This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Dewey (DDG-105), specifically focused on repairing structural members in the Auxiliary Machinery Room No. 2 (4-220-0-E). The repair work includes three primary tasks: (1) weld repair a corrosion hole on the chilled water pump foundation, (2) remove and install two new pipe hangers for waste water drain piping, and (3) remove existing and install a new grating support. The work will be performed in the Auxiliary Machinery Room No. 2 and Fuel Receiving Tank Group-4, with specific technical requirements including drilling 3/4 inch diameter holes, countersinking, and following NAVSEA standard welding and inspection procedures. The total man-hours for the project are 723, with a total job material cost of $672.08, and the SRF-JRMC will provide government-furnished material and various utility and inspection services.

View the file

Other files

File Type Posted
Attachment II Proposal Breakdown Form (Contractor Response Required).xlsx XLSX spreadsheet
Attachment IV Request for Information Form Q2A2.rtf RTF text file
Solicitation Amendment N6264926RA0040002 SF 30.pdf PDF
Solicitation Amendment N6264926RA0040001 SF 30.pdf PDF
Attachment IV Request for Information Form Q1A1.rtf RTF text file
38K4212387A01_c0v0.pdf PDF
Attachment VII QASP 26RA004 Bun2.pdf PDF
Solicitation - N6264926RA004.pdf PDF
TGI_38K4286504A01_c1v1.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
TGI_38K4212359A02_c1v1.pdf PDF
TGI_38K4212357A01_c1v1.pdf PDF
38K4212301A01_c0v0.pdf PDF
TGI_38K4262204A01_c0v0.pdf PDF
TGI_38K4212354A01_c0v0.pdf PDF
Attachment IV Request for Information Form.rtf RTF text file
Attachment V Source of Repair Instruction.pdf PDF
Attachment III N6264926RA004 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_38K4212301T01_c0v0.pdf PDF
38K4212361A01_c0v0.pdf PDF
Attachment IX POP List.xlsx XLSX spreadsheet
TGI_38K4212359A01_c0v0.pdf PDF
TGI_38K4286503A01_c0v0.pdf PDF
TGI_38K4212344A01_c1v1.pdf PDF
Attachment II Proposal Breakdown Form (Contractor Response Required).xlsx XLSX spreadsheet
Attachment VIII Contract Data Sheet 26RA004.pdf PDF
38K42123ACA01.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

23-AUG-2025 1011

20.15.6.0.9333 (July 2025) ICN: 38K4265405 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: STRUCT 4-220-0-E AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: F/O - REPAIR STRUCTURAL MEMBER IN 4-220-0-E

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

EE02L041 * ES01NNY8 * ES01NNY9

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

AOKI, YOSHINORI 231A 3152434503 09-AUG-2025

APPROVED BY: CODE: PHONE: DATE:

NAKAMURA, YUUJI 231A 3152436041 11-AUG-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EE02-L041 * ES01-NNY8 * ES01-NNY9

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

654A1105 723 0 $672.08

1. SCOPE/PURPOSE:

1.1 Title: Structural Member in 4-220-0-E; repair

1.2 Location of Work:

1.2.1 Auxiliary Machinery Room No. 2 (4-220-0-E)

1.2.2 Fuel Receiving Tank Group-4 (5-220-4-F)

1.3 Identification:

1.3.1 Quantity (One EA), Foundation of Chilled Water Pump in 4-220-0-E

JCN: EE02-L041

Base Material: HTS, MIL-S-22698 GR-DH36 10.2 LBs Plate Remarks: See Sketch Enclosure-02 for location details.

TGI Short Form

23-AUG-2025 1011

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K4265405 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: STRUCT 4-220-0-E AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: F/O - REPAIR STRUCTURAL MEMBER IN 4-220-0-E

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (2 EA), Pipe Hanger for Waste Water Drain Piping

JCN: ES01-NNY8

Material: Steel Size: One Inch IPS Specification: SS000035 Type: H-13 Remarks: See Sheet 3C (Zone 5-E) of Ref. No. 4 and Sketch Enclosure-03 for location details.

1.3.3 Quantity (One Lot), Grating Support

JCN: ES01-NNY9

Remarks: See Engrg Inst Enclosuer-01 foe material and details.

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. PROCEDURE:

2.1 Pump out, clean and dry the bilge area located in 1.2.1 free from oil, debris, and other foreign matter.

2.2 Accomplish weld repair of corrosion hole on each existing foundation listed in 1.3.1, using Ref. No. 3 for guidance.

2.2.1 Drill 3/4 inch diameter hole on each foundation.

2.2.1.1 Shape remaining hole to minimum 20 degrees countersunk.

2.2.2 Accomplish the requirements of 009-012 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.

2.3 Remove existing and install new each pipe hanger listed in 1.3.2, using Ref. No. 4 and Enclosure-03 for guidance.

2.3.1 Accomplish the requirements of 009-012 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.

2.4 Remove existing, fabricate and install new grating support listed in 1.3.3 in accordance with 2.5 and Enclosure-01.

2.4.1 Accomplish the requirements of 009-012 of 2Ref. No. One, including Table 2, Column(s) A, Lines One through 7.

2.5 Accomplish the requirements of 009-032 on Ref. No. One for each new and disturbed surface.

2.6 Notes:

2.6.1 Planner: Code 231A Y. Aoki, 243-4503

Planner: Code 234 K. Akase, 243-2372

23-AUG-2025 1011

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K4265405 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: STRUCT 4-220-0-E AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: F/O - REPAIR STRUCTURAL MEMBER IN 4-220-0-E

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

Planner: Code 234 S. Yamashita, 070-7787-2035 Engineer: Code 250 C. Kinoshita, 243-4356

2.6.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.6.3 This TGI clears DFS DDG-105-1015-2022 in its entirety.

2.6.4 This TGI is in response to CCIMS report No. CCIMS-G1N6-DDG105-085-24 from TGI No. 3805Y11004I03.

2.6.5 Provision of oily/chemical water barge will be coordinated by Project Team.

2.6.6 Opening, initial cleaning, and closing the following tanks have been covered by following TGI No(s)..

Fuel Receiving Tank Group-4 (5-220-4-F): TGI No. 38K4212321A01 (KTR TGI).

Fuel Expansion Seawater Overflow Tank Group-4 (5-254-2-F): TGI No. 38K4212329A01 (KTR TGI).

Oily Waste Holding Tank (5-220-2-F): TGI No. 38K4212319A01 (KTR TGI).

Cofferdam (5-254-4-V): TGI No. 38K4212342A01 (KTR TGI).

2.6.7 JCNs EE02-L041, ES01-NNY8, and ES01-NNY9 are related to this TGI.

2.7 Government Furnished Material (GFM)

2.7.1 SRF-JRMC will provide GFM listed in the Material List.

2.8 SRF-JRMC will provide the following service work: (TGI No. 38K4265405S02).

2.8.1 [C740] Crane and crane rigging service.

2.8.2 [X99E] Utility service, electrical.

2.8.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.8.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.8.6 [C133] QA inspection for (G) symbol(s).

23-AUG-2025 1011

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K4265405 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: STRUCT 4-220-0-E AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: F/O - REPAIR STRUCTURAL MEMBER IN 4-220-0-E

FOUO Pg 4 of 5

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 DWG 180-7060484 FDN ARR DWG DSGN ZONE

2320 BKLT NO. 1

F Y 5E1

-6

4 DWG 531-7060593 DISTILLED WATER SYSTEM,

ZONE 2320

D Y 3C

5 DWG 622-7058590 FLOOR PLATES, GRATING &

HANDRAILS AUX MCHRY RM

NO.2 ARR, FAB & INSTL

C Y 3H, 5C

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 LBR 160HRs, SFTR 32HRs 22/KE PC 1 192 N

2.2 WELD 82HRs, QA 8HRs, SFTR 96HRs, PNTR 38HRs, PFTR

48HRs, OMCH 16HRs, BLRM 64HRs

22/KE PC 1 352 N

2.3 PFTR 48HRs, PNTR 22HRs, WELD 14HRs, QA 4HRs 22/KE PC 1 88 N

2.4 BLRM 16HRs, WELD 6HRs, PNTR 22 HRs, QA 4HRs 22/KE PC 1 48 N

2.5 PNTR 32HRs, QA 10HRs 22/KE PC 1 42 N

Dewatering/Cleaning Work CFM: $3,604.47, marine chemist cost, misc and such as other consumable.

22/MQ CS 0 0 N

Structure and Preservation Work CFM: $6,375.06, all paints, copper grit including disposal cost, thinner, fire watch cost, confined space watch cost, enclosing/covering materials, and misc such as electrode, gases, and other consumable.

22/MQ CS 0 0 N

Piping Work CFM: $1,646.76 for firewatch cost, tank watch cost, covering material, argon gas, disposable coverall, plastic bag/sheet, tape, welding rod, gasket, paint, saw blade and misc.

22/MQ CS 0 0 N

Boiler Work CFM: $972.00, fire watch cost, electrode, paint, fasteners covering material and other consumable material (misc).

22/MQ CS 0 0 N

Process Funding Document. 10/CT OM 1 1 N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

400 158 1 M ANGLE,STRUCTURAL, SIZE 2”

X 2” X 3/16” THK, MIL-S-22698,

GRADE AH-36

ORDERED FOR KTR

C234 K.AKASE 243-2372

9B 9520 002777318 NA 4 N 51825212 10/FT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

1 512-7059777 L

ICN: 38K4265405 KEY OP: A01

23-AUG-2025 1011

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K4265405 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: STRUCT 4-220-0-E AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: F/O - REPAIR STRUCTURAL MEMBER IN 4-220-0-E

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

401 M ANGLE,STRUCTURAL, FOR

PIPE HANGER

ORIG: C234 S. YAMASHITA

070-7787-2035

ODERED FOR KTR

9B 9520 002775983 NA 4 N 52045039 3/FT

402 M PIPE HANGER, PIPE HANGER.

SIZE: 1"IPS X 12" LENGTH,

STEEL. LINER MATL: RUBBER

SYNTHETIC, 1/ 8" THK, STD

DWG:810-4714432

TYPE 38.

PREMIER COPPER P/N:

PH438200

ORIG: C234 S. YAMASHITA

070-7787-2035

ODERED FOR KTR

LL9307016 NA 4 N 2/EA

403 M COUPLING,TUBE, ORIG: C234

S. YAMASHITA 070-7787-2035

ODERED FOR KTR

9B 4730 007225477 NA 4 N 52045206 2/EA

404 M BACKING, ORIG: C234 S.

YAMASHITA 070-7787-2035

ODERED FOR KTR

9C 4730 LL4558792 NA 4 N 52047477 2/EA

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38K4265405A01-Engrg Inst.pdf 31-JUL-2025 0000 ENCLOSURE-02 38K4265405A01-Sketch-01.pdf 31-JUL-2025 0000 ENCLOSURE-03 38K4265405A01-Sketch-02.pdf 31-JUL-2025 0000

SUBJECT: REPAIR PLAN OF CORRODED FL PLATE SPRT IN AUX MCHRY RM NO.2

( 4-22O-O-E)

ICN: 38K4265405

JCN: ES01-NNY9

ORIGINATOR: C250 C. KINOSHITA

DA TE: 07/26/2025

REFERENCE:

( a) DDG51 CL-622-7058590 "c", FLOOR PLATES, GRATING & HANDRAILS AUX MCHRY RM N0.2

ARR, F AB & INSTL

NOTES:

1. THE PURPOSE OF THIS ENGINEERING INSTRUCTION IS TO PROVIDE REPAIR PLAN OF CORRODED

FLOOR PLATE SUPPORT IN AUXILIARY MACHINERY ROOM N0.2 (4-220-0-E) OF USS DEWEY

(DDG 105).

2. REMOVAL NOTE: EXISTING FLOOR PLATE SUPPORT WHICH IS RENEWED SHALL BE REMOVED WITH

SAME DIMENSIONS SHOWN ON INSTALLATION PLANS.

3. WELDING AND INSPECTION FOR STEEL MATERIALS SHALL BE CONDUCTED IN ACCORDANCE WITH

NAVSEA STD ITEM N0.009-012.

4. FOR INFORMATION OF FLOOR PLATE SUPPORT NOT SHOWN ON THIS INSTRUCTION, SEE REF ( a).

ENGRG INST

SHEET 1 OF 3 38K4265405A01 ENCLOSURE-01

38K4265405A01 ENCLOSURE-01

38K4265405A01 ENCLOSURE-01

PLAN VEW

HOLD

SEE ELEV 2-A

SKETCH

ENCLOSURE-0238K4265405A01 SHEET 1 OF 2

ELEVATION 2-A

SEE DETAIL 2-B

DETAIL 2-B

38K4245405A01 SKETCH ENCLOSURE-02 SHEET 2 OF 2

FDN

These markings were applied by JEDMICS on 26-FEB-2010 and supersede any other sensitivity markings on this document. Do not scale off this document; docu DISTRIBUTION STATEMENT D: Distribution authorized to DoD and DoD contractors only; Critical Technology. Other U.S. requests for this document shall be referred

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec. 2841 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401, et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate per the provisions of O DESTRUCTION NOTICE: This document may be destroyed by any means that will prevent disclosure of contents or reconstru

Shun.Yamashita.ja Oval

Shun.Yamashita.ja_1 Oval

Shun.Yamashita.ja_2 Oval

Shun.Yamashita.ja_3 Oval

Shun.Yamashita.ja_4 Line

Shun.Yamashita.ja_5 Line

Shun.Yamashita.ja_6 Text Box

38K4265405A01

Shun.Yamashita.ja_7 Text Box

SKETCH

ENCLOSURE-03

Shun.Yamashita.ja_8 Text Box

SHEET 1 OF 1