About this file

This is an architectural drawing and technical specification document for the isolation of chlorination equipment at Building No. 2119, Oklahoma City Tinker Air Force Base. The drawing details modifications to relocate existing chlorination equipment and install new plumbing, electrical, and HVAC systems to isolate the chlorination function within a designated area.

The general notes specify five primary work tasks: (1) cut a trench in the floor and install a 5-foot transite line from a new chlorinator location to existing transite hose in the tunnel, pulling the existing chlorinator hose from its current location and reinstalling it as shown; (2) break away existing concrete mounting base for the chlorinator and plug the drain pipe, then install new concrete foundation for the relocated chlorinator; (3) remove and reinstall all electrical conduit, switches, and water pipe as needed; (4) install a gravity closing louver with damper film type exhaust fan at 1000 CFM, 1/4 HP, rated at 1785 RPM with wall-mounted configuration and 5000 BTU/HR unit heater; and (5) install an 8-foot by 6-foot cinder block wall from floor to ceiling. The drawing includes detailed sections, specifications for typical door framing, and dimensions. The document is scaled at 5/8 inch to 1 foot and was prepared for submittal by the Chief Engineer, with revision date of October 6, 1965.

View the file

Other files

File Type Posted
240176_ATT03_Amendment 2_Drawings.pdf PDF
240176_ATT01_Design Narrative_Amendment 2.pdf PDF
240176_ATT02_STATEMENT OF WORK_Admendment 2.pdf PDF
240176_ROUND 3_PRE BID RFIs_For Signature 2 - COR Signed.pdf PDF
240176_PRE-BID RFI RESPONSES - COR Signed.pdf PDF
240176_Site Visit Sign In.pdf PDF
WWYK143004_CU503.pdf PDF
tinkerafbi21-100.pdf PDF
EM_385-1-1.pdf PDF
dafi13-213.pdf PDF
240176_ATT 11_Submittal Register.xlsx XLSX spreadsheet
240176_STATEMENT OF WORK-Amendment 1.pdf PDF
1993_IndWaste.pdf PDF
00 70 00.pdf PDF
Industrial Waste Lines 1969.pdf PDF
afman32-7003.pdf PDF
WWYK143004_CU513.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
480211.pdf PDF
240176_ATT 3_Green Procurement Statement.pdf PDF
WWYK143004_CU514.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
017800_Attch1_DD1354.pdf PDF
WWYK143004_CU501.pdf PDF
SOW Att 01_Appointment of Security Representative Template 496.docx DOCX document
tinkerafb_INRMP_App G.pdf PDF
WWYK143004_CU504.pdf PDF
00 80 00.pdf PDF
01 78 23.pdf PDF
1995_IndWaste.pdf PDF
ufc_3_535_01_2017_c4.pdf PDF
WWYK143004_CU511.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
01 33 00.pdf PDF
tinkerafb_INRMP.pdf PDF
007200_Attch14_Information for New Boilers.pdf PDF
FIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf PDF
20010298.pdf PDF
UMRL.pdf PDF
WWYK143004_CU502.pdf PDF
20090026A.pdf PDF
B02119.txt TXT text file
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
WWYK143004_CU505.pdf PDF
afman91-203_oc-alcsup.pdf PDF
007000_Attch1_TAFB Outage Request Form.pdf PDF
013300_Attch1_TAFBF3000.pdf PDF
240176_ATT 9_STATEMENT OF WORK.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
Show 40 more

Latest 50 of 120 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .