This document provides responses to questions regarding a Request for Proposals for Base Realignment and Closure Environmental Construction and Optimization Services in the Midwest Region. The solicitation seeks to establish multiple Indefinite Delivery Indefinite Quantity contracts to perform environmental remediation, monitoring, and related services at current and former military installations. Key details include that work will be performed at sites including Wurtsmith Air Force Base and involve ongoing operation and maintenance of groundwater treatment systems, long-term monitoring and sampling programs, and implementation of corrective measures and remedial actions. The period of performance is five years and contractors will be responsible for meeting all applicable federal, state, and local requirements, coordinating public meetings, and implementing recommendations from five-year reviews.

View the file

Other files

File Type Posted
05182020_Amendment 02_Question_Website Response 20R0015 Midwest.xlsx XLSX spreadsheet
20200518_TO2 PWS Attch1 Midwest Base Site List BECOS_Amendment_02.xlsx XLSX spreadsheet
05182020_Amendment 02_Additional Question and Response 20R0015 Midwest.xlsx XLSX spreadsheet
20200518_Midwest TO2 Price Model_Amendment_02.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150002 SF 30 (2).pdf PDF
TO 2 PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150001 SF 30.pdf PDF
20200501_FA890320R0015_BECOS_Midwest_Section_M_Amendment_01.docx DOCX document
20200501_Midwest TO2 Price Model_Amendment_01.xlsx XLSX spreadsheet
20200501_FA890320R0015_BECOS_Midwest_Section_L_Amendment_01.docx DOCX document
IDIQ PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
FA890320R0015 Midwest Amendment Changes.docx DOCX document
20-R-0015 Midwest RFP QAs 1 of 2.xlsx XLSX spreadsheet
MO20190038 8Nov2019 Cass Building.pdf PDF
20200122_Midwest FFP FBLR Tables.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 KI Sawyer Base Spec Req Midwest BECOS vf2.docx DOCX document
20200109_Midwest TO2 Price Model.xlsx XLSX spreadsheet
IDIQ PWS Midwest BECOS vf4.docx DOCX document
OH20190001 25Oct2019 Statewide Heavy.pdf PDF
TO 2 PWS Attch 2 Grissom Base Specific Req Midwest BECOS vf2.docx DOCX document
20200131_FA8903-20-R-0015_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
IL20190015 6Dec2019 Champaign Heavy.pdf PDF
IDIQ PWS Attch 2 Midwest Acr and Def BECOS vf3.docx DOCX document
MI20190042 27Sep2019 Heavy Iosco.pdf PDF
OH20190093 25Oct2019 Montgomery Building.pdf PDF
IL20190009 6Dec2019 Cook Building Heavy.pdf PDF
OH20190086 22Nov2019 Licking Building.pdf PDF
TO 2 PWS Attch 2 Gentile Base Spec Req Midwest BECOS vf2.docx DOCX document
IDIQ PWS Attch 4 Midwest Perf Obj Def and Req BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Midwest BECOS vf1.pdf PDF
WI20190001 13Dec2019 Milwaukee Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 General Mitchell Base Spec Req Midwest BECOS vf2.docx DOCX document
TO 2 PWS Attch 1 Midwest Base Site List BECOS vf9.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Richards-Gebaur Base Spec Req Midwest BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Midwest BECOS vf1.pdf PDF
IN20190006 1Nov2019 Cass Heavy.pdf PDF
TO 2 PWS Attch 2 Chanute Base Spec Req Midwest BECOS vf2.docx DOCX document
Midwest IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
TO 2 PWS Midwest BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Midwest BECOS vf1.pdf PDF
TO 1 PWS MidWest BECOS vf3.docx DOCX document
TO 1 CDRLs Exhibit A B Midwest BECOS vf1.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ PWS Attch 1 Midwest Base Site List BECOS vf6.xlsx XLSX spreadsheet
20201217_Compensation Plan Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Midwest BECOS vf1.pdf PDF
MO20190001 8Nov2019 Statewide Missouri.pdf PDF
MI20190135 1Nov2019 Marquette Building.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Q #Document ReferenceRFP QUESTIONSDocument ReferenceGOV'T RESPONSERESPONSE DATE
1Wurtsmith; Arrow Street PTS 2010 OMM Manual (AR461693)Can the AF provide the March 2010 Arrow Street PTS OMM manual? Please provide updated with current system O&M components/required mantenance since discharge to CTS.Wurtsmith; Arrow Street PTS 2010 OMM Manual (AR461693)The March 2010 Arrow Street PTS OMM manual is available on the Wurtsmith Administrative Record site (#461693). The draft CTS O&M manual will be available at the Google site.29-Apr-20
2Wurtsmith, 2018 and 2019 RA-O annual ReportThe 2018 and 2019 RA-O Annual report for the Pump and Treat Systems are not available on the AR. Can the AF provide copies of those reports?Wurtsmith, 2018 and 2019 RA-O annual ReportThe Draft 2018 RA-O Annual Report for PTSs will be available at the Google site. The 2019 RA-O Annual Report for PTSs has not been submitted.29-Apr-20
3Wurtsmith, All PTSPlease provide a copy of the monitoring well and the pumping well installation logs for the well fields?Wurtsmith, All PTSThis information should be available on the Wurtsmith Administrative Record.29-Apr-20
4Wurtsmith, CTSPlease provide the most recent three analytical data for Central Treatment System influent/internal/effluent dataWurtsmith, CTSThe requested Central Treatment System analytical data is available in the most recent Monthly Technical Status Report (MTSR). The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
5Wurtsmith, SRDthe only SRD available on the AR for ASPTS is the 2016 SRD, is it still applicable for monitoring requirements?Wurtsmith, SRDArrow Street Pump and Treat System and Benzene Plant Pump and Treat System well fields are now connected to the Central Treatment System. The 2016 Substantive Requirements Document is still applicable for uploading data to the MiWaters website; however, Central Treatment System is being sampled based upon an interim sampling plan issued by EGLE. The interim sampling plan was uploaded to the Google Drive29-Apr-20
6Wurtsmith, All PTSWhat PFAS sampling is required for system OMM? Please provide a copy of all lab data generated during OMM activities (e.g., geochemical analysis, PFAS, internal sample port analysis) for Arrow Street PTS, Benzene Plant PTS, FT002 PTS, Mission Street PTSWurtsmith, All PTSReview the Substantive Requirements Documents for all pump and treat system and the interim sampling plan for the Central Treatment System for compliance sampling requirements. Review the Monthly Technical Status Reports for performance monitoring frequencies. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
7Wurtsmith, All PTSPlease provide copies of recent routine site and PTS inspections formsWurtsmith, All PTSReview the available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
8Wurtsmith, All PTSPlease provide a copy of the Arrow Street PTS, Benzene Plant PTS, FT002 PTS, Mission Street PTS and CTS alarm lists and logs and any repairs completed as a result of alarmsWurtsmith, All PTSReview the available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
9Wurtsmith, All PTSWhat software and licenses are required to operate and maintain the PTS's?Wurtsmith, All PTSReview the O&M manuals for each system. APTS and EWTS O&M Manuals are available on the AR. Consult the State of Michigan regarding licensing requirements. The draft CTS and MPTS O&M manuals are available on the Google site.29-Apr-20
10Wurtsmith, All PTSWhat routine subcontractors are used to complete OMM activities and what is the current routine OMM activities since air stripping towers are no longer active?Wurtsmith, All PTSThe incumbent contractors perform the routine O&M. See Annual RA-O Reports. Review the available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
11Wurtsmith, All PTSHow are pumping well specific capacities monitored?Wurtsmith, All PTSSee Annual RA-O Reports. Review the available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
12Wurtsmith, All PTSHow often are pumping wells replaced/rehabilitated to meet specific capacity needs?Wurtsmith, All PTSThere is no set schedule. Please review the Annual RA-O Reports. Review the available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
13Wurtsmith, All PTSWhat waste is generated during OMM activities and at what frequency?Wurtsmith, All PTSFor FT002: Review the available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive. For CTS:

- approximately 500 gallons of sludge while running the water back through the treatment system.

- approximately 3,000 gallons of carbon sludge.

For MPTS: approximately 1.5 drums of filter bags per month.

29-Apr-20
14Wurtsmith, All PTSPlease provide a copy of non-hazardous and hazardous bill of ladings and manifests for OMM waste generatedWurtsmith, All PTSNo bills of lading have been generated from O&M activities.29-Apr-20
15Wurtsmith, All PTSPlease provide a copy of system OMM data logs (e.g, flow data, pressure data, level data, etc.)Wurtsmith, All PTSSee Annual RA-O Reports. Review the available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
16Wurtsmith, All PTSPlease provide a copy of current equipment inventoried and maintained for the PTS'sWurtsmith, All PTSClarify question. Government furnished equipment? Components of each PTS? Other?29-Apr-20
17Wurtsmith, All PTSWhat routine supplies and equipment require procurement to annually operate the PTS's?Wurtsmith, All PTSSee Annual RA-O Reports. Review the available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
18Wurtsmith, All PTSHow often are well pumps replaced, what wells, and what subcontractor completes the work?Wurtsmith, All PTSSee Annual RA-O Reports. Review the available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
19Wurtsmith, All PTSPlease provide a list of all repairs that were requried last year (2019) for the PTS's?Wurtsmith, All PTSSee Annual RA-O Reports. Review the available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
20Wurtsmith, All PTSAre PWs rehabilitated twice annually?Wurtsmith, All PTSThere is no set schedule. Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
21Wurtsmith, All PTSAre pumping wells replaced (1 every 3 years)?Wurtsmith, All PTSThere is no set schedule. Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
22Wurtsmith, CTSWhat PFAS, metals, and/or VOC concentrations trigger media change out?Wurtsmith, CTSThe draft CTS O&M manual will be made available on the Google site. Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
23Wurtsmith, Mission Street PTSWhat PFAS, metals, and/or VOC concentrations trigger media change out?Wurtsmith, Mission Street PTSThe MPTS O&M manual is currently in draft and will be available on the Google site. Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
24Wurtsmith, FT002 PTSWhat PFAS, metals, and/or VOC concentrations trigger media change out?Wurtsmith, FT002 PTSThe FT002 PTS O&M manual is available on the Wurtsmith Administrative Record (AR# 477287). Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
25Wurtsmith, Benzene Plant PTS 2002 OMM Manual (AR461694)Is the February 2002 Benzene Plant PTS OMM the most recent OMM manual? Can the AF provide an update with current system components/requirements since discharge to CTS?Wurtsmith, Benzene Plant PTS 2002 OMM Manual (AR461694)The Benzene Plant PTS and Arrow Street PTS extraction wells are now connected to the Central Treatment System. The CTS O&M manual is currently in draft and will be made available on the Google site.29-Apr-20
26Wurtsmith, BPTSIs the 2016 SRD still applicable for monitoring requirements? If not please provide the most recent SRD for Benzene PTSWurtsmith, BPTSThe ASPTS and BPTS extraction well fields are now connected to the Central Treatment System. Central Treatment System results are uploaded to the MiWaters website per the requirements of the 2016 SRD. Sampling at Central Treatment Plant is conducted per the EGLE Interim Sampling Plan which was uploaded to the Google Drive29-Apr-20
27Wurtsmith, Mission Street PTSCan the AF provide a copy of the most recent OMM manual for the Mission Street Pump and Treat System, as no O&M manual is located on AR?Wurtsmith, Mission Street PTSThe MPTS O&M manual is currently in draft and will be made available on the Google site.29-Apr-20
28Wurtsmith, Mission Street PTSIs the 2016 SRD still applicable for monitoring requirements? If not please provide the most recent SRD for Mission Street PTSWurtsmith, Mission Street PTSYes, the 2016 SRD is still applicable for monitoring the Mission Street PTS29-Apr-20
29Wurtsmith, FT-02 PTS OMM manual (AR469569)Is the December FT-02 Groundwater PTS the most recent OMM manual? Can the AF provide an updated version with current system O&M components/required maintenance?Wurtsmith, FT-02 PTS OMM manual (AR469569)The June 2016 FT002 O&M manual is the most current version. The FT002 PTS O&M manual is available on the Wurtsmith Administrative Record (AR# 477287).29-Apr-20
30Wurtsmith, FT02 PTSCan the AF provide a copy of the current SRD/NPDES discharge permit, and any regulatory approvals to modify the existing permit?Wurtsmith, FT02 PTSAll Wurtsmith SRDs have been loaded to the Google drive.29-Apr-20
31Wurtsmith, Central Treatment SystemPlease provide a copy of the most recent O&M Manual for CTS with all appendiciesWurtsmith, Central Treatment SystemThe CTS O&M manual is currently in draft and will be made available on the Google site. Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
32Wurtsmith, CTS Mission PTS and FT002 PTsWill expansion of the current groundwater capture extent and extraction rate be part of the scope?Wurtsmith, CTS Mission PTS and FT002 PTsNo, it will not be.29-Apr-20
33Wurtsmith, Central Treatment SystemWhich GAC media is used at the CTS and what is the observed changeout frequency for all vessels, since startup in 2018?Wurtsmith, Central Treatment SystemThe CTS O&M manual is currently in draft and will be made available on the Google site. Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
34Wurtsmith, Mission Street PTSWhich media is used at the Mission Street PTTS and what is the observed changeout frequency for all vessels, since startup in 2018?Wurtsmith, Mission Street PTSMission Street PTS became operational 30-Dec-19. Ionizing resin is the treatment media. The system has not been in operation a sufficient amount of time to develop media changeout frequencies, but it is anticipated that the resin will be changed every two years. The MPTS O&M manual is currently in draft and will be made available on the Google site. Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
35Wurtsmith, FT002What maintenance is required for the infiltration trenches at FT002?Wurtsmith, FT002Please review the Annual RA-O Reports for FT-02, LF30/31 and SS-5729-Apr-20
36Wurtsmith, FT002Are additional injections anticipated in the Infiltration Trenches at FT002?Wurtsmith, FT002Additional injections are not anticipated at this time.29-Apr-20
37Wurtsmith, FT002Is the new PBR contractor responsible for implementing the RAWP construction submitted by Bay West, including the IAB Source Area Treatment?Wurtsmith, FT002No. The current PBR contractor will implement the IAB remedy. For bidding purposes, in addition to the annual RA-O sampling conducted at Site FT002, assume that the performance monitoring identified in the Final Remedial Action Work Plan for VOCs (Bay West, 2017) will also be required.29-Apr-20
38Wurtsmith, FT002According to the 2018 RAO Report, 3 different GACs were used in 2018. Which one is currently in use? What is the observed changeout frequency in 2019?Wurtsmith, FT002Please referenct the 2018 Annual RA-O Systems report.29-Apr-20
39Wurtsmith, CTSPlease provide a copy of UFP-QAPP (ASL, 2019)?Wurtsmith, CTSThe CTS UFP-QAPP is currently in draft and will be made available on the Google site.29-Apr-20
40Wurtsmith, CTSCan we have a copy of most recent version of SRD?Wurtsmith, CTSThe 2016 SRD is the most recent and the Interim Sampling Plan for Central Treatment System was uploaded to the Google Drive29-Apr-20
41Wurtsmith, CTSWhat is the required frequency of monitoring of Outfall 007A?Wurtsmith, CTSPlease review the 2016 SRD and Interim Sampling Plan for Central Treatment System which was uploaded to the Google Drive29-Apr-20
42Wurtsmith, CTS and FT0002 PTSHow often was carbon changed out in 2019Wurtsmith, CTS and FT0002 PTSThe CTS O&M manual is currently in draft and will be made available on the Google site. Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
43Wurtsmith, CTS and FT0002 PTSHow frequent is backwashing?Wurtsmith, CTS and FT0002 PTSThe Benzene Plant PTS and Arrow Street PTS extraction wells are now connected to the Central Treatment System. The CTS O&M manual is currently in draft and will be made available on the Google site. The FT002 PTS O&M manual is available on the Wurtsmith Administrative Record (AR# 477287). Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
44Wurtsmith, CTSWhat frequency is remediation-derived waste (i.e., settled solids and expanded GAC) generated during OMM activities?Wurtsmith, CTSThe CTS O&M manual is currently in draft and will be made available on the Google site. Please review the Annual RA-O Reports and available Monthly Technical Status Reports available on the Google drive. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
45Wurtsmith, CTSHow often are treatment pumps replaced?Wurtsmith, CTSThere is no set frequency. Please review the Annual RA-O Reports29-Apr-20
46Wurtsmith, CTSMay we receive a copy of monthly and annual utility invoices?Wurtsmith, CTSUtility information was provided on the Google Drive.29-Apr-20
47Wurstmith, SS072SS072 has a draft ROD dated 2011, however the 3rd 5 yr review states the Site was still awaiting final signatures (2013). Was the ROD ever finalized? If so please provide a copy of the Final ROD.Wurstmith, SS072The SS072 ROD has not been finalized.29-Apr-20
48Wurstmith, SS072The Final Bioremediation Pilot Study Completion Report (2015) recommends additional injections to maintain biological activity in the treatment area. The 2018 Annual RAO states additional injections should be implemented once the ROD is approved. Has the ROD been approved? Have additional injections been performed? Are additional injections required? If not performed yet, will this be the responsibility of the new PBR contrator?Wurstmith, SS072No, the ROD has not been approved. The Air Force has determined that the risk assessment included in the Final RI (MWH, 2008) is incomplete. It is intended that the current contract will addressed the proposed plan and ROD. For bidding purposes, assume groundwater monitoring, LUC/IC inspections and Five-Year Reviews are required to meet the RA-O performance objective.29-Apr-20
49Wurtsmith, WP004Attachment 1 shows Projected site closure is 2024 despite the Performance Objective being RA-O. Groundwater analytical data do not support SC by 2024, does the USAF have any agreement with EGLE for SC despite the fact that contaminants of concern are still exceeding the EGLE Residential Drinking Water Criteria? Or does the AF anticipate conditional restricted closure? If not, what is the appropriate SC date?Wurtsmith, WP004There is no AF agreement with EGLE for site closure, and the AF is not pursuing conditional restricted closure. Per Attachment 1 of the PWS, the Performance Objective under this PBR is RA-O, not SC. For bidding purposes, assume the RA-O requirements (groundwater monitoring, LUC/IC inspections and Five-Year Review) will be required for the duration of the POP.29-Apr-20
50Wurtsmith, OT016Attachment 1 shows projected SC date is 2023. Groundwater analytical data do not support SC by 2023 as the most recent ground water analytical data show exceedance to Criteria. Does the USAF have any agreement with EGLE for SC despite the fact that contaminants of concern are still exceeding the EGLE Residential Drinking Water Criteria? Or does the AF anticipate conditional restricted closure? If not, what is the appropriate SC date?Wurtsmith, OT016There is no AF agreement with EGLE for site closure, and the AF is not pursuing conditional restricted closure. Site OT016 is located adjacent to Site FT002 and monitoring wells have been impacted by PFOS/PFOA. Five (5) wells at Site OT016 are sampled in conjunction with the PFOS/PFOA sampling associated with Site FT002. The Performance Objective is listed in Attachment 1 of the PWS has been revised to RA-O, and the SC date has been revised to "indefinite". For bidding purposes, assume the RA-O requirements (groundwater monitoring, LUC/IC inspections and Five-Year Review) will be required for the duration of the POP.29-Apr-20
51Wurtsmith, SS005Attachment 1 shows projected SC date is 2024. Groundwater analytical data do not support SC by 2024 as the most recent ground water analytical data show exceedance to Criteria. Does the USAF have any agreement with EGLE for SC despite the fact that contaminants of concern are still exceeding the EGLE Residential Drinking Water Criteria? Or does the AF anticipate conditional restricted closure? If not, what is the appropriate SC date?Wurtsmith, SS005There is no AF agreement with EGLE for site closure, and the AF is not pursuing conditional restricted closure. Per Attachment 1 of the PWS, the Performance Objective under this PBR is RA-O, not SC. For bidding purposes, assume the RA-O requirements (groundwater monitoring, LUC/IC inspections and Five-Year Review) will be required for the duration of the POP.29-Apr-20
52Wurtsmith, SS008Attachment 1 shows projected SC date is 2024 despite the Performance Objective is RA-O. Groundwater analytical data do not support SC by 2024, does the USAF have any agreement with EGLE for SC despite the fact that contaminants of concern are still exceeding the EGLE Residential Drinking Water Criteria? Or does the AF anticipate conditional restricted closure? If not, what is the appropriate SC date?Wurtsmith, SS008There is no AF agreement with EGLE for site closure, and the AF is not pursuing conditional restricted closure. Per Attachment 1 of the PWS, the Performance Objective is RA-O, not SC. For bidding purposes, assume the RA-O requirements (groundwater monitoring, LUC/IC inspections and Five-Year Review) will be required for the duration of the POP.29-Apr-20
53Wurtsmith, 2019 Final Remedial Enhancement Work Plan LF30/31Section 3.2 indicates an FS, followed by an ESD, will be completed and will include the prefered alternative and landfill cap drainage enhancements. Is a copy of the FS and/or ESD available that states the preferred path forward for the site?Wurtsmith, 2019 Final Remedial Enhancement Work Plan LF30/31For clarification, Section 3.1 of the referenced document indicates a FS followed by an ESD.

Section 3.2 of the referenced document incorrectly states “The FS will also include the conceptual design for the preferred alternative and landfill cap drainage enhancements to facilitate capturing runoff on the upgradient side of the LF030/031 landfill cap.” The FS will identify and evaluate remedial technologies to address the petroleum hydrocarbon source area. The FS will not consider landfill cap drainage enhancements.

There is a separate Draft Final 30% Design Document for Landfill Cap Drainage Enhancement and will be made available on the Google site.

The Draft Final Feasibility Study LF030/031 Light, Non-Aqueous Phase Liquid Area is available and will be made available on the Google site.

The ESD has not been prepared and therefore is not available.

29-Apr-20
54Wurtsmith, SS006Attachment 1 shows projected SC date is 2024. Groundwater analytical data do not support SC by 2024 for Benzene Plant Pump and Treat System wells neither for VOCs nor for PFAS, does the USAF have any agreement with EGLE for SC despite the fact that contaminants of concern are still exceeding the EGLE Residential Drinking Water Criteria? Or does the AF anticipate conditional restricted closure? If not, what is the appropriate SC date?Wurtsmith, SS006There is no AF agreement with EGLE for site closure, and the AF is not pursuing conditional restricted closure. Site SS006 are the extraction wells associated with the Benzene Plant Pump and Treat System which have now been routed to the Central Treatment System. The Performance Objective under this PBR listed in Attachment 1 of the PWS has been revised to RA-O. Note that the SC date shown on Attachment 1 of the PWS is "indefinite" not SC. For bidding purposes, assume the RA-O requirements (groundwater monitoring, LUC/IC inspections and Five-Year Review) will be required for the duration of the POP.29-Apr-20
55Wurtsmith, FT002Attachment 1 of the PWS shows projected response completion date of FY25 for FT002. What response is projected to be completed by FY25?Wurtsmith, FT002For bidding purposes, assume RC of FY25 is for VOCs. The presence of PFOS/PFOA will not allow for the attainment of SC. Note that RA-O for Site FT002 includes groundwater sampling for PFOS/PFOA.29-Apr-20
56Wurtsmith, LF0272018 RAO Report indicates that the Air Force will prepare an FS, including NFA with Land Use restrictions. Has the AF prepared the FS? If so, can a copy be provided?Wurtsmith, LF027The FS has not been prepared and is therefore not available.29-Apr-20
57Wurtsmith, LF027Attachment 1 of the PWS mentions a ROD is required to achieve RC. 2018 RAO Report suggests NFA with Land Use restrictions. If ROD is required what is the selected remedy for this site. Was there a proposed plan submitted for this site or ESD? Can the AF provide a copy of the document with remedy selection that needs to be followed along with the ROD?Wurtsmith, LF027The ultimate remedy selection is a function of the RI/FS. The AF has not prepared a FS for LF027 as described in the 2018 RA-O LTM report. Per Attachment 1 of the PWS, a feasibility study, Proposed Plan and ROD are required.29-Apr-20
58Wurtsmith, ST068Attachment 1 shows projected SC date is 2024. Groundwater analytical data do not support SC by 2024 specifically the sampling plan is biennual and the latest ground water analytical data show exceedance to Criteria. Does the USAF have any agreement with EGLE for SC despite the fact that contaminants of concern are still exceeding the EGLE Residential Drinking Water Criteria? Or does the AF anticipate conditional restricted closure? If not, what is the appropriate SC date?Wurtsmith, ST068There is no AF agreement with EGLE for site closure, and the AF is not pursuing conditional restricted closure. Per Attachment 1 of the PWS, the Performance Objective under this PBR is RA-O, not SC. For bidding purposes, assume the RA-O requirements (groundwater monitoring, LUC/IC inspections and Five-Year Review) will be required for the duration of the POP.
29-Apr-20
59Wurtsmith, SS057What maintenance is required for the BS system at SS057?Wurtsmith, SS057BV/BS maintenance activities are described in the Monthly Technical Status Reports (MTSR). The documents have been uploaded to the BECOS documents site.29-Apr-20
60Wurtsmith, SS057Is decommissioning and removal of the BV/BS system part of the scope following source area remediation?Wurtsmith, SS057Yes. For bidding purposes, assume the IAB application at SS057 will successfully addresses the source areas and eliminates the dissolved VOC plume from the BV/BS system footprint, and that the BV/BS system will be deactivated and removed from the Site.29-Apr-20
61Wurtsmith, SS0712018 RAO LTM document states the Air Force will cease sampling and apply for NFA, however the SC date is set for 2025. Has, or will, an NFA document be submitted for SS071 by the current contractor? Or is more sampling required prior to NFA?Wurtsmith, SS071AF submitted Site SS071 Site Closure Memo to MDEQ on October 1, 2015 who provided concurrence letter to that effect dated January 11, 2016.29-Apr-20
62Wurtsmith, All SCFor all Site Closure sites, is the PBR contractor responsible for well abandonments or does the USAF want to keep the monitoring wells for future PFAS monitoring?Wurtsmith, All SCWell abandonment for SC sites is expected unless that particular well is identified for PFAS monitoring.29-Apr-20
63Chanute, LF 1 -4The latest Annual OM&M Report for Landfills 1-4 at former Chanute AFB on the Air Force Administrative Record is dated 2015. Please provide the latest version of the 2019 OM&M Report.Chanute, LF 1 -4Draft 2016, 2017, and 2018 OM&M Reports are posted on the Google Drive site.29-Apr-20
65PWS Section 1.3 Applicable DocumentsThis Section includes the generic language: "The Contractor shall identify and comply with all applicable federal, state, and local statutes; Department of Defense (DoD) and AF instructions, manuals, handbooks, regulations, guidance, and policy letters." No reference to the "Air Force Guidance Memorandum Establishing Aqueous Film Forming Foam (AFFF)-Related Waste Management Implementation Guidance, AFGM 2019-32-01" was found in this Section or other areas of the documents provided. IDW that is anticipated to be generated includes development water, purge water, decon water, water with high solids content from extraction/recovery/purge well rehabilitation events, drill cuttings, excavation spoils, spent carbon from GAC treatment systems, solids generated from backwashing carbon treatment systems, spent resin from resin treatment systems, etc. Please provide direction regarding whether Contractors will be required to follow AFGM 2019-32-01 for these and other types of IDW generated when executing work under the Midwest Region BECOS Contract.PWS Section 1.3 Applicable DocumentsCompliance with AFGM 2019-32-01 is mandatory.29-Apr-20
66PWS Attach. LF-30/31 (Wurtsmith)It is known that groundwater recovered from LF-30/31 purge wells and treated at the EWTS contains PFOA and PFOS, which are not treated by the EWTS. Will the Contractor be required to manage effluent from the EWTS in accordance with AFGM 2019-32-01?PWS Attach. LF-30/31 (Wurtsmith)Compliance with AFGM 2019-32-01 is mandatory.29-Apr-20
67GeneralIs there any IDW at any installation that is specifically excluded/exempt from being managed in accordance with AFGM 2019-32-01? If yes, please provide a comprehensive list/summary of these IDW streams.GeneralNot at this time.29-Apr-20
68PWS Attach. A; SS021 (Wurtsmith)What is the historical and/or predicted change out frequency for the sacrificial carbon vessel associated with the CTS and and the disposal of the spent carbon?PWS Attach. A; SS021 (Wurtsmith)Please review annual RA-O PTS reports and Monthly Technical Stats Reports. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
69PWS Attach. A; SS021 (Wurtsmith)What is the historical and/or predicted change out frequency for the Lead carbon vessel associated with the CTS and the disposal of the spent carbon. Note that this is a different vessel than the sacrificial vessel discussed in the previous question?PWS Attach. A; SS021 (Wurtsmith)Please review annual RA-O PTS reports and Monthly Technical Stats Reports. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
70PWS Attach. A; SS021 (Wurtsmith)It is understood the Air Force is currently paying the City of Oscoda a monthly fee for the discharge of treated water from the CTS to the sewer system. Under the Midwest BECOS Contract, will the Air Force continue to make these payments or will they become the responsibility of the Contractor? If they will become the Contractor's responsibility, please provide the monthly fee.PWS Attach. A; SS021 (Wurtsmith)The AF will continue to pay the CTS discharge service fee to the Charter Township of Oscoda.29-Apr-20
71PWS Attach. A; SS021What is the historical and/or predicted cleaning frequency for the conical bottom settling tank for the CTS? What is the mass of solids removed and disposed of during each cleaning event?PWS Attach. A; SS021Please review annual RA-O PTS reports and Monthly Technical Stats Reports. The last 12 MTSR reports have been uploaded to the Google Drive.29-Apr-20
72PWS Attach. A; OT024 (Wurtsmith)What is the predicted frequency for changing out the resin in the Mission Street PTS and disposing of the spent resin?PWS Attach. A; OT024 (Wurtsmith)Mission Street PTS became operational 30-Dec-19. Ionizing resin is the treatment media. The system has not been in operation a sufficient amount of time to develop media changeout frequencies, but it is anticipated that the resin will be changed every two years. The MPTS O&M manual is currently in draft and will be made available on the Google site.29-Apr-20
73PWS Attach. A; OT024 (Wurtsmith)How often do the bag filters at the Mission Street PTS require change out?PWS Attach. A; OT024 (Wurtsmith)Bag filter change out times are TBD at this point. A UV treatment element has been added to the treatment train prior to the bag filters to reduce the change out frequency initially observed. Assume daily change out of the bag filters.29-Apr-20
74PWS Attach. A; SS072 (Wurtsmith)The PWS attachment 1 indicates that a Biowall is a component of the current remedy; however, neither a Remedial Action Work Plan (RAWP) nor a Remedial Action Construction (RA-C) report can be found in the available records. Please provide the documents describing the biowall's design, construction, and current O&M program.PWS Attach. A; SS072 (Wurtsmith)The Final Enhanced Bioremediation Pilot Study Completion Report, Former Wurtsmith Air Force Base, IRP Site SS-72, Oscoda, MI prepared by MWH Americas, Inc, dated February 19, 2015 is available on the Administrative Record (AR# 460860)29-Apr-20
752018 Annual LTM RA-O Rpt. Wurtmith IRP Site SS072The 2018 Annual RA-O report indicates that PCE concentrations exceed the PCE GSI criteria of (60 ug/L) in a couple of the compliance wells. Have any course corrections been made in 2019 to reduce the PCE concentration entering Clark's March and, if so, when does the AF anticipate compliance well concentration to be below the PCE GSI?2018 Annual LTM RA-O Rpt. Wurtmith IRP Site SS072The AF determined an updated Risk Assessment must be completed prior to moving forward with issuance of a Proposed Plan. The current PBR contractor will be completing the update.29-Apr-20
76PWS Attach. A; LF027 (Wurtsmith)Notes state: "FFS and LUC/IC Only ROD required to achieve RC." Please clarify what this note means. Is the Contractor expected to prepare a FFS, or a ROD, or perhaps both a FFS and a ROD, for this site?PWS Attach. A; LF027 (Wurtsmith)Yes, per Attachment 1 of the PWS, a feasibility study, Proposed Plan and ROD are required.29-Apr-20
80PWS Section 6.5This Section states, in part, "The Contractor is responsible for implementation of current and subsequent Five-year Review recommendations that are integral to the selected remedy excluding emerging requirements as specified in each TO." It is our understanding that the Fourth Five-Year Review for Wurtsmith will be issued after the bid due date for the Midwest BECOS Contract. As such, Contractors have no knowledge of the recommendations that will be included in this document prior to submitting our bids. Will the Contractor be responsible for implementing recommendations in the Fourth Five-Year Review for Wurtsmith even though we have no basis to price any recommendations that are included therein? For example, if the Fourth Five-Year Review recommends one or more of the CSI (MWH, 2016) recommendations be implemented to address deficiencies at Wurtsmith IRP Site LF-30/31, will the Contractor be responsible for implementing these recommendations? It is noted that this question applies to any other installation where the next Five-Year Review is issued after the bid due date for the Midwest BECOS Contract.PWS Section 6.5Clarification - the comment applies to Section 6.15 of the PWS.
The Draft 4th Five-year Review and will be made available on the Google site.29-Apr-20
81Final 2018 Annual RA-O Report, IRP Sites FT-02, LF-30/31, and SS-57, WurthsmithThis document suggests the LF-30/31 EWTS performance data does not achieve its original design criteria, with metals removal in Ponds 1 and 2 significantly below the design objectives. As a result, there is considerable metals carry over into Ponds 3 and 4 and the aggregate media in these two ponds is becoming occluded with precipitated metals and/or biological fouling. This is evidenced by some surface water flow in Ponds 3 and 4, both of which are intended to be subsurface flow wetlands. During warm weather months, Ponds 3 and 4 go anaerobic, resulting in the dissolution of previously precipitated iron and manganese. Based on the information provided, it seems likely the EWTS will fail sometime during the Period of Performance. Do Contractors need to include the level of effort to address the underperformance of the EWTS with respect to its original design, including it's likely failure during the Period of Performance? Does this include the possible reconstruction of one or more ponds and, if necessary, the associated infiltration galleries?Final 2018 Annual RA-O Report, IRP Sites FT-02, LF-30/31, and SS-57, WurthsmithYes, routine O&M of the EWTS ponds to ensure proper performance is included in this PWS. Please review the Annual RA-O Reports to determine the level of effort required. At this time, reconstruction of one or more of the ponds and/or associated infiltration galleries is not part of this TO. If that becomes necessary, the AF will evaluate issuance of another TO under this IDIQ.29-Apr-20
82CSI Report, WurtsmithThis report concludes that the existing purge well network associated with LF-30/31 is only capturing approximately 70% of the groundwater flux at an extraction rate of 340 gpm and that further increasing pumping rates at the existing purge well network is not an option since the wells are pumping at capacity. Do Contractors need to include the level of effort to improve plume capture (a ROD objective) by installing additional purge wells? If yes, given the underperformance of the EWTS as noted in the question above, do Contractors need to include modifying/expanding the EWTS to handle the additional flow that will result?CSI Report, WurtsmithAt this time, assume routine O&M of the existing purge wells is required to maintain the existing capture is required. Please review the Annual RA-O Reports to determine the level of effort required. At this time, the addition of additional purge wells and modification/expansion of the EWTS is not part of this TO. If it becomes necessary to add addition purge wells and modify/expand the EWTS, the AF will evaluate issuance of another TO under this IDIQ.29-Apr-20
83Final 2018 Annual RA-O Report, IRP Sites FT-02, LF-30/31, and SS-57, WurthsmithIt is known that groundwater pumped from LF-30/31 purge wells and treated by the EWTS contains PFOA and PFOS, which the EWTS is not designed to remove. If any material needs to be removed from any of portion of the EWTS system (e.g., sediment in Ponds 1 or 2, aggregate media from Ponds 3 or four, water within the EWTS that must be removed to access sediment or aggregate), does this material need to be managed in accordance with AFGM 2019-32-01?Final 2018 Annual RA-O Report, IRP Sites FT-02, LF-30/31, and SS-57, WurthsmithCompliance with AFGM 2019-32-01 is mandatory.29-Apr-20
84PWS Attach. A; LF030/031 (Wurtsmith)Does the Air Force have plans and a schedule to treat the PFOA and PFOS impacted groundwater pumped from LF030/031 purge wells? How will these plans impact Contract requirements to operate and maintain the LF030/031 EWTS? Given the LF030/031 EWTS issues identified in the previous questions, this information is critical to accurately scoping and pricing required work and costs for the LF030/031 EWTS over the time period covered by the Contract.PWS Attach. A; LF030/031 (Wurtsmith)The BECOS contractor will operate and maintain the EWTS per current parameters which do not include PFAS compounds.29-Apr-20
85Final 2018 Annual RA-O Report, IRP Sites FT-02, LF-30/31, and SS-57, WurthsmithBased on it operational history, how many more years of operation are anticipated before EWTS Ponds 1 and 2 at LF-30/31 will require sludge removal?Final 2018 Annual RA-O Report, IRP Sites FT-02, LF-30/31, and SS-57, WurthsmithPlease review available reports (Annual RA-O Systems Reports, Monthly Technical Status Reports, Five-Year Review Reports, and others as appropriate) as well as the EWTS O&M Manual available on the AR.29-Apr-20
86PWS Attach. A; SS57 (Wurtsmith)Language in Current Remedy includes "BioSparging (BS) ongoing and in-situ bioremediation injections implemented in 2019". Under Type of System, it states "Biosparging Systems". Under Current Frequency of Monitoring, it states "annual monitoring". Please confirm that in situ bioremediation injections were implemented in 2019. Assuming the answer is yes, please confirm whether additional injections are anticipated under the contract. Additionally, please confirm that the monitoring frequency is annual, based on a new remedy having been implemented within the past year.PWS Attach. A; SS57 (Wurtsmith)In Situ bioremediation injections were implemented in 2019.

From the Draft Remedial Action Completion Report: "Applications of IAB solutions are anticipated to proceed on a semi-annual basis; the next application is scheduled for Spring 2020. Results of the performance monitoring will be used to refine the NaNO3 and TSP dosages and to determine the optimal application frequency."

Performance groundwater monitoring will be conducted on a quarterly basis for the first year of operation and modifications to the performance sampling plan will be presented in the Annual RA-O reports. Annual results of performance monitoring will be reported in annual RA-O reports.

LTM will continue at an annual frequency.

Final Remedial Action Completion Report for SS057 is expected in the very near future and will be made available.29-Apr-20
87RAWP for VOCs - IRP Site FT002 (Wurtsmith)Has construction work associated the the referenced document been completed? If so, please provide the RA-C Report and any reports regarding ongoing operation and maintenance of the remedy.RAWP for VOCs - IRP Site FT002 (Wurtsmith)Referenced document description incomplete - all required reports have been provided.29-Apr-20
88TO 2 PWS Attch 1 Midwest Base Site List BECOS vf9KI Sawyer sites indicate system decommissioning. Does this include well abandonments and remedial system removal?TO 2 PWS Attch 1 Midwest Base Site List BECOS vf9After Site ST004 at K.I. Sawyer reaches RC, system decommissioning will include removal and proper disposal of all components of the treatment system, including sparge wells, but not monitoring wells. The recently finalized ST004 Optimized Exit Strategy and Remedial Action Closure Plan has been added to the Google document site as added reference.29-Apr-20
89TO2 PWS Attch 2 KI Sawyer Base Spec Req Midwest BECOS vf2.docThere are no reports listed in this document or on the AFCEC Admin Record related to KI Sawyer PFAS RA-O activities at CG406. Can a work plan or sampling report be provided on the AR?TO2 PWS Attch 2 KI Sawyer Base Spec Req Midwest BECOS vf2.docYes, for K.I. Sawyer Site CG406, documents outlining system operations and sampling of the home treatment system have been added to the Google Document site as requested.29-Apr-20
90PWSThe PWS requires the Contractor to: “pay the rent or purchase price and associated expenses for the AF to maintain or support modification of existing rights of access”. For each installation, please provide a list of current access agreements/rights, associated historical rent/fees/renewal fees/other fixed costs, including the frequency each fixed cost for each access agreeement at each Installation. This information is needed in support of providing accurate costs for an activity that can vary widely from agreement to agreement.PWSAssume no costs for rights of access for Wurtsmith.29-Apr-20
91PWS, Multiple, Meeting and Teleconference SupportIn one PWS it states: “If needed, contractor will provide services of a professional facilitator to run public meetings and ensure all parties are provided an opportunity to communicate. This requirement is only necessary in the event of controversial or adversarial situations where predominate viewpoint of vocal community members is negative and impairs free flowing exchange of information. Professional services can diffuse these negative group dynamics and enable positive outcomes for gaining understanding and trust among various stakeholders.” In another PWS it states: “At the direction of the Government, the Contractor shall support, coordinate, and attend community, stakeholder, Restoration Advisory Board (RAB), and other periodic public meetings/teleconferences as necessary. Public meeting requirements include meeting logistics (e.g., facilities, audio/visual), newspaper notices, radio announcements, agendas, presentations, handouts, and meeting summaries/minutes, and transcripts where specified.”

At the former Wurtsmith AFB, quarterly RAB meetings are not facilitated by the Current PBR Contractor. Instead, they are facilitated by another Air Force Contractor (i.e., Cherokee Nations). Under the new Contract, will the Government direct the new Contract holder to provide Wurtsmith RAB meeting coordination, including all the requirements cited above or will this work remain with a different Air Force Contractor? If the new Contractor holder is tasked with meeting coordination, will the government require the Contractor to provide the services of a professional facilitator? PWS, Multiple, Meeting and Teleconference Support BECOS contractor will be required to provide third part facilitator support beginning mid-2023. Assume two RABs for 2003 and four RAB meetings annually after that timeframe. 29-Apr-20