20-09 035 Narrative 13 1r1 Specs TOC 000110 035 21-06-30.pdf
PDF 191 KB Posted
- Attached to
- Y1DA--504-18-119 Replace Boilers and Piping Federal contract opportunity
- Solicitation number
- 36C25722R0010
About this file
This document contains a table of contents for technical specifications for the replacement of boilers and piping at the Thomas E. Creek Amarillo VA Health Care System in Amarillo, Texas. The specifications cover work in several construction divisions including demolition, hazardous materials abatement, concrete, masonry, metals, carpentry, thermal and moisture protection, openings, finishes, special construction, fire suppression, plumbing, HVAC, electrical, exterior improvements, and earthwork. Bidders are advised to incorporate all sections listed into their contract documents along with any additional sections required to complete the project. The related federal contract opportunity provides further details on solicitation number 36C25722R0010 to replace boilers and piping under project number 504-18-119 at the Veterans Health Administration Veterans Integrated Service Network 17 location in Amarillo, Texas.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past Performance Questionnaire.pdf | ||
| Answers to Questions 36C25722R0010 DB Replace Boilers.pdf | ||
| VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf | ||
| Amendment 36C25722R0010 0001.docx | DOCX document | |
| 36C25722R0010_1.docx | DOCX document | |
| Mech 035 - Pages 7-12.pdf | ||
| Phasing sheets.pdf | ||
| Struct 035.pdf | ||
| SELF-PERFORMED CALCULATIONS.pdf | ||
| Mech 035 - Pages 8-19.pdf | ||
| BP-2-Boilers-natgasandpropane.pdf | ||
| 20-09 035 Narrative 02 1r1 Phasing Narrative.pdf | ||
| 20-09 035 Narrative 06 1r1 Civil-LS Design Narrative.pdf | ||
| AS ST Series Sheets.pdf | ||
| AD AE Series Sheets.pdf | ||
| Elect 035.pdf | ||
| G Series Sheets.pdf | ||
| BP-4-Water-Treatment.pdf | ||
| Mech 035 - Pages 1-3.pdf | ||
| Mech 035 - Pages 4-6.pdf | ||
| OSHA - EMR requirement.pdf | ||
| BP-3-Boiler-steam.pdf | ||
| BP-1-Boiler-fueloil.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Thomas E. Creek Amarillo VAHCS 11-01-20
Replace Boilers & Piping Rev 06/30/21
504-18-119
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
00 11 21 Request for Proposal to Design Build 06-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 03-20
01 32 16.01 Architectural and Engineering CPM Schedules 03-20
01 32 16.16 Network Analysis Schedules (Design-Build Only) 03-20
01 33 23 Shop Drawings, Product Data, and Samples 05-17
01 35 26 Safety Requirements 07-20
01 42 19 Reference Standards 09-19
01 45 00 Quality Control 03-19
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 03-19
01 57 19 Temporary Environmental Controls 01-11
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 09-13
01 81 13 Sustainable Construction Requirements 10-17
01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 82 13.13 Glovebag Asbestos Abatement 09-15
02 82 13.21 Asbestos Roofing Abatement 09-15
02 83 33.13 Lead-Based Paint Removal and Disposal 08-16
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 02-16
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 02-16
04 05 13 Masonry Mortaring 10-17
04 05 16 Masonry Grouting 02-16
04 20 00 Unit Masonry 08-17
04 72 00 Cast Stone Masonry 02-15
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 50 00 Metal Fabrications 08-18
504-18-119
00 01 10-2
05 51 00 Metal Stairs 10-15
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 02-16
07 22 00 Roof and Deck Insulation 02-16
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing (Base Bid) 02-16
07 54 23 Thermoplastic Polyolefin (TPO) Roofing (Add Alternate) 08-16
07 71 00 Roof Specialties 10-15
07 72 00 Roof Accessories 10-15
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 56 53 Blast Resistant Windows 02-16
08 80 00 Glazing 10-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 06 00 Schedule for Finishes 04-15
09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES (Not Used)
DIVISION 11 – EQUIPMENT (Not Used)
DIVISION 12 – FURNISHINGS (Not Used)
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-14
DIVISION 14– CONVEYING EQUIPEMENT (Not Used)
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
21 13 16 Dry-Pipe Sprinkler Systems 01-15
DIVISION 22 – PLUMBING
504-18-119
00 01 10-3
22 05 11 Common Work Results for Plumbing 09-20
22 05 12 General Motor Requirements for Plumbing Equipment 09-20
22 05 19 Meters and Gages for Plumbing Piping 09-20
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 11-19
22 11 23 Domestic Water Pumps 09-15
22 31 11 Water Softeners 09-15
22 35 00 Domestic Water Heat Exchangers 09-20
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and Steam
Generation
04-20
23 05 11 Common Work Results for HVAC 02-20
23 05 51 Noise and Vibration Control for Boiler Plant 04-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 02-20
23 08 11 Demonstrations and Tests for Boiler Plant 04-20
23 09 11 Instrumentation and Control for Boiler Plant 02-20
23 09 23 Direct-Digital Control System for HVAC 09-11
23 10 00 Facility Fuel Systems 04-20
23 11 23 Facility Natural-Gas Piping 04-20
23 21 11 Boiler Plant Piping Systems 02-20
23 22 13 Steam and Condensate Heating Piping 02-20 23 22 23 Steam Condensate Pumps 04-20
23 25 00 HVAC Water Treatment 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 02-20
23 37 00 Air Outlets and Inlets 02-20
23 40 00 HVAC Air Cleaning Devices 03-20
23 50 11 Boiler Plant Mechanical Equipment 11-17
23 51 00 Breechings, Chimneys, and Stacks 04-20 23 52 39 Fire-Tube Boilers 04-20
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 23 13 Generator Paralleling Controls 01-17
26 27 26 Wiring Devices 01-18
504-18-119
00 01 10-4
SECTION NO. DIVISION AND SECTION TITLES DATE
26 29 11 Motor Controllers 01-18
26 32 13 Engine Generators (Add Alternate) 01-18
26 41 00 Facility Lightning Protection (Add Alternate) 01-17
DIVISION 27 – COMMUNICATIONS (Not Used)
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (Not Used)
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
32 90 00 Planting 08-16
DIVISION 33 – UTILITIES (Not Used)
DIVISION 34 – TRANSPORTATION (Not Used)
DIVISION 48 – Electrical Power Generation (Not Used)
TO THE DB OFFEROR:
1. Specifications - General: The Design-Build A/E shall utilize the latest edition of VA Master Specifications as revised and provided by the facility supplemented by the VA Office of Construction and
Facilities Management Master Specifications as needed. The VA retains no responsibility for the development or preparation of any specification. While it is recognized that certain Divisions and/or
Sections will require significant input from the VA, the Design-Build
A/E retains overall responsibility for these Sections.
2. Specifications listed in this Table of Contents comprise those sections which the Schematic Design A/E Team has identified as being required at a minimum for completion of the Scope of Work for the Project. The
Design-Build A/E team shall incorporate these sections into their
Contract Documents, along with any additional sections which the
Design-Build A/E team will require to complete the Project.
3. It shall be the responsibility of the Design-Build A/E Team to incorporate, prepare and edit Specification sections listed in this
Table of Contents which are not included in the Design-Build Request for Proposal documents for their Contract Documents.
504-18-119
00 01 10-5
4. Specification sections included in the Design-Build Request for Proposal documents by the Schematic Design A/E Team are provided for the establishment of Basis of Design for the Design-Build A/E Team. The
Design-Build A/E Team shall use these sections for preparation of their
Proposal and identify for the VA any deviation from those specifications as part of their Proposal.
- - - END - - -
504-18-119
00 01 10-6
This page intentionally left blank
File details come from the government source that posted it. Updated .