TO 2 PWS Attch 2 Richards-Gebaur Base Spec Req Midwest BECOS vf3.docx

DOCX document 51 KB Posted

Attached to
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region
Solicitation number
FA890320R0015
Issued by

About this file

This document provides the scope of work for environmental remediation and monitoring services at the former Richards-Gebaur Air Force Base in Kansas City, Missouri under the Department of the Air Force BECOS Midwest Region solicitation. Key requirements include conducting five-year reviews, monitoring and maintaining land use controls, and facilitating annual stakeholder coordination meetings. The contractor will also provide technical support including hosting monthly teleconferences and on-site meetings approximately three times per year. Annual inspections of land use controls are mandated along with geographic information systems and computer-aided design drawing updates. The contractor is not responsible for per- and polyfluoroalkyl substances investigation or remediation except as noted. Transition of existing field support and reporting from the prior contract was completed in September 2020.

View the file

Other files

File Type Posted
05182020_Amendment 02_Question_Website Response 20R0015 Midwest.xlsx XLSX spreadsheet
20200518_TO2 PWS Attch1 Midwest Base Site List BECOS_Amendment_02.xlsx XLSX spreadsheet
05182020_Amendment 02_Additional Question and Response 20R0015 Midwest.xlsx XLSX spreadsheet
20200518_Midwest TO2 Price Model_Amendment_02.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150002 SF 30 (2).pdf PDF
TO 2 PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150001 SF 30.pdf PDF
20-R-0015 Midwest RFP QAs 2 of 2.xlsx XLSX spreadsheet
20200501_FA890320R0015_BECOS_Midwest_Section_M_Amendment_01.docx DOCX document
20200501_Midwest TO2 Price Model_Amendment_01.xlsx XLSX spreadsheet
20200501_FA890320R0015_BECOS_Midwest_Section_L_Amendment_01.docx DOCX document
IDIQ PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
FA890320R0015 Midwest Amendment Changes.docx DOCX document
20-R-0015 Midwest RFP QAs 1 of 2.xlsx XLSX spreadsheet
MO20190038 8Nov2019 Cass Building.pdf PDF
20200122_Midwest FFP FBLR Tables.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 KI Sawyer Base Spec Req Midwest BECOS vf2.docx DOCX document
20200109_Midwest TO2 Price Model.xlsx XLSX spreadsheet
IDIQ PWS Midwest BECOS vf4.docx DOCX document
OH20190001 25Oct2019 Statewide Heavy.pdf PDF
TO 2 PWS Attch 2 Grissom Base Specific Req Midwest BECOS vf2.docx DOCX document
20200131_FA8903-20-R-0015_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
IL20190015 6Dec2019 Champaign Heavy.pdf PDF
IDIQ PWS Attch 2 Midwest Acr and Def BECOS vf3.docx DOCX document
MI20190042 27Sep2019 Heavy Iosco.pdf PDF
OH20190093 25Oct2019 Montgomery Building.pdf PDF
IL20190009 6Dec2019 Cook Building Heavy.pdf PDF
OH20190086 22Nov2019 Licking Building.pdf PDF
TO 2 PWS Attch 2 Gentile Base Spec Req Midwest BECOS vf2.docx DOCX document
IDIQ PWS Attch 4 Midwest Perf Obj Def and Req BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Midwest BECOS vf1.pdf PDF
WI20190001 13Dec2019 Milwaukee Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 General Mitchell Base Spec Req Midwest BECOS vf2.docx DOCX document
TO 2 PWS Attch 1 Midwest Base Site List BECOS vf9.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Midwest BECOS vf1.pdf PDF
IN20190006 1Nov2019 Cass Heavy.pdf PDF
TO 2 PWS Attch 2 Chanute Base Spec Req Midwest BECOS vf2.docx DOCX document
Midwest IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
TO 2 PWS Midwest BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Midwest BECOS vf1.pdf PDF
TO 1 PWS MidWest BECOS vf3.docx DOCX document
TO 1 CDRLs Exhibit A B Midwest BECOS vf1.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ PWS Attch 1 Midwest Base Site List BECOS vf6.xlsx XLSX spreadsheet
20201217_Compensation Plan Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Midwest BECOS vf1.pdf PDF
MO20190001 8Nov2019 Statewide Missouri.pdf PDF
MI20190135 1Nov2019 Marquette Building.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

FA8903-20-R-0015

Attachment 2 Midwest Region – Richards-Gebaur 5 December 2019

1.1 Scope

The former Richards-Gebaur AFB is located in Kansas City, Cass County, Missouri and originally occupied approximately 2,400 acres. Built as an auxiliary airport in 1942, Richards-Gebaur has served a variety of functions since that time. The installation operated from 1941 until 1994 when the military flying mission ended. In 1980, approximately 80 percent of the installation property was deemed excess to the current needs of the USAF and transferred to the General Services Administration. The majority of this area was then transferred to the cities of Kansas City and Belton, Missouri by public benefit conveyance in August 1985. At base closure, Richards-Gebaur AFB was comprised of 429 acres of land that included 244 acres in the main cantonment area and 185 acres approximately four miles south of the cantonment area at the Belton Training Complex (BTC). The majority of the base was transferred to Kansas City and is managed through the Port Authority of Kansas City (PortKC) for private and industrial sector use. The former runway has been converted to rail and truck intermodal facilities for use by the Kansas City Southern Railroad. Missouri Department of Natural Resources (MDNR) provides regulatory oversight of the environmental program at Richards-Gebaur. USEPA is no longer participating in the oversight role.

In addition to the requirements presented in this PWS, this scope includes the following:

· No base-specific requirements in addition to those in the PWS.

Contractors are not responsible for the following:

· Investigation and remediation of PFAS, except as noted in Attachment 1.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
Draft Five-year Review Report
Not in AR
September 2019
2.
Draft – 2018 Basewide Groundwater and Land Use Controls/Institutional Controls Monitoring Report
AR#TBD
April 2019
3.
Final – 2017 Basewide Groundwater and Land Use Controls/Institutional Controls Monitoring Report
AR # 578783
July 2018
4.
Final Treatability Study Performance Monitoring Report for Groundwater (Operable Unit 2): Sites ST005, SS006, SS012
AR # 579001
June 2018
5.
Final Treatability Study Performance Monitoring Report for Groundwater (Operable Unit 2): Sites ST005, SS006, SS012
AR # 574270 & 556985
March 2017
6.
Final Treatability Study Implementation Report Sites SS006 and SS012
AR # 557314
September 2015
7.
Final Construction Completion Report Site SS012 Groundwater Treatability Study
AR # 300103
November 2013
8.
Final Record of Decision (Operable Units 1 and 2)
AR # 395
July 2004
9.
Final Feasibility Study for Groundwater (Operable Unit 2)
AR # 396
November 2002
10.
Final Evaluation and Consolidation Study
AR # 181
March 1999
11.
Preliminary Groundwater Assessment, Oil Saturated Area (SS003), Hazardous Waste Storage Area (SS004), Hazardous Material Storage (SS006), and Fire Valve Area (SS009)
AR # 140
November 1996
12.
Remedial Investigation Report for Sites FT002, SS003, SS005 and ST005
AR # 37
October 1991

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

FA8903-09-D-8565
South-Central PBR
9/24/2020
9/24/2020

2.6.1 Meeting/Teleconference Support

· Richards-Gebaur BCT meetings are generally held monthly via PBR contractor-hosted teleconference calls. In addition, onsite BCT meetings are held on an as-needed basis approximately three times per year and are typically scheduled to occur the same week as other Air Force meetings (e.g., RAB meetings, public meetings, stakeholder meetings).

2.6.2 Public Meetings and Hearings

· The RAB at Richards-Gebaur has been long adjourned. However, Air Force conducts an annual stakeholders coordination meeting attended by Port KC (the reuse authority), US Army, Navy, Marines, and others involved in the current use and redevelopment at the former base. This meeting has been held at the Calvary University located at the former base in recent years. The PBR contractor is required to facilitate the meeting location and logistics, and prepare briefing material.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· No base-specific requirements in addition to those in the PWS.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements in addition to those in the PWS.

6.14 Land Use Controls (LUC)

· Annual LUC inspections required.

6.15 Five-Year Reviews

· The second Five-Year Review for Richards-Gebaur was signed in August 2012. The third Five-Year Review is in draft with MDNR for review as of October 2019. It is a policy review. The fourth and fifth Five-Year Reviews are included under this PBR TO.

File details come from the government source that posted it. Updated .