This Task Group Instruction (TGI) details repair and preservation work for a bulkhead plate on the USS Blue Ridge (LCC-19), specifically for Frame 98 in compartment 6-86-2-A. The work involves removing and replacing one bulkhead plate and conducting preservation work on 7 square feet of transverse bulkhead plating and 3 square feet of first platform deck plating. The work locations include multiple ship compartments such as the Ship Fitter Storeroom, Crew Living Space, Fresh Water Ballast, Medical Storeroom, Lube Oil Storage Tank, and Engine Room.
The contract specifies a contractor work period from January 12, 2026 through May 15, 2027, with potential hazards including asbestos and lead. The task requires detailed procedures for plate removal, fabrication, installation, welding, and surface preservation, with specific requirements for air hose testing and no allowable leakage. The work is part of a larger maintenance package for the USS Blue Ridge, managed by NAVSUP Fleet Logistics Center Yokosuka, and is intended only for sources authorized to operate in Japan.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
19-AUG-2024 1644
20.14.12.0.8874 (April 2024) ICN: 3819P14115 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BHD FR98 IN 6-86-2-A AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPAIR AND PRESERVE BULKHEAD PLATE FR98 IN 6-86-2-A
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
ES01NPL2
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
ANDO, TOMOHIKO 231B 3152434372 23-MAY-2024
APPROVED BY: CODE: PHONE: DATE:
TAKAGI, RYOUTA 231B 3152434502 23-MAY-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NPL2
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
141A0015
1. SCOPE/PURPOSE:
1.1 Title: Bulkhead Plate Frame 98 in 6-86-2-A; repair and preserve
1.2 Location of Work:
1.2.1 Ship Fitter Storeroom (6-86-2-A)
1.2.2 Crew Living Space (6-98-2-L)
1.2.3 Fresh Water Ballast (9-86-6-W)
1.2.4 Medical Storeroom (7-98-2-A)
1.2.5 Lube Oil Storage Tank 1C (7-97-10-F)
1.2.6 Engine Room (8-86-0-E)
TGI Short Form
19-AUG-2024 1644
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14115 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BHD FR98 IN 6-86-2-A AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPAIR AND PRESERVE BULKHEAD PLATE FR98 IN 6-86-2-A
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
1.3 Identification:
1.3.1 Quantity (One EA), Bulkhead Plate, Watertight Transverse Bulkhead Frame 98 in 6-86-2-A, Port
Material: OS, MIL-S-22698 Grade A, 15.3 LBs Plate Remarks: See 2.3 for detail
1.3.2 Quantity (7 SF), Transverse Bulkhead Plating Frame 98 in 6-86-2-A, including Longitudinal Bulkhead surface up to Forward of 6 inches from Bulkhead Plating
Remarks: See Sketch Enclosure-01 for location detail
1.3.3 Quantity (3 SF), First Platform Deck Plating in 6-86-2-A
Remarks: See Sketch Enclosure-01 for location detail
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.5.2 Potential Lead Hazard
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 5/15/2027
2. PROCEDURE:
2.1 Remove existing, fabricate and install new each bulkhead plate listed in 1.3.1 in accordance with Ref. No. 3.
2.1.1 Accomplish the requirements of 009-12 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.
2.1.2 Accomplish the requirements of 009-25 of Ref. No. One for a local air hose test of each new weld of each bulkhead plate.
Allowable leakage: None
2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 27, for each area listed in 1.3.2 and 1.3.3.
2.3 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.
2.4 Notes:
2.4.1 Planner: Code 231B T. Ando, 243-4372
Engineer: Code 250 Y, Seimiya, 243-0091
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
19-AUG-2024 1644
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14115 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BHD FR98 IN 6-86-2-A AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPAIR AND PRESERVE BULKHEAD PLATE FR98 IN 6-86-2-A
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
2.4.3 This TGI clears DFS LCC-19-1019-2024 in its entirety.
2.4.4 Opening, initial cleaning, and closing of each space listed in 1.2.3 will be covered by TGI No. 3819P12319A01 (KTR TGI).
2.4.5 Opening, initial cleaning, and closing of each space listed in 1.2.5 will be covered by TGI No. 3819P12332A01 (KTR TGI).
2.4.6 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
2.4.7 JCN ES01-NPL2 is related to this TGI.
2.5 Government Furnished Material (GFM):
2.5.1 SRF-JRMC will provide GFM listed in the Material List.
2.6 SRF-JRMC will provide the following service work: (TGI No. 3819P14115S02).
2.6.1 [C740] Crane and crane rigging service.
2.6.2 [X99E] Utility service, electrical.
2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.6.6 [C133] QA inspection for (G) symbol(s).
19-AUG-2024 1644
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14115 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BHD FR98 IN 6-86-2-A AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPAIR AND PRESERVE BULKHEAD PLATE FR98 IN 6-86-2-A
FOUO Pg 4 of 5
OTHER SPECIAL REQUIREMENTS:
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III.
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 PDD 114-ELM-
240199
RPR OF CORRODED WTRTT
TRANSV BHD FR 98 IN
SHIPFITTER STRM (6-86-2-A)
- Y ALL
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 SFTR HRs, WELD HRs, SMTL HRs, CARP HRs, INSL HRs, RGRS HRs, PNTR HRs, QA HRs
22/KE PC N
2.2 PNTR HRs, QA HRs 22/KE PC N
2.3 PNTR HRs, QA HRs 22/KE PC N
Structure Work CFM for firewatch cost, tankwatch cost, lead sampling/analysis cost, deck covering material cost, air compressor rental cost and fuel oil cost for air hose test, marine chemist ---continue to below---
22/MQ CS N
---continued to from above---asbestos sampler cost and analysis cost for compartment insulation and deck covering, and misc such as electrode, gases, temporary covering and closure material, and other consumable.
22/MQ CS N
Preservation Work CFM for all paints, thinner, grits including disposal cost, tankwatch cost, and MISC such as covering material, and other consumable.
22/MQ CS N
Process Funding Document. 10/CT OM N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M PLATE,ME, ORIG: C231B, T.
ANDO 243-4372
ORDERED FOR KTR
QTY: 8 SF
4 FT X 2 FT X 1 PM
9B 9515 001533223 NA 4 N 41325090 8/SF
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P14115 KEY OP: A01
19-AUG-2024 1644
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14115 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BHD FR98 IN 6-86-2-A AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE: F/O - REPAIR AND PRESERVE BULKHEAD PLATE FR98 IN 6-86-2-A
FOUO Pg 5 of 5
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
002 M INSULATI, ORIG: C231B, T.
ANDO 243-4372
ORDERED FOR KTR
9Q 5640 008096312 NA 4 N 41325091 5/EA
003 M INSULATI, ORIG: C231B, T.
ANDO 243-4372
ORDERED FOR KTR
9Q 5640 008096315 NA 4 N 41325092 5/EA
004 M ADHESIVE, ORIG: C231B, T.
ANDO 243-4372
ORDERED FOR KTR
9B 8040 002738708 NA 4 Y 41325089 1/GL
005 M TAPE,TEX, ORIG: C231B, T.
ANDO 243-4372
ORDERED FOR KTR
9B 8315 002671632 NA 4 N 41325093 1/RO
006 M TAPE,TEX, ORIG: C231B, T.
ANDO 243-4372
ORDERED FOR KTR
9B 8315 002671633 NA 4 N 41325095 1/RO
007 M CAP,SNAP, ORIG: C231B, T.
ANDO 243-4372
ORDERED FOR KTR
9B 5325 007377648 NA 4 N 41325096 30/EA
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 3819P14115A01-Sketch.pdf 23-MAY-2024 0000
KEY PLAN
FR 86 - 109
LOCATION OF WORK
SKETCH
ENCLOSURE-01
See Sheet 2
3819P14115A01 Sheet 1 of 2
SKETCH
ENCLOSURE-01
LONG BHD
12”
1ST PLATF
6”
Ship Fitter Storeroom 6-86-2-A
FR 98
Shell35”
Preservation Area
52”
3819P14115A01 Sheet 2 of 2
Preservation Area 12”
6”