Struct 035.pdf
PDF 760 KB Posted
- Attached to
- Y1DA--504-18-119 Replace Boilers and Piping Federal contract opportunity
- Solicitation number
- 36C25722R0010
About this file
This document package includes schematic foundation plans and a related federal contract opportunity notice. The foundation plans depict existing structural elements for buildings 11, 16, and 19, including concrete slabs, walls, footings, and other structural components. Dimensions, materials, and notes are provided. The related solicitation seeks replacement of boilers and piping for buildings within the Veterans Affairs medical center. The opportunity is identified as solicitation number 36C25722R0010, with the title "Y1DA--504-18-119 Replace Boilers and Piping." The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. No pricing, response dates, or other details are provided regarding the requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past Performance Questionnaire.pdf | ||
| Amendment 36C25722R0010 0001.docx | DOCX document | |
| Answers to Questions 36C25722R0010 DB Replace Boilers.pdf | ||
| VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf | ||
| 36C25722R0010_1.docx | DOCX document | |
| Mech 035 - Pages 7-12.pdf | ||
| Phasing sheets.pdf | ||
| SELF-PERFORMED CALCULATIONS.pdf | ||
| Mech 035 - Pages 8-19.pdf | ||
| BP-2-Boilers-natgasandpropane.pdf | ||
| 20-09 035 Narrative 02 1r1 Phasing Narrative.pdf | ||
| 20-09 035 Narrative 06 1r1 Civil-LS Design Narrative.pdf | ||
| 20-09 035 Narrative 13 1r1 Specs TOC 000110 035 21-06-30.pdf | ||
| Mech 035 - Pages 1-3.pdf | ||
| Mech 035 - Pages 4-6.pdf | ||
| OSHA - EMR requirement.pdf | ||
| BP-3-Boiler-steam.pdf | ||
| BP-1-Boiler-fueloil.pdf | ||
| AS ST Series Sheets.pdf | ||
| AD AE Series Sheets.pdf | ||
| Elect 035.pdf | ||
| G Series Sheets.pdf | ||
| BP-4-Water-Treatment.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD FD
FD
FD
FD
FD
FD FD
FD
FD
C
K
4A5
G
D
E
F
3.5
L
H
4 3 2 1 1A
J
C1
(E) CONC. PEDESTAL
HEADER SUPPORT
(E) CONC. CURB
(E) 5" CONC. SLAB W/
#3 @ 12" O.C., E.W., TOP
FINISH FLOOR
ELEV. = 93'-6", U.N.O.
(E) 8" CONC. SLAB FNDN.
(FROM ORIG. 1938 DESIGN)
- REINFORCING UNKNOW
- MODIFIED IN SUBSEQUENT
PROJECTS
- EXTENTS UNKNOWN
EL. 98'-1 1/2"
EL. 98'-3"
EL. 98'-4"
EL. 98'-8"
EL. 98'-9 1/2"
EL. 99'-1 1/2"
EL. 98'-10 1/2"
EL. 99'-0"
EL. 100'-6"
EL. 100'-6"
EL. 98'-6"
EL. 98'-6 1/2"
(E) BOILER #3
(E) BOILER #2
(E) BOILER #1
(E) CONC. CURB
(E) TRENCH
(E) TRENCH
(E) CONC.
TRENCH
(E) CONC. TRENCH
(E) CONC. WALL
(E) FOOTINGS
NOTES:
1. FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS AS REQ'D.
2. ALTER EXISTING FOUNDATIONS TO SUIT NEW BOILERS
OR PROVIDE NEW FOUNDATION(S).
BUILDING 16
BUILDING 11
'-7
1/ 2"
2"
3 5
/8" 1'
- 4 3/
4"
4"
0" 7 3
/4"
MATCHLINE A MATCHLINE A
MATCHLINE B MATCHLINE B
0"
6"
1'
- 0
1'
- 5
1'
- 5
1'
- 0
1'
- 0
1'
- 4
1'
- 0
1'
- 5
1'
- 5
1'
- 0
1'
- 0
1'
- 4
1'
- 0
1'
- 5
1'
- 5
1'
- 0
1'
- 0
1'
- 4
15' - 8" 9' - 0"
42' - 2"
42' - 2"
T.O.F.
EL. 97'-6"
T.O.F.
EL. 93'-0"
T.O.F.
EL. 97'-6"
T.O.F.
EL. 90'-0"
T.O.F.
EL. 90'-0"
T.O.F.
EL. 89'-0"
T.O.F.
EL. 93'-0"
T.O.F.
EL. 93'-0"
T.O.F.
EL. 97'-6"
T.O.F.
EL. 97'-6"
(E) CONC. CURB
(E) CONC. CURB
(E) CONC. CURB
(E) CONC. CURB (E) FNDN
T.O.F.
EL. 98'-6"
T.O.F.
EL. 98'-6"
(N) PEDESTAL & (N) FNDN(S)
AS REQ'D FOR
NEW STEAM HEADER
- NUMBER AND LOCATION
AS REQ'D BY DBC
(N) CURB &
(N) FNDN AS REQ'D
PROVIDE ADEQUATE
CONNECTION TO
(E) FNDN. TO PREVENT
DIFFERENTIAL SETTLEMENT
(N) CURB
AS REQ'D BY
BOILER MANUF.
DESIGN BUILD CONTRACTOR (DBC)
TO TEMPORARILY SHORE &
BRACE (E) STRUCTURE AS
REQ'D TO TEMPORARILY
REMOVE (E) LOAD BRG. WALLS
AS REQ'D FOR NEW BOILER
INSTALLATION.
- "SAWTOOTH" OUT EXISTING
MASONRY IN EACH WYTHE ON
SIDES OF TEMORARY OPENING.
- REPLACE WALL CONSTRUCTION
IN KIND FOR FOR FINAL CONDITION.
- SEE ARCH. & MECHANICAL
C
S-7
B
S-7
A S-7
---1978 K
S-7
5' - 11 3/4"
2' - 4"
(E) CURB
(E) CURB
(E) BOILER #4
T.O. SLAB
(E) PIT, FILLED
W/ SAND
(E) SUMP PIT
T.O. CURB
EL. 100'-6"
(E ) S
TL.
COL. T.O. SLAB
(E) 5" CONC. SLAB W/
#3 @ 12" O.C., E.W., TOP
FINISH FLOOR
ELEV. = 100'-0", U.N.O.
(E ) S
TL.
COL.
(E) 2'-0" SQ. CONC. PEDESTAL
EL. 99'-6"
T.O.P.
EL. 99'-6"
T.O.P.
T.O. SLAB
DBC MAY CONSIDER ANOTHER
OPENING ABOVE THE MEZZANINE
FLOOR FOR REPLACEMENT
OF DEOXYGEN TANK.
DBC TO TEMPORARILY SHORE &
BRACE (E) STRUCTURE AS
REQ'D TO TEMPORARILY
REMOVE (E) LOAD BRG. WALLS
AS REQ'D FOR NEW BOILER
INSTALLATION.
- "SAWTOOTH" OUT EXISTING
MASONRY IN EACH WYTHE ON
SIDES OF TEMORARY OPENING.
- REPLACE WALL CONSTRUCTION
IN KIND FOR FOR FINAL CONDITION.
- SEE ARCH. & MECHANICAL
T.O. CURB
T.O. SLABT.O. SLAB
T.O. CURB
T.O.F.
T.O. SLAB
T.O. SLAB
(E ) S
TL.
COL.
(E ) S
TL.
COL.
1' - 11 1/2" 2' - 0"
2'
- 0
1'
- 6 3/
4"
(E) COL. FTG.
EL. 97'-6"
T.O.F.
T.O. SLAB
T.O. SLAB
6" 6"
6"
(E) 12" BRICK WALL
(E) 13" CONC. WALL W/
BRICK MASONRY & CMU
BACKUP ABOVE ELEV. 102'-8"
(E) 5" CONC. SLAB W/
#3 @ 12" O.C., E.W., TOP
FINISH FLOOR
ELEV. = 100'-0", U.N.O.
ORIGINAL CONCRETE CURB
REMOVED IN PREVIOUS PROJECT
-EXTENTS UNKNOWN
ORIGINAL CONCRETE CURB
REMOVED IN PREVIOUS PROJECT
-EXTENTS UNKNOWN
M
N
4A
L
2.2
4 3 2 1 1A
NOTES:
1. FIELD VERIFY ALL DIMENSIONS
MATCHLINE C MATCHLINE C
(E) F.F. EL. =101'-4"
(E) F.F. EL. = 101'-4"
(E ) 5
" C O
N C
. S
LA
B
SL
O
PE
4"
2"
6"
8' - 4" 17' - 4" 16' - 5"
8"
6"
BUILDING 11
MATCHLINE B MATCHLINE B
T.O.F.
EL. 97'-6"
(E) 13" CONC. WALL W/
BRICK MASONRY & CMU
BACKUP ABOVE ELEV. 102'-8"
(E ) S
TL.
COL.
(E ) S
TL.
COL.
(E ) S
TL.
COL.
(E ) S
TL.
COL.
(E ) S
TL.
COL.
(E ) S
TL.
COL.
(E ) S
TL.
COL.
(E ) S
TL.
COL.
(E ) S
TL.
COL.
(E ) S
TL.
COL.
(E ) S
TL.
COL.
BUILDING 11
(E) 13" CONC. WALL W/
BRICK MASONRY & CMU
BACKUP ABOVE ELEV. 102'-8"
(E) 13" CONC. WALL W/
BRICK MASONRY & CMU
BACKUP ABOVE ELEV. 102'-8"
(E) 13" CONC. WALL W/
BRICK MASONRY & CMU
BACKUP ABOVE ELEV. 102'-8"
(E) 13" CONC. WALL
(E) 7 5/8" CONC. WALL
(E) 5" CONC. SLAB W/
#3 @ 12" O.C., E.W., TOP
FINISH FLOOR
ELEV. = 100'-0", U.N.O.
9" CONC.
GEN. PAD
F.F. EL =
101'-8"
BLDG. 16
BLDG. 11
BLDG. 19
BLDG. 11
MATCHLINE B MATCHLINE B
MATCHLINE C MATCHLINE C
MATCHLINE A MATCHLINE A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street Elkhorn, Nebraska 68022 Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street Omaha, Nebraska68152 Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
AMI Environmental Inc 8802 S 135th Street Omaha, NE 68138 Phone:(402) 397-5001
IMEG Corp.
14755 Preston Rd., Suite 845 Dallas, TX 75254 Phone:(972) 239-6100
15% Design Submission 07/14/2020 20% Design Submission 30% Design Submission 35% SD1 Schematic Design Submission - Request for Proposal
08/14/2020
BAS MGJ
09/08/2020 11/17/2020
FOR REFERENCE ONLY
NOT FOR
CONTRUCTION
C :\D
W G
\2
\R
3.
rv t
/1 7/
:3
6:
A M
11-S-101
Schematic Foundation Plan - Bldg 11
(FOR GENERAL INFORMATION ONLY)
November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo, TX
1/4" = 1'-0"F1 SCHEMATIC FOUNDATION PLAN - BLDG. 11 (FOR GENERAL INFORMATION ONLY) 1/4" = 1'-0"F6 SCHEMATIC FOUNDATION PLAN - BLDG. 11 (FOR GENERAL INFORMATION ONLY)
No Scale
KEY PLAN
1978 1978 1978
NTS
NTS
NTS NTS
Revisions: Date:
FD FD
FD
FD
FD
FD
FD FD
FD
FD
C
4A5
A
2.7
B
3.5
4 3 2 1 1A
C1
NOTES:
1. FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS AS REQ'D
8"
22' - 8 5/8"31' - 3 3/8"
0"
8"
0"
BUILDING 16
BUILDING 11
(E) 5" CONC. SLAB
FINISH FLOOR
ELEV. = 102'-0", U.N.O.
(E) 12"
CONC. PAD
EL. = 102'-2"
11' - 11 1/8"
54' - 0"
7 3 /4"
MATCHLINE A MATCHLINE A
(E) ASH PIT
(E) FOOTINGS
(E) 12" BRICK WALL
(E) 8" CMU WALL
T.O.F.
EL. 90'-0" T.O.F.
EL. 93'-0"
12' - 0" (E
) 3 1/
2"
Ø STD PIPE C
OL.
(E ) 3
1/ 2"
Ø STD PIPE C
OL.
(E) 16x16 CMU PILASTER (E) 16x16 CMU PILASTER
(E) 3'-0"x1'-6" TH. SLAB(E) 3'-0"x1'-6" TH. SLAB
(E) 3'-0"x5'-0"x1'-0" SPREAD FTG. (E) 3'-0"x5'-0"x1'-0" SPREAD FTG.
(E) BRICK CHIMNEY
ON CONC.. FTG.
(E) 8" CMU WALL, TYP. U.N.O.
NOTES:
1. FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS AS REQ'D.
2. SOME ORIGINAL TRENCHES HAVE BEEN FILLED WITH SAND AND
THIN CONCRETE SLABS AT FLOOR LEVEL.
MATCHLINE B MATCHLINE B
(E) 5" CONC. SLAB.
ELEV. = 99'-7", U.N.O.
(E) FOOTINGS
(E) 12" CONC. SLAB
F.F. ELEV. 99'-7", U.N.O.
(E ) 5
" C O
N C
. S
LA
B
SL
O
PE
72' - 0"
(E) 5" CONC. SLAB.
BLDG. 19 FINISH FLOOR
ELEV. = 99'-7", U.N.O.
BUILDING 11 BUILDING 19
BUILDING 11
(E) 13" CONC. WALL W/
BRICK MASONRY & CMU
BACKUP ABOVE ELEV. 102'-8"
(E) TRENCH FILLED W/
SAND AND TOPPED W/
4" CONC. SLAB
F.F. ELEV. 99'-7"
(E) 12 1/2" CONC. WALL,
TYP. AT EXT. WALLS
(E) 8" CONC. WALL
(E) 8" CONC. WALL
(E) TRENCH
(E) 4'-2"x12" FTG., (ORIGINAL WALL
REMOVED)
(E) SUMP PIT
(E) 5" CONC. SLAB.
ELEV. = 99'-7", U.N.O.
(E) 5" CONC. SLAB
F.F. ELEV. 99'-7", U.N.O.
(E) HOUSEKEEPING PAD
(E) TRENCH
BLDG. 16
BLDG. 11
BLDG. 19
BLDG. 11
MATCHLINE B MATCHLINE B
MATCHLINE C MATCHLINE C
MATCHLINE A MATCHLINE A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street Elkhorn, Nebraska 68022 Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street Omaha, Nebraska68152 Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
AMI Environmental Inc 8802 S 135th Street Omaha, NE 68138 Phone:(402) 397-5001
IMEG Corp.
14755 Preston Rd., Suite 845 Dallas, TX 75254 Phone:(972) 239-6100
15% Design Submission 07/14/2020 20% Design Submission 30% Design Submission 35%/SD1 Schematic Design Submission - Request for Proposal
08/14/2020
BAS MGJ
09/08/2020 11/17/2020
FOR REFERENCE ONLY
NOT FOR
CONSTRUCTION
C :\D
W G
\2
\R
3.
rv t
/1 7/
:3
6:
A M
16/19-S-101
Schematic Foundation Plan - Bldg's 16 &19
(FOR GENERAL INFORMATION ONLY)
November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo, TX
1/4" = 1'-0"F6 SCHEMATIC FOUNDATION PLAN - BLDG. 16 (FOR GENERAL INFORMATION ONLY) 1/4" = 1'-0"F1 SCHEMATIC FOUNDATION PLAN - BLDG. 19 (FOR GENERAL INFORMATION ONLY)
No Scale
KEY PLAN
Revisions: Date:
File details come from the government source that posted it. Updated .