Tinker General Requirements Specifications_Nov 2022_Change Log.pdf

PDF 94 KB Posted

Attached to
Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
Solicitation number
FA813726R0043
Issued by

About this file

This document is a Tinker General Requirements Change Log for August 2022 that documents revisions to multiple specification sections and attachments.

The primary changes involve terminology updates throughout sections 01 33 00 and 01 78 00, replacing references to "Contracting Officer" with "Contracting Officers Representative" and adding "and/or Contracting Officer's Representative" language to multiple sections. Section 01 33 00 includes revisions to sections 1.2.3, 1.4.2.1, 1.5.1, 1.5.3.3.2, 1.5.3.8.1, 1.8.2, 1.8.7, and 1.14. Substantive changes in Section 1.5.5 specify that file naming conventions are defined in contract documents, authorize the Contracting Officer's Representative to modify submittal format requirements, and add DOD Safe as an approved method for transmitting submittals. Section 1.8.2 modified the timing requirement for submitting the Contractor's Submittal Register to coincide with final design submittal rather than as a standalone requirement, and Section 1.8.7 changed the updated Submittal Register submission frequency to monthly. Section 01 78 00 updates include reference updates to reflect current standards, modification of "Interim DD Form 1354" to "DD Form 1354," and addition of attachment references in Section 3.6. Attachment 1 replaces the Air Force Form 3000 with the new TAFB Form 3000. Sections 00 70 00, 00 71 00, 00 72 00, 00 80 00, 00 80 05, 01 32 16.00 20, 01 33 16.00 10, 01 42 00, 01 45 00.00 10, 01 50 00, and 01 78 23 contained no changes.

View the file

Other files

File Type Posted
240176_ATT03_Amendment 2_Drawings.pdf PDF
240176_ATT01_Design Narrative_Amendment 2.pdf PDF
240176_ATT02_STATEMENT OF WORK_Admendment 2.pdf PDF
240176_ROUND 3_PRE BID RFIs_For Signature 2 - COR Signed.pdf PDF
240176_PRE-BID RFI RESPONSES - COR Signed.pdf PDF
240176_Site Visit Sign In.pdf PDF
WWYK143004_CU503.pdf PDF
tinkerafbi21-100.pdf PDF
EM_385-1-1.pdf PDF
dafi13-213.pdf PDF
240176_ATT 11_Submittal Register.xlsx XLSX spreadsheet
240176_STATEMENT OF WORK-Amendment 1.pdf PDF
1993_IndWaste.pdf PDF
00 70 00.pdf PDF
Industrial Waste Lines 1969.pdf PDF
afman32-7003.pdf PDF
WWYK143004_CU513.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
480211.pdf PDF
240176_ATT 3_Green Procurement Statement.pdf PDF
WWYK143004_CU514.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
017800_Attch1_DD1354.pdf PDF
WWYK143004_CU501.pdf PDF
SOW Att 01_Appointment of Security Representative Template 496.docx DOCX document
tinkerafb_INRMP_App G.pdf PDF
WWYK143004_CU504.pdf PDF
00 80 00.pdf PDF
01 78 23.pdf PDF
1995_IndWaste.pdf PDF
ufc_3_535_01_2017_c4.pdf PDF
WWYK143004_CU511.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
01 33 00.pdf PDF
tinkerafb_INRMP.pdf PDF
007200_Attch14_Information for New Boilers.pdf PDF
FIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf PDF
20010298.pdf PDF
UMRL.pdf PDF
WWYK143004_CU502.pdf PDF
20090026A.pdf PDF
B02119.txt TXT text file
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
WWYK143004_CU505.pdf PDF
afman91-203_oc-alcsup.pdf PDF
007000_Attch1_TAFB Outage Request Form.pdf PDF
013300_Attch1_TAFBF3000.pdf PDF
240176_ATT 9_STATEMENT OF WORK.pdf PDF
531005.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
Show 40 more

Latest 50 of 120 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker General Requirements Change Log – Aug 2022

00 70 00 No Changes

00 71 00 No Changes

00 72 00 No Changes

00 80 00 No Changes

00 80 05 No Changes

01 32 16.00 20 No Changes

01 33 00 Throughout document, changed ‘Contracting Officer’ to ‘Contracting Officers Representative.’

Section 1.2.3. Added definition of ‘Contracting Officers Representative.’

Section 1.4.2.1. Added ‘and/or Contracting Officer’s Representative.’

Section 1.5.1. First sentence revised for clarity.

Section 1.5.3.3.2. Added ‘and/or Contracting Officer’s Representative.’

Section 1.5.3.3.2. Added ‘and/or Contracting Officer’s Representative.’

Section 1.5.3.8.1. Added ‘and/or the Contracting Officer or designated alternate.’

Section 1.5.5. Multiple Changes

- Added Language specifying that file naming convention are specified in contract documents.

- Added language specifying that the COR can change requirement for submittals in PDF format.

- Added DOD Safe as means for transmittal of submittals.

Section 1.8.2. Changed requirement that Contractor’s Submittal Register must be submitted with final design submittal.

Section 1.8.7. Changed requirement that updated Submittal Register must be submitted monthly.

Section 1.14. Added ‘and/or Contracting Officer’s Representative.’

Attachment 1. Replaced AF Form 3000 with new TAFB Form 3000.

01 33 16.00 10 No Changes.

01 42 00 No Changes.

01 45 00.00 10 No Changes.

01 50 00 No Changes

01 78 00 Throughout document, changed ‘Contracting Officer’ to ‘Contracting Officers Representative.’

Section 1.1. Updated references as required to reflect most current.

Section 1.2.1. Added ‘and/or Contracting Officer’s Representative.’

Section 1.4. Changed ‘Interim DD Form 1354’ to ‘DD Form 1354.’

Section 1.7.1. Added ‘and/or Contracting Officer’s Representative.’

Section 1.7.2. Added ‘and/or Contracting Officer’s Representative.’

Section 1.7.3. Added ‘and/or Contracting Officer’s Representative.’

Section 3.6. Added ‘attachment’ references.

01 78 23 No Changes