This is a template for documenting information required for the installation and startup of new boilers at federal facilities. The document captures essential boiler specifications including manufacturer details, model, MMBtu/hr input rating, serial number, boiler type, primary fuel, and secondary/alternative fuel information. It requires documentation of construction and installation dates, along with initial and official startup dates for continuous operation.

The template mandates collection of boiler stack specifications (diameter, height, rated flow in cfm, and temperature) and requests submission of available manufacturer brochures and specifications. Continuous maintenance and recordkeeping requirements include tune-up frequency based on rated heat input capacity: annual tune-ups for boilers ≥10 MMBtu/hr, tune-ups every 2 years for boilers between 5-10 MMBtu/hr, and tune-ups every 5 years for boilers ≤5 MMBtu/hr. CEAN must be notified each time tune-ups are performed. Additional recordkeeping requirements include documentation of all startup and shutdown events with date, time, duration, fuel type, and fuel quantity. For dual fuel boilers operating on natural gas with liquid fuel backup, the facility must record all alternative fuel usage with dates, types, amounts, and reasons for use, with immediate notification to CEAN if alternative fuel is required due to natural gas curtailment.

View the file

Other files

File Type Posted
240176_ATT02_STATEMENT OF WORK_Admendment 2.pdf PDF
Solicitation - FA813726R0043.pdf PDF
240176_ATT09_SOW.pdf PDF
240176_STATEMENT OF WORK-Amendment 1.pdf PDF
240176_ATT 11_Submittal Register.xlsx XLSX spreadsheet
240176_ATT 10_Design Narrative.pdf PDF
Industrial Waste Lines 1969.pdf PDF
WWYK143004_CU507.pdf PDF
WWYK143004_CU503.pdf PDF
WWYK143004_CU500.pdf PDF
WWYK143004_CU504.pdf PDF
Pages from 910139.pdf PDF
20010298.pdf PDF
710237.pdf PDF
430515.pdf PDF
2025 TAFB Electrical Standards - Signed.pdf PDF
01 78 00.pdf PDF
UMRL.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
dafi21-101.pdf PDF
dafi13-213.pdf PDF
afman40-201.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
tinkerafbi21-100.pdf PDF
007200_Attch13_AF487.pdf PDF
007200_Attch7a_AF3952.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
240176_ATT 11_Submittal Register.pdf PDF
240176_Final_ Plan Set.pdf PDF
WWYK143004_CU502.pdf PDF
WWYK143004_CU513.pdf PDF
WWYK143004_CU501.pdf PDF
WWYK143004_CU505.pdf PDF
20090026A.pdf PDF
B02119.txt TXT text file
690255.pdf PDF
480211.pdf PDF
Combined As-Built Record Dwgs.pdf PDF
FIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf PDF
2025 TAFB Mechanical Standard_Signed.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
tinkerafb_INRMP.pdf PDF
afman32-7003.pdf PDF
afman48-148.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INFORMATION REQUIRED FOR NEW BOILER

INFORMATION REQUIRED FOR INSTALLATION/START‐UP OF THE BOILER IN BLDG_____

POST LOCATION______

Boiler Information Manufacturer:

Model and MMBtu/hr input:

Serial Number:

Type of Boiler:

Primary Fuel:

Secondary/Alternative Fuel:

Dates of construction/installation/startup Date construction commenced:

Date of installation of boiler:

Date of boiler startup (initial startup to check if the boiler is operating properly):

Date of boiler startup for continuous operation (official startup date):

Boiler Stack Information (note units, if different than shown) Stack Diameter (ft):

Stack Height (ft):

Rated Stack Flow (cfm):

Stack temperature (°F):

Provide brochures and specifications available for the boiler

CONTINUOUS MAINTENANCE AND RECORDKEEPING REQUIREMENTS

Tune‐up requirement‐

Frequency is dependent on the Rated Heat Input Capacity of the Boiler, as follows:

> =10MMBtu/hr Annual tuneups

< 10 but >5MMBtu/hr Tune‐ups every 2 years

<= 5MMBtu/hr Tune‐ups every 5 years

CEAN must be informed every time tune‐ups are performed in the boilers

Date, time, and duration of every startup and shutdown of the boiler Type of fuel and amount of fuel used during every startup and shutdown of the boiler

For dual fuel boilers (boilers that operate using NG and have liquid fuel as backup) Date, type and amount of alternative fuel usage. Reason for using alternative fuel. If alternative fuel is used due to a natural gas curtailment, it needs to be notified immediately to CEAN.

INFORMATION REQUIRED FOR INSTALLATIONSTARTUP OF THE BOILER IN BLDG:
Boiler Information:
Model and MMBtuhr input:
Serial Number:
Type of Boiler:
Primary Fuel:
SecondaryAlternative Fuel:
Dates of constructioninstallationstartup:
Date of installation of boiler:
Date of boiler startup initial startup to check if the boiler is operating properly:
Date of boiler startup for continuous operation official startup date:
Boiler Stack Information note units if different than shown:
Provide brochures and specifications available for the boiler:
Frequency is dependent on the Rated Heat Input Capacity of the Boiler as follows:
Rated Stack Flow cfm:
Stack Diameter:
Stack Height: