning as the lead regulator. Records of Decision (RODs)/Decision Documents (DDs) have been signed for 16 CERCLA sites with 2 sites requiring ROD/DD remaining to be conducted (SS072 and LF027).

The sites included in this PBR TO that are being addressed following the CERCLA process. The sites are listed in the site list below with ongoing activities that include the performance of routine, preventive, predictive, scheduled, and unscheduled operations and maintenance tasks and/or land use controls (LUCs) monitoring.

In 2018/2019 under the current PBR contract, the Air Force installed a supplemental remedy at site SS057. The Central Treatment System (CTS) became operational on 11 July 2018 and includes a granular-activated carbon (GAC) adsorption unit (a three-bed GAC system) for the primary removal of PFOS and PFOA.

The fourth Five-Year Review will be completed under the current PBR and is due in 2020.

In addition to the requirements presented in this PWS, this scope includes the following:

· No base-specific requirements in addition to those in the PWS.

Contractors are not responsible for the following:

· Investigation and remediation of PFAS, except as noted herein or in Attachment 1.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
FT002 Final ROD for VOCs
AR #1262
Nov 2016
2.
FT002 Final RAP/DD
AR #929
April 1998
3.
ESD for the Remedial Action Plans/Decision Documents for Sites WP-04 and SS-71
AR#451192
Sep 2014
4.
WP004 Final RAP/DD
AR# 1107
March 1998
5.
SS005 Final RAP/DD
AR #1112
April 1998
6.
SS006, SS013, ST040, ST046 Final RAP/DD
AR #764
February 1998
7.
SS008 Final RAP/DD
AR #1116
April 1998
8.
OT016 Final RAP/DD
AR #931
April 1998
9.
SS017, SS021, and SS047 Final RAP
AR #932
April 1998
10.
SS017/021/047 ESD
AR# 1482
October 2005
11.
LF023 Final NARAP DD
AR #1111
April 1998
12.
OT024 NFRAP Final DD
AR #1120
September 1997
13.
OT024 Final RAP/DD
AR #1165
November 1996
14.
LF026 Final NARA/DD
AR #1106
March 1998
15.
LF027 Final RAP/DD
AR #1114
April 1998
16.
LF030/LF031 Final ROD
AR#300140
April 2013
17.
SS051 Final Closure Memo
AR 577200
December 1996
18.
SS057 Final RAP/DD
AR #1276
September 2002
19.
SS057 ESD
AR #1383
August 2004 (signed)
20.
ST068 Final RAP/DD
AR #1489
November 2003
21.
ST069 Final RAP/DD
AR#1488
Dec 2008
22.
WP070 Final RAP/DD
AR #1398
September 2002
23.
SS071 Final Closure Memo
AR#1460
March 2007
24.
Substantive Requirements Document (SRD) for the Wurtsmith AFB, State of MI DEQ
Google Site
October 7, 2016

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

Contract GS10F0280V, Order Number FA8903-16-F-0014
PBR, Central Region BRAC Installations
4/27/2021
6/27/2021

2.6.1 Meeting/Teleconference Support

· BCT meetings are generally held monthly. Typically every other month they are held in person at the Michigan Department of Environment, Great Lakes, and Energy office in Lansing, MI and the others are held via PBR contractor-hosted teleconference calls.

2.6.2 Public Meetings and Hearings

· RAB meetings are held quarterly. RAB meetings are typically held at the former base in the Public Library.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· UST permit B5092

· USFS MOA for IRP sites OT024, FT002, OT016 is expired for LUC/ICs and requires AF renewal every 5 years, last renewed in 2013

· USFS well permit for all MWs on USFS lands

· MDNR well permit for one well on MDNR land SS005

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements in addition to those in the PWS.

6.14 Land Use Controls (LUC)

· No base-specific requirements in addition to those in the PWS.

6.15 Five-Year Reviews

· Non-CERCLA Five-Year Reviews (aka AF Policy Review) is required for non-CERCLA sites per AF policy as applicable. Preparation of the AF Policy Five-Year Review by September 2025 (to be initiated in 2024 with draft submitted by May 2025). A second Five-Year Review will be required in 2030 with initiation date in 2029. Implementation of the 2020 Five-Year Review recommendations and recommendations from subsequent five-year reviews.

File details come from the government source that posted it. Updated .