This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19), specifically focused on the Fuel Oil Service System, Piping & Misc (T & OP) - KTR. The TGI details a tightness and operational test for the fuel oil service system, with a specific reference document TP 26111-3-300KTR. The instruction involves three primary work types: contractor work (22/KE), quality assurance work (33/G1), and ship/force work (EM01), all of which are tasked with accomplishing and documenting the tightness and operational test in accordance with the referenced technical procedure. The document is dated 27-SEP-2024 and includes preparation by Enomoto, Daisuke and approval by Higa, Riley, with Yaginuma, Takehide listed as the zone manager.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
27-SEP-2024 0850
20.14.15.2.9020 (September 2024) ICN: 3819P22102 KeyOp: T06
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 26111-3-300KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 26111
CU PHASE TITLE: FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM01ZAG0 * EM01ZAG2 * EM01ZAG5 * EM01ZAK4 * EM01ZAG8 * EM01ZAH1 * EM01ZAH2 * EM01ZAH4 * EM01ZAH5 *
EM01ZAH7 * EM01ZAH9 * EM01ZAI2 * EM01ZAI6
PREPARING ACTIVITY: STATUS: APP WORKING STATUS: PKG
PREPARED BY: CODE: PHONE: DATE:
ENOMOTO, DAISUKE 246.2 3152437296 13-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
HIGA, RILEY 246.2 3152432291 26-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-ZAG0 * EM01-ZAG2 * EM01-ZAG5 * EM01-ZAG8 * EM01-ZAH1 * EM01-ZAH2 * EM01-ZAH4 * EM01-ZAH5 * EM01-ZAH7 *
EM01-ZAH9 * EM01-ZAI2 * EM01-ZAI6 * EM01-ZAK4
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1102
Tightness & operational test for FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
27-SEP-2024 0850
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22102 KeyOp: T06
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 26111-3-300KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 26111
CU PHASE TITLE: FUEL OIL SERVICE SYS, PIPING & MISC (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 26111-3-300KTR FUEL OIL SERVICE SYS,
PIPING & MISC (T & OP) - KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26111-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26111-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26111-3-300KTR.
/ EM01 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22102 KEY OP: T06