Technical Exhibit C- Deliverables.pdf

PDF 137 KB Posted

Attached to
GROUNDS MAINTENANCE FORT STEWART/HAAF
Solicitation number
W9124M26RA007
Issued by

About this file

This is a Technical Exhibit C detailing the deliverables schedule for a Performance Work Statement (PWS) contract requiring safety, compliance, and operational documentation submissions.

The contractor must submit multiple deliverables at specified intervals following contract award. Critical submissions include a Safety Plan and Spill Plan within thirty calendar days of award; a Key Personnel Roster within one week of award; Material Safety Data Sheets within five business days of award; Training Completion Certificates within thirty calendar days of contract start; a Georgia herbicide application certificate or license within ten calendar days during the phase-in period; and Required Insurance documentation within ten calendar days of award. The Phase-in Plan must be submitted at the time of proposal. All deliverables require one electronic copy submission to the Contracting Officer (KO) or designated Government representative/Contracting Officer's Representative (COR), except for accident reports requiring Emergency Medical Treatment, which must be reported immediately by email or telephone within two hours of the incident. All documentation submissions are in electronic format except the initial accident notification, which permits telephone communication.

View the file

Other files

File Type Posted
Solicitation Amendment W9124M26RA0070004 SF 30.pdf PDF
Solicitation Amendment W9124M26RA0070003 SF 30.pdf PDF
Questions and Answers.pdf PDF
Solicitation Amendment W9124M26RA0070002 SF 30.pdf PDF
Questions and Answers.pdf PDF
Attachment 13 -Hunter AAF_Parameters_______.pdf PDF
Technical Exhibit D - Workload Data.pdf PDF
Site Visit Sign In_Redacted.pdf PDF
Attachment 11- Service Contract Act WD 2015-4511 Rev No. 33.pdf PDF
Attachment 14 -Range Parameters.pdf PDF
Attachment 12 -FtStewart_Parameters______.pdf PDF
Attachment 1-Service Contract Act WD 2015-4485 Rev No. 30.pdf PDF
Attachment 2-Service Contract Act WD 2015-4491 Rev No. 33.pdf PDF
Solicitation Amendment W9124M26RA0070001 SF 30.pdf PDF
Attachment 10 -Grounds Maintenance Site Visit.pdf PDF
New Grounds Maintenace PWS -Final.pdf PDF
Attachment 1-Service Contract Act WD 2015-4485.pdf PDF
Attachment 2-Service Contract Act WD 2015-4491.pdf PDF
Attachment 3-FSGA Map.pdf PDF
Attachment 7 -FSGA Spill Plan.pdf PDF
Attachment 9- White Crepe Myrtle.pdf PDF
Technical Exhibit B -PRS Warriors Walk.pdf PDF
Technical Exhibit D - Workload Data.pdf PDF
Attachment 4 - FSGA Garrison Map.pdf PDF
Attachment 6-IMSH2737 Access Pass.pdf PDF
Attachment 8 -Storage Site Policy and Locations.pdf PDF
Solicitation RFP - W9124M26RA007 Professional Appearance.pdf PDF
Attachment 5 - HAAF Map.pdf PDF
Technical Exhibit A-PRS Grounds Maintenance.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8.2 Technical Exhibit C – Deliverables Schedule.

Deliverable Frequency # Of Copies Format Submit To PWS para. 1.11.1.

Accident Requiring Emergency Medical Treatment

Immediate. Not later than two (2) hours after the incident

N/A Email or telephone KO or designated Government representative/COR

PWS para 1.12.2.

Safety Plan

Contractor shall submit plan within thirty (30) calendar days of contract award

1 Electronic Copy Electronic KO or designated Government representative/COR

PWS para 1.10.5.

Key Personnel Roster

Contractor shall provide a roster of key personnel, who will be designated in writing, to the KO within one

(1) week of the contract award

1 Electronic Copy Electronic KO or designated Government representative/COR

PWS para 1.12.3.

Spill Plan

The Contractor shall submit a Spill Plan for approval within thirty (30) calendar days of contract award

1 Electronic Copy Electronic KO or designated Government representative/COR

PWS para 1.13.1 Material Safety Data Sheets

Contractor shall submit the SDS for approval five (5) business days after contract award

1 Electronic Copy Electronic KO or designated Government representative/COR

PWS para. 1.8.14 –

1.8.17 and 1.12.4 Training Completion Certificates

Certificates are filed within thirty (30) calendar days after contract start date

1 Electronic Copy Electronic KO or designated Government representative/COR

PWS para. 5.2.12 Georgia herbicide application certificate or license

Contractor shall submit certificate or license NLT ten (10) calendar days during phase-in period

1 Electronic Copy Electronic KO or designated Government representative/COR

Clause 52.228- 5 Required Insurance

Contractor shall submit within ten

(10) calendar days after contract award

1 Electronic Copy 1 Electronic Copy KO or designated Government representative/COR

PWS para. 1.10.9 Phase-in Plan

Contractor shall submit Phase in plan at the time of proposal

1 Electronic Copy 1 Electronic Copy KO