TO 2 PWS Attch 2 KI Sawyer Base Spec Req Midwest BECOS vf2.docx

DOCX document 54 KB Posted

Attached to
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region
Solicitation number
FA890320R0015
Issued by

About this file

This document contains a Performance Work Statement (PWS) for Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) for the Midwest Region. The PWS requires ongoing operations and maintenance, monitoring, and remediation services at the former K.I. Sawyer Air Force Base in Michigan and DFSP Escanaba. Key requirements include monthly BCT teleconferences and annual onsite meetings, yearly RAB meetings, five-year review reports for K.I. Sawyer and Escanaba in 2020 and 2025-2030, annual LUC inspections, and CADD/GIS updates. The related solicitation FA890320R0015 is for BECOS Midwest Region services to be awarded under contract number FA8903-20-R-0015.

View the file

Other files

File Type Posted
05182020_Amendment 02_Question_Website Response 20R0015 Midwest.xlsx XLSX spreadsheet
20200518_TO2 PWS Attch1 Midwest Base Site List BECOS_Amendment_02.xlsx XLSX spreadsheet
05182020_Amendment 02_Additional Question and Response 20R0015 Midwest.xlsx XLSX spreadsheet
20200518_Midwest TO2 Price Model_Amendment_02.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150002 SF 30 (2).pdf PDF
TO 2 PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150001 SF 30.pdf PDF
20-R-0015 Midwest RFP QAs 2 of 2.xlsx XLSX spreadsheet
20200501_FA890320R0015_BECOS_Midwest_Section_M_Amendment_01.docx DOCX document
20200501_Midwest TO2 Price Model_Amendment_01.xlsx XLSX spreadsheet
20200501_FA890320R0015_BECOS_Midwest_Section_L_Amendment_01.docx DOCX document
IDIQ PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
FA890320R0015 Midwest Amendment Changes.docx DOCX document
20-R-0015 Midwest RFP QAs 1 of 2.xlsx XLSX spreadsheet
MO20190038 8Nov2019 Cass Building.pdf PDF
20200122_Midwest FFP FBLR Tables.xlsx XLSX spreadsheet
20200109_Midwest TO2 Price Model.xlsx XLSX spreadsheet
IDIQ PWS Midwest BECOS vf4.docx DOCX document
OH20190001 25Oct2019 Statewide Heavy.pdf PDF
TO 2 PWS Attch 2 Grissom Base Specific Req Midwest BECOS vf2.docx DOCX document
20200131_FA8903-20-R-0015_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
IL20190015 6Dec2019 Champaign Heavy.pdf PDF
IDIQ PWS Attch 2 Midwest Acr and Def BECOS vf3.docx DOCX document
MI20190042 27Sep2019 Heavy Iosco.pdf PDF
OH20190093 25Oct2019 Montgomery Building.pdf PDF
IL20190009 6Dec2019 Cook Building Heavy.pdf PDF
OH20190086 22Nov2019 Licking Building.pdf PDF
TO 2 PWS Attch 2 Gentile Base Spec Req Midwest BECOS vf2.docx DOCX document
IDIQ PWS Attch 4 Midwest Perf Obj Def and Req BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Midwest BECOS vf1.pdf PDF
WI20190001 13Dec2019 Milwaukee Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 General Mitchell Base Spec Req Midwest BECOS vf2.docx DOCX document
TO 2 PWS Attch 1 Midwest Base Site List BECOS vf9.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Richards-Gebaur Base Spec Req Midwest BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Midwest BECOS vf1.pdf PDF
IN20190006 1Nov2019 Cass Heavy.pdf PDF
TO 2 PWS Attch 2 Chanute Base Spec Req Midwest BECOS vf2.docx DOCX document
Midwest IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
TO 2 PWS Midwest BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Midwest BECOS vf1.pdf PDF
TO 1 PWS MidWest BECOS vf3.docx DOCX document
TO 1 CDRLs Exhibit A B Midwest BECOS vf1.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ PWS Attch 1 Midwest Base Site List BECOS vf6.xlsx XLSX spreadsheet
20201217_Compensation Plan Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Midwest BECOS vf1.pdf PDF
MO20190001 8Nov2019 Statewide Missouri.pdf PDF
MI20190135 1Nov2019 Marquette Building.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

FA8903-20-R-0015

Attachment 2 Midwest Region – K.I. Sawyer 5 December 2019

1.1 Scope

The former K.I. Sawyer Air Force Base (AFB) (referred to as K.I. Sawyer in this and other reference documents) is located in Marquette County approximately 13 miles south of the City of Marquette and three miles east of Gwinn in the north-central region of Michigan’s Upper Peninsula. The property encompassed approximately 7.7 square miles (approximately 4,923 acres) with airfield operations facilities, industrial/disposal facilities, housing, recreational facilities, and undeveloped lands. Routine maintenance, supply, transportation, and fire training activities at the base used organic-based solvents and fuels and necessitated using, accumulating, treating, and disposing of refuse, materials, and wastes. Some activities resulted in impacts to soils and groundwater. The base was officially closed on October 1, 1995 and placed under the jurisdiction of the Air Force Real Property Agency (AFRPA) (formerly the Air Force Base Conversion Agency). The regulatory framework for K.I. Sawyer includes Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Michigan Act 451 Michigan Environmental Response Program (Act 451 Part 201 including cleanup criteria under R299.44, .46 .48, and .49) and the Michigan Safe Drinking Water Act. The Basewide Remedial Action Plan (RAP) of 2004 is the Decision Document for all IRP sites. Michigan Department of Environment, Great Lakes, and Energy (EGE) is the lead regulatory agency. USEPA is no longer involved in the BCT.

In addition to the requirements presented in this PWS, this scope includes the following:

· No base-specific requirements in addition to those in the PWS.

Contractors are not responsible for the following:

· Investigation and remediation of PFAS, except as noted in Attachment 1.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
Monthly Operations and Maintenance Report, June 2018, Site ST004
AR#582012
August 2018
2.
Final Air Sparge/Biosparge Design Analysis and Work Plan Addendum for Site ST004 - Zone 4
AR#583190
August 2018
3.
Draft Air Sparge/Biosparge Interim Remedial Action Construction Completion Report, Site ST004
AR#583157
July 2018
4.
Final Air Sparge/Biosparge Design Analysis and Work Plan for ST004
AR #574124
March 2018
5.
Monthly Operations and Maintenance Report, April 2018, Site ST004
AR#582011
August 2018
6.
Draft Five-year Review Report, Site OT013, Escanaba, Michigan
TBD
August 2019
7.
Monthly Operations and Maintenance Report, January 2018, Site ST004 Operations and Maintenance Services, Groundwater Remediation System
AR # 574122
March 2018
8.
Technical and Management Report Landfill LF008, LF010/011, and XE027 Irrigation and Maintenance September – October 2017
AR # 573800
November 2017
9.
Monthly Operations and Maintenance Report, May 2017, Site ST004 Operations and Maintenance Services, Groundwater Remediation System
AR # 574121
August 2017
10.
Annual Operations and Maintenance Report, 2016, Site ST004, Groundwater Remediation System
AR # 573798
July 2017
11.
Final Consolidated Pre-Design Investigation Work Plan for ST004 and SS017
AR # 574126
June 2017
12.
Monthly Operations and Maintenance Report, April 2017, Site ST004 Operations and Maintenance Services, Groundwater Remediation System
AR # 574059
May 2017
13.
Final Operations, Maintenance, and Monitoring Plan, 2016 Groundwater Monitoring Program, ST004, FT007, LF008, LF010/LF011, SS017, and XE027
AR # 574120
October 2016
14.
Final First Five-Year Review, DFSP Escanaba, IRP Site OT-013
AR # 465804
November 2013
15.
Final Addendum to the Final Second Five Year Remedial Actions Review
AR # 1142
August 2012
16.
Final Second Five Year Review
AR # 421658
March 2012
17.
Technical Document to Support Decision Document and Remedial Action Plan, ST-04
AR # 997
February 2000
18.
Technical Document to Support Decision Document and Remedial Action Plan, FT-07
AR # 1038
December 1999
19.
Draft Decision Document, Bulk Fuels Storage Area, ST-04
AR # 527
April 1995
20.
Draft Decision Document, Fire Training Area 2, FT-07
AR # 526
April 1995
21.
Decision Document, Wells Terminal Annex, OT-13
AR # 235
December 1994
22.
Final Decision Document, Free Product Removal, DP-01, ST04
AR # 127
March 1990
23.
Draft Decision Document, TCE Plume and Free JP-4, DP-02, ST04
AR # 90
September 1989
24.
Draft Decision Document, Landfill 2, LF-09
AR # 79
June 1988
25.
Draft Decision Document, Landfill 3, LF-10
AR # 78
June 1988

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

Contract GS10F0280V, Order Number FA8903-16-F-0014
PBR, Central Region BRAC Installations
4/27/2021
6/27/2021

2.6.1 Meeting/Teleconference Support

· K.I. Sawyer BCT meetings are generally held monthly via PBR contractor-hosted teleconference calls. In addition, onsite BCT meetings are held on an as-needed basis approximately three times per year and are typically scheduled to occur the same week as other Air Force meetings (e.g., RAB meetings, public meetings, stakeholder meetings). Onsite meetings are typically held at the Marquette EGLE office.

2.6.2 Public Meetings and Hearings

· K.I. Sawyer RAB meetings are held annually; typically in October. The meeting is currently held at the K.I. Sawyer Heritage Museum. The PBR contractor is required to facilitate the meeting location and logistics, prepare briefing material, meeting meetings, and issue a newspaper notice.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· No base-specific requirements in addition to those in the PWS.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements in addition to those in the PWS.

6.14 Land Use Controls (LUC)

· Annual LUC inspections are required.

6.15 Five-Year Reviews

· Two separate five-year reviews are required for K.I. Sawyer and DFSP Escanaba. The Five-Year Reviews for 2020 for K.I. Sawyer and Escanaba are being conducted currently under the current PBR. The successive five-year reviews (one each for K.I. Sawyer and Escanaba) in 2025 and 2030 are included in this PBR TO.

File details come from the government source that posted it. Updated .