Technical Exhibit B -PRS Warriors Walk.pdf

PDF 202 KB Posted

Attached to
GROUNDS MAINTENANCE FORT STEWART/HAAF
Solicitation number
W9124M26RA007
Issued by

About this file

This is a Technical Exhibit B document establishing the Performance Requirements Summary for the Warriors Walk contract. The exhibit specifies five performance objectives with corresponding standards, performance thresholds, and surveillance methods for landscape maintenance services.

The first four performance requirements—Daily Requirements (PRS#1), Weekly Requirements (PRS#2), Mowing & Trimming Requirements (PRS#3), and Pruning Seed Pods Requirement (PRS#4)—each allow no more than three discrepancies per month and will be monitored through random and pre-event surveillance. These tasks are governed by PWS sections 5.2.15, 5.2.16, 5.2.18, and 5.2.19 respectively. The fifth requirement, Perform Tree Replacement and Installation (PRS#5), references PWS sections 5.2.21–5.2.21.1 and maintains a stricter standard of zero deviation from the performance standard, with 100% inspection as the surveillance method. All contractor services must comply with the referenced PWS sections to meet contractual obligations.

View the file

Other files

File Type Posted
Solicitation Amendment W9124M26RA0070004 SF 30.pdf PDF
Solicitation Amendment W9124M26RA0070003 SF 30.pdf PDF
Questions and Answers.pdf PDF
Site Visit Sign In_Redacted.pdf PDF
Attachment 11- Service Contract Act WD 2015-4511 Rev No. 33.pdf PDF
Attachment 14 -Range Parameters.pdf PDF
Attachment 12 -FtStewart_Parameters______.pdf PDF
Solicitation Amendment W9124M26RA0070002 SF 30.pdf PDF
Questions and Answers.pdf PDF
Attachment 13 -Hunter AAF_Parameters_______.pdf PDF
Technical Exhibit D - Workload Data.pdf PDF
Attachment 1-Service Contract Act WD 2015-4485 Rev No. 30.pdf PDF
Attachment 2-Service Contract Act WD 2015-4491 Rev No. 33.pdf PDF
Solicitation Amendment W9124M26RA0070001 SF 30.pdf PDF
Attachment 10 -Grounds Maintenance Site Visit.pdf PDF
Attachment 7 -FSGA Spill Plan.pdf PDF
Attachment 9- White Crepe Myrtle.pdf PDF
Technical Exhibit D - Workload Data.pdf PDF
Attachment 4 - FSGA Garrison Map.pdf PDF
Attachment 6-IMSH2737 Access Pass.pdf PDF
Attachment 8 -Storage Site Policy and Locations.pdf PDF
Technical Exhibit C- Deliverables.pdf PDF
Solicitation RFP - W9124M26RA007 Professional Appearance.pdf PDF
Attachment 5 - HAAF Map.pdf PDF
Technical Exhibit A-PRS Grounds Maintenance.pdf PDF
New Grounds Maintenace PWS -Final.pdf PDF
Attachment 1-Service Contract Act WD 2015-4485.pdf PDF
Attachment 2-Service Contract Act WD 2015-4491.pdf PDF
Attachment 3-FSGA Map.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8.1.1. Technical Exhibit B – Performance Requirements Summary Warriors Walk.

Performance Objective

Standards Performance Threshold

Method of Surveillance

PRS#1Daily Requirements.

The Contractor shall provide services IAW PWS section 5.2.15

No more than three discrepancies per month

Random & Pre-Event Surveillance

PRS#2 Weekly Requirements

The Contractor shall provide services IAW PWS section 5.2.16

No more than three discrepancies per month

Random & Pre-Event Surveillance

PRS#3 Mowing & Trimming Requirements

The Contractor shall provide services IAW PWS section 5.2.18

No more than three discrepancies per month

Random & Pre-Event Surveillance

PRS#4 Pruning Seed Pods Requirement

The Contractor shall provide services IAW PWS section 5.2.19.

No more than three discrepancies per month

Random & Pre-Event Surveillance

PRS#5 Perform Tree Replacement and Installation

The Contractor shall provide services IAW PWS section 5.2.21 – 5.2.21.1

Zero Deviation from performance standard

100% Inspection

File details come from the government source that posted it. Updated .