IDIQ PWS Attch 1 Midwest Base Site List BECOS vf6.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region Federal contract opportunity
- Solicitation number
- FA890320R0015
About this file
This document provides a list of Base Realignment and Closure (BRAC) sites in the Midwest region requiring environmental construction and optimization services. The sites span multiple military bases and include a range of activities such as landfill capping and closure, groundwater monitoring and remediation, land use control inspections, and operation and maintenance of treatment systems. Contaminants of concern encompass volatile organic compounds, metals, polyfluoroalkyl substances (PFAS), and unexploded ordnance. The solicitation seeks proposals to provide services including long-term monitoring, operations and maintenance, five-year reviews, land use control inspections, and closure activities across the identified sites to meet regulatory requirements and cleanup goals on an indefinite delivery/indefinite quantity (IDIQ) contract basis over a five-year period of performance.
View the file
Other files for this federal contract opportunity
Show all 50
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Midwest
| Region | Base | Site ID | Site Name | Site Alias | Operable Unit (OU) | Regulatory Program | Site Phase | Current Remedy | Notes | Projected | |
| RC Date | Projected |
SC Date
| Midwest | Chanute | SS041 | Bldg. 995 Engine Test Cells | CERCLA | RA-O | Ongoing groundwater remediation via in-situ enhanced reductive dechlorination, monitoring, LUC inspections and Five-Year Reviews. | 1,4-dioxane detected at site | FY26 | FY26 |
| Midwest | Chanute | FT021 | Fire Training Area 2 | CERCLA | RA-O | LUC inspections and Five-Year Reviews. | PFAS detected at site | FY20 | Indefinite |
| Midwest | Chanute | LF016 | Landfill 1 | CERCLA | LTM | Ongoing operation, maintenance, and monitoring (OM&M) of landfill cap (e.g., cap inspections, mowing, and maintenance; leachate collection system maintenance; groundwater monitoring), LUC inspections, and Five-Year Reviews | FY15 | Indefinite | |
| Midwest | Chanute | LF017 | Landfill 2 | CERCLA | LTM | Ongoing OM&M of landfill cap (e.g., cap inspections, mowing, and maintenance; leachate collection system maintenance and discharge monitoring; evapotranspiration buffer maintenance; groundwater monitoring), LUC inspections, and Five-Year Reviews |
| Ongoing O&M of leachate treatment system (GAC), installed to remove PFOS/PFOA prior to discharge to the POTW, is included in this PBR. | FY15 | Indefinite | ||||||||||
| Midwest | Chanute | LF018 | Landfill 3 | CERCLA | LTM | Ongoing OM&M of landfill cap (e.g., cap inspections, mowing, and maintenance; leachate collection system maintenance; evapotranspiration buffer maintenance; groundwater monitoring), LUC inspections, and Five-Year Reviews | FY15 | Indefinite | ||||
| Midwest | Chanute | LF019 | Landfill 4 | CERCLA | LTM | Ongoing OM&M of landfill cap (e.g., cap inspections, mowing, and maintenance; evapotranspiration buffer maintenance; landfill gas monitoring; groundwater monitoring), LUC inspections, and Five-Year Reviews | FY15 | Indefinite | ||||
| Midwest | Chanute | LF017 | Landfill 2 | PFAS Site | ||||||||
| Midwest | Chanute | FT021 | Fire Training Area 2 | PFAS Site | ||||||||
| Midwest | Chanute | CG411 | North Fire Demonstration Training Area | PFAS Site | ||||||||
| Midwest | Chanute | FT060 | Firefighting Demonstration Area 3 | PFAS Site | ||||||||
| Midwest | General Mitchell | ST010 | POL Dry Wall | Wisconsin | LTM | Five-Year Reviews (Abbreviated) and annual LUC inspections | Minimal LUC inspections required each year | FY04 | Indefinite | |||
| Midwest | General Mitchell | CG011 | OU1 PFC Groundwater Plume | PFAS Site | ||||||||
| Midwest | Gentile | WP026 | Floor Drain to Infiltration Pit (R2) | R2 | CERCLA | RA-O | RA-O: GW monitoring; LUC inspections and Five-Year Reviews | FY35 | FY35 | |||
| Midwest | Gentile | SS035 | Former Storage/Salvage Area | C7 | CERCLA | RA-O | RA-O: Confirmation GW monitoring; soil vapor monitoring; LUC inspections and Five-Year Reviews | Soil excavation was conducted at the Site in 2018. Residual soil contamination near electric utilities was not excavated and may require additional effort to achieve GW goals. GW is projected to achieve MCLs within current PBRC POP but incomplete excavation puts the goal at risk. SC confirmation requires eight consecutive sample events below MCLs to demonstrate closure. | FY31 | FY31 | ||
| Midwest | Gentile | SS028 | Coal Storage Area (S1) | S1 | CERCLA | RA-O | RA-O: GW monitoring; LUC inspections and Five-Year Reviews | FY31 | FY31 | |||
| Midwest | Gentile | ST003 | Rail Lines-Parcel B (C2B) | C2B | CERCLA | LTM | LUC inspections and Five-Year Reviews | FY99 | Indefinite | |||
| Midwest | Gentile | LF009 | Disposal Area No. 2 | |||||||||
| (D2) | D2 | CERCLA | LTM | LUC inspections and Five-Year Reviews | FY99 | Indefinite | ||||||
| Midwest | Gentile | CSS024 | Rail Line Parcel A | |||||||||
| (C2A) | C2A | CERCLA | LTM | LUC inspections and Five-Year Reviews | Administrative closure may require further analysis and consideration. | FY97 | Indefinite | |||||
| Midwest | Grissom | FT001 | Fire Protection Training Area 1 | CERCLA | RA-O | GW monitoring, LUC inspections, and Five-Year Reviews | Site was expected to close in current PBR, as trends were decreasing, but due to recent unexpected increase in one well A PBR mod is underway to implement injection remedy but site cannot reach SC within current PBR as 8 quarters of verification monitoring required to close site after reaching MCL |
| Contaminated with PFAS | FY28 | FY28 | ||||||
| Midwest | Grissom | FT002 | Fire Protection Training Area 2 | CERCLA | RA-O | GW monitoring, LUC inspections, and Five-Year Reviews | Site was expected to close in current PBR, as trends were decreasing, but due to recent unexpected increase in one well A PBR mod is underway to implement injection remedy but site cannot reach SC within current PBR as 8 quarters of verification monitoring required to close site after reaching MCL. |
| Contaminated with PFAS | FY23 | FY23 | |||||
| Midwest | Grissom | SS035 | OWS at Former Building 122 | CERCLA | RA-O | Groundwater monitoring, LUC inspections and Five-Year Reviews (Industrial Use based on Soil) | |
| Residual TCE in soil remains in place. TCE in groundwater also found during current PBR, while the ROD identified TCE in soils only. Site recently underwent further investigation, which established higher TCE upgradient and groundwater gradient direction; delineation not complete. |
| Sufficient information will be available for PBR contractor to complete delineation, conduct groundwater monitoring, prepare ESD/ROD Amendment and implement remedy for soil and groundwater, as needed. | FY27 | FY28 | ||||||
| Midwest | Grissom | SS053 | North Side Hangar 200 | CERCLA | RA-O | Groundwater monitoring, LUC inspections and Five-Year Review (Industrial Use based on Soil) | TCE in groundwater found during current PBR. Groundwater was not encountered during pre-ROD investigations; however, the ROD identified potential for TCE in groundwater based on TCE in soils. Further investigation has found more extensive TCE and breakdown products; delineation could not be completed to the south and east due to buildings and utilities. |
| Due to buildings and incomplete delineation, PBR contractor will prepare an ESD/ROD Amendment to extend the LUC boundary. | Indefinite | Indefinite | ||||||
| Midwest | Grissom | SS058 | OWS 896 near Building 19 | CERCLA | RA-O | ROD Amendment, Groundwater monitoring, LUC inspections and Five-Year Reviews (Industrial Use for Soil) | TCE in groundwater found during current PBR, while the ROD identified TCE in soils only. BEHP was a COC in groundwater but is no longer a concern. Site required further investigation, which adequately delineated TCE nature and extent in groundwater. |
| Sufficient information is available for PBR contractor to conduct groundwater monitoring, prepare ESD/ROD Amendment and implement remedy for soil and groundwater, as needed, to move site towards closure. | FY27 | FY28 | ||||||||
| Midwest | Grissom | SS190 | TCE Release at Building 190 | CERCLA | RA-O | GW monitoring, targeted ISCO injections, performance and verification monitoring, LUC inspections and Five-Year Reviews | Site is close to MCL, but the required eight quarters of verification monitoring cannot be completed within the current PBR PoP. | FY22 | FY22 | |
| Midwest | Grissom | LF003 | Landfill #1 | CERCLA | LTM | LUC inspections and Five-Year Reviews | FY00 | Indefinite | ||
| Midwest | Grissom | LF004 | Landfill #2 | CERCLA | LTM | LUC inspections and Five-Year Reviews | FY01 | Indefinite | ||
| Midwest | Grissom | SS049 | Central Heat Plant Complex | CERCLA | LTM | GW monitoring, annual free product removal via bailing of monitoring wells, LUC inspections, and Five-Year Reviews | FY08 | Indefinite | ||
| Midwest | KI Sawyer | SS017 | Avenue G JP-4 Spill | CERCLA & Michigan Part 201 | RA-O | Air sparging to treat residual soil contamination, annual LUC inspections, | ||||
| pavement inspection and repair, and Five-Year Reviews | SC under current PBR likely | FY13 | FY21 | |||||||
| Midwest | KI Sawyer | ST004 | POL Yard | CERCLA & Michigan Part 201 | RA-O | Maintain free-phase JP-4 recovery and air sparging systems, enclosure, and reinjection trenches on standby, 2 years of confirmation free product gauging, system decommissioning, annual LUC inspections, and Five-Year Reviews | Current PBR contractor should complete the first year of confirmation guaging. |
| Local response within 1 hour is required to ensure immediate system operability to prevent breakthrough. | FY21 | Indefinite | |||||||||
| Midwest | KI Sawyer | LF008 | Landfills 1 and 2 | CERCLA & Michigan Part 201 | RA-O | Capped landfill with groundwater monitoring, periodic inspections, watering, mowing, and fence repair, annual LUC inspections, and Five-Year Reviews | FY28 | Indefinite | |||
| Midwest | KI Sawyer | LF010/011 | Landfills 3 and 4 | CERCLA & Michigan Part 201 | RA-O | Capped landfill with groundwater monitoring, periodic inspections, watering, mowing, and fence repair, annual LUC inspections, and Five-Year Reviews | FY28 | Indefinite | |||
| Midwest | KI Sawyer | OT013 | DFSP Escanaba | CERCLA & Michigan Part 201 | LTM | LUC/IC Inspections, Five-Year Reviews | FY13 | Indefinite | |||
| Midwest | KI Sawyer | FT007 | Fire Training Area 2 | CERCLA & Michigan Part 201 | LTM | LUC/IC Inspections, Five-Year Reviews | Site close to MCL but rebound in one well; trying to close under current PBR. | FY13 | FY23 | ||
| Midwest | KI Sawyer | XE027 (AKA OT026) | Explosive Ordinance Disposal Range (AOC 5) | CERCLA & Michigan Part 201 | LTM | Long-term monitoring | |||||
| including periodic inspections, watering, mowing, and fence repair, LUC inspections, and Five-Year Reviews | SC has been submitted EGLE under current PBR, awaiting response | FY03 | FY20 | ||||||||
| Midwest | KI Sawyer | CG406 | OU1 PFC KIS Groundwater Plume | CERCLA & Michigan Part 201 | RA-O | Maintain one whole-home resin treatment system including O&M, semiannual monitoring, and reporting for PFAS. | |||||
| PFAS Site | |||||||||||
| Facilitate provision of bottled water in the event of a system emergency; system O&M and sampling should be accomplished using local resources. | NA | NA | |||||||||
| Midwest | Newark | LF002 | Landfill 2 13-Acre Site | CERCLA | LTM | LUC inspections and Five-Year Reviews | FY02 | Indefinite | |||
| Midwest | Newark | SS102 | AOC2 Bldg 4 Dewatering Sump Pumps (AOC 102) (AOC2) | CERCLA | LTM | LUC inspections and Five-Year Reviews | FY99 | Indefinite | |||
| Midwest | Newark | CAT606P | Fire Station | PFAS Site | |||||||
| Midwest | O'Hare | LF001 | Landfill 1 | CERCLA | LTM | LUC/IC monitoring, | |||||
| Five-Year Review | FY05 | Indefinite | |||||||||
| Midwest | O'Hare | ST002 | JP4 Tank/West POL Area | CERCLA | LTM | LUC/IC monitoring, | |||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | SS005 | Fuel- Contaminated Soil | CERCLA | LTM | LUC/IC monitoring, | |||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | ST012 | South POL Area | CERCLA | LTM | LUC/IC monitoring, | |||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | OT016 | Trailer Park | OTH-TP | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | SA017 | Former Coal Storage Area | OTH-1 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | IN018 | Former Incinerator | OTH-13 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | SS019 | TCE Spill – Sanitary Sewer | OTH-SS | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | CCB001 | Former Paint Shop | OTH-8-1 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | CLF002 | Hardfill No. 2 | OTH-HF-02 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | CTU003 | UST Nos 1902A/B | UST-1902A/B | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | COW004 | Oil Water Separator No. 2909 | OWS-2909 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | COW006 | Oil Water Separator No. 30B | OWS-30B | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | OT008 | South Edge of Concrete Apron | IRP-OT-008 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | OT010 | Storm Drainage Area | IRP-OT-010 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | ST014 | Fuel Line Break Area | IRP-ST-014 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | CSS026 | Sanitary Sewer Site | OTH-SS | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | CAT021 | Suspected Fire Training Area | OTH-FT | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | CCB022 | Former Aircraft Hangar | OTH-7 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | CRW023 | Aircraft Washrack | OTH-2531-1 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | CSA024 | Former Drum Accumulation Area | OTH-2531-2 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | CFL025 | Hardfill No. 1 | OTH-HF-01 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | SS007 | Hazardous Waste Storage Site | IRP-SS-007 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | OT009 | Vehicle Maintenance Facility | IRP-OT-009 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | FT003 | Fire Protection Training Area | IRP-FT-003 | CERCLA | LTM | LUC/IC monitoring, | ||||
| Five-Year Review | FY02 | Indefinite | |||||||||
| Midwest | O'Hare | CAT271P | PFC Research Site | PFAS Site | |||||||
| Midwest | Richards-Gebaur | ST005 | POL Yard | CERCLA | RA-O | GW monitoring, LUC inspections, and Five-Year Reviews | Residual contamination remain only in a couple of wells. Additional HRC injections conducted in August 2019. | FY22 | FY22 | ||
| Midwest | Richards-Gebaur | SS006 | Hazardous Material Storage | CERCLA | RA-O | GW monitoring, LUC inspections, and Five-Year Reviews | Residual contamination in groundwater in one monitoring well. Additional amendments applied in August 2019. | FY22 | FY22 | ||
| Midwest | Richards-Gebaur | SS012 | Building 105 | CERCLA | RA-O | GW monitoring, HRC injections, installation of additional treatment trench, installation of additional wells, performance verification monitoring, LUC inspections, and Five-Year Reviews | Building demolitions, Excavation of remaining source, and application of amendments to be conducted under current PBR | FY27 | FY27 | ||
| Midwest | Richards-Gebaur | CG013 | OU PFC Groundwater Plume | PFAS Site | |||||||
| Midwest | Rickenbacker | SS001 | Former |
Hazardous Waste Storage Area Site 1 RCRA RA-O GW monitoring, LUC inspections, and Semi-Annual Correction Action Effectiveness/Protectiveness Monitoring
| FY35 | FY35 | ||||||
| Midwest | Rickenbacker | SS021 | Oil Change Area | Site 21 | CERCLA | RA-O | GW monitoring, LUC |
inspections, and Five-
| Year Reviews; confirmation GW sampling to validate closure | One well remains above cleanup goals at the site. Soil source delineation work to be completed under current PBRC. | FY31 | FY31 | |||||
| Midwest | Rickenbacker | SS041 | Multi-chambered Oil/Water Separator North of Bldg 848 | Site 41 | CERCLA | RA-O | GW monitoring, LUC |
inspections, and Five- Year Reviews
| GW concentrations increased after latest injections. Soil source suspected but not identified | FY31 | FY31 | |||||
| Midwest | Rickenbacker | SS042 | Jet Engine Test Stand, Bldg 896 | Site 42 | CERCLA | RA-O | GW monitoring, LUC |
inspections, and Five- Year Reviews LUC inspections
| FY31 | FY31 | ||||||||
| Midwest | Rickenbacker | SS046 | Facilities (Pumphouses) 898/899 | BUSTR** | LTM | LUC inspections | FY05 | FY20 | |
| Midwest | Wurtsmith | SS072 | PCE Plume discharging to Clark’s Marsh | CERCLA & Michigan Part 201 | RA-O | Biowall with discharge to Clark’s Marsh, groundwater monitoring, LUC/IC inspections and Five-Year Reviews. | FY35 | FY35 | |
| Midwest | Wurtsmith | ST068 | Oil/Water Separator, Facility 5067 | CERCLA & Michigan Part 201 | RA-O | Groundwater monitoring, LUC/IC inspections and Five-Year Reviews. | FY24 | FY24 | |
| Midwest | Wurtsmith | WP004 | Inactive Waste Treatment Plant Sludge Drying Beds | CERCLA & Michigan Part 201 | RA-O | Groundwater monitoring, LUC/IC inspections and Five-Year Reviews. | FY24 | FY24 | |
| Midwest | Wurtsmith | OT016 | Jet Engine Test Cell Building 5098 | CERCLA & Michigan Part 201 | RA-O | Groundwater monitoring, LUC/IC inspections and Five-Year Reviews. | FY23 | FY23 | |
| Midwest | Wurtsmith | SS005 | TCE Spill, Southwest of SAC Alert Apron | CERCLA & Michigan Part 201 | RA-O | Groundwater monitoring, LUC/IC inspections and Five-Year Reviews. | FY22 | FY24 | |
| Midwest | Wurtsmith | SS008 | TCE and Fuel Spill, SAC Nose Doc and Operational Apron | CERCLA & Michigan Part 201 | RA-O | Groundwater monitoring, LUC/IC inspections and Five-Year Reviews | FY21 | FY22 | |
| Midwest | Wurtsmith | LF030/ LF031 | Landfill, Northern (Perimeter Road) Area | CERCLA & Michigan Part 201 | RA-O | Pump and treat (VOCs and metals) and landfill cover maintenance. Treatment is via an Engineered Wetland Treatment System (EWTS). Groundwater monitoring, LUC/IC inspections and Five-Year Reviews. | Bioventing system is being evaluated as part of FS being prepared in 2019. |
| PFOS/PFOA impacts. | FY39 | Indefinite | ||||||||
| Midwest | Wurtsmith | SS021 | TCE Spill Northeast of Building 43 | CERCLA & Michigan Part 201 | RA-O | PTS-GAC (Central Treatment System - CTS) for PFAS (influent and effluent) and VOCs, groundwater monitoring, LUC/IC inspections and Five-Year Reviews. | PFOS/PFOA impacts associated with SS021 (PFAS) | FY39 | Indefinite | |
| Midwest | Wurtsmith | OT024 | Three Pipes Drainage Ditch | CERCLA & Michigan Part 201 | RA-O | PTS-Ion Excchange Resin (Mission Street) for PFAS (influent and effluent)and VOCs, groundwater monitoring, LUC/IC inspections and Five-Year Reviews. | PFOS/PFOA impacts associated with OT024 (PFAS) | FY39 | Indefinite | |
| Midwest | Wurtsmith | SS057 | Old Apron Hydrant Fuel System | CERCLA & Michigan Part 201 | RA-O | BioSparging (BS) ongoing and in-situ bioremediation injections implemented in 2019, groundwater monitoring, LUC/IC inspections and Five-Year Reviews. | FY29 | Indefinite | ||
| Midwest | Wurtsmith | FT002 | Active Fire Training Area | CERCLA & Michigan Part 201 | RA-O | Ongoing air sparging (AS), pump and treat system with granular activated carbon (PTS-GAC) (FT002) for PFAS (influent and effluent), groundwater monitoring including PFAS, LUC/IC inspections and Five-Year Reviews. | PFOS/PFOA impacts associated with FT002 (PFAS) | FY25 | Indefinite | |
| Midwest | Wurtsmith | SS047 | Base Gas Station | CERCLA & Michigan Part 201 | RA-O | PTS-GAC (Central Treatment System - CTS) for PFAS (influent and effluent) and VOCs (treatment at SS021), groundwater monitoring, LUC/IC inspections and Five-Year Reviews. | PFOS/PFOA impacts associated with SS021 (PFAS) | FY25 | Indefinite | |
| Midwest | Wurtsmith | SS006 | Fuel Spill, POL Bulk Storage Area | CERCLA & Michigan Part 201 | RA-O | Groundwater monitoring, Groundwater extraction (Central Treatment System - CTS) for PFAS (influent and effluent). | PFOS/PFOA impacts associated with SS021 (PFAS) | FY24 | Indefinite | |
| Midwest | Wurtsmith | LF023 | Landfill, SE of POL Bulk Storage | CERCLA & Michigan Part 201 | LTM | LUC/IC inspections and Five-Year Reviews. | FY98 | Indefinite | ||
| Midwest | Wurtsmith | LF026 | Landfill, East of Alert Apron | CERCLA & Michigan Part 201 | LTM | LUC/IC inspections and Five-Year Reviews. | FY98 | Indefinite | ||
| Midwest | Wurtsmith | LF027 | Landfill South of the Center of SAC Instrument Runway | CERCLA & Michigan Part 201 | LTM | Groundwater sampling, LUC/IC inspections and Five-Year Reviews. | FFS and LUC/IC Only ROD required to achieve RC. | FY23 | Indefinite | |
| Midwest | Wurtsmith | SS071 | Building 5045 Drain Field | CERCLA & Michigan Part 201 | RA-O | Groundwater sampling, LUC/IC inspections and Five-Year Reviews for PFAS | PFOS/PFOA impacts associated with CAT605P. | FY25 | FY25 | |
| Midwest | Wurtsmith | ST069 | TCE Plume DRMO | CERCLA & Michigan Part 201 | LTM | LUC/IC inspections and Five-Year Reviews for PFAS. | FY15 | Indefinite | ||
| Midwest | Wurtsmith | SS051 | KC135 Crash Site | CERCLA & Michigan Part 201 | LTM | LUC/IC inspections and Five-Year Reviews for PFAS | PFOS/PFOA impacts associated with CAT605P OR CG410. | FY16 | Indefinite | |
| Midwest | Wurtsmith | WP070 | Sand-Fill Storage and Borrow Area | CERCLA & Michigan Part 201 | LTM | LUC/IC inspections and Five-Year Reviews. | FY04 | Indefinite | ||
| Midwest | Wurtsmith | SR408 | Bombing and Strafing Area | CERCLA & Michigan Part 201 | LTM | LUC/IC inspections and Five-Year Reviews. | Contractor to provide public notices and conduct biennial public training to stakeholders regarding actions if ordnance remnants are encountered. | FY07 | Indefinite | |
| Midwest | Wurtsmith | XE404 | Weapons Storage Area | CERCLA & Michigan Part 201 | LTM | LUC/IC inspections and Five-Year Reviews. | Contractor to provide public notices and conduct biennial public training to stakeholders regarding actions if ordnance remnants are encountered. | FY07 | Indefinite | |
| Midwest | Wurtsmith | XU402 | Former Grenade Range | CERCLA & Michigan Part 201 | LTM | LUC/IC inspections and Five-Year Reviews. | Contractor to provide public notices and conduct biennial public training to stakeholders regarding actions if ordnance remnants are encountered. | FY11 | Indefinite | |
| Midwest | Gentile | CAT251P | Fire Station | PFAS Site | ||||||
| Midwest | Grissom | CG405 | OU1 PFC Groundwater Plume | PFAS Site | ||||||
| Midwest | KI Sawyer | CG407 | OU2 PFC Escanaba Groundwater Plume | PFAS Site | ||||||
| Midwest | Rickenbacker | CAT371P | PFC Research Site | PFAS Site | ||||||
| Midwest | Rickenbacker | CG047 | Taxiway G | PFAS Site | ||||||
| Midwest | Rickenbacker | CSA036 | Fuel Cell Maintenance Center | PFAS Site | ||||||
| Midwest | Wurtsmith | FT002 | Active Fire Training Area | PFAS Site | ||||||
| Midwest | Wurtsmith | CAT605P | PFC Research Site | PFAS Site | ||||||
| Midwest | Wurtsmith | CG410 | Aircraft Apron AFFF Release | PFAS Site | ||||||
| Midwest | Wurtsmith | ST069 | DRMO | PFAS Site | ||||||
| Midwest | Wurtsmith | OT024 | Three Pipes Drainage Ditch | PFAS Site | ||||||
| Midwest | Wurtsmith | SS060 | AFFF Release, Base Operational Apron | PFAS Site | ||||||
| Midwest | Wurtsmith | SS021 | TCE Spill Northeast of Building 43 | PFAS Site | ||||||
| Midwest | Chanute | SD027 | Bldg 922 OWS | TBD | ||||||
| Midwest | Chanute | SS083 | Chanute Field Trap Range 1 | TBD | ||||||
| Midwest | General Mitchell | CTU001 | 104 - 299852 | TBD | ||||||
| Midwest | General Mitchell | CTU006 | 212 - 299856 | TBD | ||||||
| Midwest | General Mitchell | CTU007 | 215 - 299858 | TBD | ||||||
| Midwest | General Mitchell | CTU008 | 219 - 299860 | TBD | ||||||
| Midwest | General Mitchell | CTU011 | 8002 - 299863 | TBD | ||||||
| Midwest | General Mitchell | CTU012 | 8002 - 299864 | TBD | ||||||
| Midwest | General Mitchell | CTU013 | 8002 - 299865 | TBD |
FA8903-20-R-0015
Attachment 1 Midwest Region 5 December 2019
&P of &N
File details come from the government source that posted it. Updated .