AD AE Series Sheets.pdf

PDF 15 MB Posted

Attached to
Y1DA--504-18-119 Replace Boilers and Piping Federal contract opportunity
Solicitation number
36C25722R0010
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document provides details on a federal contract opportunity to replace boilers and piping. The solicitation number is 36C25722R0010 and concerns opportunity Y1DA--504-18-119 to replace boilers and piping for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The opportunity type is a solicitation to replace boilers and piping for the VA facility located at VA-22-00004245. The related file AD AE Series Sheets.pdf provides unspecified supplementary information to support offerors in preparing responses for this contract.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--504-18-119 Replace Boilers and Piping, newest first.
File Type Posted
Amendment 36C25722R0010 0001.docx DOCX document
Answers to Questions 36C25722R0010 DB Replace Boilers.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf PDF
Past Performance Questionnaire.pdf PDF
Mech 035 - Pages 1-3.pdf PDF
Mech 035 - Pages 4-6.pdf PDF
OSHA - EMR requirement.pdf PDF
BP-3-Boiler-steam.pdf PDF
BP-1-Boiler-fueloil.pdf PDF
AS ST Series Sheets.pdf PDF
Elect 035.pdf PDF
G Series Sheets.pdf PDF
BP-4-Water-Treatment.pdf PDF
36C25722R0010_1.docx DOCX document
Mech 035 - Pages 7-12.pdf PDF
Phasing sheets.pdf PDF
Struct 035.pdf PDF
SELF-PERFORMED CALCULATIONS.pdf PDF
Mech 035 - Pages 8-19.pdf PDF
BP-2-Boilers-natgasandpropane.pdf PDF
20-09 035 Narrative 02 1r1 Phasing Narrative.pdf PDF
20-09 035 Narrative 06 1r1 Civil-LS Design Narrative.pdf PDF
20-09 035 Narrative 13 1r1 Specs TOC 000110 035 21-06-30.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

UP

UP

UP

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

C

K

M

N

4A5

A

2.7

B

G

D

E

F

3.5

L

2.2

11-AD301

B7

H

11-AD310

F1

11-AD310

F3

515 SF

PUMP

ROOM

11-B01

145 SF

BREAK

ROOM

11-103

172 SF

CONTROL

ROOM

11-102

275 SF

AUX.

GENERATOR

ROOM

11-104

29 SF

STAIRS

11-S01

15 SF

OIT

16-103

304 SF

MAINTENANCE

OFFICE

16-104

102'-0"

100'-0"

102'-8"

102'-0"

101'-4"

101'-4"

16'-7 7/8" 7 5/8"

'-4

15'-8 3/8" 1'-0"

'-8

6'-4" 1'-0" 17'-4" 16'-4"

100'-0"

4 3 2 1 1A

'-0

1"

7'-4"

8'-4"

8"

1' -0

'-4

5/

8" 7'

-4

/8

'-8

/8

J

C1

12'-0 3/4"

OUT-TO-OUT AT F.O. BRICK

42'-0"

31'-4 3/4" 22'-8"

54'-0 3/4"

6"

'-2

'-4

'-0

'-0

1" 7

3/ 4"

'-2

/8

'-1 1"

'-2

'-7

/8

'-8

/8

'-1

7/ 8"

1'-1" 39'-11" 1'-0 1/2"

'-7

'-8

LADDER

TO ROOF

EXIST SHOWER / EYEWASH

SEE MECH FOR

WORK THIS AREA

SEE ELECT FOR

GENERATOR

REPLACEMENT

MATCHLINE AMATCHLINE A

11-AD310

F6

BOILER 4

BOILER 1

BOILER 2

BOILER 3

(3) EXIST 200 hp BOILERS

TO REMOVE & REPLACE

w/ (3) 250 hp BOILERS

BOILER HEADER

S

LO

P E

D N

EXIST. 4" CMU CHASE

TO 10'-0" HIGH FOR PIPING

EXIST 4" CMU CHASE

TO 10'-0" HIGH FOR PIPING

11-AD301

B1

11-AD301

D1

11-AD301

D4

11-AD301

D7

11-AD301

F4

11-AD301

F1

11-AD301

F7

CONTRACTOR ACCESS

STAIRS TO PIPE TUNNEL

CONTRACTOR

ACCESS

3/

4"

'-7

/8

'-2

'-1 1"

'-1

1"

'-3

/8

3/

4"

1"

8"

'-4

'-0

'-4

1' -0

'-2

6"

'-8

'-4

'-5

'-7

/8

'-3

/4

6'

-4

'-0

/8

191 SF

CORRIDOR

11-C101

78 SF

STAIRS

11-S02

207 SF

MECH

16-102

59 SF

HALL

16-101A

920 SF

MAINTENANCE

STORAGE

16-101

68 SF

STAIR

16-S01

2527 SF

BOILER

ROOM

11-101

C

K

M

N

4A5

A

2.7

B

G

D

E

F

3.5

L

2.2

11-AD301

B7

H

11-AD310

F1

11-AD310

F3

550 SF

PUMP

ROOM

11-B01

54 SF

SUMP PIT

11-B02

63 SF

STAIR

11-S02

163 SF

TUNNEL

T-001

374 SF

TUNNEL

T-002

78 SF

TUNNEL

T-003

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

91'-0"

93'-6"

4 3 2 1 1A

J

C1

91'-0"93'-0"

11-AD310

F6

EXIST -

SEE STRUCT.

S

LO

P E

D N

EXIST

UTIL.

TRENCH

SLOPE DN.

EXIST.

TUNNEL

11-AD301

B1

11-AD301

D1

11-AD301

D4

11-AD301

D7

11-AD301

F4

11-AD301

F1

11-AD301

F7

72'-0"

32'-0"

1'-0 1/2" 20'-5 1/2"

7 5/8" 22'-0 1/4"

7 5/8" 26'-2"

1'-0 1/2"

'-0

1'-0 1/2"

29'-11"

1'-1"

3'-1 1/4" 5'-1"

21'-8 1/2"

7'-6" 3'-9 1/2"

18'-7"

99'-7"

99'-7"

99'-7"

209 SF

CORRIDOR

11-C102

621 SF

WATER

TREATMENT

19-101

780 SF

WATER

TREATMENT

19-103

99'-7"

MATCHLINE A

478 SF

WATER

TREATMENT

19-102

S

LO

P E

U P

BRINE

TANK

#1 WATER

SOFTENER

#2 WATER

SOFTENER

#3 WATER

SOFTENER

R.O.

STORAGE

TANK

R.O.

STORAGE

TANK

11-AD301

F7

CONTRACTOR ACCESS

ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -

GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.

1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING

AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW

RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,

ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE

ARCHITECTURAL DRAWINGS.

2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT

BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.

ALTERNATES:

1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -

TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER

REVISIONS.

2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW

BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.

PHASE ALSO INCLUDES:

A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE

LINES IN PIPE TUNNELS;

B. BLDG. 11 - REPAIR (BASE BID) AND/OR

REPLACEMENT OF ROOFING (ADD ALTERNATE);

C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT

EXTERIOR WALLS;

D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD

ALTERNATE);

E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT

EXCHANGER WATER HEATERS;

F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM

DISTRIBUTION AND CONDENSATE PIPING;

G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE

REDUCTION VALVES AND CONDENSATE RETURN

LINES;

H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE

STEAM TRAPS.

3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11

21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-

GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'

HEATING AND COOLING SEASONS TO MINIMIZE

DISRUPTIONS TO OPERATION OF THE FACILITY.

5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN

ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -

GENERAL REQUIREMENTS AND GENERAL NOTES FOR

NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.

REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.

FOR ADD'L INFO. RE: PHASING.

PHASING NOTES:

1. EXISTING FIXED ROOF LADDER - REMOVE PORTION AND

PREPARE FOR NEW PLATFORM, HAND RAILS / EXTENSIONS,

SAFETY GATE AND FALL PROTECTION EQUIPMENT FOR

OSHA COMPLIANCE.

2. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW

DEAERATION TANK - SEE MECHANICAL.

3. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW

BOILERS - SEE MECHANICAL.

4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY

OPENING COVER. FABRICATION, CONSTRUCTION AND

ATTACHMENT OF OPENING COVER TO BE REVIEWED AND

APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY

OPENING.

5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN

EXTERIOR WALL. PREPARE JOINT FOR REPAIR.

6. EXISTING BUILDING EXPANSION JOINT - REMOVE OLD

SEALANT AND PREPARE FOR NEW.

7. EXISTING WINDOW FRAME AND GLAZING TO BE REMOVED (IF

REQUIRED), REVIEW WITH COR FOR SALVAGE AND

REINSTALL OF ASSEMBLY IN EXISTING OPENING.

8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID

BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT

WITH NEW TPO ROOFING (ADD ALTERNATE).

9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.

SEE MECHANICAL.

10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING

DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF

WORK. SEE ROOF PLAN.

11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING

DEMOLITION; REPAIR/REWORK AS REQ'D. FOR TIE-IN WITH

ROOF WORK. SEE ROOF PLAN.

12. EXISTING FLOOR TRENCH - BOILER ROOM. PREPARE AS

REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.

13. EXISTING FLOOR TRENCH - GENERATOR ROOM.

14. DEMOLISH PORTIONS OF EXISTING FLOOR SLAB AND

FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.

SEE STRUCT & MECH.

15. DEMOLISH PORITONS OF EXISITNG FLOOR SLAB FOR NEW

BOILER HEADER FOOTINGS - SEE STRUCT & MECH.

16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW

GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL

REQUIRE REMOVAL OF EXISITING GENERATOR,

PREPARATION OF EQUIPMENT PAD AND DUCTWORK FOR

NEW GENERATOR. SEE ELECT. & MECH.

17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-

SLAB WORK.

18. BOILER 4 TO REMAIN. SEE MECH.

19. BOILERS 1, 2 & 3 TO REMOVE. SEE MECH.

20. TEMPORARY BOILER CONNECTION TO GO THROUGH

EXISTING EAST WALL. LOCATION TO BE COORDINATED W/

COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION

RELATED TO TEMPORARY BOILER CONNECTIONS.

21. PROTECT ENTRY ENCLOSURE DURING DEMOLITION FOR

TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE

MAINTAINED AT ALL TIMES.

22. EXISTING BOILER LADDERS, CATWALKS AND OVERHEAD

PLATFORMS (NOT SHOWN FOR DRAWING CLARITY) ARE TO

BE REMOVED. PREP FOR NEW LADDERS, CATWALKS AND

OVERHEAD PLATFORMS AS REQ'D. FOR NEW BOILERS.

23. GENERATOR EXHAUST LOUVER - REWORK SHROUD AS

REQ'D. FOR CONNECTION TO NEW GENERATOR (ADD

ALTERNATE) - SEE MECH. & ELECT.

DEMOLITION

SHEET/KEY NOTES X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission - Request for Proposal

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

08/14/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

09/08/2020

11/17/2020

C

L H

D C

\H o m e \t fi e s e lm a n

\R e v it

M o d e ls \R

-5

-1 -1

B o ile rs tf ie s e lm a n A

G Y

.r v t

/1 /2

:4

:5

P

M

11-AD101

LOWER LEVEL & FIRST FLOOR PLANS -

DEMOLITION BLDGS. 11, 16 & 19

? ?November 17, 2020

Replace Boilers & PipingSD-1 35% SUBMITTAL -

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo,TX

1/8" = 1'-0"2

B11-B16 FIRST FLOOR PLAN - DEMOLITION

1/8" = 1'-0"1

B11 PUMP FLOOR & SUMP PIT PLAN - DEMOLITION

N

PLAN

NORTH

N

TRUE

NORTH

N

PLAN

NORTH

N

TRUE

NORTH

1/8" = 1'-0"3

B19 FIRST FLOOR PLAN - DEMOLITION

N

PLAN

NORTH

N

TRUE

NORTH

FLOOR PLANS -

DEMOLITION

GENERAL NOTES:

1. XXXX

1. SEE SHEET G-002 FOR GENERAL, GENERAL DEMOLITION AND

ARCHITECTURAL GENERAL NOTES.

2. DEMOLITION SHEET/KEY NOTES SHOWN ARE TO PROVIDE

INFORMATION AND DIRECTION FOR THE D-B OFFEROR

REGARDING DESIGN INTENT. OFFEROR IS RESPONSIBLE FOR

DEVELOPING MEANS AND METHODS TO COMPLETE TASKS

LISTED.

Revisions: Date:

UP

UP

DN

DN

C

K

M

N

4A5

A

2.7

B

G

D

E

F

3.5

L

2.2

11-AD301

B7

H

11-AD310

F1

11-AD310

F3

61 SF

SHOWER

11-202

50 SF

TOILET

11-203

63 SF

STAIR

16-S01

71 SF

CORR.

11-C201

107'-0"

OPEN TO BELOW

OPEN TO BELOW

4 3 2 1 1A

J

C1

MATCHLINE AMATCHLINE A

11-AD310

F6

BOILER 4

BOILER 1

BOILER 2

BOILER 3

REPLACE EXIST ROOFING

SEE ROOF PLAN

11-AD301

B1

11-AD301

D1

11-AD301

D4

11-AD301

D7

11-AD301

F4

11-AD301

F1

11-AD301

F7

339 SF

NORTH

MEZZ

11-201

C

K

M

N

4A5

A

2.7

B

G

D

E

F

3.5

L

2.2

11-AD301

B7

H

11-AD310

F1

11-AD310

F3

378 SF

SO.

MEZZANINE

11-302

524 SF

DEAERATION

PLATFORM

11-301

92 SF

SO.

MEZZANINE

STAIRS

11-S03

OPEN TO

BELOW

OPEN TO BELOW

117'-0"

112'-0"

112'-0"

100'-0"

4 3 2 1 1A

J

C1

STORAGE

DECK

LADDER

LADDER

ROOF HATCH (ABOVE)

MATCHLINE AMATCHLINE A

EXIST EXPANDED METAL PLATFORM/ STL

FRAMING AT BOTTOM TRUSS CHORD

LADDER

REMOVE EXIST. DEAERATION

TANK - SEE MECHANICAL.

11-AD310

F6

BOILER 4

BOILER 1

BOILER 2

BOILER 3

REMOVE PORTION OF WALL FOR TANK

REMOVAL & REPLACEMENT

FIXED LADDER TO REMAIN

SEE ROOF PLAN FOR

ROOFING REMOVAL &

RELACEMENT

ROOF-MTD

AIR INTAKE

11-AD301

B1

11-AD301

D1

11-AD301

D4

11-AD301

D7

11-AD301

F4

11-AD301

F1

11-AD301

F7

170 SF

UPPER

PLATFORM

11-402 11-401

SUSPENDED PLATFORM ABOVE

SUSPENDED PLATFORM ABOVE

LADDER

1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -

TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER

REVISIONS.

2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW

BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.

PHASE ALSO INCLUDES:

A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE

LINES IN PIPE TUNNELS;

B. BLDG. 11 - REPAIR (BASE BID) AND/OR

REPLACEMENT OF ROOFING (ADD ALTERNATE);

C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT

EXTERIOR WALLS;

D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD

ALTERNATE);

E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT

EXCHANGER WATER HEATERS;

F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM

DISTRIBUTION AND CONDENSATE PIPING;

G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE

REDUCTION VALVES AND CONDENSATE RETURN

LINES;

H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE

STEAM TRAPS.

3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11

21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-

GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'

HEATING AND COOLING SEASONS TO MINIMIZE

DISRUPTIONS TO OPERATION OF THE FACILITY.

5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN

ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -

GENERAL REQUIREMENTS AND GENERAL NOTES FOR

NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.

REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.

FOR ADD'L INFO. RE: PHASING.

PHASING NOTES:

ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -

GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.

1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING

AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW

RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,

ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE

ARCHITECTURAL DRAWINGS.

2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT

BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.

ALTERNATES:

1. EXISTING FIXED ROOF LADDER - REMOVE PORTION AND

PREPARE FOR NEW PLATFORM, HAND RAILS / EXTENSIONS,

SAFETY GATE AND FALL PROTECTION EQUIPMENT FOR

OSHA COMPLIANCE.

2. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW

DEAERATION TANK - SEE MECHANICAL.

3. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW

BOILERS - SEE MECHANICAL.

4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY

OPENING COVER. FABRICATION, CONSTRUCTION AND

ATTACHMENT OF OPENING COVER TO BE REVIEWED AND

APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY

OPENING.

5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN

EXTERIOR WALL. PREPARE JOINT FOR REPAIR.

6. EXISTING BUILDING EXPANSION JOINT - REMOVE OLD

SEALANT AND PREPARE FOR NEW.

7. EXISTING WINDOW FRAME AND GLAZING TO BE REMOVED (IF

REQUIRED), REVIEW WITH COR FOR SALVAGE AND

REINSTALL OF ASSEMBLY IN EXISTING OPENING.

8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID

BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT

WITH NEW TPO ROOFING (ADD ALTERNATE).

9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.

SEE MECHANICAL.

10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING

DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF

WORK. SEE ROOF PLAN.

11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING

DEMOLITION; REPAIR/REWORK AS REQ'D. FOR TIE-IN WITH

ROOF WORK. SEE ROOF PLAN.

12. EXISTING FLOOR TRENCH - BOILER ROOM. PREPARE AS

REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.

13. EXISTING FLOOR TRENCH - GENERATOR ROOM.

14. DEMOLISH PORTIONS OF EXISTING FLOOR SLAB AND

FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.

SEE STRUCT & MECH.

15. DEMOLISH PORITONS OF EXISITNG FLOOR SLAB FOR NEW

BOILER HEADER FOOTINGS - SEE STRUCT & MECH.

16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW

GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL

REQUIRE REMOVAL OF EXISITING GENERATOR,

PREPARATION OF EQUIPMENT PAD AND DUCTWORK FOR

NEW GENERATOR. SEE ELECT. & MECH.

17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-

SLAB WORK.

18. BOILER 4 TO REMAIN. SEE MECH.

19. BOILERS 1, 2 & 3 TO REMOVE. SEE MECH.

20. TEMPORARY BOILER CONNECTION TO GO THROUGH

EXISTING EAST WALL. LOCATION TO BE COORDINATED W/

COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION

RELATED TO TEMPORARY BOILER CONNECTIONS.

21. PROTECT ENTRY ENCLOSURE DURING DEMOLITION FOR

TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE

MAINTAINED AT ALL TIMES.

22. EXISTING BOILER LADDERS, CATWALKS AND OVERHEAD

PLATFORMS (NOT SHOWN FOR DRAWING CLARITY) ARE TO

BE REMOVED. PREP FOR NEW LADDERS, CATWALKS AND

OVERHEAD PLATFORMS AS REQ'D. FOR NEW BOILERS.

23. GENERATOR EXHAUST LOUVER - REWORK SHROUD AS

REQ'D. FOR CONNECTION TO NEW GENERATOR (ADD

ALTERNATE) - SEE MECH. & ELECT.

DEMOLITION

SHEET/KEY NOTES X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission - Request for Proposal

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

08/14/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

09/08/2020

11/17/2020

C

L H

D C

\H o m e \t fi e s e lm a n

\R e v it

M o d e ls \R

-5

-1 -1

B o ile rs tf ie s e lm a n A

G Y

.r v t

/1 /2

:4

:5

P

M

11-AD102

MEZZANINE PLANS - DEMOLITION - BLDG.

? ?November 17, 2020

Replace Boilers & PipingSD-1 35% SUBMITTAL -

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo,TX

1/8" = 1'-0"1

B11 LOWER MEZZANINE PLAN - DEMOLITION

1/8" = 1'-0"2

B11 UPPER MEZZANINE PLAN - DEMOLITION

ROOF HATCH

FLOOR PLANS -

DEMOLITION

GENERAL NOTES:

1. SEE SHEET 11-AD101 FOR DEMOLITION GENERAL NOTES.

2. SEE ROOF PLAN SHEET 11-AE110 FOR ROOF DEMOLITION PLAN.

N

PLAN

NORTH

N

TRUE

NORTH

N

PLAN

NORTH

N

TRUE

NORTH

X

FIRST FLOOR

100'-0"

T.O. PARAPET

131'-1 1/4"

JOIST BRG

122'-0"

4A5 2.73.5 2.24 3 2 1 1A

RETAINING WALL

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

T.O. PARAPET

131'-1 1/4"

LOWER MEZZANINE

107'-0"

JOIST BRG

122'-0"

CKMN ABG DEF

T.O. NORTH MEZZ LID

117'-0"

L HJ C1

AREA OF WALL TO BE REMOVED & REPLACED (PH.1 & 2)

1 2

BLDG. 11CONN CORR.

8 4

BLDG. 16BLDG. 11

EXIST MASONRY INFILLES

PROVIDE PROTECTION FOR BOILER

PLANT ENTERANCE DURING

DEMOLITION CONSTRUCTION.

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

T.O. PARAPET

131'-1 1/4"

LOWER MEZZANINE

107'-0"

JOIST BRG

122'-0"

C K M NA B GD E F

T.O. NORTH MEZZ LID

117'-0"

LH JC1

REMOVEL EXIST. WDW. AND SALVAGE FOR REINSTALLATION.

REBUILD WALL AFTER BOILERS INSTALLED, MATCH EXIST. CONST.

4 1

9 6

BLDG. 11BLDG. 16

EXIST VENT

EXIST SMOKE STACK

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

T.O. PARAPET

131'-1 1/4"

LOWER MEZZANINE

107'-0"

JOIST BRG

122'-0"

4A 52.7 3.5

T.O. NORTH MEZZ LID

117'-0"

2.2 43211A

ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -

GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.

1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING

AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW

RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,

ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE

ARCHITECTURAL DRAWINGS.

2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT

BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.

ALTERNATES:

1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -

TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER

REVISIONS.

2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW

BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.

PHASE ALSO INCLUDES:

A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE

LINES IN PIPE TUNNELS;

B. BLDG. 11 - REPAIR (BASE BID) AND/OR

REPLACEMENT OF ROOFING (ADD ALTERNATE);

C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT

EXTERIOR WALLS;

D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD

ALTERNATE);

E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT

EXCHANGER WATER HEATERS;

F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM

DISTRIBUTION AND CONDENSATE PIPING;

G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE

REDUCTION VALVES AND CONDENSATE RETURN

LINES;

H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE

STEAM TRAPS.

3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11

21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-

GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'

HEATING AND COOLING SEASONS TO MINIMIZE

DISRUPTIONS TO OPERATION OF THE FACILITY.

5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN

ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -

GENERAL REQUIREMENTS AND GENERAL NOTES FOR

NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.

REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.

FOR ADD'L INFO. RE: PHASING.

PHASING NOTES:

1. EXISTING FIXED ROOF LADDER - REMOVE PORTION AND

PREPARE FOR NEW PLATFORM, HAND RAILS / EXTENSIONS,

SAFETY GATE AND FALL PROTECTION EQUIPMENT FOR

OSHA COMPLIANCE.

2. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW

DEAERATION TANK - SEE MECHANICAL.

3. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW

BOILERS - SEE MECHANICAL.

4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY

OPENING COVER. FABRICATION, CONSTRUCTION AND

ATTACHMENT OF OPENING COVER TO BE REVIEWED AND

APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY

OPENING.

5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN

EXTERIOR WALL. PREPARE JOINT FOR REPAIR.

6. EXISTING BUILDING EXPANSION JOINT - REMOVE OLD

SEALANT AND PREPARE FOR NEW.

7. EXISTING WINDOW FRAME AND GLAZING TO BE REMOVED (IF

REQUIRED), REVIEW WITH COR FOR SALVAGE AND

REINSTALL OF ASSEMBLY IN EXISTING OPENING.

8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID

BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT

WITH NEW TPO ROOFING (ADD ALTERNATE).

9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.

SEE MECHANICAL.

10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING

DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF

WORK. SEE ROOF PLAN.

11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING

DEMOLITION; REPAIR/REWORK AS REQ'D. FOR TIE-IN WITH

ROOF WORK. SEE ROOF PLAN.

12. EXISTING FLOOR TRENCH - BOILER ROOM. PREPARE AS

REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.

13. EXISTING FLOOR TRENCH - GENERATOR ROOM.

14. DEMOLISH PORTIONS OF EXISTING FLOOR SLAB AND

FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.

SEE STRUCT & MECH.

15. DEMOLISH PORITONS OF EXISITNG FLOOR SLAB FOR NEW

BOILER HEADER FOOTINGS - SEE STRUCT & MECH.

16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW

GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL

REQUIRE REMOVAL OF EXISITING GENERATOR,

PREPARATION OF EQUIPMENT PAD AND DUCTWORK FOR

NEW GENERATOR. SEE ELECT. & MECH.

17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-

SLAB WORK.

18. BOILER 4 TO REMAIN. SEE MECH.

19. BOILERS 1, 2 & 3 TO REMOVE. SEE MECH.

20. TEMPORARY BOILER CONNECTION TO GO THROUGH

EXISTING EAST WALL. LOCATION TO BE COORDINATED W/

COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION

RELATED TO TEMPORARY BOILER CONNECTIONS.

21. PROTECT ENTRY ENCLOSURE DURING DEMOLITION FOR

TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE

MAINTAINED AT ALL TIMES.

22. EXISTING BOILER LADDERS, CATWALKS AND OVERHEAD

PLATFORMS (NOT SHOWN FOR DRAWING CLARITY) ARE TO

BE REMOVED. PREP FOR NEW LADDERS, CATWALKS AND

OVERHEAD PLATFORMS AS REQ'D. FOR NEW BOILERS.

23. GENERATOR EXHAUST LOUVER - REWORK SHROUD AS

REQ'D. FOR CONNECTION TO NEW GENERATOR (ADD

ALTERNATE) - SEE MECH. & ELECT.

DEMOLITION

SHEET/KEY NOTES X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission - Request for Proposal

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

08/14/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

09/08/2020

11/17/2020

C

L H

D C

\H o m e \t fi e s e lm a n

\R e v it

M o d e ls \R

-5

-1 -1

B o ile rs tf ie s e lm a n A

G Y

.r v t

/1 /2

:4

:5

P

M

11-AD201

EXTERIOR ELEVATIONS - DEMOLITION -

BLDGS. 11, 16 & 19

November 17, 2020

Replace Boilers & PipingSD-1 35% SUBMITTAL -

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo,TX

1/8" = 1'-0"D1

B11 SOUTH ELEVATION - DEMOLITION

1/8" = 1'-0"B1

B11-B16 EAST ELEVATION - DEMOLITION

1/8" = 1'-0"F1

B11-B16 WEST ELEVATION - DEMOLITION

1/8" = 1'-0"D7

B11-B16 NORTH ELEVATION - DEMOLITION

EXTERIOR

ELEVATIONS -

DEMOLITION

GENERAL NOTES:

1. SEE SHEET 11-AD101 FOR DEMOLITION GENERAL NOTES.

2. REFER TO STRUCTURAL DRAWINGS FOR PREPARATION OF

TEMPORARY OPENINGS INCLUDING SAW-TOOTHING OF

MASONRY AND SUPPORT OF WALL ABOVE OPENING.

3. REFER TO EXTERIOR ELEVATIONS - RENOVATION FOR ITEMS

RELATED TO NEW WORK FOR REPAIR OF MASONRY JOINTS

AND JOINT SEALANT REPLACEMENT.

T ectonic Cop yright 2007T ectonic Cop yright 2007T ectonic Cop yright 2007

100'-0"

MEZZANINE

112'-0"

PUMP FLOOR

93'-6"

T.O. PARAPET

131'-1 1/4"

LOWER MEZZANINE

107'-0"

JOIST BRG

122'-0"

CKMN G DEF

T.O. NORTH MEZZ LID

117'-0"

L

SUMP PUMP

91'-0"

11-AD301

B7

H

11-AD310

F1

11-AD310

F3

J C1

11-AD301

D4

11-AD301

D7

11-AD301

F4

11-AD301

F1

BASE BID - REPAIR EXIST. EPDM ROOF

ADD ALT. - REMOVE EXIST. EPDM ROOF/INSUL.

PREP FOR NEW TPO ROOF/INSUL.

6 87

3 4

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

T.O. PARAPET

131'-1 1/4"

LOWER MEZZANINE

107'-0"

JOIST BRG

122'-0"

4A 53.5

T.O. NORTH MEZZ LID

117'-0"

43211A

11-AD301

B1

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

T.O. PARAPET

131'-1 1/4"

LOWER MEZZANINE

107'-0"

JOIST BRG

122'-0"

4A 3.5

T.O. NORTH MEZZ LID

117'-0"

4 3 2 1 1A

11-AD301

B1

2 4

11-AD310

F6

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

T.O. PARAPET

131'-1 1/4"

JOIST BRG

122'-0"

4A 3.54 3 2 1 1A

11-AD301

B1

11-AD310

F1

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

T.O. PARAPET

131'-1 1/4"

JOIST BRG

122'-0"

4A 2.24 3 2 1 1A

11-AD301

B1

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

PUMP FLOOR

93'-6"

T.O. PARAPET

131'-1 1/4"

JOIST BRG

122'-0"

4A2.2

SUMP PUMP

91'-0"

43211A

11-AD301

B1

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

N

OPEN

1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -

TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER

REVISIONS.

2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW

BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.

PHASE ALSO INCLUDES:

A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE

LINES IN PIPE TUNNELS;

B. BLDG. 11 - REPAIR (BASE BID) AND/OR

REPLACEMENT OF ROOFING (ADD ALTERNATE);

C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT

EXTERIOR WALLS;

D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD

ALTERNATE);

E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT

EXCHANGER WATER HEATERS;

F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM

DISTRIBUTION AND CONDENSATE PIPING;

G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE

REDUCTION VALVES AND CONDENSATE RETURN

LINES;

H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE

STEAM TRAPS.

3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11

21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-

GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'

HEATING AND COOLING SEASONS TO MINIMIZE

DISRUPTIONS TO OPERATION OF THE FACILITY.

5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN

ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -

GENERAL REQUIREMENTS AND GENERAL NOTES FOR

NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.

REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.

FOR ADD'L INFO. RE: PHASING.

PHASING NOTES:

ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -

GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.

1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING

AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW

RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,

ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE

ARCHITECTURAL DRAWINGS.

2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT

BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.

ALTERNATES:

1. EXISTING FIXED ROOF LADDER - REMOVE PORTION AND

PREPARE FOR NEW PLATFORM, HAND RAILS / EXTENSIONS,

SAFETY GATE AND FALL PROTECTION EQUIPMENT FOR

OSHA COMPLIANCE.

2. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW

DEAERATION TANK - SEE MECHANICAL.

3. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW

BOILERS - SEE MECHANICAL.

4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY

OPENING COVER. FABRICATION, CONSTRUCTION AND

ATTACHMENT OF OPENING COVER TO BE REVIEWED AND

APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY

OPENING.

5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN

EXTERIOR WALL. PREPARE JOINT FOR REPAIR.

6. EXISTING BUILDING EXPANSION JOINT - REMOVE OLD

SEALANT AND PREPARE FOR NEW.

7. EXISTING WINDOW FRAME AND GLAZING TO BE REMOVED (IF

REQUIRED), REVIEW WITH COR FOR SALVAGE AND

REINSTALL OF ASSEMBLY IN EXISTING OPENING.

8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID

BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT

WITH NEW TPO ROOFING (ADD ALTERNATE).

9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.

SEE MECHANICAL.

10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING

DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF

WORK. SEE ROOF PLAN.

11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING

DEMOLITION; REPAIR/REWORK AS REQ'D. FOR TIE-IN WITH

ROOF WORK. SEE ROOF PLAN.

12. EXISTING FLOOR TRENCH - BOILER ROOM. PREPARE AS

REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.

13. EXISTING FLOOR TRENCH - GENERATOR ROOM.

14. DEMOLISH PORTIONS OF EXISTING FLOOR SLAB AND

FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.

SEE STRUCT & MECH.

15. DEMOLISH PORITONS OF EXISITNG FLOOR SLAB FOR NEW

BOILER HEADER FOOTINGS - SEE STRUCT & MECH.

16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW

GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL

REQUIRE REMOVAL OF EXISITING GENERATOR,

PREPARATION OF EQUIPMENT PAD AND DUCTWORK FOR

NEW GENERATOR. SEE ELECT. & MECH.

17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-

SLAB WORK.

18. BOILER 4 TO REMAIN. SEE MECH.

19. BOILERS 1, 2 & 3 TO REMOVE. SEE MECH.

20. TEMPORARY BOILER CONNECTION TO GO THROUGH

EXISTING EAST WALL. LOCATION TO BE COORDINATED W/

COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION

RELATED TO TEMPORARY BOILER CONNECTIONS.

21. PROTECT ENTRY ENCLOSURE DURING DEMOLITION FOR

TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE

MAINTAINED AT ALL TIMES.

22. EXISTING BOILER LADDERS, CATWALKS AND OVERHEAD

PLATFORMS (NOT SHOWN FOR DRAWING CLARITY) ARE TO

BE REMOVED. PREP FOR NEW LADDERS, CATWALKS AND

OVERHEAD PLATFORMS AS REQ'D. FOR NEW BOILERS.

23. GENERATOR EXHAUST LOUVER - REWORK SHROUD AS

REQ'D. FOR CONNECTION TO NEW GENERATOR (ADD

ALTERNATE) - SEE MECH. & ELECT.

DEMOLITION

SHEET/KEY NOTES X

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

T.O. PARAPET

131'-1 1/4"

JOIST BRG

122'-0"

4A2.2

SUMP PUMP

91'-0"

43211A

11-AD301

B1

BOILER DISPLAY

PANEL - SEE MECH

11-AD310

F3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission - Request for Proposal

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

08/14/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

09/08/2020

11/17/2020

C

L H

D C

\H o m e \t fi e s e lm a n

\R e v it

M o d e ls \R

-5

-1 -1

B o ile rs tf ie s e lm a n A

G Y

.r v t

/1 /2

:4

:0

P

M

11-AD301

BUILDING SECTIONS - DEMOLITION -

BLDGS. 11, 16 & 19

November 17, 2020

Replace Boilers & PipingSD-1 35% SUBMITTAL -

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo,TX

1/8" = 1'-0"B1

B11 SEC'N - LONGITUDINAL, BOILER PLANT

1/8" = 1'-0"D1

B16 SEC'N-CROSS - MAINT

1/8" = 1'-0"D4

B11 SEC'N-CROSS - PUMP FLOOR-NO. MEZZ

1/8" = 1'-0"D7

B11 SEC'N-CROSS - BOILER ROOM

1/8" = 1'-0"F4

B11 SEC'N-CROSS - GENERATOR RM

1/8" = 1'-0"F1

B11-SEC'N - SO. MEZZANINE STAIRS-SUMP PIT-TUNNEL

1/8" = 1'-0"F7

B11 SEC'N - B19 CONNECTING CORR.

BLDG. SECTIONS -

DEMOLITION

GENERAL NOTES:

1. SEE SHEETS 11-AD201AND 11-AD201 FOR DEMOLITION

GENERAL NOTES.

1/8" = 1'-0"B7

B11 SEC'N - STAIR-SO. MEZZANINE

EXIST SUSPENDED

PLATFORM

EXIST LADDER

T.O. PARAPET

131'-1 1/4"

JOIST BRG

122'-0"

4A4

T E

M P

O R

A R

Y O

P E

N

IN

G

EXIST ALUM. WDW -

REMOVE FOR

ACCESS INTO

BOILER PLANT;

SALVAGE FOR

REUSE

EXIST MASONRY

WALL - REMOVE

PORTION FOR

ACCESS INTO BOILER

PLANT;

TOOTH AT PILASTERS

FOR REPLACEMENT

INFILL

EXIST CONC STEM

WALL - REMOVE

PORTION BETWEEN

PILASTERS FOR

ACCESS INTO BOILER

PLANT;

PREP FOR CONC

REPLACEMENT INFILL

PROVIDE TEMPORARY

SHORING / SUPPORT

FOR EXIST WALL

ABOVE - SEE STRUCT

EXIST SOLDIER

COURSE HEADER

EXIST JACK ARCH

LINTEL

EXIST TRUSS

EXIST ALUM WDW TO REMAIN

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

T.O. PARAPET

131'-1 1/4"

JOIST BRG

122'-0"

4A4

EXIST SOLDIER COURSE

HEADER

EXIST. BEAM

EXIST JACK ARCH

LINTEL

EXIST BAR GRATE

PLATFORM OVER

STL C-CHANNEL

EXIST CONC OVER STL

FLOOR DECK

EXIST CMU

EXIST FACE BRICK

EXIST ALUM WDW TO

REMAIN

FIRST FLOOR

100'-0"

MEZZANINE

112'-0"

T.O. PARAPET

131'-1 1/4"

T.O. NORTH MEZZ LID

117'-0"

1 1A

EXIST ALUM. WDW - REMOVE

FOR ACCESS INTO BOILER

PLANT (IF REQUIRED)

SALVAGE FOR REUSE

EXIST MASONRY WALL - REMOVE

PORTION FOR ACCESS TO

DEAERATION PLATFORM; TOOTH AT

PILASTERS FOR REPLACEMENT INFILL

REMOVE EXIST BALLASTED

EPDM ROOFING/ / INSUL;

PREP FOR NEW INSUL / TPO

ROOFING (ADD ALTERNATE)

PROVIDE TEMPORARY SHORING /

SUPPORT FOR EXIST WALL ABOVE -

SEE STRUCT

PROTECT EXISTING

CONSTRUCTION DURING

DEMOLITIION, TANK

REMOVAL/ REPLACEMENT

AND REPLACEMENT OF

MASONRY INFILL

EXIST JACK ARCH

LINTEL

2 4

PROTECT DURING CONST.

T E

M P

O R

A R

Y O

P E

N

IN

G

1. EXISTING FIXED ROOF LADDER - REMOVE PORTION AND

PREPARE FOR NEW PLATFORM, HAND RAILS / EXTENSIONS,

SAFETY GATE AND FALL PROTECTION EQUIPMENT FOR

OSHA COMPLIANCE.

2. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW

DEAERATION TANK - SEE MECHANICAL.

3. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW

BOILERS - SEE MECHANICAL.

4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY

OPENING COVER. FABRICATION, CONSTRUCTION AND

ATTACHMENT OF OPENING COVER TO BE REVIEWED AND

APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY

OPENING.

5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN

EXTERIOR WALL. PREPARE JOINT FOR REPAIR.

6. EXISTING BUILDING EXPANSION JOINT - REMOVE OLD

SEALANT AND PREPARE FOR NEW.

7. EXISTING WINDOW FRAME AND GLAZING TO BE REMOVED (IF

REQUIRED), REVIEW WITH COR FOR SALVAGE AND

REINSTALL OF ASSEMBLY IN EXISTING OPENING.

8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID

BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT

WITH NEW TPO ROOFING (ADD ALTERNATE).

9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.

SEE MECHANICAL.

10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING

DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF

WORK. SEE ROOF PLAN.

11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING

DEMOLITION; REPAIR/REWORK AS REQ'D. FOR TIE-IN WITH

ROOF WORK. SEE ROOF PLAN.

12. EXISTING FLOOR TRENCH - BOILER ROOM. PREPARE AS

REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.

13. EXISTING FLOOR TRENCH - GENERATOR ROOM.

14. DEMOLISH PORTIONS OF EXISTING FLOOR SLAB AND

FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.

SEE STRUCT & MECH.

15. DEMOLISH PORITONS OF EXISITNG FLOOR SLAB FOR NEW

BOILER HEADER FOOTINGS - SEE STRUCT & MECH.

16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW

GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL

REQUIRE REMOVAL OF EXISITING GENERATOR,

PREPARATION OF EQUIPMENT PAD AND DUCTWORK FOR

NEW GENERATOR. SEE ELECT. & MECH.

17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-

SLAB WORK.

18. BOILER 4 TO REMAIN. SEE MECH.

19. BOILERS 1, 2 & 3 TO REMOVE. SEE MECH.

20. TEMPORARY BOILER CONNECTION TO GO THROUGH

EXISTING EAST WALL. LOCATION TO BE COORDINATED W/

COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION

RELATED TO TEMPORARY BOILER CONNECTIONS.

21. PROTECT ENTRY ENCLOSURE DURING DEMOLITION FOR

TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE

MAINTAINED AT ALL TIMES.

22. EXISTING BOILER LADDERS, CATWALKS AND OVERHEAD

PLATFORMS (NOT SHOWN FOR DRAWING CLARITY) ARE TO

BE REMOVED. PREP FOR NEW LADDERS, CATWALKS AND

OVERHEAD PLATFORMS AS REQ'D. FOR NEW BOILERS.

23. GENERATOR EXHAUST LOUVER - REWORK SHROUD AS

REQ'D. FOR CONNECTION TO NEW GENERATOR (ADD

ALTERNATE) - SEE MECH. & ELECT.

DEMOLITION

SHEET/KEY NOTES X

ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -

GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.

1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING

AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW

RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,

ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE

ARCHITECTURAL DRAWINGS.

2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT

BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.

ALTERNATES:

1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -

TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER

REVISIONS.

2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW

BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.

PHASE ALSO INCLUDES:

A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE

LINES IN PIPE TUNNELS;

B. BLDG. 11 - REPAIR (BASE BID) AND/OR

REPLACEMENT OF ROOFING (ADD ALTERNATE);

C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT

EXTERIOR WALLS;

D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD

ALTERNATE);

E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT

EXCHANGER WATER HEATERS;

F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM

DISTRIBUTION AND CONDENSATE PIPING;

G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE

REDUCTION VALVES AND CONDENSATE RETURN

LINES;

H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE

STEAM TRAPS.

3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11

21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-

GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'

HEATING AND COOLING SEASONS TO MINIMIZE

DISRUPTIONS TO OPERATION OF THE FACILITY.

5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN

ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -

GENERAL REQUIREMENTS AND GENERAL NOTES FOR

NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.

REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.

FOR ADD'L INFO. RE: PHASING.

PHASING NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission - Request for Proposal

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

08/14/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

09/08/2020

11/17/2020

C

L H

D C

\H o m e \t fi e s e lm a n

\R e v it

M o d e ls \R

-5

-1 -1

B o ile rs tf ie s e lm a n A

G Y

.r v t

/1 /2

:4

:0

P

M

11-AD310

WALL SECTIONS - DEMOLITION - BLDG. 11

November 17, 2020

Replace Boilers & PipingSD-1 35% SUBMITTAL -

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo,TX

3/4" = 1'-0"F1

WALL SEC'N - B11 ORIG. WEST WALL - DEMO

3/4" = 1'-0"F3

WALL SEC'N - B11 ADD'N WEST WALL - DEMO

3/4" = 1'-0"F6

WALL SEC'N - B11 ORIG. BLDG EAST WALL - DEAERATION

PLATFORM - DEMO

WALL SECTIONS -

DEMOLITION

GENERAL NOTES:

1. SEE SHEETS 11-AD201 AND 11-AD201 FOR DEMOLITION

GENERAL NOTES.

DN

UP

UP

UP

FD

TT

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

UP

UPT

FD

11-AE201B1

11-AE201

11-AE201

11-AE201

D6

F1

D1

C

K

M

N

4A5

A

2.7

B

G

D

E

F

3.5

11-AE301

B1

11-AE301

D7

11-AE301

F1

11-AE301

D4

11-AE301

D1

L

2.2

11-AE301

F4

11-AE301

F7

42'-1"

'-2

'-0

/4

'-7

/4

8'-5" 17'-4" 16'-4"

42'-0"

H

11-AE310

F3

11-AE310

F1

42'-0"

42'-0"

4 3 2 1 1A

11'-11" 11" 13'-11" 12'-4" 14'-0" 1'-0"

FACE OF CONCRETE

42'-2"

J

C1

EXIST.

EYEWASH & SHOWER

MATCHLINE AMATCHLINE A

11-AE310

F6

EXIST. 4" CMU

CHASE

TO 10'-0" HIGH

FOR PIPING

EXIST. 4" CMU

CHASE

TO 10'-0" HIGH

FOR PIPING

BOILER 4

BOILER 1

BOILER 2

BOILER 3

BOILER HEADER

REPLACE PORTION

OF WALL DUE TO

BOILER REMOVAL

PROVIDE TEMPORARY

ENCLOSURE AT OPENING

DURING CONSTRUCTION

CONTRACTOR ACCESS

STAIR TO PIPE TUNNEL

11-AE301

B7

7 34

PROTECT

DURING

CONST.

102'-0"

100'-0"

101'-4"

100'-0" 101'-4"

11-AE201B1

11-AE201

11-AE201F1

D1

C

K

M

N

4A

A

2.7

B

G

D

E

F

3.5

11-AE301

B1

11-AE301

D7

11-AE301

F1

11-AE301

D4

11-AE301

D1

L

11-AE301

F4

'-8

'-8

/2

H

11-AE310

F3

11-AE310

F1

4 3 2 1 1A

J

C1

MATCHLINE AMATCHLINE A

11-AE310

F6

11-AE301

B7

99'-7"

99'-7"

99'-7"

99'-7"

MATCHLINE AMATCHLINE A

FENCE

FENCE

ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -

GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.

1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING

AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW

RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,

ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE

ARCHITECTURAL DRAWINGS.

2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT

BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.

ALTERNATES:

1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -

TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER

REVISIONS.

2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW

BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.

PHASE ALSO INCLUDES:

A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE

LINES IN PIPE TUNNELS;

B. BLDG. 11 - REPAIR (BASE BID) AND/OR

REPLACEMENT OF ROOFING (ADD ALTERNATE);

C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT

EXTERIOR WALLS;

D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD

ALTERNATE);

E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT

EXCHANGER WATER HEATERS;

F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM

DISTRIBUTION AND CONDENSATE PIPING;

G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE

REDUCTION VALVES AND CONDENSATE RETURN

LINES;

H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE

STEAM TRAPS.

3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11

21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-

GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'

HEATING AND COOLING SEASONS TO MINIMIZE

DISRUPTIONS TO OPERATION OF THE FACILITY.

5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN

ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -

GENERAL REQUIREMENTS AND GENERAL NOTES FOR

NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.

REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.

FOR ADD'L INFO. RE: PHASING.

PHASING NOTES:

RENOVATION

SHEET/KEY NOTES

1. EXISTING FIXED ROOF LADDER TO BE MODIFIED TO INSTALL

NEW PLATFORM, HAND RAILS / EXTENSIONS, SAFETY GATE

AND FALL PROTECTION EQUIPMENT FOR OSHA

COMPLIANCE. SEE 2/11-AE201

2. INFILL OPENING FOR NEW DEAERATION TANK WITH IN-KIND

CONSTRUCTION USING BRICK TO MATCH EXISTING AFTER

DEAERATION TANK HAS BEEN INSTALLED. SEE STRUCTURAL

FOR ADDITIONAL REQUIREMENTS RELATED TO IN-KIND

CONSTRUCTION.

3. INFILL OPENING FOR NEW BOILERS WITH IN-KIND

CONSTRUCTION USING CAST-IN-PLACE CONCRETE AND

BRICK MATCHING EXISTING AFTER BOILER INSTALLATION

HAS BEEN COMPLETED. SEE STRUCTURAL FOR ADDITIONAL

REQUIREMENTS RELATED TO IN-KIND CONSTRUCTION.

4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY

OPENING COVER. FABRICATION, CONSTRUCTION AND

ATTACHMENT OF OPENING COVER TO BE REVIEWED AND

APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY

OPENING.

5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN

EXTERIOR WALL. REPAIR JOINTS AS REQUIRED.

6. EXISTING BUILDING EXPANSION JOINT – INSTALL NEW

SEALANT, BACKER ROD, ETC. FULL LENGTH OF JOINT.

7. EXISTING WINDOW FRAME AND GLAZING TO BE

REINSTALLED AND OPENING RESTORED TO PRE-

CONSTRUCTION CONDITION., REVIEW WITH COR FOR

SALVAGE AND REINSTALL OF ASSEMBLY IN EXISTING

OPENING.

8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID

BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT

WITH NEW TPO ROOFING (ADD ALTERNATE).

9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.

SEE MECHANICAL.

10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING

DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF

WORK. SEE ROOF PLAN.

11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING

DEMOLITION; REPAIR / REWORK AS REQ'D. FOR TIE-IN WITH

ROOF WORK. SEE ROOF PLAN.

12. EXISTING FLOOR TRENCH - BOILER ROOM. PATCH AND

REPAIR AS REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.

13. EXISTING FLOOR TRENCH - GENERATOR ROOM.

14. PATCH & REPAIR PORTIONS OF EXISTING FLOOR SLAB AND

FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.

SEE STRUCT & MECH.

15. PATCH AND REPAIR EXISITNG FLOOR SLAB FOR NEW BOILER

HEADER FOOTINGS - SEE STRUCT & MECH.

16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW

GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL

REQUIRE PREPARATION OF EQUIPMENT PAD AND

DUCTWORK FOR NEW GENERATOR. SEE ELECT. & MECH.

17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-

SLAB WORK.

18. EXISTING BOILER 4 TO REMAIN. SEE MECH.

19. NEW BOILERS 1, 2 & 3. SEE MECH.

20. TEMPORARY BOILER CONNECTION TO GO THROUGH

EXISTING EAST WALL. LOCATION TO BE COORDINATED W/

COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION

RELATED TO TEMPORARY BOILER CONNECTIONS.

21. PROTECT ENTRY ENCLOSURE DURING RENOVATION FOR

TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE

MAINTAINED AT ALL TIMES.

22. DESIGN, PROVIDE AND INSTALL NEW BOILER LADDERS,

CATWALKS AND OVERHEAD PLATFORMS AS REQ'D. FOR

NEW BOILERS.

X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission - Request for Proposal

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

08/14/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

09/08/2020

11/17/2020

C

L H

D C

\H o m e \t fi e s e lm a n

\R e v it

M o d e ls \R

-5

-1 -1

B o ile rs tf ie s e lm a n A

G Y

.r v t

/1 /2

:4

:0

P

M

11-AE101

LOWER LEVEL & FIRST FLOOR PLANS -

RENOVATION - BLDGS. 11, 16 & 19

? ?November 17, 2020

Replace Boilers & PipingSD-1 35% SUBMITTAL -

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo,TX

1/8" = 1'-0"2

B11-B16 FIRST FLOOR PLAN - RENOVATION

1/8" = 1'-0"1

B11 PUMP FLOOR & SUMP PIT PLAN - RENOVATION

1/8" = 1'-0"3

B19 FIRST FLOOR PLAN - RENOVATION

N

PLAN

NORTH

N

TRUE

NORTH

FLOOR PLANS -

RENOVATION

GENERAL NOTES:

1. SEE SHEET G-002 FOR GENERAL AND ARCHITECTURAL

GENERAL NOTES. SEE SHEETS 11-RA101/11-RA103 FOR

EXIST COND. PHOTOS.

2. RENOVATION SHEET/KEY NOTES SHOWN ARE TO PROVIDE

INFORMATION AND DIRECTION FOR THE D-B OFFEROR

REGARDING DESIGN INTENT. OFFEROR IS RESPONSIBLE FOR

DEVELOPING MEANS AND METHODS TO COMPLETE TASKS

LISTED.

N

PLAN

NORTH

N

TRUE

NORTH

N

PLAN

NORTH

N

TRUE

NORTH

RENOVATION

FLOOR PLAN FINISH

NOTES

1. PATCH AND MATCH EXISTING FINISHES DISTURBED BY

CONSTRUCTION.

2. PAINT COLOR SELECTION TO BE COORDINATED W/ COR AND

MEDICAL CENTER'S INTERIOR DESIGNER.

3. PAINT WALLS CORNER-TO-CORNER UNLESS OTHERWISE

DIRECTED BY THE COR.

UP

UP

DN

DN

11-AE201B1

11-AE201

11-AE201

11-AE201

D6

F1

D1

C

K

M

N

4A5

A

2.7

B

G

D

E

F

3.5

11-AE301

B1

11-AE301

D7

11-AE301

F1

11-AE301

D4

11-AE301

D1

L

2.2

11-AE301

F4

11-AE301

F7

'-8

42'-0"

25'-8" 16'-4"

H

11-AE310

F3

11-AE310

F1

4 3 2 1 1A

J

C1

MATCHLINE AMATCHLINE A

11-AE310

F6

REPLACE WALL & WINDOW AFTER NEW

TANK INSTALLED

PROVIDE TEMPORARY ENCLOSURE

DURING CONSTRUCTION AT OPENING

11-AE301

B7

PROTECT

DURING

CONST.

2 4

SUSPENDED PLATFORMS ABOVE

LADDER(S)

112'-0"

DEAERATION TANK - SEE MECH.

112'-0"

11-AE201B1

11-AE201

11-AE201F1

D1

C

K

M

N

4A5

A

2.7

B

G

D

E

F

3.5

11-AE301

B1

11-AE301

D7

11-AE301

F1

11-AE301

D4

11-AE301

D1

L

2.2

11-AE301

F4

H

11-AE310

F3

11-AE310

F1

4 3 2 1 1A

J

C1

MATCHLINE AMATCHLINE A

11-AE310

F6

11-AE301

B7

7 34

PROTECT

DURING

CONST.

107'-0"

ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -

GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.

1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING

AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW

RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,

ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE

ARCHITECTURAL DRAWINGS.

2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT

BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.

ALTERNATES:

1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -

TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER

REVISIONS.

2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW

BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.

PHASE ALSO INCLUDES:

A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE

LINES IN PIPE TUNNELS;

B. BLDG. 11 - REPAIR (BASE BID) AND/OR

REPLACEMENT OF ROOFING (ADD ALTERNATE);

C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT

EXTERIOR WALLS;

D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD

ALTERNATE);

E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT

EXCHANGER WATER HEATERS;

F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM

DISTRIBUTION AND CONDENSATE PIPING;

G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE

REDUCTION VALVES AND CONDENSATE RETURN

LINES;

H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE

STEAM TRAPS.

3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11

21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-

GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'

HEATING AND COOLING SEASONS TO MINIMIZE

DISRUPTIONS TO OPERATION OF THE FACILITY.

5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN

ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -

GENERAL REQUIREMENTS AND GENERAL NOTES FOR

NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.

REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.

FOR ADD'L INFO. RE: PHASING.

PHASING NOTES:

RENOVATION

SHEET/KEY NOTES

1. EXISTING FIXED ROOF LADDER TO BE MODIFIED TO INSTALL

NEW PLATFORM, HAND RAILS / EXTENSIONS, SAFETY GATE

AND FALL PROTECTION EQUIPMENT FOR OSHA

COMPLIANCE. SEE 2/11-AE201

2. INFILL OPENING FOR NEW DEAERATION TANK WITH IN-KIND

CONSTRUCTION USING BRICK TO MATCH EXISTING AFTER

DEAERATION TANK HAS BEEN INSTALLED. SEE STRUCTURAL

FOR ADDITIONAL REQUIREMENTS RELATED TO IN-KIND

CONSTRUCTION.

3. INFILL OPENING FOR NEW BOILERS WITH IN-KIND

CONSTRUCTION USING CAST-IN-PLACE CONCRETE AND

BRICK MATCHING EXISTING AFTER BOILER INSTALLATION

HAS BEEN COMPLETED. SEE STRUCTURAL FOR ADDITIONAL

REQUIREMENTS RELATED TO IN-KIND CONSTRUCTION.

4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY

OPENING COVER. FABRICATION, CONSTRUCTION AND

ATTACHMENT OF OPENING COVER TO BE REVIEWED AND

APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY

OPENING.

5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN

EXTERIOR WALL. REPAIR JOINTS AS REQUIRED.

6. EXISTING BUILDING EXPANSION JOINT – INSTALL NEW

SEALANT, BACKER ROD, ETC. FULL LENGTH OF JOINT.

7. EXISTING WINDOW FRAME AND GLAZING TO BE

REINSTALLED AND OPENING RESTORED TO PRE-

CONSTRUCTION CONDITION., REVIEW WITH COR FOR

SALVAGE AND REINSTALL OF ASSEMBLY IN EXISTING

OPENING.

8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID

BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT

WITH NEW TPO ROOFING (ADD ALTERNATE).

9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.

SEE MECHANICAL.

10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING

DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF

WORK. SEE ROOF PLAN.

11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING

DEMOLITION; REPAIR / REWORK AS REQ'D. FOR TIE-IN WITH

ROOF WORK. SEE ROOF PLAN.

12. EXISTING FLOOR TRENCH - BOILER ROOM. PATCH AND

REPAIR AS REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.

13. EXISTING FLOOR TRENCH - GENERATOR ROOM.

14. PATCH & REPAIR PORTIONS OF EXISTING FLOOR SLAB AND

FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.

SEE STRUCT & MECH.

15. PATCH AND REPAIR EXISITNG FLOOR SLAB FOR NEW BOILER

HEADER FOOTINGS - SEE STRUCT & MECH.

16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW

GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL

REQUIRE PREPARATION OF EQUIPMENT PAD AND

DUCTWORK FOR NEW GENERATOR. SEE ELECT. & MECH.

17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-

SLAB WORK.

18. EXISTING BOILER 4 TO REMAIN. SEE MECH.

19. NEW BOILERS 1, 2 & 3. SEE MECH.

20. TEMPORARY BOILER CONNECTION TO GO THROUGH

EXISTING EAST WALL. LOCATION TO BE COORDINATED W/

COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION

RELATED TO TEMPORARY BOILER CONNECTIONS.

21. PROTECT ENTRY ENCLOSURE DURING RENOVATION FOR

TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE

MAINTAINED AT ALL TIMES.

22. DESIGN, PROVIDE AND INSTALL NEW BOILER LADDERS,

CATWALKS AND OVERHEAD PLATFORMS AS REQ'D. FOR

NEW BOILERS.

X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission - Request for Proposal

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

08/14/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

09/08/2020

11/17/2020

C

L H

D C

\H o m e \t fi e s e lm a n

\R e v it

M o d e ls \R

-5

-1 -1

B…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .