- Former Plattsburgh AFB PBR RFI - SOO Enclosure 5 Acronyms and Definitions
FA8903-20-R-0015
Midwest Region Attachment 2 5 December 2019
Acronyms and Definitions
Acronyms
| ADR |
| Alternative Dispute Resolution |
| ADEC |
| Alaska Department of Environmental Conservation |
| AFCEC |
| Air Force Civil Engineer Center |
| API |
| American Petroleum Institute |
| ARARs |
| Applicable or Relevant and Appropriate Requirements |
| AST |
| Above Ground Storage Tank |
| ASTM |
| American Society for Testing and Materials |
| BRAC |
| Base Realignment and Closure |
| CDRL |
| Contract Data Requirements List |
| CDUT |
| Contract Deliverables Upload Tool |
| CERCLA |
| Comprehensive Environmental Response, Compensation, and Liability Act |
| CFR |
| Code of Federal Regulations |
| CLIN |
| Contract Line Item Number |
| CONUS |
| Continental United States |
| COR |
| Contracting Officer’s Representative |
| CMCR |
| Corrective Measure Completion Report |
| CPSMR |
| Contractor’s Progress, Status, and Management Report |
| CQP |
| Construction Quality Plan |
| CRP |
| Community Relations Plan |
| C/SSR |
| Cost/Schedule Status Report |
| DoD |
| Department of Defense |
| DQO |
| Data Quality Objectives |
| DSMOA |
| Defense and State Memorandum of Agreement |
| EE/CA |
| Engineering Evaluation / Cost Analysis |
| ELAP |
| Environmental Laboratory Accreditation Program |
| ERP |
| Environmental Restoration Program |
| ERPIMS |
| Environmental Restoration Program Information Management System |
| ESD |
| Explanation of Significant Differences |
| ESTCP |
| Environmental Security Technology Certification Program |
| FAA |
| Federal Aviation Administration |
| FAR |
| Federal Acquisition Regulations |
| FFA |
| Federal Facilities Agreement |
| FOL |
| Forward Operating Location |
| GFI |
| Government Furnished Information |
| GFE |
| Government Furnished Equipment |
| GIO |
| Geospatial Integration Office |
| GIS |
| Geographic Information System |
| GSR |
| Green and Sustainable Remediation |
| GSU |
| Geographically Separated Unit |
| HAZWOPER |
| Hazardous Waste Operations and Emergency Response |
| HSP |
| Health and Safety Plan |
| IMS |
| Integrated Master Schedule |
| IBC |
| International Building Code |
| IRA |
| Interim Removal Action |
| IRP |
| Installation Restoration Program |
| LRIP |
| Last Remedy in Place |
| MCL |
| Maximum Contaminant Level |
| MMRP |
| Military Munitions Response Program |
| MNA |
| Monitored Natural Attenuation |
| MPS |
| Milestone Payment Schedule |
| NACE |
| National Association of Corrosion Engineers |
| NAPL |
| Non-Aqueous Phase Liquids |
| NEC |
| National Electrical Code |
| NFPA |
| National Fire Protection Association |
| NPL |
| National Priorities List |
| NTCRA |
| Non-Time Critical Removal Action |
| O&M |
| Operations and Maintenance |
| OSHA |
| Occupational Safety and Health Administration |
| PAO |
| Public Affairs Officer |
| PBR |
| Performance-Based Remediation |
| PCEAD |
| Project Cost Estimating Assumptions Document |
| PFAS |
| Per- and Polyfluoroalkyl Substances |
| PFOS/PFOA |
| Perfluorooctane Sulfonate (PFOS) and Perfluorooctanoic Acid (PFOA) |
| PGDB |
| Personal Geodatabase |
| PMP |
| Project Management Plan |
| PMR |
| Project Management Review |
| PoP |
| Period of Performance |
| QA/QC |
| Quality Assurance/Quality Control |
| QAPP |
| Quality Assurance Program Plan |
| RAB |
| Restoration Advisory Board |
| RACR |
| Remedial Action Completion Report |
| RA-O |
| Remedial Action – Operation |
| RCRA |
| Resource Conservation and Recovery Act |
| RECAP |
| Risk Evaluation and Corrective Action Program |
| RI |
| Remedial Investigation |
| RPO |
| Remedial Process Optimization |
| SAP |
| Sampling and Analysis Plan |
| SDS |
| Service Delivery Summary |
| SDSFIE |
| Spatial Data Standard for Infrastructure and Environment |
| SITE |
| Superfund Innovative Technology Evaluation |
| SSPC |
| Steel Structures and Painting Counsel |
| SVE |
| Soil Vapor Extraction |
| TCRA |
| Time Critical Removal Action |
| UIC |
| Unit Identification Code |
| UFP-QAPP |
| Uniform Federal Policy Quality Assurance Project Plan |
| USEPA |
| United States Environmental Protection Agency |
| UST |
| Underground Storage Tank |
| UU/UE |
| Unlimited Use and Unrestricted Exposure |
Definitions
| Life-cycle Cost (LCC) |
| Refers to all Air Force financial liabilities related to a site including the costs incurred under this contract and remaining financial liabilities following the end of this contract. |
| Performance Milestone |
| A definable, measurable, and tangible interim or final performance measurement which establishes progress towards meeting the site-specific performance objective. |
| Performance Objective (PO) |
| AF established objective that establishes the contractor focus for a specific site as identified at the TO level. The achievement of this objective represents the value received by the AF in exchange for contractor performance and becomes the established end point for the site. |