- BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region Federal contract opportunity
- Solicitation number
- FA890320R0015
About this file
This document contains a Performance Work Statement (PWS) for Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) for the Midwest Region. The PWS requires ongoing operations and maintenance, monitoring, and remediation services at the former K.I. Sawyer Air Force Base in Michigan and DFSP Escanaba. Key requirements include monthly BCT teleconferences and annual onsite meetings, yearly RAB meetings, five-year review reports for K.I. Sawyer and Escanaba in 2020 and 2025-2030, annual LUC inspections, and CADD/GIS updates. The related solicitation FA890320R0015 is for BECOS Midwest Region services to be awarded under contract number FA8903-20-R-0015.
View the file
Other files for this federal contract opportunity
Show all 50
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
FA8903-20-R-0015
Attachment 2 Midwest Region – K.I. Sawyer 5 December 2019
1.1 Scope
The former K.I. Sawyer Air Force Base (AFB) (referred to as K.I. Sawyer in this and other reference documents) is located in Marquette County approximately 13 miles south of the City of Marquette and three miles east of Gwinn in the north-central region of Michigan’s Upper Peninsula. The property encompassed approximately 7.7 square miles (approximately 4,923 acres) with airfield operations facilities, industrial/disposal facilities, housing, recreational facilities, and undeveloped lands. Routine maintenance, supply, transportation, and fire training activities at the base used organic-based solvents and fuels and necessitated using, accumulating, treating, and disposing of refuse, materials, and wastes. Some activities resulted in impacts to soils and groundwater. The base was officially closed on October 1, 1995 and placed under the jurisdiction of the Air Force Real Property Agency (AFRPA) (formerly the Air Force Base Conversion Agency). The regulatory framework for K.I. Sawyer includes Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Michigan Act 451 Michigan Environmental Response Program (Act 451 Part 201 including cleanup criteria under R299.44, .46 .48, and .49) and the Michigan Safe Drinking Water Act. The Basewide Remedial Action Plan (RAP) of 2004 is the Decision Document for all IRP sites. Michigan Department of Environment, Great Lakes, and Energy (EGE) is the lead regulatory agency. USEPA is no longer involved in the BCT.
In addition to the requirements presented in this PWS, this scope includes the following:
· No base-specific requirements in addition to those in the PWS.
Contractors are not responsible for the following:
· Investigation and remediation of PFAS, except as noted in Attachment 1.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Monthly Operations and Maintenance Report, June 2018, Site ST004 |
| AR#582012 |
| August 2018 |
| 2. |
| Final Air Sparge/Biosparge Design Analysis and Work Plan Addendum for Site ST004 - Zone 4 |
| AR#583190 |
| August 2018 |
| 3. |
| Draft Air Sparge/Biosparge Interim Remedial Action Construction Completion Report, Site ST004 |
| AR#583157 |
| July 2018 |
| 4. |
| Final Air Sparge/Biosparge Design Analysis and Work Plan for ST004 |
| AR #574124 |
| March 2018 |
| 5. |
| Monthly Operations and Maintenance Report, April 2018, Site ST004 |
| AR#582011 |
| August 2018 |
| 6. |
| Draft Five-year Review Report, Site OT013, Escanaba, Michigan |
| TBD |
| August 2019 |
| 7. |
| Monthly Operations and Maintenance Report, January 2018, Site ST004 Operations and Maintenance Services, Groundwater Remediation System |
| AR # 574122 |
| March 2018 |
| 8. |
| Technical and Management Report Landfill LF008, LF010/011, and XE027 Irrigation and Maintenance September – October 2017 |
| AR # 573800 |
| November 2017 |
| 9. |
| Monthly Operations and Maintenance Report, May 2017, Site ST004 Operations and Maintenance Services, Groundwater Remediation System |
| AR # 574121 |
| August 2017 |
| 10. |
| Annual Operations and Maintenance Report, 2016, Site ST004, Groundwater Remediation System |
| AR # 573798 |
| July 2017 |
| 11. |
| Final Consolidated Pre-Design Investigation Work Plan for ST004 and SS017 |
| AR # 574126 |
| June 2017 |
| 12. |
| Monthly Operations and Maintenance Report, April 2017, Site ST004 Operations and Maintenance Services, Groundwater Remediation System |
| AR # 574059 |
| May 2017 |
| 13. |
| Final Operations, Maintenance, and Monitoring Plan, 2016 Groundwater Monitoring Program, ST004, FT007, LF008, LF010/LF011, SS017, and XE027 |
| AR # 574120 |
| October 2016 |
| 14. |
| Final First Five-Year Review, DFSP Escanaba, IRP Site OT-013 |
| AR # 465804 |
| November 2013 |
| 15. |
| Final Addendum to the Final Second Five Year Remedial Actions Review |
| AR # 1142 |
| August 2012 |
| 16. |
| Final Second Five Year Review |
| AR # 421658 |
| March 2012 |
| 17. |
| Technical Document to Support Decision Document and Remedial Action Plan, ST-04 |
| AR # 997 |
| February 2000 |
| 18. |
| Technical Document to Support Decision Document and Remedial Action Plan, FT-07 |
| AR # 1038 |
| December 1999 |
| 19. |
| Draft Decision Document, Bulk Fuels Storage Area, ST-04 |
| AR # 527 |
| April 1995 |
| 20. |
| Draft Decision Document, Fire Training Area 2, FT-07 |
| AR # 526 |
| April 1995 |
| 21. |
| Decision Document, Wells Terminal Annex, OT-13 |
| AR # 235 |
| December 1994 |
| 22. |
| Final Decision Document, Free Product Removal, DP-01, ST04 |
| AR # 127 |
| March 1990 |
| 23. |
| Draft Decision Document, TCE Plume and Free JP-4, DP-02, ST04 |
| AR # 90 |
| September 1989 |
| 24. |
| Draft Decision Document, Landfill 2, LF-09 |
| AR # 79 |
| June 1988 |
| 25. |
| Draft Decision Document, Landfill 3, LF-10 |
| AR # 78 |
| June 1988 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| Contract GS10F0280V, Order Number FA8903-16-F-0014 |
| PBR, Central Region BRAC Installations |
| 4/27/2021 |
| 6/27/2021 |
2.6.1 Meeting/Teleconference Support
· K.I. Sawyer BCT meetings are generally held monthly via PBR contractor-hosted teleconference calls. In addition, onsite BCT meetings are held on an as-needed basis approximately three times per year and are typically scheduled to occur the same week as other Air Force meetings (e.g., RAB meetings, public meetings, stakeholder meetings). Onsite meetings are typically held at the Marquette EGLE office.
2.6.2 Public Meetings and Hearings
· K.I. Sawyer RAB meetings are held annually; typically in October. The meeting is currently held at the K.I. Sawyer Heritage Museum. The PBR contractor is required to facilitate the meeting location and logistics, prepare briefing material, meeting meetings, and issue a newspaper notice.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· No base-specific requirements in addition to those in the PWS.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No base-specific requirements in addition to those in the PWS.
6.14 Land Use Controls (LUC)
· Annual LUC inspections are required.
6.15 Five-Year Reviews
· Two separate five-year reviews are required for K.I. Sawyer and DFSP Escanaba. The Five-Year Reviews for 2020 for K.I. Sawyer and Escanaba are being conducted currently under the current PBR. The successive five-year reviews (one each for K.I. Sawyer and Escanaba) in 2025 and 2030 are included in this PBR TO.
File details come from the government source that posted it. Updated .