TO 2 PWS Attch 2 Rickenbacker Base Spec Req Midwest BECOS vf2.docx

DOCX document 51 KB Posted

Attached to
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region Federal contract opportunity
Solicitation number
FA890320R0015
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

This attachment to a solicitation provides requirements for Base Realignment and Closure environmental construction and optimization services at Rickenbacker Air National Guard Base in Ohio. The scope includes management of cleanup and restoration programs under CERCLA, RCRA, and Ohio regulations with oversight by state environmental agencies. Annual onsite meetings are held with additional teleconferences. Land use control inspections are required annually during groundwater monitoring and every five years before scheduled five-year reviews, with the third review due in May 2020 and fourth and fifth reviews included in the performance-based remediation contract period.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region, newest first.
File Type Posted
20200518_Midwest TO2 Price Model_Amendment_02.xlsx XLSX spreadsheet
20200518_TO2 PWS Attch1 Midwest Base Site List BECOS_Amendment_02.xlsx XLSX spreadsheet
05182020_Amendment 02_Additional Question and Response 20R0015 Midwest.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150002 SF 30 (2).pdf PDF
20-R-0015 Midwest RFP QAs 2 of 2.xlsx XLSX spreadsheet
20200501_FA890320R0015_BECOS_Midwest_Section_M_Amendment_01.docx DOCX document
20200501_Midwest TO2 Price Model_Amendment_01.xlsx XLSX spreadsheet
TO 2 PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
IDIQ PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
20-R-0015 Midwest RFP QAs 1 of 2.xlsx XLSX spreadsheet
FA890320R0015 Midwest Amendment Changes.docx DOCX document
20200501_FA890320R0015_BECOS_Midwest_Section_L_Amendment_01.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Richards-Gebaur Base Spec Req Midwest BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Gentile Base Spec Req Midwest BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 Chanute Base Spec Req Midwest BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Midwest BECOS vf1.pdf PDF
Midwest IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
TO 1 PWS MidWest BECOS vf3.docx DOCX document
IN20190006 1Nov2019 Cass Heavy.pdf PDF
OH20190086 22Nov2019 Licking Building.pdf PDF
IL20190009 6Dec2019 Cook Building Heavy.pdf PDF
20200131_FA890320R0015_BECOS_Relevancy_Matrix v2.docx DOCX document
20200203_FA890320R0015_Midwest_BECOS_Section_M v4.docx DOCX document
OH20190001 25Oct2019 Statewide Heavy.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Grissom Base Specific Req Midwest BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Midwest BECOS vf1.pdf PDF
TO 2 PWS Midwest BECOS vf3.docx DOCX document
TO 2 PWS Attch 2 Newark Base Spec Req Midwest BECOS vf2.docx DOCX document
OH20190096 22Nov2019 Pickaway Building.pdf PDF
20201217_Compensation Plan Model.xlsx XLSX spreadsheet
MI20190048 1Nov2019 Marquette Heavy.pdf PDF
MO20190001 8Nov2019 Statewide Missouri.pdf PDF
TO 2 PWS Attch 1 Midwest Base Site List BECOS vf9.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Midwest BECOS vf1.pdf PDF
MI20190135 1Nov2019 Marquette Building.pdf PDF
MO20190038 8Nov2019 Cass Building.pdf PDF
TO 2 PWS Attch 2 OHare Base Spec Req Midwest BECOS vf2.docx DOCX document
OH20190078 22Nov2019 Franklin Building.pdf PDF
WI20190015 13Dec2019 Statewide Heavy.pdf PDF
20200131_FA890320R0015_BECOS_Relevancy_PPQ v2.docx DOCX document
Solicitation FA890320R0015 Midwest.pdf PDF
20200122_Midwest FFP FBLR Tables.xlsx XLSX spreadsheet
IN20190002 1Nov2019 Cass Building.pdf PDF
TO 2 PWS Attch 2 KI Sawyer Base Spec Req Midwest BECOS vf2.docx DOCX document
MI20190126 25Oct2019 Building Iosco.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Midwest BECOS vf1.pdf PDF
TO 2 CDRLs Exhibit A B Midwest BECOS vf1.docx DOCX document
Show all 50

BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

FA8903-20-R-0015

Attachment 2 Midwest Region - Rickenbacker 5 December 2019

1.1 Scope

The Rickenbacker ANGB is located in the City of Columbus, in Franklin County and Pickaway County, Ohio. Portions of Rickenbacker ANGB were closed on September 30, 1994, and other portions were realigned as part of the 1991 and 1993 round of BRAC closures. The BRAC mandated property transfer actions at Rickenbacker ANGB were completed on June 26, 2007.

The environmental restoration program at the BRAC portion of RANGB is currently managed under CERCLA, RCRA and Ohio’s Bureau of Underground Storage Tank Regulation (BUSTR) program. Regulatory oversight is provided primarily by Ohio EPA and BUSTR. The United States Environmental Protection Agency Region 5 (USEPA) is currently not involved in an oversight role. RANGB is not listed on the National Priorities List (NPL).

In addition to the requirements presented in this PWS, this scope includes the following:

· No base-specific requirements in addition to those in the PWS.

Contractors are not responsible for the following:

· Investigation and remediation of PFAS, except as noted in Attachment 1.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
IT. Final, Remedial Action Decision Document For IRP Sites 2, 21, 41, 42, and 43, Rickenbacker Air National Guard Base, Columbus, Ohio, October.
AR 964
October 1999
2.
IT. Final Decision Document for IRP Sites 25/27 Drainage Ditches, Rickenbacker Air National Guard Base, Columbus, Ohio.
AR 887
September 2001
3.
FPM/AFCEC, Amended Closure/Post Closure Plan (Revision 10), Site 1, November 2014
AR 421854
November 2014
4.
FPM/AFCEC. Annual Groundwater Report for January Through December 2017 (Includes the Corrective Action Effectiveness Report for 2017)
AR 573012
March 2018
5.
FPM/. Remedial Action-Operation (RA-O) Report for Sites 21, 41, and 42, July through December 2018
AR 591786
April 2019
6.
AFCEC, Second Five-Year Review Report, BRAC Portion of Rickenbacker ANG Base
AR 421616
March 2014
7.
AFCEC, Land Use Control (LUC) Compliance Inspection Report - 2018
AR 585569
March 2019

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

Contract Number: FA8903-09-D-8565 TO 0008
Region 5 PBR
9/24/2020
9/24/2020

2.6.1 Meeting/Teleconference Support

· Onsite RANGB BCT meetings are held once per year and are typically scheduled to occur the same week as other Air Force BRAC meetings in Ohio (at nearby Gentile AFS and Newark AFB). Onsite meetings are typically held at Columbus Regional Airport Authority facilities at the Rickenbacker International Airport. These meetings are to be coordinated and facilitated by the PBR contractor. Post-meeting minutes (draft, draft final and final) are to be developed to document these meetings. Other as-needed BCT or other meetings are generally held via PBR contractor-hosted teleconference calls (typically two per year).

2.6.2 Public Meetings and Hearings

· No base-specific requirements in addition to those in the PWS.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· No base-specific requirements in addition to those in the PWS.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements in addition to those in the PWS.

6.14 Land Use Controls (LUC)

· LUC inspections are required every year as long as RA-O groundwater monitoring is performed. Thereafter, every five years, typically in the period immediately before a scheduled Five-Year Review.

6.15 Five-Year Reviews

· The third Five-Year Review will be completed under the current PBR and is due May 2020. The fourth and fifth Five-Year Reviews are due May 2025 and 2030 and are included in this PBR TO.