TGI_3819P14207_T01_c0v0.pdf
PDF 95 KB Posted
- Solicitation number
- N6264925RA024
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, specifically focused on the Potable Water System Tightness and Operational Test. The TGI is dated 30-AUG-2024 and is associated with the ship's maintenance project 19P, system 53311. The instruction details three primary work tasks to be performed by different teams: a contractor (22/KE) to accomplish and document the tightness and operational test, a Quality Assurance (QA) team (33/G1) to verify the test, and a support/facilities (S/F) team (ES01) to complete documentation, all in accordance with reference document TP 53311-3-300KTR.
The document is part of a larger naval maintenance effort for the USS Blue Ridge, located at Commander, Fleet Activities Yokosuka (CFAY) Naval Base in Japan. Key personnel involved include Yuuji Fukuda (preparer), Riley Higa (approver), and Takehide Yaginuma (zone manager). The TGI serves as a detailed instruction set for performing a specific technical test on the ship's potable water system, ensuring proper operational readiness and documentation of the maintenance procedure.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
30-AUG-2024 1627
20.14.15.0.8998 (August 2024) ICN: 3819P14207 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 6 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 53311
CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
ES01NPL0 * ES01NPK0 * ES01NPK1 * ES01NPK2 * ES01NPK3 * ES01NPK4 * ES01NPK5 * ES01NPK6 * ES01NPK7 * ES01NPK8 * ES01NPK9 * ES01NPKA * ES01NPKB * ES01NPKC * ES01NPKD * ES01NPKE * ES01NPKF * ES01NPKG * ES01NPKH * ES01NPKJ * ES01NPKK * ES01NPKL * ES01NPKM * ES01NPKN * ES01NPKP * ES01NPKQ * ES01NPKR * ES01NPKS * ES01NPKT * ES01NPKU * ES01NPKV * ES01NPKW * ES01NPKX * ES01NPKY * ES01NPKZ * ES01NPJE *
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
FUKUDA, YUUJI 246.2 3152435265 17-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
HIGA, RILEY 246.2 3152432291 26-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM02-L182 * ES01-NPF0 * ES01-NPF1 * ES01-NPF2 * ES01-NPF3 * ES01-NPF4 * ES01-NPF5 * ES01-NPF6 * ES01-NPJE *
ES01-NPJF * ES01-NPJG * ES01-NPJH * ES01-NPJJ * ES01-NPJK * ES01-NPJL
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
142A0007
Tightness & Operational Test for Potable Water System - KTR.
TGI Short Form
30-AUG-2024 1627
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P14207 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 6 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 53311
CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR
FOUO Pg 2 of 3
REASON FOR WORK/NEED FOR CHANGE (Cont.):
JCNs (Cont.):
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 53311-3-300KTR POTABLE WATER SYS (T &
OP) - KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 53311-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 53311-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 53311-3-300KTR.
/ ES01 N
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ES01NPJF * ES01NPJG * ES01NPJH * ES01NPJJ * ES01NPJK * ES01NPJL * ES01NPJM * ES01NPJN * ES01NPJP * ES01NPJQ * ES01NPJR * ES01NPJS * ES01NPJU * ES01NPJV * ES01NPJW * ES01NPJX * ES01NPJY * ES01NPJZ * ES01NPJT * EM02L182 * ES01NPF0 * ES01NPF1 * ES01NPF2 * ES01NPF3 * ES01NPF4 * ES01NPF5 * ES01NPF6
ES01-NPJM * ES01-NPJN * ES01-NPJP * ES01-NPJQ * ES01-NPJR * ES01-NPJS * ES01-NPJT * ES01-NPJU * ES01-NPJV * ES01-NPJW * ES01-NPJX * ES01-NPJY * ES01-NPJZ * ES01-NPK0 * ES01-NPK1 * ES01-NPK2 * ES01-NPK3 * ES01-NPK4 * ES01-NPK5 * ES01-NPK6 * ES01-NPK7 * ES01-NPK8 * ES01-NPK9 * ES01-NPKA * ES01-NPKB * ES01-NPKC * ES01-NPKD
* ES01-NPKE * ES01-NPKF * ES01-NPKG * ES01-NPKH * ES01-NPKJ * ES01-NPKK (more)
30-AUG-2024 1627
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P14207 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 6 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 53311
CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR
FOUO Pg 3 of 3
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ICN: 3819P14207 KEY OP: T01