TGI_38K4212354A01_c0v0.pdf

PDF 211 KB Posted

Attached to
USS DEWEY (DDG-105) FY26 6C1 CNO SRA(d) BUNDLE #2, Chief of Naval Operation Availability Yokosuka Japan
Solicitation number
N6264926RA004
Issued by

About this file

This Task Group Instruction (TGI) details an inspection, repair, and preservation task for the No. One Gas Turbine Module (GTM) intake on the USS Dewey (DDG-105). The work will be performed in multiple engine room locations, including port and starboard dirty and clean sides, involving a total of 5,620 square feet of interior surface areas. Key tasks include visual inspections, commercial blast cleaning, ultrasonic thickness measurements, and structural repairs such as base metal weld buildup (244 square inches), replacing deck/overhead/bulkhead sections (110 square feet), and repairing stiffeners and welds.

The document specifies special requirements, including potential asbestos hazards and hot work in magazine and adjacent spaces. The work requires fabricating a non-flammable closure for fire zone boundary modifications. Materials to be used include perforated stainless steel sheets, acoustic and thermal insulation, and adhesives. The instruction notes that removal and installation of certain interferences and gas-free operations will be covered in future documentation. The work is to be performed by SRF-JRMC (Shore Repair Facility), with various support services including crane rigging, utility services, and quality assurance inspections.

View the file

Other files

File Type Posted
Attachment II Proposal Breakdown Form (Contractor Response Required).xlsx XLSX spreadsheet
Attachment IV Request for Information Form Q2A2.rtf RTF text file
Solicitation Amendment N6264926RA0040002 SF 30.pdf PDF
Solicitation Amendment N6264926RA0040001 SF 30.pdf PDF
Attachment IV Request for Information Form Q1A1.rtf RTF text file
TGI_38K4265405A01_c0v0.pdf PDF
38K4212387A01_c0v0.pdf PDF
Attachment VII QASP 26RA004 Bun2.pdf PDF
Solicitation - N6264926RA004.pdf PDF
TGI_38K4286504A01_c1v1.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
TGI_38K4212359A02_c1v1.pdf PDF
TGI_38K4212357A01_c1v1.pdf PDF
38K4212301A01_c0v0.pdf PDF
TGI_38K4262204A01_c0v0.pdf PDF
Attachment IV Request for Information Form.rtf RTF text file
Attachment V Source of Repair Instruction.pdf PDF
Attachment III N6264926RA004 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_38K4212301T01_c0v0.pdf PDF
38K4212361A01_c0v0.pdf PDF
Attachment IX POP List.xlsx XLSX spreadsheet
TGI_38K4212359A01_c0v0.pdf PDF
TGI_38K4286503A01_c0v0.pdf PDF
TGI_38K4212344A01_c1v1.pdf PDF
Attachment II Proposal Breakdown Form (Contractor Response Required).xlsx XLSX spreadsheet
Attachment VIII Contract Data Sheet 26RA004.pdf PDF
38K42123ACA01.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: FWD INTK AY A 0 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE:

F/O – INSPECT, REPAIR, AND PRESERVE NO. ONE GTM INTAKE

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

RYO YAJIMA 231A 315-243-2791 16-JUL-2025

APPROVED BY: CODE PHONE DATE

YUUJI NAKAMURA 231A 315-243-6041 16-JUL-2025

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

HOT WORK IN MAGAZINE AND ADJACENT SPACES IAW S6740-AA-SAF-010 AND NAVSEA OP 4, SURFMEPP, This work Affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: FWD INTK AY A 0

FOUO

SHIP: DDG-105 CHG/VER: 0/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-6 J1-2 M1-2

1. SCOPE/PURPOSE

1.1 Title: No. One GTM Intake Dirty and Clean Side; inspect, repair, and preserve

1.2 Location of Work:

1.2.1 Intake Engine Room No. One, Port (Dirty Side) (02-174-0-Q)

1.2.2 Intake Engine Room No. One, Port (Clean Side) (02-174-0-Q)

1.2.3 Intake Engine Room No. One, Starboard (Stbd) (Dirty Side) (02-174-1-Q)

1.2.4 Intake Engine Room No. One, Stbd (Clean Side) (02-174-1-Q)

1.2.5 Intake Trunk (A) Engine Room No. One (1-174-1-Q)

1.2.6 Intake Trunk (B) Engine Room No. One (1-174-5-Q)

1.2.7 Engine Room No. One (4-174-0-E)

1.3 Identification:

1.3.1 Quantity (2 EA), No. One GTM Intake

1.3.1.1 Quantity (One EA), No. 1A GTM Intake, Dirty and Clean Side (02-174-1-Q)

1.3.1.2 Quantity (One EA), No. 1B GTM Intake, Dirty and Clean Side (02-174-0-Q)

1.3.2 Quantity (1,050 SF) Entire Interior Surface of No. 1A GTM Intake Dirty Side (02-174-1-Q) Remarks: The area excludes the intake louvers.

1.3.3 Quantity (930 SF), Entire Interior Surface of No. 1A GTM Intake Clean Side (02-174-1-Q) Remarks: The area includes the structural surface where covered with perforated sheathing and inner insulation.

1.3.4 Quantity (1,050 SF), Entire Interior Surface of No. 1B GTM Intake Dirty Side (02-174-0-Q) Remarks: The area excludes the intake louvers.

1.3.5 Quantity (2,590 SF), Entire Interior Surface of No. 1B GTM Intake Clean Side (02-174-0-Q) Remarks: The area includes the structural surface where covered with perforated sheathing and inner insulation.

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard.

FOUO

SHIP: DDG-105 CHG/VER: 0/0

1.5.2 Critical Coated Area: CCNY-DDG105-010-26 for the area listed in 1.3.2 through 1.3.5.

1.6 Contractor Work start date: See attached POP list.

1.7 Contractor Work completion date: See attached POP list.

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 MP LM23-

K4212354-

EM01ZBD2

1A/1B GTM INTKE FOD PROTN

FOR INTK CLEAN/DIRTY SIDE

PRESERVATION ON 02 LEVEL

- Y AL

L

4 DWG 150-

7060426

Unit Structural ARR DWG ASSY Unit 4220

J Y SE

E N

OT

E

5 DWG 150-

7060432

Unit Structural ARR DWG ASSY Unit 4320

C Y SE

E N

OT

E

6 DWG 150-

7060425

UNIT STRUCTURAL ARR DWG

ASSY UNIT 4210

D Y 3-5

7 DWG 150-

7060431

UNIT STRUCTURAL ARR DWG

ASSY UNIT 4310

C Y 3-

8 TM

SYSTEMS &

SPECIFICAT

IONS

SSPC Painting Manual Volume 2 - N

9 TM T9074-

AS-GIB-

010/271

Requirements for Nondestructive Testing Methods

1 N

10 TM S9086-

DA-STM-

010/CH-100

Hull Structures 4 N

11 MIL MIL-

STD-2035

Nondestructive Testing Acceptable Criteria

A N

3. APPENDICES:

3.1. Appendix “J” TGI Job Summary Information Sheet

3.2. Appendix "M" TGI Material List

3.3. Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirements of 2.3.

(V)(G) “GAS TURBINE MAINTENANCE PROCEDURE”

FOUO

SHIP: DDG-105 CHG/VER: 0/0

5.2 Accomplish a visual inspection of the current ship condition, listed in 1.3.1 and located in 1.2.1 through 1.2.4, using 2.4 through 2.7 for guidance.

5.2.1 Ensure to inspect each deck, bulkhead, and overhead surface, stiffener, penetration, and pipe hanger.

5.2.2 Mark each corroded, damaged and/or deteriorated area.

5.2.3 Submit one legible copy, in hard copy or approved transferrable media, of a report with a sketch listing results of the requirements of 5.2 to the SUPERVISOR.

5.3 Commercial blast clean each surface listed in 1.3.2 through 1.3.5. Accomplish each requirement of Surface Preparation Specification SSPC-SP 6 of 2.8.

5.4 Accomplish a visual inspection of each intake listed in 1.3.1 for structural integrity, deterioration, pitting, each crack, and area of damage or distortion in each location located in 1.2.1 through 1.2.4, using 2.4 through 2.7 for guidance.

5.4.1 Mark each corroded, damaged and/or deteriorated area.

5.4.2 Submit one legible copy, in hard copy or approved transferable media, of a report with a sketch listing results of the requirements of 5.4 to the SUPERVISOR.

5.5 Accomplish each ultrasonic thickness measurement (UTM) up to 100 locations in each location reported in 5.4.2, listed in 1.3.1, located in 1.2.1 through 1.2.4 in accordance with Paragraph 6.7 of 2.9 and 2.10, as designated by the SUPERVISOR, using 2.4 through 2.7 for guidance. The acceptance criteria must be in accordance with 2.11.

5.5.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 5.5 to the SUPERVISOR.

5.5.2 Ensure a sketch showing each location of each UTM reading, original material thickness, existing material thickness, and percentage of material thickness reduction.

5.6 Accomplish the following repairs documented in 5.2.3, 5.4.2 and 5.5.1, listed in 1.3.1, located in 1.2.1 through

1.2.4 as designated by the SUPERVISOR, using 2.4 through 2.7 for guidance. See 5.9.5 and 5.9.6.

5.6.1 Base metal weld buildup, a total of 244 square inches.

5.6.1.1 Ensure each base metal buildup area does not exceed 2 inches in diameter.

5.6.1.2 Estimate the base metal buildup to be one quarter inch thick for pricing purposes.

5.6.1.3 Fill each local pit and groove with weld metal prior to the application of each principal build-up layer.

5.6.1.4 Each surface must be ground smooth to metal.

5.6.2 Remove existing and install new, a total of 110 square feet of deck, overhead, and bulkhead.

5.6.3 Remove existing and install new, a total of 50 linear feet of longitudinal, vertical, and transverse stiffener.

5.6.4 Vee-out and weld a total of 8 linear feet of each cracked, split, broken or damaged weld.

5.6.5 Chip and grind each surface flush in way of each repair.

5.6.6 Template exact size, configuration, and location from each existing shipboard condition.

5.6.7 Accomplish the requirements of 009-012 of 2.1, including Table 2, Columns A, and D, Lines One through 7.

FOUO

SHIP: DDG-105 CHG/VER: 0/0

5.6.8 Accomplish the requirements of 009-025 of 2.1 for an air hose test of each new weld. Allowable leakage:

None.

5.7 Accomplish the requirements of 009-032 of 2.1, including Table 3, Line 18A for each area listed in 1.3.2 through 1.3.5.

5.8 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.

5.9 Notes:

5.9.1 Planner: Code 231A R. Yajima, 243-2791

Planner: Code 234 N. Izumi, 243-2243

5.9.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

5.9.3 This TGI meets the intent of DDG CSWT File No. 251-042 and 251-046.

5.9.4 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.

5.9.5 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.

5.9.6 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.

5.9.7 WPC will copy the following pages in reference.

REF. 2.4: Pages 3-6, 7A-6, 6-6, and 5C-7 REF. 2.5: Pages 7A, 7B-3, 5-5, 3-6, 7-6, 6-6, 5A-12

5.9.8 JCNs EM01-ZBD2, EM01-ZBD3, EM01-ZBD5, and EM01-ZBD6 are related to this TGI.

5.10 Government Furnished Material (GFM):

5.10.1 SRF-JRMC will provide material listed in Appendix “M”.

5.11 SRF-JRMC will provide the following service work: (TGI No. 38K4212354S03).

5.11.1 [C740] Crane and crane rigging service.

5.11.2 [X99E] Utility service, electrical.

5.11.3 [X99M] Utilities service, including water supply, steam supply, and low pressure air supply except on-board blasting work.

5.11.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.11.5 [C106.2] Gas free inspection for SRF-JRMC employees.

FOUO

SHIP: DDG-105 CHG/VER: 0/0

5.11.6 [C133] Provide QA inspection for (G) symbol(s) and review coating application data.

5.11.7 [C285] Inspection for (G) symbol(s).

FOUO

J-1

SHIP: DDG-105 CHG/VER: 0/0

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

FWD INTK AY A 0 0

CU PHASE TITLE:

F/O – INSPECT, REPAIR, AND PRESERVE NO. ONE GTM INTAKE

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

CMPT 02-174-0-Q MS CMPT 02-174-1-Q MS #1A GTM INTAKE IT #1B GTM INTAKE

IT

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: TOTAL DURATION: PLANNING ACCEPTANCE:

38K4212354 A01

TOTAL MAT’L COST

CU PHASE DESCRIPTION:

The purpose of this TGI is to inspect, repair, and preserve No. One Gas Turbine Module (GTM) intake.

Location of Work:

Intake Engine Room No. One, Port (Dirty Side) (02-174-0-Q) Intake Engine Room No. One, Port (Clean Side) (02-174-0-Q) Intake Engine Room No. One, Starboard (Stbd) (Dirty Side) (02-174-1-Q) Intake Engine Room No. One, Stbd (Clean Side) (02-174-1-Q) Intake Trunk (A) Engine Room No. One (1-174-1-Q) Intake Trunk (B) Engine Room No. One (1-174-5-Q) Engine Room No. One (4-174-0-E)

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

5.1 SFTR , OMCH 22 KE PC 0

5.2 SFTR , RGRS 22 KE PC 0

5.3 PNTR , BLRM , INSL , WELD , QA , RGRS 22 KE PC 0

5.4 SFTR 22 KE PC 0

5.5 SFTR 22 KE PC 0

5.6 SFTR s, WELD , PNTR , CARP , QA 22 KE PC 0

5.7 PNTR , RGRS , QA 22 KE PC 0

5.8 PNTR , QA 22 KE PC 0

CFM: for all paints, thinner, UT inspection cost, fire watch/ confined space watch cost, air compressor/fuel oil cost, grit including waste disposal cost, and MISC such as electrode, gas/oxyzen and welding rod, asbestos sampler/analysis cost temporary closure, covering material and other consumables.

22 MQ CS 0 0 0

FOUO

J-2

SHIP: DDG-105 CHG/VER: 0/0

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

Process Funding Document 10 CT OM 1 1 0

FOUO

M-1

SHIP: DDG-105 CHG/VER: 0/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

FWD INTK AY A 0 0

CU PHASE TITLE:

F/O – INSPECT, REPAIR, AND PRESERVE NO. ONE GTM INTAKE

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

38K4212354 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

400 M SHEET, P, SHEET,

PERFORATED, 4FT X 8FT X

0.063"THK, CRES 316L, ASTM-

A240, 3/16"DIA, PITCH: 3/8" ON

STAGGERED CENTERS

ORDERD FOR KTR

C234 N. IZUMI, 243-2243

9B 9515 LL9603130 NA 4 N 51837415 75/SH

401 M ACOUSTIC INSULATION,

ACOUSTIC INSULATION,

SPEC: MIL-DTL-32585 TYPE II

FORM 2 FACING D (FORMER:

MIL-I-22023 TYPE 3),

THK: 2", SIZE: 24" X 36",

MATL: FIBER GLASS,

FACING: FACED WITH

POLYESTER FILM

REINFORCED WITH FIBROUS

GLASS SCRIM,

TUFFSKIN STYLE: 1613,

NSN: 5640-01-509-0809(SMIC:

X3), BIW CAT#: 47068-011,

9Q FY26 LL4808709 NA 4 N

550/SH

NOTES:

FOUO

M-2

SHIP: DDG-105 CHG/VER: 0/0

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

402 M INSULATION, THERMAL,

INSULATION, THERMAL FELT,

2FT X 3FT X 2"THK, 1.5LB/QFT

DENSITY, FIBROUS GLASS,

INSULA (FORMER SPEC MIL-I-

22023 TY-I CL-4), 10 SHEETS

PER BOX.

ORDERED FOR KTR

C234 N. IZUMI, 243-2243

9Q FY26 LL9005023 NA 4 N

550/SH

403 M ADHESIVE, ADHESIVE FOR

INTAKE INSULATION

ORDERED FOR KTR

C234 N. IZUMI, 243-2243

9B 8040 002738708 NA 4 Y 51835018 55/GL

404 M TAPE,PRESSURE SENSI,

ORDERED FOR KTR

C234 N.IZUMI, 243-2243

TAPE, GLASS CLOTH

9Q 7510 015406777 NA 4 N 51835019 55/RO

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-105 FWD INTK AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

38K4212354 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-105 FWD INTK AY A 0

File details come from the government source that posted it. Updated .