This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Dewey (DDG-105), dated 04-JUN-2025, focused on replacing insulation, lagging, and reusable covers on exhaust ducts for No. 2 Ship Service Gas Turbine Generator (SSGTG) and 2A/2B Gas Turbine Modules (GTM). The specific work is located in Uptake Engine Room No. 2 and involves replacing approximately 560 square feet of insulation and lagging, using MIL-PRF-2818 insulation and MIL-C-20079 Type I, Class 9 lagging, along with three reusable manhole covers. The materials include thermal mineral wool insulation blankets, glass cloth, wire mesh, adhesives, and weather barrier coating, with SRF-JRMC providing government-furnished materials and additional services such as crane rigging, utility services, and quality assurance inspections.

The task instruction includes detailed specifications for removing existing insulation and installing new materials, with special attention to potential asbestos hazards. The contractor is required to follow specific references and guidelines for installation, including applying weather barrier coating and meeting various technical requirements. The work is part of a maintenance project for the USS Dewey, with the specific job code EM02-L142, and involves precise technical specifications for insulation and covering of exhaust ducts in the ship's engine room.

View the file

Other files

File Type Posted
Attachment II Proposal Breakdown Form (Contractor Response Required).xlsx XLSX spreadsheet
Attachment IV Request for Information Form Q2A2.rtf RTF text file
Solicitation Amendment N6264926RA0040002 SF 30.pdf PDF
Solicitation Amendment N6264926RA0040001 SF 30.pdf PDF
Attachment IV Request for Information Form Q1A1.rtf RTF text file
TGI_38K4265405A01_c0v0.pdf PDF
38K4212387A01_c0v0.pdf PDF
Attachment VII QASP 26RA004 Bun2.pdf PDF
Solicitation - N6264926RA004.pdf PDF
TGI_38K4286504A01_c1v1.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
TGI_38K4212359A02_c1v1.pdf PDF
TGI_38K4212357A01_c1v1.pdf PDF
38K4212301A01_c0v0.pdf PDF
TGI_38K4262204A01_c0v0.pdf PDF
TGI_38K4212354A01_c0v0.pdf PDF
Attachment IV Request for Information Form.rtf RTF text file
Attachment V Source of Repair Instruction.pdf PDF
Attachment III N6264926RA004 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_38K4212301T01_c0v0.pdf PDF
38K4212361A01_c0v0.pdf PDF
Attachment IX POP List.xlsx XLSX spreadsheet
TGI_38K4212359A01_c0v0.pdf PDF
TGI_38K4212344A01_c1v1.pdf PDF
Attachment II Proposal Breakdown Form (Contractor Response Required).xlsx XLSX spreadsheet
Attachment VIII Contract Data Sheet 26RA004.pdf PDF
38K42123ACA01.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

04-JUN-2025 1311

20.14.15.2.9020 (September 2024) ICN: 38K4286503 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AFT 02 LVL EXH IN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. 2 GTG AND 2A/2B GTM EXHAUST DUCT

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 6

EM02L142

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

HOSODA, MASATO 234 3152434572 25-APR-2025

APPROVED BY: CODE: PHONE: DATE:

ITO, SHINICHI 234 3152434297 25-APR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L142

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

UENO, KOUICHI

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

865A5103 0

1. SCOPE/PURPOSE:

1.1 Title: Insulation, Lagging and Reusable Cover on No. 2 Ship Service Gas Turbine Generator (SSGTG) and 2A/2B Gas Turbine Module (GTM) Exhaust Duct; replace

1.2 Location of Work:

1.2.1 Uptake Engine Room No. 2 (02-242-0-Q)

1.3 Identification:

1.3.1 Quantity (200 SF), Insulation and Lagging, Exterior, Exhaust Duct, No. 2 SSGTG Insulation: MIL-PRF-2818 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.3.1.1 Quantity (One EA), Reusable Cover, Manhole Cover, No. 2 SSGTG

TGI Short Form

04-JUN-2025 1311

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K4286503 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AFT 02 LVL EXH IN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. 2 GTG AND 2A/2B GTM EXHAUST DUCT

FOUO Pg 2 of 6

CU PHASE DESCRIPTION (Cont.)

Insulation: MIL- DTL-32585, Type-I, Form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.3.2 Quantity (180 SF), Insulation and Lagging, Exterior, Exhaust Duct, 2A GTM Insulation: MIL-PRF-2818 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.3.2.1 Quantity (One EA), Reusable Cover, Manhole Cover, 2A GTM Insulation: MIL- DTL-32585, Type-I, Form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.3.3 Quantity (180 SF), Insulation and Lagging, Exterior, Exhaust Duct, 2B GTM Insulation: MIL-PRF-2818 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.3.3.1 Quantity (One EA), Reusable Cover, Manhole Cover, 2B GTM Insulation: MIL- DTL-32585, Type-I, Form-3 Lagging: MIL-C-20079, Type I, Class 9 Remarks: See Sketch Enclosure-01 for details.

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.6 Contractor Start Date: See attached POP list.

1.7 Contractor Work Completion Date: See attached POP list.

2. PROCEDURE:

2.1 Remove each existing insulation, lagging, and reusable cover listed in 1.3.1 through 1.3.3 from exhaust duct, using Ref. No.

3 for guidance.

2.2 Accomplish the requirements of 009-011 of Ref. No. One for installation each new insulation, lagging and reusable cover listed in 1.3.1 through 1.3.3 to exhaust duct, using Ref. No. 4 and Ref. No. 5 for guidance.

2.2.1 Apply weather barrier coating to the new lagging surface.

2.2.2 Accomplish the requirements of 009-032 of Ref. No. One for top surface where new insulation and lagging are installed.

2.3 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.

2.4 Notes:

04-JUN-2025 1311

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K4286503 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AFT 02 LVL EXH IN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. 2 GTG AND 2A/2B GTM EXHAUST DUCT

FOUO Pg 3 of 6

CU PHASE DESCRIPTION (Cont.)

2.4.1 Planner: Code 234 M. Hosoda, 243-4572

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.4.3 JCN EM02-L142 is related to this TGI.

2.5 Government Furnished Material (GFM):

2.5.1 SRF-JRMC will provide GFM listed in the Material List.

2.6 SRF-JRMC will provide the following service work: (TGI No: 38K4286503S02)

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [X99E] Provide utility service.

2.6.3 [X99M] Provide utility service, including low pressure air supply, water supply, and steam supply.

2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.6 [C133] QA inspection for (G) Symbol(s).

04-JUN-2025 1311

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K4286503 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AFT 02 LVL EXH IN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. 2 GTG AND 2A/2B GTM EXHAUST DUCT

FOUO Pg 4 of 6

OTHER SPECIAL REQUIREMENTS:

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - N

3 TM S9086 VH-STM-

010/CH-635

Thermal, Fire, and Acoustic Insulation

3 N

4 DWG 259-7060869 FAB & INSTL OF SSGTG

UPTAKE ENG ROOM NO.2 &

ABOVE

B N

5 DWG 259-7060867 FAB & INSTL OF GTRB

UPTAKE ENG RM NO.2 &

ABOVE

B N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 INSL , RGRS 22/KE PC N

2.2 INSL , PNTR , QA , RGRS 22/KE PC N

2.3 PNTR , QA , 22/KE PC N

CFM: for asbestos sampler and analysis cost, tyvek suit, all paint, wire, hook / washer, plastic bag/sheet, enclosing/covering materials and other consumable.

22/MQ CS 0 0 N

Process Funding Document. 10/CT OM 1 1 N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K4286503 KEY OP: A01

04-JUN-2025 1311

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K4286503 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AFT 02 LVL EXH IN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. 2 GTG AND 2A/2B GTM EXHAUST DUCT

FOUO Pg 5 of 6

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M INSULATI, INSULATION

BLANKET, THERMAL, MINERAL

WOOL,

SPEC: MIL-PRF-2818,

SIZE: 24" X 48" X 2" THK,

DENSITY: 8 LBS/CU FT,

BIW CATALOG NO. 47111-030,

ROCKWOOL P/N: SEAROX SL

620(128), REMARKS: OMIT METALLIC

SUPPORT MEMBERS FROM

BOTH SIDES,

9B 5640 LL9606678 NA 4 N 51217572

130/SH

002 M CLOTH,PLAIN WEAVE, H/W

GLASS CLOTH, 5 FT X 150 FT

LONG PER ROLL, COLOR IS

NATURAL,

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9B 8305 001487364 NA 4 N 51215100 2/RO

003 M WIRE FABRIC, WIRE MESH,

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9B 5335 005989404 NA 4 N 51215098 1/EA

004 M ADHESIVE, ADHESIVE FOR

CLOTH,

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9B 8040 002738708 NA 4 Y 51215084 30/GL

005 M WIRE MES, WIRE, MESH,

CHICKEN NET, #20 X 16 MESH

NO.20G, HEXAGONAL WIRE

NETTING, GALVANIZED

STEEL, 1RLL=30METER

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9Z 5340 LL4651079 NA 4 N 51217809 4/RL

006 M CEMENT,INSULATION,H,

CEMENT, FINISH

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9Q 5640 002264540 NA 4 Y 51215081 25/BG

006 M CEMENT,INSULATION,H,

CEMENT, FINISH

ORIG:C234 M.HOSODA, 070-

7787-2043

ORDERED FOR CONTRACTOR

9Q 5640 002264540 NA 4 Y 51225006 25/BG

007 M COATING, WEATHER BARRIER

COATING

ORIG: C234 M. HOSODA, 243-

ORDERED FOR CONTRACTOR

9Q 8030 LLN044831 NA 4 Y 51217457 40/CN

04-JUN-2025 1311

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K4286503 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AFT 02 LVL EXH IN AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-105 USS DEWEY K42

CU PHASE TITLE: *F/O - REPLACE INSULATION AND LAGGING ON NO. 2 GTG AND 2A/2B GTM EXHAUST DUCT

FOUO Pg 6 of 6

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38K4286503A01-Sketch.pdf 25-APR-2025 0000

SKETCH

ENCLOSURE-01

38K4286503A01 SHEET 1 OF 2

Replace insulation, lagging and reusable cover listed in 1.3.1

SKETCH

ENCLOSURE-01

38K4286503A01 SHEET 2 OF 2

Replace insulation, lagging and reusable cover listed in 1.3.2

Replace insulation, lagging and reusable cover listed in 1.3.3