G Series Sheets.pdf

PDF 1 MB Posted

Attached to
Y1DA--504-18-119 Replace Boilers and Piping Federal contract opportunity
Solicitation number
36C25722R0010
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document package includes architectural drawings and specifications for a federal construction project to replace boilers and piping at a Department of Veterans Affairs medical center. Key project details include replacing existing boilers, installing a new deaerator tank and related equipment in two phases, replacing steam tunnels, repairing or replacing the building roof, repairing exterior walls, replacing heat exchangers and modernizing steam and condensate systems across multiple campus buildings. The project also offers alternates for additional roof replacement and generator replacement. Drawings cover demolition plans, renovation plans, mechanical, electrical, structural, phasing and existing conditions. Specifications address asbestos abatement, lead remediation and other hazardous materials handling requirements. The related solicitation is for design-build services for the project under solicitation number 36C25722R0010.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--504-18-119 Replace Boilers and Piping, newest first.
File Type Posted
Amendment 36C25722R0010 0001.docx DOCX document
Answers to Questions 36C25722R0010 DB Replace Boilers.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf PDF
Past Performance Questionnaire.pdf PDF
Mech 035 - Pages 1-3.pdf PDF
Mech 035 - Pages 4-6.pdf PDF
OSHA - EMR requirement.pdf PDF
BP-3-Boiler-steam.pdf PDF
BP-1-Boiler-fueloil.pdf PDF
AS ST Series Sheets.pdf PDF
AD AE Series Sheets.pdf PDF
Elect 035.pdf PDF
BP-4-Water-Treatment.pdf PDF
36C25722R0010_1.docx DOCX document
Mech 035 - Pages 7-12.pdf PDF
Phasing sheets.pdf PDF
Struct 035.pdf PDF
SELF-PERFORMED CALCULATIONS.pdf PDF
Mech 035 - Pages 8-19.pdf PDF
BP-2-Boilers-natgasandpropane.pdf PDF
20-09 035 Narrative 02 1r1 Phasing Narrative.pdf PDF
20-09 035 Narrative 06 1r1 Civil-LS Design Narrative.pdf PDF
20-09 035 Narrative 13 1r1 Specs TOC 000110 035 21-06-30.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission - Request for Proposal

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

08/14/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

09/08/2020

11/17/2020

C

L H

D C

\H o m e \t fi e s e lm a n

\R e v it

M o d e ls \R

-5

-1 -1

B o ile rs tf ie s e lm a n A

G Y

.r v t

/1 /2

:1

:2

A

M

G-001

COVER SHEET

xxx AHTNovember 17, 2020

Replace Boilers & PipingSD-1 35% SUBMITTAL -

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo,TX

EXTERIOR PERSPECTIVE - BUILDINGS 11-16-19

REPLACE BOILERS & PIPING

THOMAS E. CREEK AMARILLO VA HEALTH CARE SYSTEM

VA PROJECT NO. 504-18-119

CLH PROJECT NO. 2020-09

6010 Amarillo Blvd. West, Amarillo, TX 79106-1990

BOILER PLANT -

BLDG. 11

WATER

TREATMENT -

BLDG. 19

COMMUNITY

LIVING CENTER

(CLC) - BLDG. 29

MAIN

HOSPITAL -

BLDG. 28

ORIGINAL

HOSPITAL -

BLDG. 1

SERVICES /

DIETARY -

BLDG. 4

W E S T

A M

A R

IL

LO

B

LV

D

(H

IS

T.

U

S H

W Y . 6

6)

S.W. 9TH AVENUE

MAIN ENTRANCE

NORTH ENTRANCE

B E

L L

S T

R E

E T

N N

TRUE

NORTH

PLAN

NORTH

12" = 1'-0"

PROJECT LOCATION PLAN

MAINTENANCE

STORAGE -

BLDG. 16

HENRID

ON

W . E

DM

AN

N. EDM

AN

S. EDM

AN

E. W

ALKER

W . W

A

LK

E R

NOT TO SCALE

PARKING LOT 'K'

PARKING LOT 'J'

REQUEST FOR PROPOSAL

TO DESIGN BUILD

Revisions: Date:

ABBREVIATIONS

DET, DTL

DIAMETER

DIMENSION

DAMPER

DOWN

DISTRIBUTION PANEL

DOWNSPOUT, STORM DRAINAGE STRUCTURE

DOMESTIC WATER

DRAWING

EACH

EACH FACE, EXHAUST FAN

EXHAUST GRILLE

ELEVATION

ELECTRIC, ELECTRICAL CLOSET

EMER

EQ

EQUIP

EACH WAY

ELECTRIC WATER COOLER

EXH

EXIST

EXP

EXPANSION JOINT

EXPANSION JOINT

HEIGHT, HUMIDIFIER

HB

HANDICAPPED

HDW

HORIZ

HR

NA

NEC

NEUT

NIC

NOM

NTS

OA

OC

OD

OPNG

OPP

OH, OVHD

FRAME

FTG

T

T&B

TEL

TEMP

TERM

3/C

3/P

3 WAY

TO

TRANS

TS

TV

TW

TYP

WA

UH

V

VA

VAC

VCT

VENT

VERT

VEST

VS

VTR

VWC

W

W

W/

W/O

WC

WD

WP

WS

WT

WWF

SG

SAN

SCH

SD

SECT

SH

1 PH

SL

SP

SPDT

SPEC

SPST

SQ

SR

SS

ST

STA

STD

STL

SUP

SUSP

SV

SW

SWBD

SWGR

SIM

M

MAS

MATL

MAX

MECH

MET/MTL

MH

MIN

MISC

MM

MTD

MTG

MWP

MULL

KO

KVA

KW

L

LT

LAV

INT

INSUL

INV

JB

JC

JCT

JT

FXTR

GA

GALV

GFI

GL

GWB

GYP

C

C

CAPACITY

CENTER TO CENTER

CEILING DIFFUSER

CEM

CAST IRON, COURTYARD INLET

CHILLER

CAST IRON PIPE

CIRCULATING

CONTROL JOINT

CIRCUIT

CENTERLINE

CEILING

CLEAR

CORRUGATED METAL PIPE

CORRUGATED METAL PIPE ARCH

CONCRETE MASONRY UNITS

CONDENSATE

CLEANOUT

COLUMN

COMMUNICATION

CONCRETE

CONDUCTOR

CONNECTION

CONSTRUCTION

CONTINUOUS

CONVERTER

NONREINFORCED CONCRETE PIPE

CONDUIT

CERAMIC TILE, CURRENT TRANSFORMER,

COOLING TOWER

CENTER, COOLING TOWER RETURN

COOLING TOWER SUPPLY

COLD WATER

CARPET

CONCRETE SEALER/SURFACE

BOARD

BUILDING

BLK

BEAM

BOTTOM

BEARING

BASEMENT

ACOUSTIC

ADJUSTABLE

ABOVE FINISHED FLOOR

ALTERNATE

AIR HANDLING UNIT

ANCHOR BOLT, AUGER BORING

AL

APPROXIMATE

ARCH

AUTOMATIC TRANSFER SWITCH

FA

FLOOR DRAIN, FIRE DAMPER

FOUNDATION

FEEDER

FIRE EXTINGUISHER

FINISHED FLOOR ELEVATION

FIG

FIN

FLOOR, FLASHING, FLOW LINE

FLUOR

P

PB

PIV

PL

PLYWD

PNL

PNT

CHAIR OR CRASH RAIL

CORNER GUARD

FIRE EXTINGUISHER CABINET

OF

WG

ALC

CUBICAL CURTAIN TRACK

CLEAN

ACOUSTIC TILE

L

EPDM ROOF MEMBRANE

HSKP

NEG

STRUC

R

RA

RAD

RVB

RCP

RECP

REINF

REG

REQD

REV

RF

RHC

RM

RPM

RVT

PRELIM

PRIM

PT

PTN

PVMT

PVC

PVC

AB

ACT

ACST

ADJ

AFF

AHU

ALT

ALUMINUM

ALCOVE

APPROX

ARCHITECTURAL

ATS

BD

BLDG

BLOCK

BM

BOT

BRG

BSMT

CELSIUS

CAP

CC

CD

CCT

CEMENT

CG

CH

CI

CIP

CIR

CJ

CKT

CLN

CLG

CLR

CMP

CMPA

CMU

CND,C

CNDS

CO

COL

COMM

CONC

COND

CONN

CONST

CONT

CONV

CP

CR

CS

CT

CT

CTR

CTS

CW

CPT

DETAIL

DIA

DIM

DMPR

DN

DP

DS

DW

DWG

EA

EF

EG

EJ

ELEV

ELEC

EMERGENCY

EPDM

EQUAL

EQUIPMENT

EW

EWC

EXHAUST

EXISTING

EXPANSION, EXPOSED

EXP JT

FIRE ALARM

FD

FDN

FDR

FE

FEC

FFE

FIGURE

FINISH

FL

FLUORESCENT

FRAME

FOOTING

FIXTURE

GAGE

GALVANIZED

GROUND FAULT INTERRUPT

GLASS

GYPSUM WALL BOARD

GYPSUM

HGT, H

HOSE BIBB

HC

HARDWARE

HORIZONTAL

HOUR, HAND RAIL

HOUSEKEEPING

INTERIOR

INSULATION, INSULATED

INVERT

JUNCTION BOX

JANITOR CLOSET

JUNCTION

JOINT

KNOCK OUT

KILOVOLT-AMPERE

KILOWATT

LOUVER, LENGTH, LENGTH OF CURVE

LIGHT

LAVATORY VERTICAL

METER, MEGA

MASONRY

MATERIAL

MAXIMUM

MECHANICAL

METAL

MANHOLE

MINIMUM, MINUTE

MISCELLANEOUS

MILLIMETER

MOUNTED

MOUNTING

MEMBRANE WATERPROOFING

MULLION

NOT APPLICABLE

NATIONAL ELECTRIC CODE

NEGATIVE

NEUTRAL

NOT IN CONTRACT

NOMINAL

NOT TO SCALE

OUTSIDE AIR

ON CENTER

OUTSIDE DIAMETER

OVERFLOW DRAIN

OPENING

OPPOSITE

PIPE, POLE

OVERHEAD

PULL BOX

POST INDICATOR VALVE

PLATE

PLYWOOD

PANEL

PAINT

PRELIMINARY

PRIMARY

POINT, POINT OF TANGENT

PARTITION

POINT OF VERTICAL CURVE

POLY VINYL CHLORIDE

PAVEMENT

RADIUS, RISER, RUBBER SHEATH

RETURN AIR

RADIUS

RESILIENT VINYL BASE

RCP

RECEPTACLE

REINFORCEMENT

REGULATOR, REGISTER

REQUIRED

REVISION

ROOF, RETURN FAN

REHEAT COIL

ROOM

REVOLUTIONS PER MINUTE

RESILIENT VINYL TILE

SANITARY SEWER

SCHEDULE

SPLITTER DAMPER, STORM DRAIN

SECTION

SUPPLY GRILLE

SHEET

SIMILAR

SINGLE PHASE

SLOPE

STATIC PRESSURE, SINGLE POLE

SINGLE POLE, DOUBLE THROW

SPECIFICATION

SINGLE POLE, SINGLE THROW

SQUARE

SUPPLY REGISTER

SANITARY SEWER

STEAM, SINGLE THROW, STREET, STAFF

STATION

STANDARD

STEEL

STRUCTURAL

SUPPORT

SUSPENDED

SHEET VINYL

SWITCH, SIDEWALK

SWITCHBOARD

SWITCHGEAR

TILE,TOP,TANGENT

TOP AND BOTTOM

TELEPHONE

TEMPERATURE, TEMPORARY

TERMINAL

THREE CONDUCTOR

THREE POLE

THREE WAY

TOP OF

TRANSITION

TOP OF STEEL, TOP OF STONE, TOP OF SLAB

TELEVISION

TOP OF WALL

TYPICAL

UNIT HEATER

VENT,VOLT,VALVE

VOLT AMPRE

VACUUM

VINYL COMPOSITION TILE

VENTILATING

VERTICAL

VESTIBULE

VENT STACK

VENT THRU ROOF

VINYL WALL COVERING

WIDTH,WASTE,WATER,WATT,WEST, WIRE,

WATER LINE STRUCTURE

WATT

WITH

WITHOUT

WATER CLOSET, WHEEL CHAIR

WIDTH, WINDOW DIMENSION

WALL GUARD

WATERPROOF, WEATHERPROOF

WASTE STACK, WATER SURFACE, WATERSTOP

WEIGHT

WELDED WIRE FABRIC

TA TOILET ACCESSORIES

WDW WINDOW

ARCHITECTURAL

SYMBOLS

A101

DETAIL NUMBER

COLUMN NUMBER /

GRID LINE

SHEET NUMBER

ARCHITECTURAL

SECTION

WINDOW TYPE

1 Ref

R e f

1 Ref

R e f

ARCHITECTURAL

ELEVATION

X

X-XXX

DETAIL NUMBER

SHEET NUMBER

CENTER LINE

DIMENSION LINE

DOOR NUMBER

SYMBOL

x'- x"

EXISTING TO REMAIN

NEW CONSTRUCTION

EXISTING TO BE

REMOVED

EXISTING TO REMAIN

1i

KEYNOTE -

RENOVATION

WALL / PARTITION TYPE

KEYNOTE - DEMOLITION

PLAN

X

X

X

NOTE: NOT ALL SYMBOLS USED

ROOM NAME

ROOM NAME

ROOM NUMBER

XX

X-XXX

SHEET DETAIL IS

DRAWN ON

DETAIL NUMBER

XX

X-XXX ARCHITECTURAL

ELEVATION - EXTERIOR

XX SP XX SP DESIGN SF

PROGRAM SF

ACT-X

X'-X" AFF

CEILING CODE

CEILING HEIGHT,

ABOVE FINISH FLOOR

1. SCHEMATIC DEISGN DRAWINGS HAVE BEEN PREPARED FOR

USE OF DESIGN-BUILD OFFERORS TO ILLUSTRATE DESIGN

CONCEPTS AND SCOPE OF WORK IN CONJUNCTION WITH

ADDITIONAL REQUEST FOR PROPOSAL (RFP) DOCUMENTS.

THE DESIGN-BUILD TEAM/OFFEROR SHALL REVIEW ALL

DOCUMENTS PROVIDED AS PART OF THIS RFP SOLICITATION

AND PREPARE THEIR PROPOSAL AS REQUIRED IN SECTION 00

11 21 - REQUEST FOR PROPOSAL TO DESIGN-BUILD.

2. REFER TO SPECIFICATION SECTIONS 00 11 21 AND 01 00 00

FOR DESCRIPTION OF ITEMS TO BE INCLUDED IN THE BASE

BID AND LISTING OF ADD ALTERNATES.

3. DESIGN-BUILD OFFERORS, CONSULTANTS,

SUBCONTRACTORS, MANUFACTURERS AND SUPPLIERS ARE

REQUIRED TO ATTEND A PRE-PROPOSAL CONFERENCE AND

WALK-THROUGH TO BE SCHEDULED BY THE OWNER. REFER

TO THE RFP SOLICITATION AND SECTION 00 11 21.A4 FOR

DATE, TIME AND LOCATION.

4. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO CONSTRUCTION.

5. ALL NEW CONSTRUCTION IS INDICATED BOLD OR FULL TONE.

6. ALL EXISTING CONSTRUCTION, CABINETWORK, EQUIPMENT,

ETC. TO REMAIN IS INDICATED LIGHT OR HALF TONE.

7. ALL METAL STUD AND GYPSUM WALLBOARD PARTITIONS ARE

DIMENSIONED TO THE OUTSIDE FACE AND TO COLUMN GRID

UNLESS OTHERWISE NOTED.

8. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING

INTERSECT, THE HIGHEST RATED PARTITION TAKES

PRECEDENT. MAINTAIN RATING BEHIND FIRE EXTINGUISHER

CABINETS, ETC.

9. ALL FURNITURE SHOWN HALF TONE WILL BE OWNER

FURNISHED AND OWNER INSTALLED.

10. ALL EXISTING TO REMAIN CEILING AND WALL GRILLES,

DIFFUSERS AND LIGHTS ETC. ARE TO BE CLEANED PRIOR TO

PROJECT COMPLETION AND ACCEPTANCE BY THE OWNER.

11. VERIFY THAT THE EXISTING WALLS REQUIRING FIRE RATING

ARE MAINTAINED, REPAIRED AND EXTENDED TO STRUCTURE.

12. ALL CORRIDOR WALLS ARE REQUIRED TO BE SMOKE TIGHT,

WHETHER THEY ARE FIRE RATED OR NOT. REPAIR AND

EXTEND AT LEAST THE CORRIDOR SIDE OF NON-FIRE RATED

CORRIDOR WALLS TO STRUCTURE, UNLESS NOTED

OTHERWISE.

13. TEMPORARY OPENING SUPORTS AND ENCLOSURES SHALL

BE DESINGED AND INSTALLED BY THE DESIGN-BUILD

OFFEROR SO AS TO PROVIDE A WEATHERTIGHT ENCLOUSRE

FOR THE BUILDING. REVIEW AND APPROVAL OF OPENING

SUPPORTS AND ENCLOSURE DESIGN IS REQUIRED BY THE

VA'S COR PRIOR TO BEGINNING OF WORK.

14. PROTECTION OF EXISTING STRUCTURES ADJACENT TO

TEMPORARY OPENINGS SHALL BE REVIEWED WITH AND

APPROVED BY THE VA'S COR PRIOR TO BEGINNING OF

WORK.

15. PHASING AND SCHEDULING OF UTILITY SHUT-DOWNS OR

OTHER DISTURBANCES IN OPERATION OF THE FACILTY SHALL

BE WITH THE INPUT AND APPROVAL OF THE VA'S COR AND

CAMPUS ENGINEERING.

16. REFER TO SPECIFICATIONS FOR REQUIREMENTS RELATED

TO THE USE AND OPERATION OF TEMPORARY BOILERS,

INCLUDING SAFETY TRAINING, INSPECTIONS AND

MAINTENANCE BY THE CONTRACTOR.

17. COMPLY WITH REQUIREMENTS OF THE LATEST VA PHYSICAL

SECURITY & RESILIENCY DESIGN MANUAL FOR ITEMS

DISTURBED BY THE WORK, INCLUDING PROVISION OF

PROTECTIVE FILMS, LAMINATED GLAZING AND USE OF

STRUCTURAL SILICONE, ANCHORAGES OF WINDOW FRAMES,

AND RELATED ITEMS AT WINDOWS.

18. SEE ARCH RA-SERIES, MECH M-SERIES FLOOR PLANS &

MECH RM-SERIES EXISTING CONDITIONS SHEETS FOR

PHOTOS OF EXISTING CONDITIONS.

GENERAL NOTES:

1. THE CONTRACTOR SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS,

REVIEW DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS PROVIDED AS

PART OF THE CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL ADJUST FOR

ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE GOV'T.

2. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE

RESPONSIBLE FOR SAME. COORDINATE THE WORK AND SHOP DRAWINGS WITH

ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO

CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL

MEMBERS AND OTHER OBSTRUCTIONS.

3. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION

UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED BY THE THE GOV'T..

CONTRACTOR MUST CONTACT VA'S COR PRIOR TO ANY SHUTDOWNS.

4. TEMPORARY ALTERATIONS AND CONNECTIONS REQUIRED BY THIS CONTRACT

SHALL BE MADE SO THAT ALL BUILDING SERVICES ARE MAINTAINED WITH

MINIMUM INTERRUPTION.

5. SCHEDULE ALL ELECTRICAL/MECHANICAL OUTAGES 14 DAYS IN ADVANCE WITH

THE GOV'T. UNLESS OTHERWISE DIRECTED IN THE SPECIFICATIONS.

SPECIFICATIONS REQUIREMENTS WILL SUPERSEDE.

6. PROTECT ALL WORK, MATERIALS AND EQUIPMENT DESIGNATED TO REMAIN. CAP

OR PLUG TEMPORARY OPENINGS. DELIVER ALL WORK TO THE THE GOV'T. IN

CLEAN AND IN GOOD CONDITION.

7. WHEN DEMOLITION IS COMPLETE, NOTIFY ARCHITECT AND THE GOV'T. FOR A

SCHEDULED MEETING TO REVIEW EXISTING CONDITIONS AND ANY CONCERNS

REGARDING NEW WORK.

8. CUTTING AND PATCHING OF EXISTING WALLS, FLOORS OR CEILINGS REQUIRED

BY NEW WORK SHALL BE INCLUDED AS WORK PROVIDED UNDER THIS CONTRACT.

9. CUTTING SHALL BE DONE WITH CARE SO AS NOT TO DAMAGE EXISTING

EQUIPMENT, CONNECTIONS, CONTROLS, ETC. DAMAGE CAUSED BY SUCH

CUTTING SHALL BE REPLACED OR REPAIRED TO ORIGINAL CONDITION BY

CONTRACTOR AT NO COST TO THE THE GOV'T., UNLESS UNFORESEEN EXISTING

CONDITIONS ARE DISCOVERED AND THE GOV'T./ARCHITECT ARE NOTIFIED.

10. ALL OCCUPIED WORK AREAS, BUILDING CORRIDORS AND EXTERIOR AREAS

SHALL BE KEPT CLEAR OF DEBRIS.

11. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND

FREE FROM DEFECTS.

12. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND

QUALITY REQUIRED, UNLESS OTHERWISE NOTED.

13. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND

ORDINANCES.

14. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS NECESSARY

TO DEMONSTRATE A COMPLETE AND SATISFACTORY INSTALLATION.

15. ALL EXPOSED PENETRATIONS MADE THROUGH EXISTING ROOFS, FLOORS, AND

WALLS SHALL BE PATCHED WITH LIKE MATERIALS TO MATCH THE SURROUNDING

AREAS, AND FILLED AS CLOSE AS POSSIBLE TO THE NEW PIPING OR DUCTWORK.

16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING AND REPLACING ANY

DAMAGE TO EXISTING MATERIALS RESULTING FROM WORK UNDER THIS

CONTRACT AND SHALL RESTORE SUCH TO ITS ORIGINAL CONDITION OR BETTER

WITH NEW MATERIALS TO MATCH.

17. INSTALL THE SPECIFIED FIRE STOPPING (SLEEVES, WRAP, CONDUIT, ETC.) AT

RATED CONSTRUCTION (NEW OR EXISTING) OR SMOKE PARTITIONS:

A. REPLACE FIRE STOPPING AT ALL PENETRATIONS WHERE NEW

DEVICES/LINES USE EXISTING PENETRATIONS OF RATED BARRIERS.

B. REPLACE FIRE STOPPING AT ALL EXISTING PENETRATIONS OF RATED

BARRIERS WHERE EXISTING LINES HAVE BEEN MODIFIED OR RELOCATED.

C. FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE NEW

DEVICES/LINES PENETRATE EXISTING FLOORS, CEILINGS AND OTHER

RATED BARRIERS.

D. FIRE STOP ALL NEW PENETRATIONS WHERE NEW DEVICES/LINES

PENETRATE THROUGH NEWLY CONSTRUCTED RATED BARRIERS OR

SMOKE PARTITIONS.

E. USE ONLY APPROVED FIRE CAULKING AND FIRE STOPPING (SEE

SPECIFICATIONS).

18. ALL METAL STUD AND GYPSUM WALLBOARD PARTITIONS ARE DIMENSIONED TO

THE OUTSIDE FINISH FACE OF WALL AND TO THE COLUMN GRID UNLESS

OTHERWISE NOTED.

19. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD AND SHALL

BE MOLD AND MOISTURE RESISTANT.

20. PROVIDE WOOD BLOCKING OR 16 GA. SHEET METAL BACKING PLATES IN ALL

WALLS TO RECEIVE WALL HUNG ACCESSORIES, SUCH AS EQUIPMENT, GRAB

BARS, MILLWORK, COAT HOOKS, AND DOOR STOPS, ETC. IF WOOD BLOCKING IS

USED, PROVIDE AS FIRE-RESISTANT.

21. ALL ITEMS AND DEVICES, SUCH AS COVER PLATES, SWITCH PLATES,

CONVENIENCE OUTLETS, DOOR STOPS, AND OTHER FINISH HARDWARE, ETC.

SHALL BE REMOVED AND REINSTALLED AS PART OF THE REFINISHING OF

EXISTING WALLS INDICATED TO REMAIN.

22. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE

SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND MODIFICATIONS

IDENTIFIED, COORDINATED, AND INCORPORATED INTO THE SHOP DRAWING

PROCESS. COORDINATE ALL ABOVE EILING WORK TO ENSURE A COMPLETE AND

OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE GOV'T.. COORDINATION

SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:

A. THE GOV'T.'S EQUIPMENT REQUIREMENTS.

B. THE CEILING SUPPORT SYSTEM.

C. THE MECHANICAL DUCTWORK SYSTEM.

D. THE LIGHTING FIXTURES.

E. ELECTRICAL WIRING AND CONDUIT SYSTEMS.

F. THE PLUMBING AND PIPING SYSTEMS.

G. FIRE PROTECTION SYSTEMS

H. THE COMMUNICATIONS AND SPECIAL SYSTEMS.

23. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF

DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR SHALL

NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW ENTIRE SET OF

DOCUMENTS.

24. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE

UNLESS NOTED OTHERWISE.

25. WHEN ALTERING THE BUILDING, IF STRUCTURAL INTEGRITY APPEARS TO BE IN

QUESTION CONTRACTOR SHALL NOTIFY THE GOV'T. AND ARCHITECT

IMMEDIATELY.

26. ALL NEW CONSTRUCTION IS INDICATED BOLD OR FULL TONE.

27. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING INTERSECT, THE HIGHEST

RATED PARTITION TAKES PRECEDENT. MAINTAIN RATING BEHIND RECESSED

AREAS IN WALLS.

28. ALL CORRIDOR WALLS WITHIN BUILDINGS ARE REQUIRED TO BE SMOKE TIGHT,

WHETHER THEY ARE FIRE RATED OR NOT. REPAIR AND EXTEND AT LEAST THE

CORRIDOR SIDE OF NON-RATED CORRIDOR WALLS TO STRUCTURE, UNLESS

NOTED OTHERWISE.

29. COORDINATE CONSTRUCTION REQUIREMENTS WITH CIVIL, STRUCTURAL,

MECHANICAL, FIRE PROTECTION, PLUMBING AND ELECTRICAL DRAWINGS.

30. AFTER DEMOLITION AND NEW CONSTRUCTION, REPAIR ALL FINISHED SURFACES

ON EXISTING ITEMS TO REMAIN AFFECTED BY WORK TO LIKE-NEW CONDITION.

31. ALL FINISHED SURFACES ON NEW WALLS, ETC. INFILLING OR EXTENDING

EXISTING ITEMS SHALL BE INSTALLED SO NEW FINISHED SURFACES ALIGN WITH

EXISTING.

32. FURNITURE SHOWN IS N.I.C. UNLESS NOTED OTHERWISE. EQUIPMENT SHALL BE

PROVIDED BY THE GOV'T. UNLESS NOTED OTHERWISE AND INSTALLED BY THE

CONTRACTOR AS SCHEDULED. DISCONNECTION, RELOCATION, AND

RECONNECTION OF EXISTING EQUIPMENT IS THE RESPONSIBILITY OF THE

CONTRACTOR.

33. CONTRACTOR SHALL VERIFY LOCATION OF ANY EXISTING CONDUITS, PIPING AND

SUPPORTS ABOVE AND BELOW THE EXISTING ROOF PRIOR TO START OF

DRILLING OR CUTTING ANY HOLES, IF NECESSARY, IN THE ROOF DECK. POWER

INTERRUPTION SHALL BE AVOIDED.

GENERAL

ARCHITECTURAL

NOTES:

1. DASHED BOLD LINES INDICATE EXTEND OF DEMOLITION

INCLUDING THE FOLLOWING:

A. INTERIOR PARTITIONS (REMOVED TO STRUCTURE

B. CEILINGS, INCLUDING CEILING SUSPENSION SYSTEM,

MISC. STEEL SUPPORTS FOR SUSPENDED

EQUIPMENT, SUSPENDED EQUIPMENT, LIGHT

FIXTURES, DIFFUSERS AND GRILLES ETC.

C. FLOOR FINISHES (TO CONCRETE) INCLUDING CARPET,

RVT, SHEET VINYL, CERAMIC TILE, QUARRY TILE,

BRICK PAVERS, ETC.

D. DOORS AND FRAMES UNLESS NOTED OTHERWISE IN

DOOR SCHEDULE

E. WINDOW GLAZING AND FRAMES UNLESS NOTED

OTHERWISE

F. BRICK AND BACK-UP WALL SYSTEM

G. CABINETWORK, SHELVING, BASES

H. TOILET PARTITIONS AND ACCESSORIES

I. TACK BOARDS, MARKER BOARDS, PEGBOARDS,

DISPLAY BOARDS

J. EQUIPMENT ITEMS

K. PLUMBING FIXTURES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS.

2. ALL LIGHT OR HALFTONE LINES INDICATE EXISTING TO

REMAIN.

3. SEE SPECIFICATIONS SECTION 02 41 00 FOR CUTTING,

PATCHING AND DEMOLITION.

4. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS

FOR EXTENTS OF WORK AT OR ABOVE EXSTING

CEILINGS. PATCH AND REFINISH CEILINGS DISTURBED BY

DEMOLITION AND NEW CONSTRUCTION TO MATCH

ADJACENT FINISHES UNLESS NOTED OTHERWISE.

5. EXISTING FLOORS WHICH ARE DISTURBED BY

DEMOLTION AND NEW CONSTRUCTION ARE TO BE

PATCHED AND REFINISHED TO MATCH ADJACENT

EXISTING FINISHES UNLESS NOTED OTHERWISE.

6. IN ARES WHERE EXSITING WALL FINISHES ARE

DISTURBED BY DEMOLITION AND NEW CONSTRUCTION,

PATCH AND REFINISH TO MATCH ADJACENT EXISTING

FINISHES. REMOVE EXISTING WALL FINISHES (I.E.

RESILIENT WALL BASE, CERAMIC TILE, ETC.) AND

REPLACE WITH NEW MATERIAL TO MATCH EXISTING.

7. CONTRACTOR TO VERIFY ALL WALL CONSTRUCTION &

FINISHES NOTED FOR REMOVAL. TAKE INTO ACCOUNT

ANY DISCREPANCY AND MAKE PROPER ADJUSTMENT TO

ACCOMPLISH REQUIRED CONSTRUCTION & FINISHES. IF

STRUCTURAL INTEGRITY IS VIOLATED, CONTACT

ARCHITECT. COORDINATE PHASING WITH OWNER.

8. COORDINATE REMOVAL OF FURNITURE AND EXISTING

EQUIPMENT WITH OWNER.

9. SAW CUT EDGES OF EXISTING FLOOR SLAB FOR

REMOVAL AND INSTALLATION OF UNDERFLOOR ITEMS

SUCH AS FOOTINGS, FOUNDATIONS AND UTILITIES.

REFER TO STRUCTURAL, MECHANICAL AND ELECTRICAL

DRAWINGS.

10. REMOVE FURRING OR GWB ONLY WHERE REQUIRED TO

COMPLETE CONSTRUCTION. PATCH AND MATCH WALLS

AS REQUIRED TO COMPLETE AND MATCH EXISTING

CONDITIONS, UNLESS AN ALTERNATIVE MATERIAL AND

FINISH IS INDICATED.

11. REMOVE CEILINGS ONLY AS REQUIRED FOR NEW

CONSTRUCTION. REINSTALL, REPLACE OR PATCH AS

REQUIRED.

GENERAL

DEMOLITION

NOTES:

1. CONTRACTOR SHALL COMPLY WITH THE MOST-CURRENT

VERSION OF OSHA'S PUBLICATION 3142-12R "LEAD IN

CONSTRUCTION" (29 CFR 1926.62) FOR CONSTRUCTION

ACTIVITIES THAT DISTURB LEAD-BASED PAINTED SURFACES,

PAINT CONTAINING DETECTABLE LEVELS OF LEAD OR OTHER

MATERIALS CONTAINING LEAD..

2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF

ASBESTOS AND LEAD BASED PAINT (LBP) REPORTS. REFER TO

DIVISION 2 IN THE SPECIFICATIONS FOR ASBESTOS ABATEMENT

AND LEAD BASED PAINT REMOVAL AND/OR ENCAPSULATION

SPECIFICATIONS.

3. HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP

REPORTS MAY NOT BE A FULL ACCOUNTING OF SUCH

MATERIALS IN THE AREA OF THE FACILITY IN QUESTION. REFER

TO THE VA'S ABATEMENT SPECIFICATIONS FOR HANDLING OF

MATERIALS THAT WERE NOT DIRECTLY OBSERVED, BUT

SHOULD BE EXPECTED BY THE ABATEMENT CONTRACTOR.

4. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS

CONTAINING MATERIALS (ACM) PRIOR TO ANY DEMOLITION.

5. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT COULD BE

HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND

NOTIFY THE GOVT. IMMEDIATELY FOR DIRECTION.

6. ALL CONTRACTORS' PERSONNEL IN AREAS NEAR DISTURBANCE

OR ABATEMENT OF HAZARDOUS MATERIALS MUST MUST BE

NOTIFIED OF ACTIVITIES.

7. ASBESTOS AND LEAD-BASED PAINT ABATEMENT, IF REQUIRED,

SHALL BE CONDUCTED IN ACCORDANCE WITH VA

SPECIFICATIONS AND ALL APPLICABLE REGULATIONS.

8. ABATEMENT CONTRACTORS SHALL SCHEDULE WORK IN

GENERAL ACCORDANCE WITH THE PROJECT'S PHASING

STRATEGY.

1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL

PENETRATIONS - CONSTRUCTION IS TO CONFORM TO

MANUFACTURER'S FIRE RATED / TEST ASSEMBLIES.

2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS /

PARTITIONS AND FLOORS. CONFORM WITH THE TESTED /

SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND

LABEL WALL WITH U.L. DESIGN NUMBER. FIRE RATED WALLS

SHOWN ON PLAN.

3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING

STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS

UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED

DURING CONSTRUCTION.

4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING AT EXISTING

RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND

THAT WHICH IS DISTURBED DURING CONSTRUCTION. RE-

LABEL EXISTING WALL IF NECESSARY.

HAZARDOUS MATERIALS

FIRE PROOFING

GENERAL NOTES

MATERIAL SYMBOLS

EARTH

CAST-IN-PLACE CONCRETE /

PRECAST CONCRETE

CONCRETE MASONRY

STEEL

CONTINUOUS WOOD FRAMING

WOOD BLOCKING

FIBROUS INSULATION

GYPSUM BOARD

BRICK MASONRY

RIGID INSULATION

ROOF INSULATION

ALUMINUM

1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -

TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER

REVISIONS.

2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW

BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.

PHASE ALSO INCLUDES:

A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE

LINES IN PIPE TUNNELS;

B. BLDG. 11 - REPAIR (BASE BID) AND/OR

REPLACEMENT OF ROOFING (ADD ALTERNATE);

C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT

EXTERIOR WALLS;

D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD

ALTERNATE);

E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT

EXCHANGER WATER HEATERS;

F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM

DISTRIBUTION AND CONDENSATE PIPING;

G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE

REDUCTION VALVES AND CONDENSATE RETURN

LINES;

H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE

STEAM TRAPS.

3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11

21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-

GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'

HEATING AND COOLING SEASONS TO MINIMIZE

DISRUPTIONS TO OPERATION OF THE FACILITY.

5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN

ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -

GENERAL REQUIREMENTS AND GENERAL NOTES FOR

NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.

REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.

FOR ADD'L INFO. RE: PHASING.

PHASING NOTES:

ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -

GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.

1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING

AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW

RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,

ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE

ARCHITECTURAL DRAWINGS.

2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT

BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.

ALTERNATES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission - Request for Proposal

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

08/14/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

09/08/2020

11/17/2020

C

L H

D C

\H o m e \t fi e s e lm a n

\R e v it

M o d e ls \R

-5

-1 -1

B o ile rs tf ie s e lm a n A

G Y

.r v t

/1 /2

:1

:2

A

M

G-002

SHEET INDEX, ABBREVIATIONS, SYMBOLS

& GENERAL NOTES

RJRNovember 17, 2020

Replace Boilers & PipingSD-1 35% SUBMITTAL -

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo,TX

Index of Drawings - Architectural

SHEET

NO. SHEET NAME

AS100 ARCHITECTURAL SITE PLAN & LOCATION

ST-AE100 STEAM TUNNEL PLAN

11-AD101 LOWER LEVEL & FIRST FLOOR PLANS - DEMOLITION BLDGS. 11, 16

& 19

11-AD102 MEZZANINE PLANS - DEMOLITION - BLDG. 11

11-AD201 EXTERIOR ELEVATIONS - DEMOLITION - BLDGS. 11, 16 & 19

11-AD301 BUILDING SECTIONS - DEMOLITION - BLDGS. 11, 16 & 19

11-AD310 WALL SECTIONS - DEMOLITION - BLDG. 11

11-AE101 LOWER LEVEL & FIRST FLOOR PLANS - RENOVATION - BLDGS. 11,

16 & 19

11-AE102 MEZZANINE PLANS - RENOVATION - BLDG. 11

11-AE110 ROOF PLANS - DEMOLITION & RENOVATION - BLDGS. 11, 16 & 19

11-AE201 EXTERIOR ELEVATIONS - RENOVATION - BLDGS. 11, 16 & 19

11-AE301 BUILDING SECTIONS - RENOVATION - BLDGS. 11 & 16

11-AE310 WALL SECTIONS - RENOVATION - BLDG. 11

AE401 PARTIAL FLOOR PLANS - BLDGS. 1, 4, 28 & 29 MECHANICAL ROOMS

Index of Drawings - General

SHEET

NO. SHEET NAME

G-001 COVER SHEET

G-002 SHEET INDEX, ABBREVIATIONS, SYMBOLS & GENERAL NOTES

Index of Drawings - Mechanical

SHEET

NO. SHEET NAME

MD010 MECHANICAL DEMOLITION SITE PLAN

M-010 MECHANICAL SITE PLAN

01-M-100 EXISTING CONDITIONS PLAN & PHOTOS - MECH ROOM - BLDG. 1

04-M-100 EXISTING CONDITIONS PLAN & PHOTOS - MECH ROOM - BLDG. 4

11-M-100 FIRST FLOOR PLAN - MECHANICAL - BLDGS. 11, 16 & 19

11-M-101 PARTIAL LOWER LEVEL - MECHANICAL - BLDG. 11

11-M-102 ROOF PLAN - MECHANICAL - BLDG. 11

28-M-100 EXISTING CONDITIONS PLAN & PHOTOS - MECH ROOM - BLDG. 28

29-M-100 EXISTING CONDITIONS PLAN & PHOTOS - MECH ROOM - BLDG. 29

M-300 MECHANICAL DETAILS

M-301 MECHANICAL DETAILS

M-302 MECHANICAL DETAILS

M-400 MECHANICAL FLOW DIAGRAMS - WATER AND STEAM - DEMOLITION

M-401 MECHANICAL FLOW DIAGRAMS - WATER AND STEAM

M-402 MECHANICAL FLOW DIAGRAMS - WATER TREATMENT

M-403 MECHANICAL FLOW DIAGRAMS - BOILER - FUEL OIL - DEMOLITION

M-404 MECHANICAL FLOW DIAGRAMS - BOILERS - FUEL OIL

M-601 BOILER PLANT DEMO ISOMETRIC

M-602 BOILER PLANT NEW WORK ISOMETRIC

Index of Drawings - Electrical

SHEET

NO. SHEET NAME

E-100 ELECTRICAL COVER SHEET

11-ED100 FIRST FLOOR PLAN ELECTRICAL - DEMOLITION - BUILDGS 11, 16, &

11-E-100 FIRST FLOOR PLAN ELECTRICAL - BUILDGS 11, 16, & 19

E-300 ELECTRICAL DETAILS

Index of Drawings - Structural

SHEET

NO. SHEET NAME

11-S-101 SCHEMATIC FOUNDATION PLAN - BLDG. 11 (FOR GENERAL

INFORMATION ONLY)

16/19-S-101 SCHEMATIC FOUNDATION PLAN - BLDGS. 16 & 19 (FOR GENERAL

INFORMATION ONLY)

Index of Drawings - Phasing

SHEET

NO. SHEET NAME

00-PH103 PHASING PLAN - CAMPUS - PHASE 2

11-PH101 PHASING PLANS - BOILER PLANT - PHASE 1

11-PH102 PHASING PLANS - BOILER PLANT - PHASE 2

Index of Drawings - Resource

SHEET

NO. SHEET NAME

11-RA101 EXISTING CONDITIONS PLAN & PHOTOS - INTERIOR - BLDG. 11

11-RA102 EXISTING CONDITIONS PLAN & PHOTOS - MEZZANINES - BLDG. 11

& 16

11-RA103 EXISTING CONDITIONS PLAN & PHOTOS - EXTERIOR - BLDG. 11 &

11-RA104 EXISTING CONDITIONS PLAN & PHOTOS - ROOF - BLDG. 11 & 16

19-RA101 EXISTING CONDITIONS PLAN & PHOTOS - INTERIOR & EXTERIOR -

BLDG. 19

11-RM100 EXISTING CONDITIONS PLAN & PHOTOS - MECHANICAL - BLDG. 11,

16, 19

11-RM101 EXISTING CONDITIONS PLAN & PHOTOS - MECHANICAL - BLDG.

11,16, 19

ST-RM100 EXISTING CONDITIONS PLAN AND PHOTOS MECHANICAL - STEAM

TUNNELS

Revisions: Date:

Sheets
G-001 - COVER SHEET
G-002 - SHEET INDEX, ABBREVIATIONS, SYMBOLS & GENERAL NOTES

File details come from the government source that posted it. Updated .