TO 2 PWS Attch 2 Gentile Base Spec Req Midwest BECOS vf2.docx

DOCX document 50 KB Posted

Attached to
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region Federal contract opportunity
Solicitation number
FA890320R0015
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

This attachment to a Request for Proposals provides additional details regarding environmental remediation and monitoring services required at the former Gentile Air Force Station in Kettering, Ohio. The scope of work includes coordinating annual on-site BCT meetings, developing meeting minutes, facilitating teleconferences, performing land use control inspections annually or before five-year reviews, and completing the third and fourth five-year reviews. Contractors are not responsible for investigating or remediating PFAS except as noted. Key documents related to prior remediation decisions and monitoring reports are also provided.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region, newest first.
File Type Posted
20200501_FA890320R0015_BECOS_Midwest_Section_M_Amendment_01.docx DOCX document
20200501_Midwest TO2 Price Model_Amendment_01.xlsx XLSX spreadsheet
TO 2 PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150001 SF 30.pdf PDF
20200203_FA890320R0015_Midwest_BECOS_Section_M v4.docx DOCX document
OH20190001 25Oct2019 Statewide Heavy.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Grissom Base Specific Req Midwest BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Midwest BECOS vf1.pdf PDF
TO 2 PWS Midwest BECOS vf3.docx DOCX document
TO 2 PWS Attch 2 Newark Base Spec Req Midwest BECOS vf2.docx DOCX document
OH20190096 22Nov2019 Pickaway Building.pdf PDF
20201217_Compensation Plan Model.xlsx XLSX spreadsheet
MI20190048 1Nov2019 Marquette Heavy.pdf PDF
MO20190001 8Nov2019 Statewide Missouri.pdf PDF
TO 2 PWS Attch 1 Midwest Base Site List BECOS vf9.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Midwest BECOS vf1.pdf PDF
MI20190135 1Nov2019 Marquette Building.pdf PDF
MO20190038 8Nov2019 Cass Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN) Midwest BECOS vf1.pdf PDF
IDIQ PWS Attch 4 Midwest Perf Obj Def and Req BECOS vf2.docx DOCX document
TO 1 CDRLs Exhibit A B Midwest BECOS vf1.docx DOCX document
OH20190093 25Oct2019 Montgomery Building.pdf PDF
IDIQ PWS Attch 3 Midwest Del Rev Process BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 General Mitchell Base Spec Req Midwest BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Midwest BECOS vf1.pdf PDF
IL20190002 6Dec2019 Champaign Building.pdf PDF
MI20190042 27Sep2019 Heavy Iosco.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Midwest BECOS vf1.pdf PDF
MI20190116 1Nov2019 Delta Building.pdf PDF
MI20190047 1Nov2019 Delta Heavy.pdf PDF
20200203_FA890320R0015_BECOS_Midwest_Section_L v5.docx DOCX document
IDIQ PWS Midwest BECOS vf4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ PWS Attch 1 Midwest Base Site List BECOS vf6.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Wurts Base Spec Req Midwest BECOS vf3.docx DOCX document
WI20190001 13Dec2019 Milwaukee Building.pdf PDF
TO 2 PWS Attch 2 OHare Base Spec Req Midwest BECOS vf2.docx DOCX document
OH20190078 22Nov2019 Franklin Building.pdf PDF
WI20190015 13Dec2019 Statewide Heavy.pdf PDF
20200131_FA890320R0015_BECOS_Relevancy_PPQ v2.docx DOCX document
Solicitation FA890320R0015 Midwest.pdf PDF
20200122_Midwest FFP FBLR Tables.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Rickenbacker Base Spec Req Midwest BECOS vf2.docx DOCX document
IN20190002 1Nov2019 Cass Building.pdf PDF
TO 2 PWS Attch 2 KI Sawyer Base Spec Req Midwest BECOS vf2.docx DOCX document
MI20190126 25Oct2019 Building Iosco.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Midwest BECOS vf1.pdf PDF
TO 2 CDRLs Exhibit A B Midwest BECOS vf1.docx DOCX document
Show all 50

BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

FA8903-20-R-0015

Attachment 2 Midwest Region - Gentile 5 December 2019

1.1 Scope

The former Gentile Air Force Station (AFS), also known as the Defense Electronics Supply Center (DESC), is located within the city of Kettering, in Montgomery County, Ohio. All former Air Force property has been transferred by deed to the City of Kettering, the recognized Local Redevelopment Authority (LRA), through an Economic Development Conveyance (EDC) Agreement. The environmental restoration program at Gentile is currently managed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Regulatory oversight is provided primarily by Ohio EPA. The United States Environmental Protection Agency Region 5 (USEPA) is currently not involved in an oversight role. The former Gentile AFS is not listed on the National Priorities List (NPL).

In addition to the requirements presented in this PWS, this scope includes the following:

· No base-specific requirements in addition to those in the PWS.

Contractors are not responsible for the following:

· Investigation and remediation of PFAS, except as noted in Attachment 1.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
Base Realignment and Closure (BRAC) Cleanup Team (BCT). Decision Document. Groundwater Remediation, Site R2 Floor Drain to Infiltration Pit at Defense Electronics Supply Center, Gentile Air Force Station, Ohio.
AR 130
April 1997
2.
BCT. Decision Document, Parcel B Groundwater at the Defense Electronics Supply Center, Gentile Air Force Station, Ohio, September
AR 552
September 2000
3.
BCT. 2003. Decision Document. Statement of Basis/Final Decision. Site C7 and D1 in Parcel E.
AR 682
February 2003
4.
BCT. Statement of Basis/Final Decision, Long-Term Monitoring Program Optimization for Sites C7, R2, S1.
AR 657
August 2007
5.
FPM, 2018 Semi-Annual Remedial Action-Operations Letter Report – April 2018 Results – Former Gentile Air Force Station, Kettering, Ohio
AR 584447
January 2019
6.
AFRPA, Second Five Year Review
AR 815
June 2011
7.
AFCEC, LUC Compliance Inspection Report - 2018
AR 581558
January 2019

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

Contract Number: FA8903-09-D-8565 TO 0008
Region 5 PBR
9/24/2020
9/24/2020

2.6.1 Meeting/Teleconference Support

· Onsite Gentile BCT meetings are held once per year and are typically scheduled to occur the same week as other Air Force BRAC meetings in Ohio (at nearby Rickenbacker ANGB and Newark AFB). Onsite meetings are typically held at the Kettering Government Center. These meetings are to be coordinated and facilitated by the PBR contractor. Post-meeting minutes (draft, draft final and final) are to be developed to document these meetings. Other as-needed meetings are generally held via PBR contractor-hosted teleconference calls (typically two per year).

2.6.2 Public Meetings and Hearings

· No base-specific requirements in addition to those in the PWS.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· No base-specific requirements in addition to those in the PWS.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements in addition to those in the PWS.

6.14 Land Use Controls (LUC)

· LUC inspections are required every year as long as RA-O groundwater monitoring is taking place. Thereafter, every year, typically in the period immediately before a scheduled Five-Year Review.

6.15 Five-Year Reviews

· The third Five-Year Review will be completed under the current PBR and is due May 2020. The fourth and fifth Five-Year Reviews are included in this PBR TO.