TGI_3819P22102_T08_c0v0.pdf
PDF 25 KB Posted
- Solicitation number
- N6264925RA024
About this file
This document is a Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19) Naval vessel, specifically focusing on a Boiler Blow Piping Tightness and Operational Test. The TGI is dated 27-SEP-2024 and includes details for a contractor (KTR) to accomplish and document the tightness and operational test in accordance with technical procedure TP 22131-3-300KTR. The task involves work by three groups: a contractor (22/KE), quality assurance (33/G1), and ship's force (EM01), each responsible for executing and documenting the test in compliance with the referenced technical procedure.
The document is part of a larger naval maintenance package for the USS Blue Ridge, prepared by personnel with codes 246.2, including Yuuji Fukuda (prepared) and Riley Higa (approved). The TGI is marked FOUO (For Official Use Only) and contains specific identification numbers such as TGI NO: 22131-3-300KTR, with a project number 19P and system number 22131. The task is associated with a specific zone and compartment, though specific location details are not fully populated in this document.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
27-SEP-2024 0850
20.14.15.2.9020 (September 2024) ICN: 3819P22102 KeyOp: T08
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 22131-3-300KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 22131
CU PHASE TITLE: BOILER BLOW PIPING (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM01ZAG0 * EM01ZAG2 * EM01ZAG5 * EM01ZAK4 * EM01ZAG8 * EM01ZAH1 * EM01ZAH2 * EM01ZAH4 * EM01ZAH5 *
EM01ZAH7 * EM01ZAH9 * EM01ZAI2 * EM01ZAI6
PREPARING ACTIVITY: STATUS: APP WORKING STATUS: PKG
PREPARED BY: CODE: PHONE: DATE:
FUKUDA, YUUJI 246.2 3152435265 13-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
HIGA, RILEY 246.2 3152432291 26-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-ZAG0 * EM01-ZAG2 * EM01-ZAG5 * EM01-ZAG8 * EM01-ZAH1 * EM01-ZAH2 * EM01-ZAH4 * EM01-ZAH5 * EM01-ZAH7 *
EM01-ZAH9 * EM01-ZAI2 * EM01-ZAI6 * EM01-ZAK4
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1102
Tightness and Operational Test for Boiler Blow System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
27-SEP-2024 0850
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22102 KeyOp: T08
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 22131-3-300KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 22131
CU PHASE TITLE: BOILER BLOW PIPING (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 22131-3-300KTR BOILER BLOW PIPING (T &
OP) - KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 22131-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 22131-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 22131-3-300KTR.
/ EM01 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22102 KEY OP: T08
File details come from the government source that posted it. Updated .