This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Dewey (DDG-105) detailing a maintenance task to replace insulation, lagging, and reusable covers on exhaust ducts for three gas turbine systems. The specific work involves replacing 560 square feet of insulation and lagging across the No. One Ship Service Gas Turbine Generator (SSGTG) and 1A/1B Gas Turbine Modules (GTM) exhaust ducts, located in the Uptake Engine Room No. One.

The task requires using specific military-grade materials including MIL-PRF-2818 insulation, MIL-C-20079 Type I, Class 9 lagging, and MIL-DTL-32585 Type-I, Form-3 insulation for reusable covers. The work includes removing existing insulation, installing new materials, applying weather barrier coating, and addressing potential asbestos hazards. The instruction provides detailed specifications, references, and a material list for the contractors, with the work to be performed according to attached references and sketches. The task is scheduled for completion in June 2025, with specific dates to be determined by an attached Period of Performance (POP) list.

View the file

Other files

File Type Posted
Attachment II Proposal Breakdown Form (Contractor Response Required).xlsx XLSX spreadsheet
Attachment IV Request for Information Form Q2A2.rtf RTF text file
Solicitation Amendment N6264926RA0040002 SF 30.pdf PDF
Solicitation Amendment N6264926RA0040001 SF 30.pdf PDF
Attachment IV Request for Information Form Q1A1.rtf RTF text file
TGI_38K4265405A01_c0v0.pdf PDF
38K4212387A01_c0v0.pdf PDF
Attachment VII QASP 26RA004 Bun2.pdf PDF
Solicitation - N6264926RA004.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
TGI_38K4212359A02_c1v1.pdf PDF
TGI_38K4212357A01_c1v1.pdf PDF
38K4212301A01_c0v0.pdf PDF
TGI_38K4262204A01_c0v0.pdf PDF
TGI_38K4212354A01_c0v0.pdf PDF
Attachment IV Request for Information Form.rtf RTF text file
Attachment V Source of Repair Instruction.pdf PDF
Attachment III N6264926RA004 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_38K4212301T01_c0v0.pdf PDF
38K4212361A01_c0v0.pdf PDF
Attachment IX POP List.xlsx XLSX spreadsheet
TGI_38K4212359A01_c0v0.pdf PDF
TGI_38K4286503A01_c0v0.pdf PDF
TGI_38K4212344A01_c1v1.pdf PDF
Attachment II Proposal Breakdown Form (Contractor Response Required).xlsx XLSX spreadsheet
Attachment VIII Contract Data Sheet 26RA004.pdf PDF
38K42123ACA01.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

04-JUN-2025 1312

20.14.15.2.9020 (September 2024) ICN: 38K4286504 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FWD 02 LVL EXH IN AY A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. ONE GTG AND 1A/1B GTM EXHAUST DUCT

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 6

EM01L826

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

HOSODA, MASATO 234 3152434572 23-APR-2025

APPROVED BY: CODE: PHONE: DATE:

HARADA, HIDEO 234 3152435176 24-APR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM01-L826

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

UENO, KOUICHI

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

865A5104

1. SCOPE/PURPOSE:

1.1 Title: Insulation, Lagging and Reusable Cover on No. One Ship Service Gas Turbine Generator (SSGTG) and 1A/1B Gas Turbine Module (GTM) Exhaust Duct; replace

1.2 Location of Work:

1.2.1 Uptake Engine Room No. One (02-186-0-Q)

1.3 Identification:

1.3.1 Quantity (200 SF), Insulation and Lagging, Exterior, Exhaust Duct, No. One SSGTG Insulation: MIL-PRF-2818 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.3.1.1 Quantity (One EA), Reusable Cover, Manhole Cover, No. One SSGTG

TGI Short Form

04-JUN-2025 1312

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K4286504 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FWD 02 LVL EXH IN AY A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. ONE GTG AND 1A/1B GTM EXHAUST DUCT

FOUO Pg 2 of 6

CU PHASE DESCRIPTION (Cont.)

Insulation: MIL- DTL-32585, Type-I, Form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.3.2 Quantity (180 SF), Insulation and Lagging, Exterior, Exhaust Duct, 1A GTM Insulation: MIL-PRF-2818 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.3.2.1 Quantity (One EA), Reusable Cover, Manhole Cover, 1A GTM Insulation: MIL- DTL-32585, Type-I, Form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.3.3 Quantity (180 SF), Insulation and Lagging, Exterior, Exhaust Duct, 1B GTM Insulation: MIL-PRF-2818 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.3.3.1 Quantity (One EA), Reusable Cover, Manhole Cover, 1B GTM Insulation: MIL- DTL-32585, Type-I, Form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.6 Contractor Start Date: See attached POP list.

1.7 Contractor Work Completion Date: See attached POP list.

2. PROCEDURE:

2.1 Remove each existing insulation, lagging, and reusable cover listed in 1.3.1 through 1.3.3 from exhaust duct, using Ref. No.

3 for guidance.

2.2 Accomplish the requirements of 009-011 of Ref. No. One for installation each new insulation, lagging and reusable cover listed in 1.3.1 through 1.3.3 to exhaust duct, using Ref. No. 4 and Ref. No. 5 for guidance.

2.2.1 Apply weather barrier coating to the new lagging surface.

2.2.2 Accomplish the requirements of 009-032 of Ref. No. One for top surface where new insulation and lagging are installed.

2.3 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.

2.4 Notes:

04-JUN-2025 1312

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K4286504 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FWD 02 LVL EXH IN AY A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. ONE GTG AND 1A/1B GTM EXHAUST DUCT

FOUO Pg 3 of 6

CU PHASE DESCRIPTION (Cont.)

2.4.1 Planner: Code 234 M. Hosoda, 243-4572

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.4.3 JCN EM01-L826 is related to this TGI.

2.5 Government Furnished Material (GFM):

2.5.1 SRF-JRMC will provide GFM listed in the Material List.

2.6 SRF-JRMC will provide the following service work: (TGI No: 38K4286504S02)

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [X99E] Provide utility service.

2.6.3 [X99M] Provide utility service, including low pressure air supply, water supply, and steam supply.

2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.6 [C133] QA inspection for (G) symbol(s).

04-JUN-2025 1312

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K4286504 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FWD 02 LVL EXH IN AY A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. ONE GTG AND 1A/1B GTM EXHAUST DUCT

FOUO Pg 4 of 6

OTHER SPECIAL REQUIREMENTS:

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - N

3 TM S9086 VH-STM-

010/CH-635

Thermal, Fire, and Acoustic Insulation

3 N

4 DWG 259-7060871 FAB & INSTL OF SSGTG

UPTAKE AUX MCHRY RM

NO.1 & ABOVE

C N

5 DWG 259-7060868 FAB & INSTL OF GTRB

UPTAKE ENG RM NO.1 &

ABOVE

B N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 INSL HRs, RGRS HRs 22/KE PC N

2.2 INSL HRs, PNTR HRs, QA, HRs, RGRS HRs 22/KE PC N

2.3 PNTR HRs, QA HRs 22/KE PC N

CFM for asbestos sampler and analysis cost, tyvek suit, all paint, wire, hook / washer, plastic bag/sheet, enclosing/covering materials and other consumable.

22/MQ CS N

Process Funding Document. 10/CT OM N

Version-1: Admin change. Code 234 H. Harada, 4/24/2025, -/-/N / V-01 N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K4286504 KEY OP: A01

04-JUN-2025 1312

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K4286504 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FWD 02 LVL EXH IN AY A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. ONE GTG AND 1A/1B GTM EXHAUST DUCT

FOUO Pg 5 of 6

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M INSULATI, INSULATION

BLANKET, THERMAL, MINERAL

WOOL,

SPEC: MIL-PRF-2818,

SIZE: 24" X 48" X 2" THK,

DENSITY: 8 LBS/CU FT,

BIW CATALOG NO. 47111-030,

ROCKWOOL P/N: SEAROX SL

620(128), REMARKS: OMIT METALLIC

SUPPORT MEMBERS FROM

BOTH SIDES,

9B 5640 LL9606678 NA 4 N 51217573

130/SH

002 M CLOTH,PLAIN WEAVE, H/W

GLASS CLOTH, 5 FT X 150 FT

LONG PER ROLL, COLOR IS

NATURAL,

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9B 8305 001487364 NA 4 N 51215076 2/RO

003 M WIRE FABRIC, WIRE MESH,

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9B 5335 005989404 NA 4 N 51215075 1/EA

004 M ADHESIVE, ADHESIVE FOR

CLOTH,

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9B 8040 002738708 NA 4 Y 51215071 30/GL

005 M WIRE MES, WIRE, MESH,

CHICKEN NET, #20 X 16 MESH

NO.20G, HEXAGONAL WIRE

NETTING, GALVANIZED

STEEL, 1RLL=30METER

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9Z 5340 LL4651079 NA 4 N 51217810 4/RL

006 M CEMENT,INSULATION,H,

CEMENT, FINISH

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9Q 5640 002264540 NA 4 Y 51225021 25/BG

006 M CEMENT,INSULATION,H,

CEMENT, FINISH

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9Q 5640 002264540 NA 4 Y 51215069 25/BG

007 M COATING, WEATHER BARRIER

COATING

ORIG: C234 M. HOSODA, 243-

ORDERED FOR CONTRACTOR

9Q 8030 LLN044831 NA 4 Y 51217458 30/CN

04-JUN-2025 1312

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K4286504 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FWD 02 LVL EXH IN AY A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. ONE GTG AND 1A/1B GTM EXHAUST DUCT

FOUO Pg 6 of 6

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

008 M COATING, WEATHER BARRIER

COATING

ORIG: C234 M. HOSODA, 243-

ORDERED FOR CONTRACTOR

9Q 8030 LLN044831 NA 4 Y 51217459 10/CN

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38K4286504A01-Sketch-01.pdf 21-APR-2025 0000

SKETCH

ENCLOSURE-01

38K4286504A01 SHEET 1 OF 2

Replace insulation, lagging and reusable cover listed in 1.3.1

SKETCH

ENCLOSURE-01

38K4286504A01 SHEET 2 OF 2

Replace insulation, lagging and reusable cover listed in 1.3.2

Replace insulation, lagging and reusable cover listed in 1.3.3