This is a template for documenting information required for the installation and startup of new boilers at federal facilities. The document captures essential boiler specifications including manufacturer details, model, MMBtu/hr input rating, serial number, boiler type, primary fuel, and secondary/alternative fuel information. It requires documentation of construction and installation dates, along with initial and official startup dates for continuous operation.

The template mandates collection of boiler stack specifications (diameter, height, rated flow in cfm, and temperature) and requests submission of available manufacturer brochures and specifications. Continuous maintenance and recordkeeping requirements include tune-up frequency based on rated heat input capacity: annual tune-ups for boilers ≥10 MMBtu/hr, tune-ups every 2 years for boilers between 5-10 MMBtu/hr, and tune-ups every 5 years for boilers ≤5 MMBtu/hr. CEAN must be notified each time tune-ups are performed. Additional recordkeeping requirements include documentation of all startup and shutdown events with date, time, duration, fuel type, and fuel quantity. For dual fuel boilers operating on natural gas with liquid fuel backup, the facility must record all alternative fuel usage with dates, types, amounts, and reasons for use, with immediate notification to CEAN if alternative fuel is required due to natural gas curtailment.

View the file

Other files

File Type Posted
240176_ATT03_Amendment 2_Drawings.pdf PDF
240176_ATT01_Design Narrative_Amendment 2.pdf PDF
240176_ATT02_STATEMENT OF WORK_Admendment 2.pdf PDF
240176_ROUND 3_PRE BID RFIs_For Signature 2 - COR Signed.pdf PDF
240176_PRE-BID RFI RESPONSES - COR Signed.pdf PDF
240176_Site Visit Sign In.pdf PDF
WWYK143004_CU503.pdf PDF
tinkerafbi21-100.pdf PDF
EM_385-1-1.pdf PDF
dafi13-213.pdf PDF
240176_ATT 11_Submittal Register.xlsx XLSX spreadsheet
240176_STATEMENT OF WORK-Amendment 1.pdf PDF
1993_IndWaste.pdf PDF
00 70 00.pdf PDF
Industrial Waste Lines 1969.pdf PDF
afman32-7003.pdf PDF
WWYK143004_CU513.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
480211.pdf PDF
240176_ATT 3_Green Procurement Statement.pdf PDF
WWYK143004_CU514.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
017800_Attch1_DD1354.pdf PDF
WWYK143004_CU501.pdf PDF
SOW Att 01_Appointment of Security Representative Template 496.docx DOCX document
tinkerafb_INRMP_App G.pdf PDF
WWYK143004_CU504.pdf PDF
00 80 00.pdf PDF
01 78 23.pdf PDF
1995_IndWaste.pdf PDF
ufc_3_535_01_2017_c4.pdf PDF
WWYK143004_CU511.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
01 33 00.pdf PDF
tinkerafb_INRMP.pdf PDF
FIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf PDF
20010298.pdf PDF
UMRL.pdf PDF
WWYK143004_CU502.pdf PDF
20090026A.pdf PDF
B02119.txt TXT text file
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
WWYK143004_CU505.pdf PDF
afman91-203_oc-alcsup.pdf PDF
007000_Attch1_TAFB Outage Request Form.pdf PDF
013300_Attch1_TAFBF3000.pdf PDF
240176_ATT 9_STATEMENT OF WORK.pdf PDF
531005.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
Show 40 more

Latest 50 of 120 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INFORMATION REQUIRED FOR NEW BOILER

INFORMATION REQUIRED FOR INSTALLATION/START‐UP OF THE BOILER IN BLDG_____

POST LOCATION______

Boiler Information Manufacturer:

Model and MMBtu/hr input:

Serial Number:

Type of Boiler:

Primary Fuel:

Secondary/Alternative Fuel:

Dates of construction/installation/startup Date construction commenced:

Date of installation of boiler:

Date of boiler startup (initial startup to check if the boiler is operating properly):

Date of boiler startup for continuous operation (official startup date):

Boiler Stack Information (note units, if different than shown) Stack Diameter (ft):

Stack Height (ft):

Rated Stack Flow (cfm):

Stack temperature (°F):

Provide brochures and specifications available for the boiler

CONTINUOUS MAINTENANCE AND RECORDKEEPING REQUIREMENTS

Tune‐up requirement‐

Frequency is dependent on the Rated Heat Input Capacity of the Boiler, as follows:

> =10MMBtu/hr Annual tuneups

< 10 but >5MMBtu/hr Tune‐ups every 2 years

<= 5MMBtu/hr Tune‐ups every 5 years

CEAN must be informed every time tune‐ups are performed in the boilers

Date, time, and duration of every startup and shutdown of the boiler Type of fuel and amount of fuel used during every startup and shutdown of the boiler

For dual fuel boilers (boilers that operate using NG and have liquid fuel as backup) Date, type and amount of alternative fuel usage. Reason for using alternative fuel. If alternative fuel is used due to a natural gas curtailment, it needs to be notified immediately to CEAN.

INFORMATION REQUIRED FOR INSTALLATIONSTARTUP OF THE BOILER IN BLDG:
Boiler Information:
Model and MMBtuhr input:
Serial Number:
Type of Boiler:
Primary Fuel:
SecondaryAlternative Fuel:
Dates of constructioninstallationstartup:
Date of installation of boiler:
Date of boiler startup initial startup to check if the boiler is operating properly:
Date of boiler startup for continuous operation official startup date:
Boiler Stack Information note units if different than shown:
Provide brochures and specifications available for the boiler:
Frequency is dependent on the Rated Heat Input Capacity of the Boiler as follows:
Rated Stack Flow cfm:
Stack Diameter:
Stack Height: