AD AE Series Sheets.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--504-18-119 Replace Boilers and Piping Federal contract opportunity
- Solicitation number
- 36C25722R0010
About this file
This document provides details on a federal contract opportunity to replace boilers and piping. The solicitation number is 36C25722R0010 and concerns opportunity Y1DA--504-18-119 to replace boilers and piping for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The opportunity type is a solicitation to replace boilers and piping for the VA facility located at VA-22-00004245. The related file AD AE Series Sheets.pdf provides unspecified supplementary information to support offerors in preparing responses for this contract.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 36C25722R0010 0001.docx | DOCX document | |
| Answers to Questions 36C25722R0010 DB Replace Boilers.pdf | ||
| VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Mech 035 - Pages 1-3.pdf | ||
| Mech 035 - Pages 4-6.pdf | ||
| OSHA - EMR requirement.pdf | ||
| BP-3-Boiler-steam.pdf | ||
| BP-1-Boiler-fueloil.pdf | ||
| AS ST Series Sheets.pdf | ||
| Elect 035.pdf | ||
| G Series Sheets.pdf | ||
| BP-4-Water-Treatment.pdf | ||
| 36C25722R0010_1.docx | DOCX document | |
| Mech 035 - Pages 7-12.pdf | ||
| Phasing sheets.pdf | ||
| Struct 035.pdf | ||
| SELF-PERFORMED CALCULATIONS.pdf | ||
| Mech 035 - Pages 8-19.pdf | ||
| BP-2-Boilers-natgasandpropane.pdf | ||
| 20-09 035 Narrative 02 1r1 Phasing Narrative.pdf | ||
| 20-09 035 Narrative 06 1r1 Civil-LS Design Narrative.pdf | ||
| 20-09 035 Narrative 13 1r1 Specs TOC 000110 035 21-06-30.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
UP
UP
UP
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
2.2
11-AD301
B7
H
11-AD310
F1
11-AD310
F3
515 SF
PUMP
ROOM
11-B01
145 SF
BREAK
ROOM
11-103
172 SF
CONTROL
ROOM
11-102
275 SF
AUX.
GENERATOR
ROOM
11-104
29 SF
STAIRS
11-S01
15 SF
OIT
16-103
304 SF
MAINTENANCE
OFFICE
16-104
102'-0"
100'-0"
102'-8"
102'-0"
101'-4"
101'-4"
16'-7 7/8" 7 5/8"
'-4
15'-8 3/8" 1'-0"
'-8
6'-4" 1'-0" 17'-4" 16'-4"
100'-0"
4 3 2 1 1A
'-0
1"
7'-4"
8'-4"
8"
1' -0
'-4
5/
8" 7'
-4
/8
'-8
/8
J
C1
12'-0 3/4"
OUT-TO-OUT AT F.O. BRICK
42'-0"
31'-4 3/4" 22'-8"
54'-0 3/4"
6"
'-2
'-4
'-0
'-0
1" 7
3/ 4"
'-2
/8
'-1 1"
'-2
'-7
/8
'-8
/8
'-1
7/ 8"
1'-1" 39'-11" 1'-0 1/2"
'-7
'-8
LADDER
TO ROOF
EXIST SHOWER / EYEWASH
SEE MECH FOR
WORK THIS AREA
SEE ELECT FOR
GENERATOR
REPLACEMENT
MATCHLINE AMATCHLINE A
11-AD310
F6
BOILER 4
BOILER 1
BOILER 2
BOILER 3
(3) EXIST 200 hp BOILERS
TO REMOVE & REPLACE
w/ (3) 250 hp BOILERS
BOILER HEADER
S
LO
P E
D N
EXIST. 4" CMU CHASE
TO 10'-0" HIGH FOR PIPING
EXIST 4" CMU CHASE
TO 10'-0" HIGH FOR PIPING
11-AD301
B1
11-AD301
D1
11-AD301
D4
11-AD301
D7
11-AD301
F4
11-AD301
F1
11-AD301
F7
CONTRACTOR ACCESS
STAIRS TO PIPE TUNNEL
CONTRACTOR
ACCESS
3/
4"
'-7
/8
'-2
'-1 1"
'-1
1"
'-3
/8
3/
4"
1"
8"
'-4
'-0
'-4
1' -0
'-2
6"
'-8
'-4
'-5
'-7
/8
'-3
/4
6'
-4
'-0
/8
191 SF
CORRIDOR
11-C101
78 SF
STAIRS
11-S02
207 SF
MECH
16-102
59 SF
HALL
16-101A
920 SF
MAINTENANCE
STORAGE
16-101
68 SF
STAIR
16-S01
2527 SF
BOILER
ROOM
11-101
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
2.2
11-AD301
B7
H
11-AD310
F1
11-AD310
F3
550 SF
PUMP
ROOM
11-B01
54 SF
SUMP PIT
11-B02
63 SF
STAIR
11-S02
163 SF
TUNNEL
T-001
374 SF
TUNNEL
T-002
78 SF
TUNNEL
T-003
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
91'-0"
93'-6"
4 3 2 1 1A
J
C1
91'-0"93'-0"
11-AD310
F6
EXIST -
SEE STRUCT.
S
LO
P E
D N
EXIST
UTIL.
TRENCH
SLOPE DN.
EXIST.
TUNNEL
11-AD301
B1
11-AD301
D1
11-AD301
D4
11-AD301
D7
11-AD301
F4
11-AD301
F1
11-AD301
F7
72'-0"
32'-0"
1'-0 1/2" 20'-5 1/2"
7 5/8" 22'-0 1/4"
7 5/8" 26'-2"
1'-0 1/2"
'-0
1'-0 1/2"
29'-11"
1'-1"
3'-1 1/4" 5'-1"
21'-8 1/2"
7'-6" 3'-9 1/2"
18'-7"
99'-7"
99'-7"
99'-7"
209 SF
CORRIDOR
11-C102
621 SF
WATER
TREATMENT
19-101
780 SF
WATER
TREATMENT
19-103
99'-7"
MATCHLINE A
478 SF
WATER
TREATMENT
19-102
S
LO
P E
U P
BRINE
TANK
#1 WATER
SOFTENER
#2 WATER
SOFTENER
#3 WATER
SOFTENER
R.O.
STORAGE
TANK
R.O.
STORAGE
TANK
11-AD301
F7
CONTRACTOR ACCESS
ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -
GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.
1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING
AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW
RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,
ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE
ARCHITECTURAL DRAWINGS.
2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT
BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.
ALTERNATES:
1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -
TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER
REVISIONS.
2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW
BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.
PHASE ALSO INCLUDES:
A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE
LINES IN PIPE TUNNELS;
B. BLDG. 11 - REPAIR (BASE BID) AND/OR
REPLACEMENT OF ROOFING (ADD ALTERNATE);
C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT
EXTERIOR WALLS;
D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD
ALTERNATE);
E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT
EXCHANGER WATER HEATERS;
F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM
DISTRIBUTION AND CONDENSATE PIPING;
G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE
REDUCTION VALVES AND CONDENSATE RETURN
LINES;
H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE
STEAM TRAPS.
3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11
21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-
GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'
HEATING AND COOLING SEASONS TO MINIMIZE
DISRUPTIONS TO OPERATION OF THE FACILITY.
5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN
ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -
GENERAL REQUIREMENTS AND GENERAL NOTES FOR
NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.
REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.
FOR ADD'L INFO. RE: PHASING.
PHASING NOTES:
1. EXISTING FIXED ROOF LADDER - REMOVE PORTION AND
PREPARE FOR NEW PLATFORM, HAND RAILS / EXTENSIONS,
SAFETY GATE AND FALL PROTECTION EQUIPMENT FOR
OSHA COMPLIANCE.
2. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW
DEAERATION TANK - SEE MECHANICAL.
3. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW
BOILERS - SEE MECHANICAL.
4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY
OPENING COVER. FABRICATION, CONSTRUCTION AND
ATTACHMENT OF OPENING COVER TO BE REVIEWED AND
APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY
OPENING.
5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN
EXTERIOR WALL. PREPARE JOINT FOR REPAIR.
6. EXISTING BUILDING EXPANSION JOINT - REMOVE OLD
SEALANT AND PREPARE FOR NEW.
7. EXISTING WINDOW FRAME AND GLAZING TO BE REMOVED (IF
REQUIRED), REVIEW WITH COR FOR SALVAGE AND
REINSTALL OF ASSEMBLY IN EXISTING OPENING.
8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID
BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT
WITH NEW TPO ROOFING (ADD ALTERNATE).
9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.
SEE MECHANICAL.
10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING
DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF
WORK. SEE ROOF PLAN.
11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING
DEMOLITION; REPAIR/REWORK AS REQ'D. FOR TIE-IN WITH
ROOF WORK. SEE ROOF PLAN.
12. EXISTING FLOOR TRENCH - BOILER ROOM. PREPARE AS
REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.
13. EXISTING FLOOR TRENCH - GENERATOR ROOM.
14. DEMOLISH PORTIONS OF EXISTING FLOOR SLAB AND
FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.
SEE STRUCT & MECH.
15. DEMOLISH PORITONS OF EXISITNG FLOOR SLAB FOR NEW
BOILER HEADER FOOTINGS - SEE STRUCT & MECH.
16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW
GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL
REQUIRE REMOVAL OF EXISITING GENERATOR,
PREPARATION OF EQUIPMENT PAD AND DUCTWORK FOR
NEW GENERATOR. SEE ELECT. & MECH.
17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-
SLAB WORK.
18. BOILER 4 TO REMAIN. SEE MECH.
19. BOILERS 1, 2 & 3 TO REMOVE. SEE MECH.
20. TEMPORARY BOILER CONNECTION TO GO THROUGH
EXISTING EAST WALL. LOCATION TO BE COORDINATED W/
COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION
RELATED TO TEMPORARY BOILER CONNECTIONS.
21. PROTECT ENTRY ENCLOSURE DURING DEMOLITION FOR
TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE
MAINTAINED AT ALL TIMES.
22. EXISTING BOILER LADDERS, CATWALKS AND OVERHEAD
PLATFORMS (NOT SHOWN FOR DRAWING CLARITY) ARE TO
BE REMOVED. PREP FOR NEW LADDERS, CATWALKS AND
OVERHEAD PLATFORMS AS REQ'D. FOR NEW BOILERS.
23. GENERATOR EXHAUST LOUVER - REWORK SHROUD AS
REQ'D. FOR CONNECTION TO NEW GENERATOR (ADD
ALTERNATE) - SEE MECH. & ELECT.
DEMOLITION
SHEET/KEY NOTES X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street
Omaha, Nebraska68152
Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
IMEG Corp.
14755 Preston Rd., Suite 845
Dallas, TX 75254
Phone:(972) 239-6100
15% Design Submission 07/14/2020
20% Design Submission
30% Design Submission
35%/SD1 Schematic Design Submission - Request for Proposal
AMI Environmental Inc
8802 S 135th Street
Omaha, NE 68138
Phone:(402) 397-5001
08/14/2020
FOR REFERENCE
ONLY NOT FOR
CONSTRUCTION
09/08/2020
11/17/2020
C
L H
D C
\H o m e \t fi e s e lm a n
\R e v it
M o d e ls \R
-5
-1 -1
B o ile rs tf ie s e lm a n A
G Y
.r v t
/1 /2
:4
:5
P
M
11-AD101
LOWER LEVEL & FIRST FLOOR PLANS -
DEMOLITION BLDGS. 11, 16 & 19
? ?November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL -
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo,TX
1/8" = 1'-0"2
B11-B16 FIRST FLOOR PLAN - DEMOLITION
1/8" = 1'-0"1
B11 PUMP FLOOR & SUMP PIT PLAN - DEMOLITION
N
PLAN
NORTH
N
TRUE
NORTH
N
PLAN
NORTH
N
TRUE
NORTH
1/8" = 1'-0"3
B19 FIRST FLOOR PLAN - DEMOLITION
N
PLAN
NORTH
N
TRUE
NORTH
FLOOR PLANS -
DEMOLITION
GENERAL NOTES:
1. XXXX
1. SEE SHEET G-002 FOR GENERAL, GENERAL DEMOLITION AND
ARCHITECTURAL GENERAL NOTES.
2. DEMOLITION SHEET/KEY NOTES SHOWN ARE TO PROVIDE
INFORMATION AND DIRECTION FOR THE D-B OFFEROR
REGARDING DESIGN INTENT. OFFEROR IS RESPONSIBLE FOR
DEVELOPING MEANS AND METHODS TO COMPLETE TASKS
LISTED.
Revisions: Date:
UP
UP
DN
DN
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
2.2
11-AD301
B7
H
11-AD310
F1
11-AD310
F3
61 SF
SHOWER
11-202
50 SF
TOILET
11-203
63 SF
STAIR
16-S01
71 SF
CORR.
11-C201
107'-0"
OPEN TO BELOW
OPEN TO BELOW
4 3 2 1 1A
J
C1
MATCHLINE AMATCHLINE A
11-AD310
F6
BOILER 4
BOILER 1
BOILER 2
BOILER 3
REPLACE EXIST ROOFING
SEE ROOF PLAN
11-AD301
B1
11-AD301
D1
11-AD301
D4
11-AD301
D7
11-AD301
F4
11-AD301
F1
11-AD301
F7
339 SF
NORTH
MEZZ
11-201
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
2.2
11-AD301
B7
H
11-AD310
F1
11-AD310
F3
378 SF
SO.
MEZZANINE
11-302
524 SF
DEAERATION
PLATFORM
11-301
92 SF
SO.
MEZZANINE
STAIRS
11-S03
OPEN TO
BELOW
OPEN TO BELOW
117'-0"
112'-0"
112'-0"
100'-0"
4 3 2 1 1A
J
C1
STORAGE
DECK
LADDER
LADDER
ROOF HATCH (ABOVE)
MATCHLINE AMATCHLINE A
EXIST EXPANDED METAL PLATFORM/ STL
FRAMING AT BOTTOM TRUSS CHORD
LADDER
REMOVE EXIST. DEAERATION
TANK - SEE MECHANICAL.
11-AD310
F6
BOILER 4
BOILER 1
BOILER 2
BOILER 3
REMOVE PORTION OF WALL FOR TANK
REMOVAL & REPLACEMENT
FIXED LADDER TO REMAIN
SEE ROOF PLAN FOR
ROOFING REMOVAL &
RELACEMENT
ROOF-MTD
AIR INTAKE
11-AD301
B1
11-AD301
D1
11-AD301
D4
11-AD301
D7
11-AD301
F4
11-AD301
F1
11-AD301
F7
170 SF
UPPER
PLATFORM
11-402 11-401
SUSPENDED PLATFORM ABOVE
SUSPENDED PLATFORM ABOVE
LADDER
1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -
TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER
REVISIONS.
2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW
BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.
PHASE ALSO INCLUDES:
A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE
LINES IN PIPE TUNNELS;
B. BLDG. 11 - REPAIR (BASE BID) AND/OR
REPLACEMENT OF ROOFING (ADD ALTERNATE);
C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT
EXTERIOR WALLS;
D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD
ALTERNATE);
E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT
EXCHANGER WATER HEATERS;
F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM
DISTRIBUTION AND CONDENSATE PIPING;
G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE
REDUCTION VALVES AND CONDENSATE RETURN
LINES;
H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE
STEAM TRAPS.
3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11
21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-
GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'
HEATING AND COOLING SEASONS TO MINIMIZE
DISRUPTIONS TO OPERATION OF THE FACILITY.
5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN
ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -
GENERAL REQUIREMENTS AND GENERAL NOTES FOR
NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.
REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.
FOR ADD'L INFO. RE: PHASING.
PHASING NOTES:
ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -
GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.
1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING
AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW
RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,
ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE
ARCHITECTURAL DRAWINGS.
2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT
BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.
ALTERNATES:
1. EXISTING FIXED ROOF LADDER - REMOVE PORTION AND
PREPARE FOR NEW PLATFORM, HAND RAILS / EXTENSIONS,
SAFETY GATE AND FALL PROTECTION EQUIPMENT FOR
OSHA COMPLIANCE.
2. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW
DEAERATION TANK - SEE MECHANICAL.
3. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW
BOILERS - SEE MECHANICAL.
4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY
OPENING COVER. FABRICATION, CONSTRUCTION AND
ATTACHMENT OF OPENING COVER TO BE REVIEWED AND
APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY
OPENING.
5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN
EXTERIOR WALL. PREPARE JOINT FOR REPAIR.
6. EXISTING BUILDING EXPANSION JOINT - REMOVE OLD
SEALANT AND PREPARE FOR NEW.
7. EXISTING WINDOW FRAME AND GLAZING TO BE REMOVED (IF
REQUIRED), REVIEW WITH COR FOR SALVAGE AND
REINSTALL OF ASSEMBLY IN EXISTING OPENING.
8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID
BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT
WITH NEW TPO ROOFING (ADD ALTERNATE).
9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.
SEE MECHANICAL.
10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING
DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF
WORK. SEE ROOF PLAN.
11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING
DEMOLITION; REPAIR/REWORK AS REQ'D. FOR TIE-IN WITH
ROOF WORK. SEE ROOF PLAN.
12. EXISTING FLOOR TRENCH - BOILER ROOM. PREPARE AS
REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.
13. EXISTING FLOOR TRENCH - GENERATOR ROOM.
14. DEMOLISH PORTIONS OF EXISTING FLOOR SLAB AND
FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.
SEE STRUCT & MECH.
15. DEMOLISH PORITONS OF EXISITNG FLOOR SLAB FOR NEW
BOILER HEADER FOOTINGS - SEE STRUCT & MECH.
16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW
GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL
REQUIRE REMOVAL OF EXISITING GENERATOR,
PREPARATION OF EQUIPMENT PAD AND DUCTWORK FOR
NEW GENERATOR. SEE ELECT. & MECH.
17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-
SLAB WORK.
18. BOILER 4 TO REMAIN. SEE MECH.
19. BOILERS 1, 2 & 3 TO REMOVE. SEE MECH.
20. TEMPORARY BOILER CONNECTION TO GO THROUGH
EXISTING EAST WALL. LOCATION TO BE COORDINATED W/
COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION
RELATED TO TEMPORARY BOILER CONNECTIONS.
21. PROTECT ENTRY ENCLOSURE DURING DEMOLITION FOR
TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE
MAINTAINED AT ALL TIMES.
22. EXISTING BOILER LADDERS, CATWALKS AND OVERHEAD
PLATFORMS (NOT SHOWN FOR DRAWING CLARITY) ARE TO
BE REMOVED. PREP FOR NEW LADDERS, CATWALKS AND
OVERHEAD PLATFORMS AS REQ'D. FOR NEW BOILERS.
23. GENERATOR EXHAUST LOUVER - REWORK SHROUD AS
REQ'D. FOR CONNECTION TO NEW GENERATOR (ADD
ALTERNATE) - SEE MECH. & ELECT.
DEMOLITION
SHEET/KEY NOTES X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street
Omaha, Nebraska68152
Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
IMEG Corp.
14755 Preston Rd., Suite 845
Dallas, TX 75254
Phone:(972) 239-6100
15% Design Submission 07/14/2020
20% Design Submission
30% Design Submission
35%/SD1 Schematic Design Submission - Request for Proposal
AMI Environmental Inc
8802 S 135th Street
Omaha, NE 68138
Phone:(402) 397-5001
08/14/2020
FOR REFERENCE
ONLY NOT FOR
CONSTRUCTION
09/08/2020
11/17/2020
C
L H
D C
\H o m e \t fi e s e lm a n
\R e v it
M o d e ls \R
-5
-1 -1
B o ile rs tf ie s e lm a n A
G Y
.r v t
/1 /2
:4
:5
P
M
11-AD102
MEZZANINE PLANS - DEMOLITION - BLDG.
? ?November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL -
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo,TX
1/8" = 1'-0"1
B11 LOWER MEZZANINE PLAN - DEMOLITION
1/8" = 1'-0"2
B11 UPPER MEZZANINE PLAN - DEMOLITION
ROOF HATCH
FLOOR PLANS -
DEMOLITION
GENERAL NOTES:
1. SEE SHEET 11-AD101 FOR DEMOLITION GENERAL NOTES.
2. SEE ROOF PLAN SHEET 11-AE110 FOR ROOF DEMOLITION PLAN.
N
PLAN
NORTH
N
TRUE
NORTH
N
PLAN
NORTH
N
TRUE
NORTH
X
FIRST FLOOR
100'-0"
T.O. PARAPET
131'-1 1/4"
JOIST BRG
122'-0"
4A5 2.73.5 2.24 3 2 1 1A
RETAINING WALL
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
T.O. PARAPET
131'-1 1/4"
LOWER MEZZANINE
107'-0"
JOIST BRG
122'-0"
CKMN ABG DEF
T.O. NORTH MEZZ LID
117'-0"
L HJ C1
AREA OF WALL TO BE REMOVED & REPLACED (PH.1 & 2)
1 2
BLDG. 11CONN CORR.
8 4
BLDG. 16BLDG. 11
EXIST MASONRY INFILLES
PROVIDE PROTECTION FOR BOILER
PLANT ENTERANCE DURING
DEMOLITION CONSTRUCTION.
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
T.O. PARAPET
131'-1 1/4"
LOWER MEZZANINE
107'-0"
JOIST BRG
122'-0"
C K M NA B GD E F
T.O. NORTH MEZZ LID
117'-0"
LH JC1
REMOVEL EXIST. WDW. AND SALVAGE FOR REINSTALLATION.
REBUILD WALL AFTER BOILERS INSTALLED, MATCH EXIST. CONST.
4 1
9 6
BLDG. 11BLDG. 16
EXIST VENT
EXIST SMOKE STACK
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
T.O. PARAPET
131'-1 1/4"
LOWER MEZZANINE
107'-0"
JOIST BRG
122'-0"
4A 52.7 3.5
T.O. NORTH MEZZ LID
117'-0"
2.2 43211A
ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -
GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.
1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING
AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW
RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,
ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE
ARCHITECTURAL DRAWINGS.
2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT
BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.
ALTERNATES:
1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -
TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER
REVISIONS.
2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW
BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.
PHASE ALSO INCLUDES:
A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE
LINES IN PIPE TUNNELS;
B. BLDG. 11 - REPAIR (BASE BID) AND/OR
REPLACEMENT OF ROOFING (ADD ALTERNATE);
C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT
EXTERIOR WALLS;
D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD
ALTERNATE);
E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT
EXCHANGER WATER HEATERS;
F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM
DISTRIBUTION AND CONDENSATE PIPING;
G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE
REDUCTION VALVES AND CONDENSATE RETURN
LINES;
H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE
STEAM TRAPS.
3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11
21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-
GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'
HEATING AND COOLING SEASONS TO MINIMIZE
DISRUPTIONS TO OPERATION OF THE FACILITY.
5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN
ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -
GENERAL REQUIREMENTS AND GENERAL NOTES FOR
NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.
REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.
FOR ADD'L INFO. RE: PHASING.
PHASING NOTES:
1. EXISTING FIXED ROOF LADDER - REMOVE PORTION AND
PREPARE FOR NEW PLATFORM, HAND RAILS / EXTENSIONS,
SAFETY GATE AND FALL PROTECTION EQUIPMENT FOR
OSHA COMPLIANCE.
2. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW
DEAERATION TANK - SEE MECHANICAL.
3. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW
BOILERS - SEE MECHANICAL.
4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY
OPENING COVER. FABRICATION, CONSTRUCTION AND
ATTACHMENT OF OPENING COVER TO BE REVIEWED AND
APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY
OPENING.
5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN
EXTERIOR WALL. PREPARE JOINT FOR REPAIR.
6. EXISTING BUILDING EXPANSION JOINT - REMOVE OLD
SEALANT AND PREPARE FOR NEW.
7. EXISTING WINDOW FRAME AND GLAZING TO BE REMOVED (IF
REQUIRED), REVIEW WITH COR FOR SALVAGE AND
REINSTALL OF ASSEMBLY IN EXISTING OPENING.
8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID
BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT
WITH NEW TPO ROOFING (ADD ALTERNATE).
9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.
SEE MECHANICAL.
10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING
DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF
WORK. SEE ROOF PLAN.
11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING
DEMOLITION; REPAIR/REWORK AS REQ'D. FOR TIE-IN WITH
ROOF WORK. SEE ROOF PLAN.
12. EXISTING FLOOR TRENCH - BOILER ROOM. PREPARE AS
REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.
13. EXISTING FLOOR TRENCH - GENERATOR ROOM.
14. DEMOLISH PORTIONS OF EXISTING FLOOR SLAB AND
FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.
SEE STRUCT & MECH.
15. DEMOLISH PORITONS OF EXISITNG FLOOR SLAB FOR NEW
BOILER HEADER FOOTINGS - SEE STRUCT & MECH.
16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW
GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL
REQUIRE REMOVAL OF EXISITING GENERATOR,
PREPARATION OF EQUIPMENT PAD AND DUCTWORK FOR
NEW GENERATOR. SEE ELECT. & MECH.
17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-
SLAB WORK.
18. BOILER 4 TO REMAIN. SEE MECH.
19. BOILERS 1, 2 & 3 TO REMOVE. SEE MECH.
20. TEMPORARY BOILER CONNECTION TO GO THROUGH
EXISTING EAST WALL. LOCATION TO BE COORDINATED W/
COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION
RELATED TO TEMPORARY BOILER CONNECTIONS.
21. PROTECT ENTRY ENCLOSURE DURING DEMOLITION FOR
TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE
MAINTAINED AT ALL TIMES.
22. EXISTING BOILER LADDERS, CATWALKS AND OVERHEAD
PLATFORMS (NOT SHOWN FOR DRAWING CLARITY) ARE TO
BE REMOVED. PREP FOR NEW LADDERS, CATWALKS AND
OVERHEAD PLATFORMS AS REQ'D. FOR NEW BOILERS.
23. GENERATOR EXHAUST LOUVER - REWORK SHROUD AS
REQ'D. FOR CONNECTION TO NEW GENERATOR (ADD
ALTERNATE) - SEE MECH. & ELECT.
DEMOLITION
SHEET/KEY NOTES X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street
Omaha, Nebraska68152
Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
IMEG Corp.
14755 Preston Rd., Suite 845
Dallas, TX 75254
Phone:(972) 239-6100
15% Design Submission 07/14/2020
20% Design Submission
30% Design Submission
35%/SD1 Schematic Design Submission - Request for Proposal
AMI Environmental Inc
8802 S 135th Street
Omaha, NE 68138
Phone:(402) 397-5001
08/14/2020
FOR REFERENCE
ONLY NOT FOR
CONSTRUCTION
09/08/2020
11/17/2020
C
L H
D C
\H o m e \t fi e s e lm a n
\R e v it
M o d e ls \R
-5
-1 -1
B o ile rs tf ie s e lm a n A
G Y
.r v t
/1 /2
:4
:5
P
M
11-AD201
EXTERIOR ELEVATIONS - DEMOLITION -
BLDGS. 11, 16 & 19
November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL -
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo,TX
1/8" = 1'-0"D1
B11 SOUTH ELEVATION - DEMOLITION
1/8" = 1'-0"B1
B11-B16 EAST ELEVATION - DEMOLITION
1/8" = 1'-0"F1
B11-B16 WEST ELEVATION - DEMOLITION
1/8" = 1'-0"D7
B11-B16 NORTH ELEVATION - DEMOLITION
EXTERIOR
ELEVATIONS -
DEMOLITION
GENERAL NOTES:
1. SEE SHEET 11-AD101 FOR DEMOLITION GENERAL NOTES.
2. REFER TO STRUCTURAL DRAWINGS FOR PREPARATION OF
TEMPORARY OPENINGS INCLUDING SAW-TOOTHING OF
MASONRY AND SUPPORT OF WALL ABOVE OPENING.
3. REFER TO EXTERIOR ELEVATIONS - RENOVATION FOR ITEMS
RELATED TO NEW WORK FOR REPAIR OF MASONRY JOINTS
AND JOINT SEALANT REPLACEMENT.
T ectonic Cop yright 2007T ectonic Cop yright 2007T ectonic Cop yright 2007
100'-0"
MEZZANINE
112'-0"
PUMP FLOOR
93'-6"
T.O. PARAPET
131'-1 1/4"
LOWER MEZZANINE
107'-0"
JOIST BRG
122'-0"
CKMN G DEF
T.O. NORTH MEZZ LID
117'-0"
L
SUMP PUMP
91'-0"
11-AD301
B7
H
11-AD310
F1
11-AD310
F3
J C1
11-AD301
D4
11-AD301
D7
11-AD301
F4
11-AD301
F1
BASE BID - REPAIR EXIST. EPDM ROOF
ADD ALT. - REMOVE EXIST. EPDM ROOF/INSUL.
PREP FOR NEW TPO ROOF/INSUL.
6 87
3 4
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
T.O. PARAPET
131'-1 1/4"
LOWER MEZZANINE
107'-0"
JOIST BRG
122'-0"
4A 53.5
T.O. NORTH MEZZ LID
117'-0"
43211A
11-AD301
B1
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
T.O. PARAPET
131'-1 1/4"
LOWER MEZZANINE
107'-0"
JOIST BRG
122'-0"
4A 3.5
T.O. NORTH MEZZ LID
117'-0"
4 3 2 1 1A
11-AD301
B1
2 4
11-AD310
F6
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
T.O. PARAPET
131'-1 1/4"
JOIST BRG
122'-0"
4A 3.54 3 2 1 1A
11-AD301
B1
11-AD310
F1
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
T.O. PARAPET
131'-1 1/4"
JOIST BRG
122'-0"
4A 2.24 3 2 1 1A
11-AD301
B1
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
PUMP FLOOR
93'-6"
T.O. PARAPET
131'-1 1/4"
JOIST BRG
122'-0"
4A2.2
SUMP PUMP
91'-0"
43211A
11-AD301
B1
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
N
OPEN
1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -
TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER
REVISIONS.
2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW
BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.
PHASE ALSO INCLUDES:
A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE
LINES IN PIPE TUNNELS;
B. BLDG. 11 - REPAIR (BASE BID) AND/OR
REPLACEMENT OF ROOFING (ADD ALTERNATE);
C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT
EXTERIOR WALLS;
D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD
ALTERNATE);
E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT
EXCHANGER WATER HEATERS;
F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM
DISTRIBUTION AND CONDENSATE PIPING;
G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE
REDUCTION VALVES AND CONDENSATE RETURN
LINES;
H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE
STEAM TRAPS.
3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11
21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-
GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'
HEATING AND COOLING SEASONS TO MINIMIZE
DISRUPTIONS TO OPERATION OF THE FACILITY.
5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN
ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -
GENERAL REQUIREMENTS AND GENERAL NOTES FOR
NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.
REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.
FOR ADD'L INFO. RE: PHASING.
PHASING NOTES:
ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -
GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.
1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING
AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW
RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,
ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE
ARCHITECTURAL DRAWINGS.
2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT
BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.
ALTERNATES:
1. EXISTING FIXED ROOF LADDER - REMOVE PORTION AND
PREPARE FOR NEW PLATFORM, HAND RAILS / EXTENSIONS,
SAFETY GATE AND FALL PROTECTION EQUIPMENT FOR
OSHA COMPLIANCE.
2. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW
DEAERATION TANK - SEE MECHANICAL.
3. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW
BOILERS - SEE MECHANICAL.
4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY
OPENING COVER. FABRICATION, CONSTRUCTION AND
ATTACHMENT OF OPENING COVER TO BE REVIEWED AND
APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY
OPENING.
5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN
EXTERIOR WALL. PREPARE JOINT FOR REPAIR.
6. EXISTING BUILDING EXPANSION JOINT - REMOVE OLD
SEALANT AND PREPARE FOR NEW.
7. EXISTING WINDOW FRAME AND GLAZING TO BE REMOVED (IF
REQUIRED), REVIEW WITH COR FOR SALVAGE AND
REINSTALL OF ASSEMBLY IN EXISTING OPENING.
8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID
BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT
WITH NEW TPO ROOFING (ADD ALTERNATE).
9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.
SEE MECHANICAL.
10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING
DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF
WORK. SEE ROOF PLAN.
11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING
DEMOLITION; REPAIR/REWORK AS REQ'D. FOR TIE-IN WITH
ROOF WORK. SEE ROOF PLAN.
12. EXISTING FLOOR TRENCH - BOILER ROOM. PREPARE AS
REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.
13. EXISTING FLOOR TRENCH - GENERATOR ROOM.
14. DEMOLISH PORTIONS OF EXISTING FLOOR SLAB AND
FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.
SEE STRUCT & MECH.
15. DEMOLISH PORITONS OF EXISITNG FLOOR SLAB FOR NEW
BOILER HEADER FOOTINGS - SEE STRUCT & MECH.
16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW
GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL
REQUIRE REMOVAL OF EXISITING GENERATOR,
PREPARATION OF EQUIPMENT PAD AND DUCTWORK FOR
NEW GENERATOR. SEE ELECT. & MECH.
17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-
SLAB WORK.
18. BOILER 4 TO REMAIN. SEE MECH.
19. BOILERS 1, 2 & 3 TO REMOVE. SEE MECH.
20. TEMPORARY BOILER CONNECTION TO GO THROUGH
EXISTING EAST WALL. LOCATION TO BE COORDINATED W/
COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION
RELATED TO TEMPORARY BOILER CONNECTIONS.
21. PROTECT ENTRY ENCLOSURE DURING DEMOLITION FOR
TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE
MAINTAINED AT ALL TIMES.
22. EXISTING BOILER LADDERS, CATWALKS AND OVERHEAD
PLATFORMS (NOT SHOWN FOR DRAWING CLARITY) ARE TO
BE REMOVED. PREP FOR NEW LADDERS, CATWALKS AND
OVERHEAD PLATFORMS AS REQ'D. FOR NEW BOILERS.
23. GENERATOR EXHAUST LOUVER - REWORK SHROUD AS
REQ'D. FOR CONNECTION TO NEW GENERATOR (ADD
ALTERNATE) - SEE MECH. & ELECT.
DEMOLITION
SHEET/KEY NOTES X
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
T.O. PARAPET
131'-1 1/4"
JOIST BRG
122'-0"
4A2.2
SUMP PUMP
91'-0"
43211A
11-AD301
B1
BOILER DISPLAY
PANEL - SEE MECH
11-AD310
F3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street
Omaha, Nebraska68152
Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
IMEG Corp.
14755 Preston Rd., Suite 845
Dallas, TX 75254
Phone:(972) 239-6100
15% Design Submission 07/14/2020
20% Design Submission
30% Design Submission
35%/SD1 Schematic Design Submission - Request for Proposal
AMI Environmental Inc
8802 S 135th Street
Omaha, NE 68138
Phone:(402) 397-5001
08/14/2020
FOR REFERENCE
ONLY NOT FOR
CONSTRUCTION
09/08/2020
11/17/2020
C
L H
D C
\H o m e \t fi e s e lm a n
\R e v it
M o d e ls \R
-5
-1 -1
B o ile rs tf ie s e lm a n A
G Y
.r v t
/1 /2
:4
:0
P
M
11-AD301
BUILDING SECTIONS - DEMOLITION -
BLDGS. 11, 16 & 19
November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL -
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo,TX
1/8" = 1'-0"B1
B11 SEC'N - LONGITUDINAL, BOILER PLANT
1/8" = 1'-0"D1
B16 SEC'N-CROSS - MAINT
1/8" = 1'-0"D4
B11 SEC'N-CROSS - PUMP FLOOR-NO. MEZZ
1/8" = 1'-0"D7
B11 SEC'N-CROSS - BOILER ROOM
1/8" = 1'-0"F4
B11 SEC'N-CROSS - GENERATOR RM
1/8" = 1'-0"F1
B11-SEC'N - SO. MEZZANINE STAIRS-SUMP PIT-TUNNEL
1/8" = 1'-0"F7
B11 SEC'N - B19 CONNECTING CORR.
BLDG. SECTIONS -
DEMOLITION
GENERAL NOTES:
1. SEE SHEETS 11-AD201AND 11-AD201 FOR DEMOLITION
GENERAL NOTES.
1/8" = 1'-0"B7
B11 SEC'N - STAIR-SO. MEZZANINE
EXIST SUSPENDED
PLATFORM
EXIST LADDER
T.O. PARAPET
131'-1 1/4"
JOIST BRG
122'-0"
4A4
T E
M P
O R
A R
Y O
P E
N
IN
G
EXIST ALUM. WDW -
REMOVE FOR
ACCESS INTO
BOILER PLANT;
SALVAGE FOR
REUSE
EXIST MASONRY
WALL - REMOVE
PORTION FOR
ACCESS INTO BOILER
PLANT;
TOOTH AT PILASTERS
FOR REPLACEMENT
INFILL
EXIST CONC STEM
WALL - REMOVE
PORTION BETWEEN
PILASTERS FOR
ACCESS INTO BOILER
PLANT;
PREP FOR CONC
REPLACEMENT INFILL
PROVIDE TEMPORARY
SHORING / SUPPORT
FOR EXIST WALL
ABOVE - SEE STRUCT
EXIST SOLDIER
COURSE HEADER
EXIST JACK ARCH
LINTEL
EXIST TRUSS
EXIST ALUM WDW TO REMAIN
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
T.O. PARAPET
131'-1 1/4"
JOIST BRG
122'-0"
4A4
EXIST SOLDIER COURSE
HEADER
EXIST. BEAM
EXIST JACK ARCH
LINTEL
EXIST BAR GRATE
PLATFORM OVER
STL C-CHANNEL
EXIST CONC OVER STL
FLOOR DECK
EXIST CMU
EXIST FACE BRICK
EXIST ALUM WDW TO
REMAIN
FIRST FLOOR
100'-0"
MEZZANINE
112'-0"
T.O. PARAPET
131'-1 1/4"
T.O. NORTH MEZZ LID
117'-0"
1 1A
EXIST ALUM. WDW - REMOVE
FOR ACCESS INTO BOILER
PLANT (IF REQUIRED)
SALVAGE FOR REUSE
EXIST MASONRY WALL - REMOVE
PORTION FOR ACCESS TO
DEAERATION PLATFORM; TOOTH AT
PILASTERS FOR REPLACEMENT INFILL
REMOVE EXIST BALLASTED
EPDM ROOFING/ / INSUL;
PREP FOR NEW INSUL / TPO
ROOFING (ADD ALTERNATE)
PROVIDE TEMPORARY SHORING /
SUPPORT FOR EXIST WALL ABOVE -
SEE STRUCT
PROTECT EXISTING
CONSTRUCTION DURING
DEMOLITIION, TANK
REMOVAL/ REPLACEMENT
AND REPLACEMENT OF
MASONRY INFILL
EXIST JACK ARCH
LINTEL
2 4
PROTECT DURING CONST.
T E
M P
O R
A R
Y O
P E
N
IN
G
1. EXISTING FIXED ROOF LADDER - REMOVE PORTION AND
PREPARE FOR NEW PLATFORM, HAND RAILS / EXTENSIONS,
SAFETY GATE AND FALL PROTECTION EQUIPMENT FOR
OSHA COMPLIANCE.
2. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW
DEAERATION TANK - SEE MECHANICAL.
3. VERIFY AND COORDINATE CLEAR OPENING SIZE FOR NEW
BOILERS - SEE MECHANICAL.
4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY
OPENING COVER. FABRICATION, CONSTRUCTION AND
ATTACHMENT OF OPENING COVER TO BE REVIEWED AND
APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY
OPENING.
5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN
EXTERIOR WALL. PREPARE JOINT FOR REPAIR.
6. EXISTING BUILDING EXPANSION JOINT - REMOVE OLD
SEALANT AND PREPARE FOR NEW.
7. EXISTING WINDOW FRAME AND GLAZING TO BE REMOVED (IF
REQUIRED), REVIEW WITH COR FOR SALVAGE AND
REINSTALL OF ASSEMBLY IN EXISTING OPENING.
8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID
BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT
WITH NEW TPO ROOFING (ADD ALTERNATE).
9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.
SEE MECHANICAL.
10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING
DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF
WORK. SEE ROOF PLAN.
11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING
DEMOLITION; REPAIR/REWORK AS REQ'D. FOR TIE-IN WITH
ROOF WORK. SEE ROOF PLAN.
12. EXISTING FLOOR TRENCH - BOILER ROOM. PREPARE AS
REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.
13. EXISTING FLOOR TRENCH - GENERATOR ROOM.
14. DEMOLISH PORTIONS OF EXISTING FLOOR SLAB AND
FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.
SEE STRUCT & MECH.
15. DEMOLISH PORITONS OF EXISITNG FLOOR SLAB FOR NEW
BOILER HEADER FOOTINGS - SEE STRUCT & MECH.
16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW
GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL
REQUIRE REMOVAL OF EXISITING GENERATOR,
PREPARATION OF EQUIPMENT PAD AND DUCTWORK FOR
NEW GENERATOR. SEE ELECT. & MECH.
17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-
SLAB WORK.
18. BOILER 4 TO REMAIN. SEE MECH.
19. BOILERS 1, 2 & 3 TO REMOVE. SEE MECH.
20. TEMPORARY BOILER CONNECTION TO GO THROUGH
EXISTING EAST WALL. LOCATION TO BE COORDINATED W/
COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION
RELATED TO TEMPORARY BOILER CONNECTIONS.
21. PROTECT ENTRY ENCLOSURE DURING DEMOLITION FOR
TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE
MAINTAINED AT ALL TIMES.
22. EXISTING BOILER LADDERS, CATWALKS AND OVERHEAD
PLATFORMS (NOT SHOWN FOR DRAWING CLARITY) ARE TO
BE REMOVED. PREP FOR NEW LADDERS, CATWALKS AND
OVERHEAD PLATFORMS AS REQ'D. FOR NEW BOILERS.
23. GENERATOR EXHAUST LOUVER - REWORK SHROUD AS
REQ'D. FOR CONNECTION TO NEW GENERATOR (ADD
ALTERNATE) - SEE MECH. & ELECT.
DEMOLITION
SHEET/KEY NOTES X
ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -
GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.
1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING
AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW
RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,
ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE
ARCHITECTURAL DRAWINGS.
2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT
BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.
ALTERNATES:
1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -
TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER
REVISIONS.
2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW
BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.
PHASE ALSO INCLUDES:
A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE
LINES IN PIPE TUNNELS;
B. BLDG. 11 - REPAIR (BASE BID) AND/OR
REPLACEMENT OF ROOFING (ADD ALTERNATE);
C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT
EXTERIOR WALLS;
D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD
ALTERNATE);
E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT
EXCHANGER WATER HEATERS;
F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM
DISTRIBUTION AND CONDENSATE PIPING;
G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE
REDUCTION VALVES AND CONDENSATE RETURN
LINES;
H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE
STEAM TRAPS.
3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11
21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-
GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'
HEATING AND COOLING SEASONS TO MINIMIZE
DISRUPTIONS TO OPERATION OF THE FACILITY.
5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN
ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -
GENERAL REQUIREMENTS AND GENERAL NOTES FOR
NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.
REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.
FOR ADD'L INFO. RE: PHASING.
PHASING NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street
Omaha, Nebraska68152
Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
IMEG Corp.
14755 Preston Rd., Suite 845
Dallas, TX 75254
Phone:(972) 239-6100
15% Design Submission 07/14/2020
20% Design Submission
30% Design Submission
35%/SD1 Schematic Design Submission - Request for Proposal
AMI Environmental Inc
8802 S 135th Street
Omaha, NE 68138
Phone:(402) 397-5001
08/14/2020
FOR REFERENCE
ONLY NOT FOR
CONSTRUCTION
09/08/2020
11/17/2020
C
L H
D C
\H o m e \t fi e s e lm a n
\R e v it
M o d e ls \R
-5
-1 -1
B o ile rs tf ie s e lm a n A
G Y
.r v t
/1 /2
:4
:0
P
M
11-AD310
WALL SECTIONS - DEMOLITION - BLDG. 11
November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL -
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo,TX
3/4" = 1'-0"F1
WALL SEC'N - B11 ORIG. WEST WALL - DEMO
3/4" = 1'-0"F3
WALL SEC'N - B11 ADD'N WEST WALL - DEMO
3/4" = 1'-0"F6
WALL SEC'N - B11 ORIG. BLDG EAST WALL - DEAERATION
PLATFORM - DEMO
WALL SECTIONS -
DEMOLITION
GENERAL NOTES:
1. SEE SHEETS 11-AD201 AND 11-AD201 FOR DEMOLITION
GENERAL NOTES.
DN
UP
UP
UP
FD
TT
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
UP
UPT
FD
11-AE201B1
11-AE201
11-AE201
11-AE201
D6
F1
D1
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
11-AE301
B1
11-AE301
D7
11-AE301
F1
11-AE301
D4
11-AE301
D1
L
2.2
11-AE301
F4
11-AE301
F7
42'-1"
'-2
'-0
/4
'-7
/4
8'-5" 17'-4" 16'-4"
42'-0"
H
11-AE310
F3
11-AE310
F1
42'-0"
42'-0"
4 3 2 1 1A
11'-11" 11" 13'-11" 12'-4" 14'-0" 1'-0"
FACE OF CONCRETE
42'-2"
J
C1
EXIST.
EYEWASH & SHOWER
MATCHLINE AMATCHLINE A
11-AE310
F6
EXIST. 4" CMU
CHASE
TO 10'-0" HIGH
FOR PIPING
EXIST. 4" CMU
CHASE
TO 10'-0" HIGH
FOR PIPING
BOILER 4
BOILER 1
BOILER 2
BOILER 3
BOILER HEADER
REPLACE PORTION
OF WALL DUE TO
BOILER REMOVAL
PROVIDE TEMPORARY
ENCLOSURE AT OPENING
DURING CONSTRUCTION
CONTRACTOR ACCESS
STAIR TO PIPE TUNNEL
11-AE301
B7
7 34
PROTECT
DURING
CONST.
102'-0"
100'-0"
101'-4"
100'-0" 101'-4"
11-AE201B1
11-AE201
11-AE201F1
D1
C
K
M
N
4A
A
2.7
B
G
D
E
F
3.5
11-AE301
B1
11-AE301
D7
11-AE301
F1
11-AE301
D4
11-AE301
D1
L
11-AE301
F4
'-8
'-8
/2
H
11-AE310
F3
11-AE310
F1
4 3 2 1 1A
J
C1
MATCHLINE AMATCHLINE A
11-AE310
F6
11-AE301
B7
99'-7"
99'-7"
99'-7"
99'-7"
MATCHLINE AMATCHLINE A
FENCE
FENCE
ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -
GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.
1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING
AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW
RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,
ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE
ARCHITECTURAL DRAWINGS.
2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT
BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.
ALTERNATES:
1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -
TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER
REVISIONS.
2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW
BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.
PHASE ALSO INCLUDES:
A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE
LINES IN PIPE TUNNELS;
B. BLDG. 11 - REPAIR (BASE BID) AND/OR
REPLACEMENT OF ROOFING (ADD ALTERNATE);
C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT
EXTERIOR WALLS;
D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD
ALTERNATE);
E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT
EXCHANGER WATER HEATERS;
F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM
DISTRIBUTION AND CONDENSATE PIPING;
G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE
REDUCTION VALVES AND CONDENSATE RETURN
LINES;
H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE
STEAM TRAPS.
3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11
21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-
GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'
HEATING AND COOLING SEASONS TO MINIMIZE
DISRUPTIONS TO OPERATION OF THE FACILITY.
5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN
ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -
GENERAL REQUIREMENTS AND GENERAL NOTES FOR
NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.
REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.
FOR ADD'L INFO. RE: PHASING.
PHASING NOTES:
RENOVATION
SHEET/KEY NOTES
1. EXISTING FIXED ROOF LADDER TO BE MODIFIED TO INSTALL
NEW PLATFORM, HAND RAILS / EXTENSIONS, SAFETY GATE
AND FALL PROTECTION EQUIPMENT FOR OSHA
COMPLIANCE. SEE 2/11-AE201
2. INFILL OPENING FOR NEW DEAERATION TANK WITH IN-KIND
CONSTRUCTION USING BRICK TO MATCH EXISTING AFTER
DEAERATION TANK HAS BEEN INSTALLED. SEE STRUCTURAL
FOR ADDITIONAL REQUIREMENTS RELATED TO IN-KIND
CONSTRUCTION.
3. INFILL OPENING FOR NEW BOILERS WITH IN-KIND
CONSTRUCTION USING CAST-IN-PLACE CONCRETE AND
BRICK MATCHING EXISTING AFTER BOILER INSTALLATION
HAS BEEN COMPLETED. SEE STRUCTURAL FOR ADDITIONAL
REQUIREMENTS RELATED TO IN-KIND CONSTRUCTION.
4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY
OPENING COVER. FABRICATION, CONSTRUCTION AND
ATTACHMENT OF OPENING COVER TO BE REVIEWED AND
APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY
OPENING.
5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN
EXTERIOR WALL. REPAIR JOINTS AS REQUIRED.
6. EXISTING BUILDING EXPANSION JOINT – INSTALL NEW
SEALANT, BACKER ROD, ETC. FULL LENGTH OF JOINT.
7. EXISTING WINDOW FRAME AND GLAZING TO BE
REINSTALLED AND OPENING RESTORED TO PRE-
CONSTRUCTION CONDITION., REVIEW WITH COR FOR
SALVAGE AND REINSTALL OF ASSEMBLY IN EXISTING
OPENING.
8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID
BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT
WITH NEW TPO ROOFING (ADD ALTERNATE).
9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.
SEE MECHANICAL.
10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING
DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF
WORK. SEE ROOF PLAN.
11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING
DEMOLITION; REPAIR / REWORK AS REQ'D. FOR TIE-IN WITH
ROOF WORK. SEE ROOF PLAN.
12. EXISTING FLOOR TRENCH - BOILER ROOM. PATCH AND
REPAIR AS REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.
13. EXISTING FLOOR TRENCH - GENERATOR ROOM.
14. PATCH & REPAIR PORTIONS OF EXISTING FLOOR SLAB AND
FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.
SEE STRUCT & MECH.
15. PATCH AND REPAIR EXISITNG FLOOR SLAB FOR NEW BOILER
HEADER FOOTINGS - SEE STRUCT & MECH.
16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW
GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL
REQUIRE PREPARATION OF EQUIPMENT PAD AND
DUCTWORK FOR NEW GENERATOR. SEE ELECT. & MECH.
17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-
SLAB WORK.
18. EXISTING BOILER 4 TO REMAIN. SEE MECH.
19. NEW BOILERS 1, 2 & 3. SEE MECH.
20. TEMPORARY BOILER CONNECTION TO GO THROUGH
EXISTING EAST WALL. LOCATION TO BE COORDINATED W/
COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION
RELATED TO TEMPORARY BOILER CONNECTIONS.
21. PROTECT ENTRY ENCLOSURE DURING RENOVATION FOR
TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE
MAINTAINED AT ALL TIMES.
22. DESIGN, PROVIDE AND INSTALL NEW BOILER LADDERS,
CATWALKS AND OVERHEAD PLATFORMS AS REQ'D. FOR
NEW BOILERS.
X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street
Omaha, Nebraska68152
Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
IMEG Corp.
14755 Preston Rd., Suite 845
Dallas, TX 75254
Phone:(972) 239-6100
15% Design Submission 07/14/2020
20% Design Submission
30% Design Submission
35%/SD1 Schematic Design Submission - Request for Proposal
AMI Environmental Inc
8802 S 135th Street
Omaha, NE 68138
Phone:(402) 397-5001
08/14/2020
FOR REFERENCE
ONLY NOT FOR
CONSTRUCTION
09/08/2020
11/17/2020
C
L H
D C
\H o m e \t fi e s e lm a n
\R e v it
M o d e ls \R
-5
-1 -1
B o ile rs tf ie s e lm a n A
G Y
.r v t
/1 /2
:4
:0
P
M
11-AE101
LOWER LEVEL & FIRST FLOOR PLANS -
RENOVATION - BLDGS. 11, 16 & 19
? ?November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL -
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo,TX
1/8" = 1'-0"2
B11-B16 FIRST FLOOR PLAN - RENOVATION
1/8" = 1'-0"1
B11 PUMP FLOOR & SUMP PIT PLAN - RENOVATION
1/8" = 1'-0"3
B19 FIRST FLOOR PLAN - RENOVATION
N
PLAN
NORTH
N
TRUE
NORTH
FLOOR PLANS -
RENOVATION
GENERAL NOTES:
1. SEE SHEET G-002 FOR GENERAL AND ARCHITECTURAL
GENERAL NOTES. SEE SHEETS 11-RA101/11-RA103 FOR
EXIST COND. PHOTOS.
2. RENOVATION SHEET/KEY NOTES SHOWN ARE TO PROVIDE
INFORMATION AND DIRECTION FOR THE D-B OFFEROR
REGARDING DESIGN INTENT. OFFEROR IS RESPONSIBLE FOR
DEVELOPING MEANS AND METHODS TO COMPLETE TASKS
LISTED.
N
PLAN
NORTH
N
TRUE
NORTH
N
PLAN
NORTH
N
TRUE
NORTH
RENOVATION
FLOOR PLAN FINISH
NOTES
1. PATCH AND MATCH EXISTING FINISHES DISTURBED BY
CONSTRUCTION.
2. PAINT COLOR SELECTION TO BE COORDINATED W/ COR AND
MEDICAL CENTER'S INTERIOR DESIGNER.
3. PAINT WALLS CORNER-TO-CORNER UNLESS OTHERWISE
DIRECTED BY THE COR.
UP
UP
DN
DN
11-AE201B1
11-AE201
11-AE201
11-AE201
D6
F1
D1
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
11-AE301
B1
11-AE301
D7
11-AE301
F1
11-AE301
D4
11-AE301
D1
L
2.2
11-AE301
F4
11-AE301
F7
'-8
42'-0"
25'-8" 16'-4"
H
11-AE310
F3
11-AE310
F1
4 3 2 1 1A
J
C1
MATCHLINE AMATCHLINE A
11-AE310
F6
REPLACE WALL & WINDOW AFTER NEW
TANK INSTALLED
PROVIDE TEMPORARY ENCLOSURE
DURING CONSTRUCTION AT OPENING
11-AE301
B7
PROTECT
DURING
CONST.
2 4
SUSPENDED PLATFORMS ABOVE
LADDER(S)
112'-0"
DEAERATION TANK - SEE MECH.
112'-0"
11-AE201B1
11-AE201
11-AE201F1
D1
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
11-AE301
B1
11-AE301
D7
11-AE301
F1
11-AE301
D4
11-AE301
D1
L
2.2
11-AE301
F4
H
11-AE310
F3
11-AE310
F1
4 3 2 1 1A
J
C1
MATCHLINE AMATCHLINE A
11-AE310
F6
11-AE301
B7
7 34
PROTECT
DURING
CONST.
107'-0"
ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -
GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.
1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING
AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW
RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,
ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE
ARCHITECTURAL DRAWINGS.
2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT
BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.
ALTERNATES:
1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -
TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER
REVISIONS.
2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW
BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.
PHASE ALSO INCLUDES:
A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE
LINES IN PIPE TUNNELS;
B. BLDG. 11 - REPAIR (BASE BID) AND/OR
REPLACEMENT OF ROOFING (ADD ALTERNATE);
C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT
EXTERIOR WALLS;
D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD
ALTERNATE);
E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT
EXCHANGER WATER HEATERS;
F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM
DISTRIBUTION AND CONDENSATE PIPING;
G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE
REDUCTION VALVES AND CONDENSATE RETURN
LINES;
H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE
STEAM TRAPS.
3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11
21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-
GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'
HEATING AND COOLING SEASONS TO MINIMIZE
DISRUPTIONS TO OPERATION OF THE FACILITY.
5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN
ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -
GENERAL REQUIREMENTS AND GENERAL NOTES FOR
NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.
REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.
FOR ADD'L INFO. RE: PHASING.
PHASING NOTES:
RENOVATION
SHEET/KEY NOTES
1. EXISTING FIXED ROOF LADDER TO BE MODIFIED TO INSTALL
NEW PLATFORM, HAND RAILS / EXTENSIONS, SAFETY GATE
AND FALL PROTECTION EQUIPMENT FOR OSHA
COMPLIANCE. SEE 2/11-AE201
2. INFILL OPENING FOR NEW DEAERATION TANK WITH IN-KIND
CONSTRUCTION USING BRICK TO MATCH EXISTING AFTER
DEAERATION TANK HAS BEEN INSTALLED. SEE STRUCTURAL
FOR ADDITIONAL REQUIREMENTS RELATED TO IN-KIND
CONSTRUCTION.
3. INFILL OPENING FOR NEW BOILERS WITH IN-KIND
CONSTRUCTION USING CAST-IN-PLACE CONCRETE AND
BRICK MATCHING EXISTING AFTER BOILER INSTALLATION
HAS BEEN COMPLETED. SEE STRUCTURAL FOR ADDITIONAL
REQUIREMENTS RELATED TO IN-KIND CONSTRUCTION.
4. PROVIDE AND INSTALL WEATHERTIGHT TEMPORARY
OPENING COVER. FABRICATION, CONSTRUCTION AND
ATTACHMENT OF OPENING COVER TO BE REVIEWED AND
APPROVED BY COR PRIOR TO DEMOLITION FOR TEMPORARY
OPENING.
5. APPROXIMATE LOCATION OF MASONRY JOINT CRACKING IN
EXTERIOR WALL. REPAIR JOINTS AS REQUIRED.
6. EXISTING BUILDING EXPANSION JOINT – INSTALL NEW
SEALANT, BACKER ROD, ETC. FULL LENGTH OF JOINT.
7. EXISTING WINDOW FRAME AND GLAZING TO BE
REINSTALLED AND OPENING RESTORED TO PRE-
CONSTRUCTION CONDITION., REVIEW WITH COR FOR
SALVAGE AND REINSTALL OF ASSEMBLY IN EXISTING
OPENING.
8. SEE ROOF PLAN FOR REPAIR OF EXISTING LOOSE-LAID
BALLASTED EPDM ROOFING (BASE BID) OR REPLACEMENT
WITH NEW TPO ROOFING (ADD ALTERNATE).
9. EXISTING THROUGH-WALL LOUVER ASSEMBLY TO REMAIN.
SEE MECHANICAL.
10. EXISTING SCUPPER / DOWNSPOUT - PROTECT DURING
DEMOLITON; REPAIR AS REQ'D. FOR TIE-IN WITH ROOF
WORK. SEE ROOF PLAN.
11. EXISITNG GUTTER / DOWNSPOUT - PROTECT DURING
DEMOLITION; REPAIR / REWORK AS REQ'D. FOR TIE-IN WITH
ROOF WORK. SEE ROOF PLAN.
12. EXISTING FLOOR TRENCH - BOILER ROOM. PATCH AND
REPAIR AS REQ'D. FOR NEW BOILERS/FOOTINGS. SEE MECH.
13. EXISTING FLOOR TRENCH - GENERATOR ROOM.
14. PATCH & REPAIR PORTIONS OF EXISTING FLOOR SLAB AND
FOOTINGS AT BOILERS 1, 2 & 3 FOR NEW BOILER FOOTINGS.
SEE STRUCT & MECH.
15. PATCH AND REPAIR EXISITNG FLOOR SLAB FOR NEW BOILER
HEADER FOOTINGS - SEE STRUCT & MECH.
16. EXISTING ELECTRICAL GENERATOR (BASE BID) / NEW
GENERATOR (ADD ALTERNATE). ADD ALTERNATE WILL
REQUIRE PREPARATION OF EQUIPMENT PAD AND
DUCTWORK FOR NEW GENERATOR. SEE ELECT. & MECH.
17. SEE STRCT & MECH FOR BOILER & BOILER HEADER BELOW-
SLAB WORK.
18. EXISTING BOILER 4 TO REMAIN. SEE MECH.
19. NEW BOILERS 1, 2 & 3. SEE MECH.
20. TEMPORARY BOILER CONNECTION TO GO THROUGH
EXISTING EAST WALL. LOCATION TO BE COORDINATED W/
COR & MECH. SEE MECH. FOR ADDITIONAL INFORMATION
RELATED TO TEMPORARY BOILER CONNECTIONS.
21. PROTECT ENTRY ENCLOSURE DURING RENOVATION FOR
TEMPORARY OPENING ABOVE. ACCESS TO DOOR TO BE
MAINTAINED AT ALL TIMES.
22. DESIGN, PROVIDE AND INSTALL NEW BOILER LADDERS,
CATWALKS AND OVERHEAD PLATFORMS AS REQ'D. FOR
NEW BOILERS.
X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street
Omaha, Nebraska68152
Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
IMEG Corp.
14755 Preston Rd., Suite 845
Dallas, TX 75254
Phone:(972) 239-6100
15% Design Submission 07/14/2020
20% Design Submission
30% Design Submission
35%/SD1 Schematic Design Submission - Request for Proposal
AMI Environmental Inc
8802 S 135th Street
Omaha, NE 68138
Phone:(402) 397-5001
08/14/2020
FOR REFERENCE
ONLY NOT FOR
CONSTRUCTION
09/08/2020
11/17/2020
C
L H
D C
\H o m e \t fi e s e lm a n
\R e v it
M o d e ls \R
-5
-1 -1
B…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .