Attachment IX POP List.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- USS DEWEY (DDG-105) FY26 6C1 CNO SRA(d) BUNDLE #2, Chief of Naval Operation Availability Yokosuka Japan
- Solicitation number
- N6264926RA004
About this file
The document is an attachment listing multiple task groups for ship repair and maintenance for USS DEWEY (DDG-105) at Yokosuka Naval Base, Japan. The Period of Performance (POP) spans from 30 March 2026 to 14 December 2026, with specific task orders focusing on inspection, repair, and preservation of various ship systems and spaces, including bilge areas, exhaust trunks, intake ducts, structural members, and insulation replacement.
The associated federal contract opportunity (Solicitation Number N6264926RA004) is issued by the Department of the Navy Naval Supply Systems Command, involving fourteen Task Group Instructions (TGIs) for ship repair overhaul and maintenance. The solicitation requires proposals to be submitted by 17 November 2025 to specified Navy contacts, with specific requirements for hazardous material identification and potential sea transportation specifications. The work will be performed at Yokosuka Naval Base in Japan, with references to be provided via DoD safe file transfer system.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
List
| ICN | KO | DESC | POP START DATE | POP END DATE |
| 38K4212301 | A01 | F/O - INSPECT, REPAIR, AND PRESERVE BILGE AND BILGE DRAIN WELL IN 4-254-0-E | 30-Mar-26 | 7-Sep-26 |
| 38K4212301 | T01 | OILY WASTE WATER SYS (T & OP) - KTR | 30-Mar-26 | 14-Dec-26 |
| 38K4212344 | A01 | F/O - ACCOMPLISH REPAIR AND PRESERVATION OF NO. ONE VCHT ROOM | 30-Mar-26 | 7-Sep-26 |
| 38K4212354 | A01 | F/O – INSPECT, REPAIR, AND PRESERVE NO. ONE GTM INTAKE | 30-Mar-26 | 7-Sep-26 |
| 38K4212357 | A01 | F/O – INSPECT, REPAIR, AND PRESERVE 03-174-0-Q | 30-Mar-26 | 7-Sep-26 |
| 38K4212359 | A01 | F/O - INSPECT, REPAIR, AND PRESERVE AFT UPTAKE SPACE | 30-Mar-26 | 7-Sep-26 |
| 38K4212359 | A02 | F/O - INSPECT, REPAIR, AND PRESERVE IN SSGTG NO.2 EXHAUST TRUNK | 30-Mar-26 | 7-Sep-26 |
| 38K4212361 | A01 | F/O – INSPECT, REPAIR, AND PRESERVE 02-161-2-Q | 30-Mar-26 | 7-Sep-26 |
| 38K4212387 | A01 | F/O - INSPECT, REPAIR, AND PRESERVE IN SSGTG NO.3 EXHAUST TRUNK | 30-Mar-26 | 7-Sep-26 |
| 38K42123AC | A01 | F/O – REPAIR NO. 3 SSGTG INTAKE PERFORATED SHEET TACK WELD | 30-Mar-26 | 7-Sep-26 |
| 38K4262204 | A01 | F/O – REPAIR NO. 3 SSGTG INTAKE DUCT | 30-Mar-26 | 7-Sep-26 |
| 38K4265405 | A01 | F/O - REPAIR STRUCTURAL MEMBER IN 4-220-0-E | 30-Mar-26 | 5-Sep-26 |
| 38K4286503 | A01 | F/O - REPLACE INSULATION AND LAGGING ON NO. 2 GTG AND 2A/2B GTM EXHAUST DUCT | 30-Mar-26 | 7-Sep-26 |
| 38K4286504 | A01 | F/O - REPLACE INSULATION AND LAGGING ON NO. ONE GTG AND 1A/1B GTM EXHAUST DUCT | 30-Mar-26 | 7-Sep-26 |
&F
&P
Memo
| POP START DATE | POP END DATE |
| 30-Mar-26 | 5-Sep-26 |
| ICN/KO | |
| 38K4265405 / A01 |
| POP START DATE | POP END DATE |
| 30-Mar-26 | 7-Sep-26 |
| ICN/KO | |
| 38K4212301 / A01 | |
| 38K4212344 / A01 | |
| 38K4212354 / A01 | |
| 38K4212357 / A01 | |
| 38K4212359 / A01 | |
| 38K4212359 / A02 | |
| 38K4212361 / A01 | |
| 38K4212387 / A01 | |
| 38K42123AC / A01 | |
| 38K4262204 / A01 | |
| 38K4286503 / A01 | |
| 38K4286504 / A01 |
| POP START DATE | POP END DATE |
| 30-Mar-26 | 14-Dec-26 |
| ICN/KO | |
| 38K4212301 / T01 |
&F
&P
File details come from the government source that posted it. Updated .