Attachment II Proposal Breakdown Form (Contractor Response Required).xlsx
XLSX spreadsheet 134 KB Posted
- Attached to
- USS DEWEY (DDG-105) FY26 6C1 CNO SRA(d) BUNDLE #2, Chief of Naval Operation Availability Yokosuka Japan
- Solicitation number
- N6264926RA004
About this file
This document is a Proposal Breakdown Form for a naval ship repair solicitation for the USS DEWEY (DDG-105). The contract, numbered N6264926RA004, is for a Chief of Naval Operation Availability (CNO) at the US Naval Ship Repair Facility and Japan Regional Maintenance Center in Yokosuka, Japan. The scope includes fourteen Task Group Instructions (TGIs) involving ship repair, overhaul, preservation, and replacement work, with a performance period from 30 March 2026 through 14 December 2026. The spreadsheet details specific work items such as inspecting, repairing, and preserving various ship compartments and systems, including bilge wells, exhaust trunks, intake ducts, and replacing insulation and lagging on different ship equipment.
The solicitation requires submission of proposals by 20 November 2025 at 10:00 AM, to be sent to kazuo.takamura.ln@us.navy.mil. Contractors must specify any hazardous materials and potential sea transportation requirements. The breakdown form includes detailed sections for labor hours, cost breakdowns, and work item specifics, with placeholders for in-house and subcontractor labor hours across multiple work categories. The document is structured to capture comprehensive cost and labor information for each of the 14 specified task group instructions, with a growth CLIN percentage of 9.28% noted.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | N6264926RA004 | CLIN 0001(14 SOW) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| SHIP NAME: | USS DEWEY (DDG-105) | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| AVAILABILITY: | FY26 6C1 SRA(d) | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total TGIs (Specify Total) | 14 | Total Evaluated Price | ¥0 |
| Growth CLIN % | 9.28% |
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | |||||||||
| No. | WI No. | DESCRIPTION | Proposed Labor | Material/ODCs | Proposed Price (JPY) | ||||
| In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | ||||
| 1 | 38K4212301-A01 | F/O - INSPECT, REPAIR, AND PRESERVE BILGE AND BILGE DRAIN WELL IN 4-254-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 38K4212301-T01 | F/O - INSPECT, REPAIR, AND PRESERVE BILGE AND BILGE DRAIN WELL IN 4-254-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 38K4212354-A01 | F/O – INSPECT, REPAIR, AND PRESERVE NO. ONE GTM INTAKE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 38K4212357-A01 | F/O – INSPECT, REPAIR, AND PRESERVE 03-174-0-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 38K4212359-A01 | F/O - INSPECT, REPAIR, AND PRESERVE AFT UPTAKE SPACE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 38K4212359-A02 | F/O - INSPECT, REPAIR, AND PRESERVE IN SSGTG NO.2 EXHAUST TRUNK | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 38K4212361-A01 | F/O – INSPECT, REPAIR, AND PRESERVE 02-161-2-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 38K4212387-A01 | F/O - INSPECT, REPAIR, AND PRESERVE IN SSGTG NO.3 EXHAUST TRUNK | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 9 | 38K42123AC-A01 | F/O – REPAIR NO. 3 SSGTG INTAKE PERFORATED SHEET TACK WELD | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 10 | 38K4262204-A01 | F/O – REPAIR NO. 3 SSGTG INTAKE DUCT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 11 | 38K4265405-A01 | F/O - REPAIR STRUCTURAL MEMBER IN 4-220-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 12 | 38K4286503-A01 | F/O - REPLACE INSULATION AND LAGGING ON NO. 2 GTG AND 2A/2B GTM EXHAUST DUCT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 13 | 38K4286504-A01 | F/O - REPLACE INSULATION AND LAGGING ON NO. ONE GTG AND 1A/1B GTM EXHAUST DUCT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 14 | 38K4212344-A01 | F/O - ACCOMPLISH REPAIR AND PRESERVATION OF NO. ONE VCHT ROOM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 15 | |||||||||
| 16 | |||||||||
| 17 | |||||||||
| 18 | |||||||||
| 19 | |||||||||
| 20 | |||||||||
| 21 | |||||||||
| 22 | |||||||||
| 23 | |||||||||
| 24 | |||||||||
| 25 | |||||||||
| 26 | |||||||||
| 27 | |||||||||
| 28 | |||||||||
| 29 | |||||||||
| 30 | |||||||||
| 31 | |||||||||
| 32 | |||||||||
| 33 | |||||||||
| 34 | |||||||||
| 35 | |||||||||
| 36 | |||||||||
| 37 | |||||||||
| 38 | |||||||||
| 39 | |||||||||
| 40 | |||||||||
| 41 | |||||||||
| 42 | |||||||||
| 43 | |||||||||
| 44 | |||||||||
| 45 | |||||||||
| 46 | |||||||||
| 47 | |||||||||
| 48 | |||||||||
| 49 | |||||||||
| 50 | |||||||||
| 51 | |||||||||
| 52 | |||||||||
| 53 | |||||||||
| 54 | |||||||||
| 55 | |||||||||
| 56 | |||||||||
| 57 | |||||||||
| 58 | |||||||||
| 59 | |||||||||
| 60 | |||||||||
| 61 | |||||||||
| 62 | |||||||||
| 63 | |||||||||
| 64 | |||||||||
| 65 | |||||||||
| 66 | |||||||||
| 67 | |||||||||
| 68 | |||||||||
| 69 | |||||||||
| 70 | |||||||||
| 71 | |||||||||
| 72 | |||||||||
| 73 | |||||||||
| 74 | |||||||||
| 75 | |||||||||
| 76 | |||||||||
| 77 | |||||||||
| 78 | |||||||||
| 79 | |||||||||
| 80 | |||||||||
| 81 | |||||||||
| 82 | |||||||||
| 83 | |||||||||
| 84 | |||||||||
| 85 | |||||||||
| 86 | |||||||||
| 87 | |||||||||
| 88 | |||||||||
| 89 | |||||||||
| 90 | |||||||||
| 91 | |||||||||
| 92 | |||||||||
| 93 | |||||||||
| 94 | |||||||||
| 95 | |||||||||
| 96 | |||||||||
| 97 | |||||||||
| 98 | |||||||||
| 99 | |||||||||
| 100 | |||||||||
| 101 | |||||||||
| 102 | |||||||||
| 103 | |||||||||
| 104 | |||||||||
| 105 | |||||||||
| 106 | |||||||||
| 107 | |||||||||
| 108 | |||||||||
| 109 | |||||||||
| 110 | |||||||||
| 111 | |||||||||
| 112 | |||||||||
| 113 | |||||||||
| 114 | |||||||||
| 115 | |||||||||
| 116 | |||||||||
| 117 | |||||||||
| 118 | |||||||||
| 119 | |||||||||
| 120 | |||||||||
| 121 | |||||||||
| 122 | |||||||||
| 123 | |||||||||
| 124 | |||||||||
| 125 | |||||||||
| 126 | |||||||||
| 127 | |||||||||
| 128 | |||||||||
| 129 | |||||||||
| 130 | |||||||||
| 131 | |||||||||
| 132 | |||||||||
| 133 | |||||||||
| 134 | |||||||||
| 135 | |||||||||
| 136 | |||||||||
| 137 | |||||||||
| 138 | |||||||||
| 139 | |||||||||
| 140 | |||||||||
| 141 | |||||||||
| 142 | |||||||||
| 143 | |||||||||
| 144 | |||||||||
| 145 | |||||||||
| 146 | |||||||||
| 147 | |||||||||
| 148 | |||||||||
| 149 | |||||||||
| 150 | |||||||||
| 151 | |||||||||
| 152 | |||||||||
| 153 | |||||||||
| 154 | |||||||||
| 155 | |||||||||
| 156 | |||||||||
| 157 | |||||||||
| 158 | |||||||||
| 159 | |||||||||
| 160 | |||||||||
| 161 | |||||||||
| 162 | |||||||||
| 163 | |||||||||
| 164 | |||||||||
| 165 | |||||||||
| 166 | |||||||||
| 167 | |||||||||
| 168 | |||||||||
| 169 | |||||||||
| 170 | |||||||||
| 171 | |||||||||
| 172 | |||||||||
| 173 | |||||||||
| 174 | |||||||||
| 175 | |||||||||
| 176 | |||||||||
| 177 | |||||||||
| 178 | |||||||||
| 179 | |||||||||
| 180 | |||||||||
| 181 | |||||||||
| 182 | |||||||||
| 183 | |||||||||
| 184 | |||||||||
| 185 | |||||||||
| 186 | |||||||||
| 187 | |||||||||
| 188 | |||||||||
| 189 | |||||||||
| 190 | |||||||||
| 191 | |||||||||
| 192 | |||||||||
| 193 | |||||||||
| 194 | |||||||||
| 195 | |||||||||
| 196 | |||||||||
| 197 | |||||||||
| 198 | |||||||||
| 199 | |||||||||
| 200 |
1_38K4212301-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 1_38K4212301-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 1_38K4212301-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - INSPECT, REPAIR, AND PRESERVE BILGE AND BILGE DRAIN WELL IN 4-254-0-E | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 5.1 | 0.0 | ||||||||||
| 5.2 | 0.0 | ||||||||||
| 5.3 | 0.0 | ||||||||||
| 5.4 | 0.0 | ||||||||||
| 5.5 | 0.0 | ||||||||||
| 5.6 | 0.0 | ||||||||||
| 5.7 | 0.0 | ||||||||||
| 5.8 | 0.0 | ||||||||||
| 5.9 | 0.0 | ||||||||||
| 5.10 | 0.0 | ||||||||||
| 5.11 | 0.0 | ||||||||||
| 5.12 | 0.0 | ||||||||||
| 5.13 | 0.0 | ||||||||||
| 5.14 | 0.0 | ||||||||||
| 5.15 | 0.0 | ||||||||||
| 5.16 | 0.0 | ||||||||||
| 5.17 | 0.0 | ||||||||||
| 5.18 | 0.0 | ||||||||||
| 5.19 | 0.0 | ||||||||||
| TOTAL IN-HOUSE M/Hs | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 5.1 | 0 | 0 | 0 | |||||
| 5.2 | 0 | 0 | 0 | |||||
| 5.3 | 0 | 0 | 0 | |||||
| 5.4 | 0 | 0 | 0 | |||||
| 5.5 | 0 | 0 | 0 | |||||
| 5.6 | 0 | 0 | 0 | |||||
| 5.7 | 0 | 0 | 0 | |||||
| 5.8 | 0 | 0 | 0 | |||||
| 5.9 | 0 | 0 | 0 | |||||
| 5.10 | 0 | 0 | 0 | |||||
| 5.11 | 0 | 0 | 0 | |||||
| 5.12 | 0 | 0 | 0 | |||||
| 5.13 | 0 | 0 | 0 | |||||
| 5.14 | 0 | 0 | 0 | |||||
| 5.15 | 0 | 0 | 0 | |||||
| 5.16 | 0 | 0 | 0 | |||||
| 5.17 | 0 | 0 | 0 | |||||
| 5.18 | 0 | 0 | 0 | |||||
| 5.19 | 0 | 0 | 0 | |||||
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | |||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | |||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | |||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | ||||||||
| MATERIAL COST BREAKDOWN | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_38K4212301-T01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 2_38K4212301-T01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 2_38K4212301-T01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - INSPECT, REPAIR, AND PRESERVE BILGE AND BILGE DRAIN WELL IN 4-254-0-E | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_38K4212354-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 3_38K4212354-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 3_38K4212354-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – INSPECT, REPAIR, AND PRESERVE NO. ONE GTM INTAKE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 5.1 | 0.0 | ||||||||||
| 5.2 | 0.0 | ||||||||||
| 5.3 | 0.0 | ||||||||||
| 5.4 | 0.0 | ||||||||||
| 5.5 | 0.0 | ||||||||||
| 5.6 | 0.0 | ||||||||||
| 5.7 | 0.0 | ||||||||||
| 5.8 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 5.1 | 0 | 0 | 0 |
| 5.2 | 0 | 0 | 0 |
| 5.3 | 0 | 0 | 0 |
| 5.4 | 0 | 0 | 0 |
| 5.5 | 0 | 0 | 0 |
| 5.6 | 0 | 0 | 0 |
| 5.7 | 0 | 0 | 0 |
| 5.8 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_38K4212357-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 4_38K4212357-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 4_38K4212357-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – INSPECT, REPAIR, AND PRESERVE 03-174-0-Q | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 5.1 | 0.0 | ||||||||||
| 5.2 | 0.0 | ||||||||||
| 5.3 | 0.0 | ||||||||||
| 5.4 | 0.0 | ||||||||||
| 5.5 | 0.0 | ||||||||||
| 5.6 | 0.0 | ||||||||||
| 5.7 | 0.0 | ||||||||||
| 5.8 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 5.1 | 0 | 0 | 0 |
| 5.2 | 0 | 0 | 0 |
| 5.3 | 0 | 0 | 0 |
| 5.4 | 0 | 0 | 0 |
| 5.5 | 0 | 0 | 0 |
| 5.6 | 0 | 0 | 0 |
| 5.7 | 0 | 0 | 0 |
| 5.8 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_38K4212359-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 5_38K4212359-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 5_38K4212359-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - INSPECT, REPAIR, AND PRESERVE AFT UPTAKE SPACE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 5.1 | 0.0 | ||||||||||
| 5.2 | 0.0 | ||||||||||
| 5.3 | 0.0 | ||||||||||
| 5.4 | 0.0 | ||||||||||
| 5.5 | 0.0 | ||||||||||
| 5.6 | 0.0 | ||||||||||
| 5.7 | 0.0 | ||||||||||
| 5.8 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 5.1 | 0 | 0 | 0 |
| 5.2 | 0 | 0 | 0 |
| 5.3 | 0 | 0 | 0 |
| 5.4 | 0 | 0 | 0 |
| 5.5 | 0 | 0 | 0 |
| 5.6 | 0 | 0 | 0 |
| 5.7 | 0 | 0 | 0 |
| 5.8 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_38K4212359-A02
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 6_38K4212359-A02 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 6_38K4212359-A02 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - INSPECT, REPAIR, AND PRESERVE IN SSGTG NO.2 EXHAUST TRUNK | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 5.1 | 0.0 | ||||||||||
| 5.2 | 0.0 | ||||||||||
| 5.3 | 0.0 | ||||||||||
| 5.4 | 0.0 | ||||||||||
| 5.5 | 0.0 | ||||||||||
| 5.6 | 0.0 | ||||||||||
| 5.7 | 0.0 | ||||||||||
| 5.8 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 5.1 | 0 | 0 | 0 |
| 5.2 | 0 | 0 | 0 |
| 5.3 | 0 | 0 | 0 |
| 5.4 | 0 | 0 | 0 |
| 5.5 | 0 | 0 | 0 |
| 5.6 | 0 | 0 | 0 |
| 5.7 | 0 | 0 | 0 |
| 5.8 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_38K4212361-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 7_38K4212361-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 7_38K4212361-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – INSPECT, REPAIR, AND PRESERVE 02-161-2-Q | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 5.1 | 0.0 | ||||||||||
| 5.2 | 0.0 | ||||||||||
| 5.3 | 0.0 | ||||||||||
| 5.4 | 0.0 | ||||||||||
| 5.5 | 0.0 | ||||||||||
| 5.6 | 0.0 | ||||||||||
| 5.7 | 0.0 | ||||||||||
| 5.8 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 5.1 | 0 | 0 | 0 |
| 5.2 | 0 | 0 | 0 |
| 5.3 | 0 | 0 | 0 |
| 5.4 | 0 | 0 | 0 |
| 5.5 | 0 | 0 | 0 |
| 5.6 | 0 | 0 | 0 |
| 5.7 | 0 | 0 | 0 |
| 5.8 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
8_38K4212387-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 8_38K4212387-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 8_38K4212387-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - INSPECT, REPAIR, AND PRESERVE IN SSGTG NO.3 EXHAUST TRUNK | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 5.1 | 0.0 | ||||||||||
| 5.2 | 0.0 | ||||||||||
| 5.3 | 0.0 | ||||||||||
| 5.4 | 0.0 | ||||||||||
| 5.5 | 0.0 | ||||||||||
| 5.6 | 0.0 | ||||||||||
| 5.7 | 0.0 | ||||||||||
| 5.8 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 5.1 | 0 | 0 | 0 |
| 5.2 | 0 | 0 | 0 |
| 5.3 | 0 | 0 | 0 |
| 5.4 | 0 | 0 | 0 |
| 5.5 | 0 | 0 | 0 |
| 5.6 | 0 | 0 | 0 |
| 5.7 | 0 | 0 | 0 |
| 5.8 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
9_38K42123AC-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 9_38K42123AC-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 9_38K42123AC-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – REPAIR NO. 3 SSGTG INTAKE PERFORATED SHEET TACK WELD | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 2.1 | 0.0 | ||||||||||
| 2.2 | 0.0 | ||||||||||
| 2.3 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 2.1 | 0 | 0 | 0 |
| 2.2 | 0 | 0 | 0 |
| 2.3 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
10_38K4262204-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 10_38K4262204-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 10_38K4262204-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – REPAIR NO. 3 SSGTG INTAKE DUCT | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 2.1 | 0.0 | ||||||||||
| 2.2 | 0.0 | ||||||||||
| 2.3 | 0.0 | ||||||||||
| 2.4 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 2.1 | 0 | 0 | 0 |
| 2.2 | 0 | 0 | 0 |
| 2.3 | 0 | 0 | 0 |
| 2.4 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
11_38K4265405-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 11_38K4265405-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 11_38K4265405-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - REPAIR STRUCTURAL MEMBER IN 4-220-0-E | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 2.1 | 0.0 | ||||||||||
| 2.2 | 0.0 | ||||||||||
| 2.3 | 0.0 | ||||||||||
| 2.4 | 0.0 | ||||||||||
| 2.5 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 2.1 | 0 | 0 | 0 |
| 2.2 | 0 | 0 | 0 |
| 2.3 | 0 | 0 | 0 |
| 2.4 | 0 | 0 | 0 |
| 2.5 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
12_38K4286503-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 12_38K4286503-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 12_38K4286503-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - REPLACE INSULATION AND LAGGING ON NO. 2 GTG AND 2A/2B GTM EXHAUST DUCT | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 2.1 | 0.0 | ||||||||||
| 2.2 | 0.0 | ||||||||||
| 2.3 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 2.1 | 0 | 0 | 0 |
| 2.2 | 0 | 0 | 0 |
| 2.3 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
13_38K4286504-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 13_38K4286504-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 13_38K4286504-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - REPLACE INSULATION AND LAGGING ON NO. ONE GTG AND 1A/1B GTM EXHAUST DUCT | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 2.1 | 0.0 | ||||||||||
| 2.2 | 0.0 | ||||||||||
| 2.3 | 0.0 |
TOTAL IN-HOUSE M/Hs 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 2.1 | 0 | 0 | 0 |
| 2.2 | 0 | 0 | 0 |
| 2.3 | 0 | 0 | 0 |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
14_38K4212344-A01
| SHIP NAME/AVAILABILITY: | USS DEWEY (DDG-105) - FY26 6C1 SRA(d) | TGI 14_38K4212344-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA004 | ||||||||||
| SRF-JRMC TGI #: | 14_38K4212344-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - ACCOMPLISH REPAIR AND PRESERVATION OF NO. ONE VCHT ROOM | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
| 5.1 | 0.0 | ||||||||||
| 5.2 | 0.0 | ||||||||||
| 5.3 | 0.0 | ||||||||||
| 5.4 | 0.0 | ||||||||||
| 5.5 | 0.0 | ||||||||||
| 5.6 | 0.0 | ||||||||||
| 5.7 | 0.0 | ||||||||||
| 5.8 | 0.0 | ||||||||||
| 5.9 | 0.0 | ||||||||||
| 5.10 | 0.0 | ||||||||||
| 5.11 | 0.0 | ||||||||||
| 5.12 | 0.0 | ||||||||||
| 5.13 | 0.0 | ||||||||||
| 5.14 | 0.0 | ||||||||||
| 5.15 | 0.0 | ||||||||||
| 5.16 | 0.0 | ||||||||||
| TOTAL IN-HOUSE M/Hs | 0.0 |
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 5.1 | 0 | 0 | 0 | |||||
| 5.2 | 0 | 0 | 0 | |||||
| 5.3 | 0 | 0 | 0 | |||||
| 5.4 | 0 | 0 | 0 | |||||
| 5.5 | 0 | 0 | 0 | |||||
| 5.6 | 0 | 0 | 0 | |||||
| 5.7 | 0 | 0 | 0 | |||||
| 5.8 | 0 | 0 | 0 | |||||
| 5.9 | 0 | 0 | 0 | |||||
| 5.10 | 0 | 0 | 0 | |||||
| 5.11 | 0 | 0 | 0 | |||||
| 5.12 | 0 | 0 | 0 | |||||
| 5.13 | 0 | 0 | 0 | |||||
| 5.14 | 0 | 0 | 0 | |||||
| 5.15 | 0 | 0 | 0 | |||||
| 5.16 | 0 | 0 | 0 | |||||
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | |||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | |||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | |||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | ||||||||
| MATERIAL COST BREAKDOWN | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| Masking | ¥0 | |||||||
| Blast media | ¥0 | |||||||
| FAST CLAD ER | ¥0 | |||||||
| F124 | ¥0 | |||||||
| Thinner | ¥0 | |||||||
| Gasket | ¥0 | |||||||
| Manhole Nut | ¥0 | |||||||
| Fuel Oil | ¥0 | |||||||
| Detergent | ¥0 |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
File details come from the government source that posted it. Updated .