TO 2 PWS Attch 2 Newark Base Spec Req Midwest BECOS vf2.docx

DOCX document 50 KB Posted

Attached to
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region
Solicitation number
FA890320R0015
Issued by

About this file

This document outlines requirements for base realignment and closure environmental construction and optimization services at the former Newark Air Force Base in Ohio. The scope of work includes facilitating annual onsite meetings and teleconferences to review environmental remediation and monitoring activities. It also requires completing the third and overseeing the fourth and fifth 5-year reviews of the environmental restoration program by 2029. The contractor will be responsible for annual inspections of land use controls through the contract period. Relevant documents pertaining to the environmental cleanup program and property transfers are referenced.

View the file

Other files

File Type Posted
05182020_Amendment 02_Question_Website Response 20R0015 Midwest.xlsx XLSX spreadsheet
20200518_TO2 PWS Attch1 Midwest Base Site List BECOS_Amendment_02.xlsx XLSX spreadsheet
05182020_Amendment 02_Additional Question and Response 20R0015 Midwest.xlsx XLSX spreadsheet
20200518_Midwest TO2 Price Model_Amendment_02.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150002 SF 30 (2).pdf PDF
TO 2 PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150001 SF 30.pdf PDF
20-R-0015 Midwest RFP QAs 2 of 2.xlsx XLSX spreadsheet
20200501_FA890320R0015_BECOS_Midwest_Section_M_Amendment_01.docx DOCX document
20200501_Midwest TO2 Price Model_Amendment_01.xlsx XLSX spreadsheet
20200501_FA890320R0015_BECOS_Midwest_Section_L_Amendment_01.docx DOCX document
IDIQ PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
FA890320R0015 Midwest Amendment Changes.docx DOCX document
20-R-0015 Midwest RFP QAs 1 of 2.xlsx XLSX spreadsheet
MO20190038 8Nov2019 Cass Building.pdf PDF
20200122_Midwest FFP FBLR Tables.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 KI Sawyer Base Spec Req Midwest BECOS vf2.docx DOCX document
20200109_Midwest TO2 Price Model.xlsx XLSX spreadsheet
IDIQ PWS Midwest BECOS vf4.docx DOCX document
OH20190001 25Oct2019 Statewide Heavy.pdf PDF
TO 2 PWS Attch 2 Grissom Base Specific Req Midwest BECOS vf2.docx DOCX document
20200131_FA8903-20-R-0015_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
IL20190015 6Dec2019 Champaign Heavy.pdf PDF
IDIQ PWS Attch 2 Midwest Acr and Def BECOS vf3.docx DOCX document
MI20190042 27Sep2019 Heavy Iosco.pdf PDF
OH20190093 25Oct2019 Montgomery Building.pdf PDF
IL20190009 6Dec2019 Cook Building Heavy.pdf PDF
OH20190086 22Nov2019 Licking Building.pdf PDF
TO 2 PWS Attch 2 Gentile Base Spec Req Midwest BECOS vf2.docx DOCX document
IDIQ PWS Attch 4 Midwest Perf Obj Def and Req BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Midwest BECOS vf1.pdf PDF
WI20190001 13Dec2019 Milwaukee Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 General Mitchell Base Spec Req Midwest BECOS vf2.docx DOCX document
TO 2 PWS Attch 1 Midwest Base Site List BECOS vf9.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Richards-Gebaur Base Spec Req Midwest BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Midwest BECOS vf1.pdf PDF
IN20190006 1Nov2019 Cass Heavy.pdf PDF
TO 2 PWS Attch 2 Chanute Base Spec Req Midwest BECOS vf2.docx DOCX document
Midwest IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
TO 2 PWS Midwest BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Midwest BECOS vf1.pdf PDF
TO 1 PWS MidWest BECOS vf3.docx DOCX document
TO 1 CDRLs Exhibit A B Midwest BECOS vf1.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ PWS Attch 1 Midwest Base Site List BECOS vf6.xlsx XLSX spreadsheet
20201217_Compensation Plan Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Midwest BECOS vf1.pdf PDF
MO20190001 8Nov2019 Statewide Missouri.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

FA8903-20-R-0015

Attachment 2 Midwest Region - Newark 5 December 2019

1.1 Scope

The former Newark AFB is located in Heath, Ohio, approximately 30 miles north east of Columbus. While the installation was closed in 1996, the AF mission at the former Newark AFB continued uninterrupted due to the privatization in place of the workload. The installation encompasses approximately 70 acres, the majority of which consists of improved grounds on which the main building (Building 4) and adjacent facilities are located. There are three property transfer parcels at the former Newark AFB, Parcel 1a (56.17 acres), Parcel 1b (0.76 acres) and Parcel 2 (13.30 acres). Parcel 1a was transferred in September 1996 to the Heath-Newark-Licking County Port Authority (HNLCPA) as part of an Economic Development Conveyance (EDC). Parcel 1b (which contains Site FF-87) was similarly transferred to HNLCPA as part of an EDC in February 2011. HNLCPA subsequently transferred Parcel 1b to APCLNH, LLC on March 2, 2011. Parcel 2 was transferred to the Licking County Regional Airport Authority (LCRAA) under a Public Benefit Conveyance (PBC) in September 2003. The former Newark AFB is not listed on the National Priorities List (NPL). The environmental restoration program at Newark is currently managed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The United States Environmental Protection Agency Region 5 (USEPA) is currently not involved in an oversight role.

In addition to the requirements presented in this PWS, this scope includes the following:

· No base-specific requirements in addition to those in the PWS.

Contractors are not responsible for the following:

· Investigation and remediation of PFAS, except as noted in Attachment 1.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
AFBCA, 2002, Remedial Action Decision Document for Landfill 02
AR 376
September 2002
2.
USAF, Final Consensus Statement No. 99-01, Agreement on No Further Response Action

Planned for Parcel 1a (56-acre Parcel)

AR 255
May 1999
3.
AFCEC, Second Five-Year Review for Newark AFB
AR 467
2013
4.
AFCEC, Land Use Control (LUC) Compliance Inspection Report - 2018
AR 586384
April 2019
5.
Ohio EPA, RCRA Corrective Action Performance Standard Attained- Controls (CA900CR)
AR 558692
July 2017

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

Contract Number: FA8903-09-D-8565 TO 0008

Region 5 PBR
9/24/2020
9/24/2020

2.6.1 Meeting/Teleconference Support

· Onsite Newark BCT meetings are held once per year and are typically scheduled to occur the same week as other Air Force BRAC meetings in Ohio (at nearby Rickenbacker ANGB and Gentile AFS). Onsite meetings are typically held at the former base in the main conference room of the Heath-Newark-Licking-County Port Authority. These meetings are to be coordinated and facilitated by the PBR contractor. Post-meeting minutes (draft and final) are to be developed to document these meetings. Other as-needed meetings are generally held via PBR contractor-hosted teleconference calls (typically one per year).

2.6.2 Public Meetings and Hearings

· No base-specific requirements in addition to those in the PWS.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· No base-specific requirements in addition to those in the PWS.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements in addition to those in the PWS.

6.14 Land Use Controls (LUC)

· LUC inspections have been conducted annually through 2018. Future LUC inspections are required yearly.

6.15 Five-Year Reviews

· The third Five-Year Review will be completed under the current PBR and is due June 2020. The fourth and fifth Five-Year Reviews due May 2024 and May 2029 are included in this PBR TO.