This document is a comprehensive engineering drawing set for an HMT Geodesic Dome Roof structure designed and fabricated for Luckinbill Inc. at Tinker Air Force Base, Midwest City, Oklahoma. The dome covers Tank Number TK-2120 with an inside diameter of 70 feet 0 inches and an outside diameter of 72 feet 1 inch, standing 19 feet 1.5 inches tall. The structure is designed per API AWWA D108-10 standards and engineered to withstand specific load conditions including 2.17 psf dead load, 20 psf live load, 10 psf unbalanced live load, 15 psf snow load, 22.5 psf unbalanced snow load, and 120 mph wind speeds.

The dome structure consists of aluminum components with multiple integration details including batten bars, tension ring connections, center safety line support with stainless steel cables, and comprehensive sealing systems utilizing silicone gaskets and primary/secondary seals. The design incorporates 18 shoe beams arranged around the perimeter, a central hub with upper and lower node plates, and dome panels that attach to an annular sealing angle system. Key subassemblies detailed include the center hub connection details, batten bar and hub connection details, tension ring connection details, skirt flashing and bird screen installation, a 14-inch diameter center vent with bird screen, 36-inch square manway installation, and a lifting plan for dome installation. The total weight of the paneled structure is approximately 7,900 pounds, with a complete dome assembly weight of approximately 9,500 pounds. Engineering drawings are dated 04/21/2014 and cover fabrication, assembly, and field installation requirements.

View the file

Other files

File Type Posted
240176_ROUND 3_PRE BID RFIs_For Signature 2 - COR Signed.pdf PDF
240176_Site Visit Sign In.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
240176_ATT 11_Submittal Register.pdf PDF
240176_Final_ Plan Set.pdf PDF
WWYK143004_CU502.pdf PDF
WWYK143004_CU513.pdf PDF
WWYK143004_CU501.pdf PDF
WWYK143004_CU505.pdf PDF
20090026A.pdf PDF
B02119.txt TXT text file
690255.pdf PDF
480211.pdf PDF
Combined As-Built Record Dwgs.pdf PDF
2025 TAFB Mechanical Standard_Signed.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
tinkerafb_INRMP.pdf PDF
afman32-7003.pdf PDF
afman48-148.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
017800_Attch1_DD1354.pdf PDF
007200_Attch14_Information for New Boilers.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
007200_Attch9_EMS Awareness Training.pdf PDF
Solicitation - FA813726R0043.pdf PDF
240176_ATT09_SOW.pdf PDF
240176_STATEMENT OF WORK-Amendment 1.pdf PDF
240176_ATT 11_Submittal Register.xlsx XLSX spreadsheet
240176_ATT 10_Design Narrative.pdf PDF
Industrial Waste Lines 1969.pdf PDF
WWYK143004_CU507.pdf PDF
WWYK143004_CU503.pdf PDF
WWYK143004_CU500.pdf PDF
WWYK143004_CU504.pdf PDF
Pages from 910139.pdf PDF
20010298.pdf PDF
710237.pdf PDF
430515.pdf PDF
2025 TAFB Electrical Standards - Signed.pdf PDF
01 78 00.pdf PDF
UMRL.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
dafi21-101.pdf PDF
dafi13-213.pdf PDF
afman40-201.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .