TGI_3819P13339T01_c0v0.pdf
PDF 91 KB Posted
- Solicitation number
- N6264925RA024
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for a static load test of a liferail stanchion on the USS Blue Ridge (LCC-19). The TGI is dated 27-AUG-2024 and focuses on a load test for rail, stanchion, and lifeline equipment, with specific tasks assigned to contractors (22/KE), quality assurance (33/G1), and support/facilities (OT01) personnel. The document references technical procedure TP 61211-2-701KTR and is part of a naval maintenance and repair process for the ship, with key personnel including Koutaro Susa (preparer), Riley Higa (approver), and Takehide Yaginuma (zone manager).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
27-AUG-2024 0935
20.14.15.0.8998 (August 2024) ICN: 3819P13339 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 61211-2-701KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 61211
CU PHASE TITLE: RAIL, STANCHION, LIFELINE (LOAD TEST) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
DA029737
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
SUSA, KOUTARO 246.2 3152431107 10-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
HIGA, RILEY 246.2 3152432291 26-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
DA02-9737
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
133A0039
Static Load Test for Liferail Stanchion - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
27-AUG-2024 0935
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P13339 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 61211-2-701KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 61211
CU PHASE TITLE: RAIL, STANCHION, LIFELINE (LOAD TEST) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 61211-2-701KTR RAIL, STANCHION, LIFELINE
(LOAD TEST)
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the load test in accordance with reference, TP
61211-2-701KTR.
22/KE PC N
(G) QA work:
Accomplish/document the load test in accordance with reference, TP
61211-2-701KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the load test in accordance with reference, TP
61211-2-701KTR.
/ OT01 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P13339 KEY OP: T01
File details come from the government source that posted it. Updated .