SELF-PERFORMED CALCULATIONS.pdf

PDF 119 KB Posted

Attached to
Y1DA--504-18-119 Replace Boilers and Piping Federal contract opportunity
Solicitation number
36C25722R0010
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document provides instructions for calculating self-performed work for a federal contract opportunity to replace boilers and piping at a Veterans Affairs medical center. The solicitation is issued by the Department of Veterans Health Administration Veterans Integrated Service Network 17 for project 504-18-119. Offerors must complete calculations showing the percentage of work they estimate will be self-performed versus paid to non-Veteran-Involved Procurement listed Service-Disabled Veteran-Owned Small Businesses, with limits of 50% for services, 85% for general construction, and 75% for special trade contractors. Instructions are provided on how to calculate these percentages based on the total proposed price and estimated amounts paid to non-VIP firms.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--504-18-119 Replace Boilers and Piping, newest first.
File Type Posted
Amendment 36C25722R0010 0001.docx DOCX document
Answers to Questions 36C25722R0010 DB Replace Boilers.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf PDF
Past Performance Questionnaire.pdf PDF
Mech 035 - Pages 1-3.pdf PDF
Mech 035 - Pages 4-6.pdf PDF
OSHA - EMR requirement.pdf PDF
BP-3-Boiler-steam.pdf PDF
BP-1-Boiler-fueloil.pdf PDF
AS ST Series Sheets.pdf PDF
AD AE Series Sheets.pdf PDF
Elect 035.pdf PDF
G Series Sheets.pdf PDF
BP-4-Water-Treatment.pdf PDF
36C25722R0010_1.docx DOCX document
Mech 035 - Pages 7-12.pdf PDF
Phasing sheets.pdf PDF
Struct 035.pdf PDF
Mech 035 - Pages 8-19.pdf PDF
BP-2-Boilers-natgasandpropane.pdf PDF
20-09 035 Narrative 02 1r1 Phasing Narrative.pdf PDF
20-09 035 Narrative 06 1r1 Civil-LS Design Narrative.pdf PDF
20-09 035 Narrative 13 1r1 Specs TOC 000110 035 21-06-30.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW

“Limitations on Subcontracting” (VAAR 852.219-10)

OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Amount projected to be paid to non VIP listed SDVOSBs: $ __________

c) Offeror’s percentage of estimated Non VIP work (b/a X 100 = %) __________%

d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%

A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.

General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)

File details come from the government source that posted it. Updated .