This federal contract opportunity solicitation seeks to replace boilers and piping. Solicitation number 36C25722R0010 was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 to replace boilers and piping under project number 504-18-119. Interested parties should review the attached phasing sheets PDF file for additional details on the required work. The opportunity type is listed as a solicitation and appears aimed at procuring installation services to upgrade boiler and piping infrastructure at a VA medical facility. No further information is provided on response dates, pricing terms, or other contractual requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past Performance Questionnaire.pdf | ||
| Answers to Questions 36C25722R0010 DB Replace Boilers.pdf | ||
| VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf | ||
| Amendment 36C25722R0010 0001.docx | DOCX document | |
| 36C25722R0010_1.docx | DOCX document | |
| Mech 035 - Pages 7-12.pdf | ||
| Struct 035.pdf | ||
| SELF-PERFORMED CALCULATIONS.pdf | ||
| Mech 035 - Pages 8-19.pdf | ||
| BP-2-Boilers-natgasandpropane.pdf | ||
| 20-09 035 Narrative 02 1r1 Phasing Narrative.pdf | ||
| 20-09 035 Narrative 06 1r1 Civil-LS Design Narrative.pdf | ||
| 20-09 035 Narrative 13 1r1 Specs TOC 000110 035 21-06-30.pdf | ||
| AS ST Series Sheets.pdf | ||
| AD AE Series Sheets.pdf | ||
| Elect 035.pdf | ||
| G Series Sheets.pdf | ||
| BP-4-Water-Treatment.pdf | ||
| Mech 035 - Pages 1-3.pdf | ||
| Mech 035 - Pages 4-6.pdf | ||
| OSHA - EMR requirement.pdf | ||
| BP-3-Boiler-steam.pdf | ||
| BP-1-Boiler-fueloil.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FD
UP
UP
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
DN
DN
C
K
M
N
4A5
A
2.7
B
G
D
F
3.5
L
H
4 3 2 1 1A
J
C1
374 SF
TUNNEL
T-002
550 SF
PUMP
ROOM
11-B01
78 SF
TUNNEL
T-003
54 SF
SUMP PIT
11-B02
BLDG. 19
BLDG. 16
BLDG. 11
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
2.2
H
4 3 2 1 1A
J
C1
BOILER 1
BOILER 4
BOILER 2
BOILER 3
BLDG. 19
BLDG. 16
BLDG. 11
304 SF
MAINTENANCE
OFFICE
16-104
920 SF
MAINTENANCE
STORAGE
16-101
145 SF
BREAK
ROOM
11-103
172 SF
CONTROL
ROOM
11-102
275 SF
AUX.
GENERATOR
11-104
191 SF
CORRIDOR
11-C101
209 SF
CORRIDOR
11-C102
621 SF
WATER
TREATMENT
19-101
478 SF
WATER
TREATMENT
19-102
780 SF
WATER
TREATMENT
19-103
REMOVE GENERATOR
(ADD ALT.)
207 SF
Room 16-102
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
2.2
H
4 3 2 1 1A
J
C1
BOILER 1
BOILER 4
BOILER 2
BOILER 3
BLDG. 19
BLDG. 16
BLDG. 11 3
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
2.2
H
4 3 2 1 1A
J
C1
524 SF
DEAERATION
PLATFORM
11-301
378 SF
SO.
MEZZANINE
11-302
STORAGE
PLATFORM
BOILER 1
BOILER 4
BOILER 2
BOILER 3
BLDG. 19
BLDG. 16
BLDG. 11
REMOVE AND REPLACE
DEAERATION TANK
PARTIAL WALL REMOVAL
/ REPLACEMENT w/
TEMP. OPENING COVER
1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -
TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER
REVISIONS.
2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW
BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.
PHASE ALSO INCLUDES:
A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE
LINES IN PIPE TUNNELS;
B. BLDG. 11 - REPAIR (BASE BID) AND/OR
REPLACEMENT OF ROOFING (ADD ALTERNATE);
C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT
EXTERIOR WALLS;
D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD
ALTERNATE);
E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT
EXCHANGER WATER HEATERS;
F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM
DISTRIBUTION AND CONDENSATE PIPING;
G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE
REDUCTION VALVES AND CONDENSATE RETURN
LINES;
H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE
STEAM TRAPS.
3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11
21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-
GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'
HEATING AND COOLING SEASONS TO MINIMIZE
DISRUPTIONS TO OPERATION OF THE FACILITY.
5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN
ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -
GENERAL REQUIREMENTS AND GENERAL NOTES FOR
NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.
REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.
FOR ADD'L INFO. RE: PHASING.
PHASING NOTES:
ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -
GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.
1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING
AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW
RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,
ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE
ARCHITECTURAL DRAWINGS.
2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT
BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.
ALTERNATES:
PHASE I -
BOILER PLANT
(BLDG. 11) &
WATER TREATMENT
(BLDG. 19) -
TEMPORARY
CONDITIONS &
DEMOLITION
1. ROUTE NEW UTILITIES FOR EMERGENCY BOILER
CONNECTIONS.
2. SET TEMPORARY BOILER(S) AND MAKE OPERATIONAL.
3. REMOVE EXISTING BOILERS.
4. REVISE EXISTING BOILER HEADER. MAINTAIN STEAM
OPERATION AS LONG AAS POSSIBLE AND MINIMIZE
SHUTDOWNS.
5. PROVIDE WALL OPENING FOR NEW BOILER AND EQUIPMENT
INSTALLATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street
Omaha, Nebraska68152
Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
IMEG Corp.
14755 Preston Rd., Suite 845
Dallas, TX 75254
Phone:(972) 239-6100
15% Design Submission 07/14/2020
20% Design Submission
30% Design Submission
35%/SD1 Schematic Design Submission - Request for Proposal
AMI Environmental Inc
8802 S 135th Street
Omaha, NE 68138
Phone:(402) 397-5001
08/14/2020
FOR REFERENCE
ONLY NOT FOR
CONSTRUCTION
09/08/2020
11/17/2020
C
L H
D C
\H o m e \t fi e s e lm a n
\R e v it
M o d e ls \R
-5
-1 -1
B o ile rs tf ie s e lm a n A
G Y
.r v t
/1 /2
:1
:2
A
M
11-PH101
PHASING PLANS - BOILER PLANT - PHASE 1
November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL -
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo,TX
1/16" = 1'-0"1
PHASE 1 - PUMP FLOOR - SUMP PIT PLAN
1/16" = 1'-0"2
PHASE 1 - FIRST FLOOR PLAN
1/16" = 1'-0"3
PHASE 1 - LOWER MEZZANINE PLAN
1/16" = 1'-0"4
PHASE 1 - UPPER MEZZANINE PLAN
N
PLAN
NORTH
X
PHASING PLANS -
GENERAL NOTES:
1. SEE SPECIFICATION SECTION 01 00 00.1.G FOR ADDITIONAL
PHASING DESCRIPTIONS AND REQUIREMENTS.
2. COORDINATE ALL AFTER-HOURS ACTIVITY W/ COR.
3. TEMPORARY BOILERS.
4. SHUT-DOWNS OF STEAM SYSTEM.
5. REFER TO STEAM TUNNEL PLAN AND MECHANICAL
DRAWINGS FOR WORK IN STEAM TUNNELS AND ADJOINING
BUILDINGS.
6. SEE MECHANICAL DRAWINGS FOR WORK IN BUILDINGS 1,4,28
AND 29 RELATED TO THIS PROJECT.
Revisions: Date:
FD
UP
UP
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
DN
DN
T
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
H
4 3 2 1 1A
J
C1
374 SF
TUNNEL
T-002
78 SF
TUNNEL
T-003
550 SF
PUMP
ROOM
11-B01
163 SF
TUNNEL
T-001
54 SF
SUMP PIT
11-B02
63 SF
STAIR
11-S02
BLDG. 19
2A
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
2.2
H
4 3 2 1 1A
J
C1
172 SF
CONTROL
ROOM
11-102
275 SF
AUX.
GENERATOR
ROOM
11-104
145 SF
BREAK
ROOM
11-103
209 SF
CORRIDOR
11-C102
621 SF
WATER
TREATMENT
19-101
780 SF
WATER
TREATMENT
19-103
515 SF
PUMP
ROOM
11-B01
191 SF
CORRIDOR
11-C101
108 SF
CORRIDOR
19-C01
78 SF
STAIRS
11-S02
83 SF
STAIRS
11-S02
29 SF
STAIRS
11-S01
34 SF
STAIRS
11-S04
304 SF
MAINTENANCE
OFFICE
16-104
BLDG. 19
478 SF
WATER
TREATMENT
19-102
920 SF
MAINTENANCE
STORAGE
16-101
207 SF
MECH
16-102
1A
1E
1D
1F
1B
1G
2K
2L
2F
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
2.2
H
4 3 2 1 1A
J
C1
63 SF
STAIR
16-S01
50 SF
TOILET
11-203
61 SF
SHOWER
11-20271 SF
CORR.
11-C201
145 SF
BREAK
ROOM
11-103
339 SF
NORTH
MEZZ
11-201
76 SF
STAIRS
11-S03
35 SF
STAIRS
S05
BLDG. 19
1E
1D
1F
1A
2K
2L
2B
C
K
M
N
4A5
A
2.7
B
G
D
E
F
3.5
L
2.2
H
4 3 2 1 1A
J
C1
524 SF
DEAERATION
PLATFORM
11-301
378 SF
SO.
MEZZANINE
11-302
63 SF
STAIRS
16-S01
STORAGE
PLATEFORM
BLDG. 19
1E
1D
1F
2K
2L
1C
2E
2B
2K
2L
1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -
TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER
REVISIONS.
2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW
BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.
PHASE ALSO INCLUDES:
A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE
LINES IN PIPE TUNNELS;
B. BLDG. 11 - REPAIR (BASE BID) AND/OR
REPLACEMENT OF ROOFING (ADD ALTERNATE);
C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT
EXTERIOR WALLS;
D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD
ALTERNATE);
E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT
EXCHANGER WATER HEATERS;
F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM
DISTRIBUTION AND CONDENSATE PIPING;
G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE
REDUCTION VALVES AND CONDENSATE RETURN
LINES;
H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE
STEAM TRAPS.
3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11
21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-
GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'
HEATING AND COOLING SEASONS TO MINIMIZE
DISRUPTIONS TO OPERATION OF THE FACILITY.
5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN
ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -
GENERAL REQUIREMENTS AND GENERAL NOTES FOR
NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.
REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.
FOR ADD'L INFO. RE: PHASING.
PHASING NOTES:
ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -
GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.
1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING
AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW
RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,
ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE
ARCHITECTURAL DRAWINGS.
2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT
BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.
ALTERNATES:
PHASE II
INSTALLATION OF
NEW EQUIPMENT
1. BOILER AND EQUIPMENT REPLACEMENT.
A. PROVIDE WALL OPENING FOR NEW BOILER AND
EQUIPMENT INSTALLATION.
B. REPLACEMENT OF FUEL-FIRED BOILERS.
C. REPLACEMENT OF DEAERATOR TANK; RUN
CONDENSATE SYSTEM IN BYPASS MODE TO
BYPASS DEAERATOR. MINIMIZE DOWNTIME.
D. REPLACEMENT OF RELATED EQUIPMENT (PUMPS,
CONTROLS, DISPLAYS, CHEMICAL FEEDERS,
WATER SOFTENER SYSTEM, ADDITIONAL
MODIFICATIONS TO EXISTING STEAM BOILER
HEADER, AD INFINITUM – SEE FPMET NARRATIVE
FOR MORE-DETAILED DESCRIPTION).
E. COMMISSIONING OF NEW SYSTEMS.
CONFIRMATION OF PROPER OPERATION AND
CONTROLS.
F. TESTING AND BALANCE OF NEW SYSTEMS.
G. REMOVAL OF TEMPORARY BOILER SYSTEMS.
2. ITEMS BELOW CAN BE PERFORMED CONCURRENTLY WITH
AND MINIMIZE STEAM SHUTDOWN QUANTITY AND
SHUTDOWNS SHALL BE PERFORMED DURING NON-
HEATING SEASON.
A. TOTAL REPLACEMENT OF CONDENSATE RETURN
LINES FROM BLDGS. 1, 4, 28 AND 29 TO BLDG. 11.
ROUTE NEW PIPING PRIOR TO REMOVING EXISTING.
B. REPAIR OF CRACKS AND RESEALING OF JOINTS IN
EXISTING EXTERIOR MASONRY WALLS.
C. REPAIR OF EXISTING ROOFING AND FLASHINGS AT
BLDG. 11 AND CONNECTING CORRIDOR (BASE BID
IF ADD ALTERNATE IS NOT ACCEPTED).
D. REPLACEMENT OF ROOFING AT BLDG. 11 AND
CONNECTING CORRIDOR TO BLDG. 19 (ADD
ALTERNATE). (SEE ROOF PLAN).
E. INSTALLATION OF FALL PROTECTION AT EXTERIOR
FIXED LADDER.
F. REPLACEMENT OF ELECTRICAL GENERATOR IN
BLDG. 11 (ADD ALTERNATE).
G. REPLACEMENT OF HEAT EXCHANGER WATER
HEATERS IN BLDGS. 1, 4, 28 AND 29. MAINTAIN
EXISTING IN OPERATION AS LONG AS POSSIBLE.
MINIMIZE DOWNTIME. (SEE MECHANICAL).
H. RECONFIGURATION AND MODERNIZATION OF
STEAM DISTRIBUTION AND CONDENSATE PIPING IN
BLDGS. 1, 4, 28 AND 29. MUST BE PERFORMED IN
NON-HEATING SEASON. (SE MECHANICAL).
I. REPLACEMENT OF PRESSURE REDUCTION VALVES
(PRVS) AND CONDENSATE RETURN LINES IN BLDGS.
1 AND 4. MUST BE PERFORMED IN NON-HEATING
SEASON. (SEE MECHANICAL).
J. REPLACEMENT OF DEFECTIVE STEAM TRAPS IN
BLDGS. 1, 4, 28 AND 29. (SEE MECHANICAL).
K. COMMISSIONING OF NEW SYSTEMS.
CONFIRMATION OF PROPER OPERATION AND
CONTROLS. (SEE MECHANICAL).
L. TESTING AND BALANCE OF NEW SYSTEMS.
(SEE MECHANICAL).
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street
Omaha, Nebraska68152
Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
IMEG Corp.
14755 Preston Rd., Suite 845
Dallas, TX 75254
Phone:(972) 239-6100
15% Design Submission 07/14/2020
20% Design Submission
30% Design Submission
35%/SD1 Schematic Design Submission - Request for Proposal
AMI Environmental Inc
8802 S 135th Street
Omaha, NE 68138
Phone:(402) 397-5001
08/14/2020
FOR REFERENCE
ONLY NOT FOR
CONSTRUCTION
09/08/2020
11/17/2020
C
L H
D C
\H o m e \t fi e s e lm a n
\R e v it
M o d e ls \R
-5
-1 -1
B o ile rs tf ie s e lm a n A
G Y
.r v t
/1 /2
:1
:2
A
M
11-PH102
PHASING PLANS - BOILER PLANT - PHASE 2
November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL -
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo,TX
1/16" = 1'-0"1
PHASE 2 - PUMP FLOOR - SUMP PIT PLAN
1/16" = 1'-0"2
PHASE 2 - FIRST FLOOR PLAN
1/16" = 1'-0"3
PHASE 2 - LOWER MEZZANINE PLAN
1/16" = 1'-0"4
PHASE 2 - UPPER MEZZANINE PLAN
N
PLAN
NORTH
PHASING PLANS -
GENERAL NOTES:
1. SEE SHEET 11-PH101 FOR PHASNG PLAN GENERAL NOTES
X
B
LD
G
FI
RS
T
FL
O O R
C O R R
ID
O R
EL
EC
TR
IC
AL
ST
OR
AG
E
SW
IT
C H
R
OO
M
ST
OR
AG
E
ST
OR
AG
E
ST
OR
AG
E
TE
LE
PH
ON
E
ST
OR
AG
E
ST
EA
M
O
FF
IC
E
EL
EC
T
W
AI
TI
N G
TE
XA
S
VE
T
C O M M
D
VA
D
AV
C O
UN
C
IL
TR
AI
N
IN
G
EM
S
O
FF
IC
E
ST
OR
AG
E
R
ES
TR
O
OM
R
ES
TR
O
OM
K
IT
C
HE
N
ST
OR
AG
E
D
RU
G
C
AC
H E
ST
OR
AG
E
ST
OR
AG
E
PO
LI
C E
ST
OR
AG
E
ST
OR
AG
E
ST
OR
AG
E
C
AN
TE
EN
ST
OR
AG
E
EL
EV
AT
O R/ M
AC
H
M
EC
H
AN
IC
AL
R
OO
M
R
EF
RI
G
ER
AT
O R
PA
TI
EN
T
LI
B
RA
RY
UN
IF
O
RM
S
C O
PY
R
OO
M
M
AI
LR
OO
M
EM
S
EQ
U
IP
M
EN
T
RE
C
EI
VI
N G
A
A
17 10
A
A
A
A
B
C
B
A
D
A
B
A
B
C
D
(1 1A
A
FL
O O R
/1 /0
FL
O O R
/1 /0
FL
O O R
/1 /0
C
OU
RT
YA
RD
AT
RI
UM
PT
A
A
A
A
A
A
A
B
C
B
A
49 11
A
B
A
B
A
C
O
FF
IC
E
C H
IE
F
W
AI
TI
N G
AR
EA
SE
C
RE
TA
RY
ST
OR
AG
E
TU
BTR
EA
TM
EN
T
P H
YS
IC
AL
TH
ER
AP
Y
TH
ER
AP
IS
T
RE
H
AB
ST
OR
AG
E
ID
F
SO
IL
ED
ST
OR
AG
E
C
LO
SE
T
C
LE
AN
ST
OR
AG
E
O
FF
IC
E
M
EN
'S
R
ES
T
FI
RE
P U M P
EL
EC
T.
W O M
EN
'S
R
ES
T
ST
OR
AG
E
C
LO
SE
T
ST
OR
AG
E/
FI
LE
S
R
EC
EP
TI
ON
M
EC
H
AN
IC
AL
R
OO
M
P H Y
M
ED
C
ON
FE
RE
N C E
VE
LR
C
OO
R
DI
N
AT
O R
ST
RG
/W O
RK
RO
O M
ST
OR
AG
E
UP
S
C O M P.
ST
OR
AG
E
LO
C
KE
RS
LO
C K
ERM
EN
LO
C K
ER
LO
C K
ER
C H
IE
F' S
O
FF
IC
E
D
EN
TI
ST
O
FF
IC
E
FI
LE
S/
SE
C
RE
C
EP
P
AI
N
TE
RS
EL
EC
TR
IC
ST
OR
AG
E
C H
IE
F
P
RO
ST
O
FF
IC
E
SO
IL
ED
LI
NE
N
EL
EC
TR
IC
AL
R
OO
M
EL
EC
TR
IC
AL
R
OO
M
AR
M
OR
Y
RE
PO
RT
R
OO
M
PH
ON
ES
FI
LE
R
OO
M
P
OL
IC
E
P
OL
IC
E
TR
AN
SC
RI
PT
IO
NP
H
YS
IC
IA
N
W O
RK
RO
O M
W O M
EN
'S
R
ES
TR
O
OM
EL
EC
TR
IC
R
ES
T
R
ES
T W
AI
TI
N G
R
OO
M
VC
P U M P
DE
NT
AL
LA
B
AL
L
P U
RP
O
SE
O
PE
RA
TO
R Y
O
PE
RA
TO
R Y
O
PE
RA
TO
R Y
O
PE
RA
TO
R Y
O
PE
RA
TO
R Y
SU
C
TI
O N
M
EC
H
AN
IC
AL
R
OO
M
O
FF
IC
E
SO
IL
ED
UT
IL
IT
Y
O
PE
RA
TO
R Y
C
LE
AN
O
FF
IC
E
X- R
AY
X- R
AY
ST
OR
AG
E
ST
OR
AG
E
ST
AI
R W
EL
L
ST
AI
R W
EL
L
ST
AI
R W
EL
L
C
AR
DI
O
EX
AM
D
RE
SS
O
FF
IC
E
EX
AM
O
FF
IC
E
EL
EV
S-
EL
EV
P-
EL
EV
P-
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
U P
UP
U P
UP
E
LE
V
S
TA
IR
W A
IT
IN
G
H A C
R E C E P T
IO
N
E L E V
M E C H
M A
LE
L O C K E R S
R E S T R O O M
F E M A
LE
L O C K
R E S T R O O M
R E S T R O O M
S T A F F
LO
U N G E
R E S T R O O M
P R E P
S H O W E R
G O W N
R E C E P T
IO
N
R E C O V E R Y
S T O R A G E
P R O C E D U R E
R O O M
P R O C E D U R E
R O O M
M E C H A N
IC
A L
R O O M
D E C O N
TA
M
V E S T
IB
U L E
S T O R A G E
M E D
G A S
S O
IL
E D
D E C O N
H A C
D E C O N
R A T
O F F
IC
E
E Q U
IP
E N D O
R O O M
S O
IL
E D
S U P P
LY
E N D O
R O O M
W O R K R O O M
E N D O
R O O M
E N D O
R O O M
ID
F
M E C H A N
IC
A L
R O O M
N U R S E
S T A
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
C O R R
ID
O R
A
A
A
A
A
A
B
B
A
A
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
SU
M P
PI
T
FD
FE
C
W S
W S
UP
A6
A5
A7
A8
A9
A12
A13 B1
B1
B1 0.3
B1
C1
C1
C1 0.3
B6
B7
B8
C6
C7
C8
C4
C3 .2
C3
C2
C1 .2
C1
C1
B4
B3 .2
B3
B2
B1 .2
C.5
C.5
C.5
D6
D7
D8
D4
D3
D2
D1 .2
D5
D9
D1
D1
D1
D12 .4
E6
E7
E8
E4
E3
E5
E9
E1
E1
E1
E12 .4
F12 .4
F6
F4
F3
F5
F9
F10
F11
F12
F.3
F.3
G6
G7
G8
G4
G3
G5
G9
G1
H6
H8
H4
H3
H1
G1
G1
F2
F1
G2
G1
H2
H1
H6 .4
H7 .6
J6
J8
J4
J10
J6.
J7.
A
A
A
A
A
A
0°F
0°F
0°F
0°F
0°F
0°F
RWR
W R
S
S
S
S F
F
F
F
F
F
F
F
F F
F
FS
F
F
F
EL
EV
AT
OR
PI
T
M
EC
H
AN
IC
AL
RO
OM
ST
AI
RS
B
UI
LD
IN
G
M
AI
N T
EL
EP
H
ON
E
RM
RE
AG
EN
T W
AT
ER
RO
OM
PI
PI
N G
B
AS
EM
EN
T
PI
PI
N G
B
AS
EM
EN
T
D
D
D
D
FM
FS
C A
C S
W S
U M
B L
P an el
B L
C irc ui t
UP
UPT
T
T
FD
BLDG. 14
BLDG. 13
BLDG. 26
BLDG. 32
BLDG. 45
BLDG.
BLDG. 20
BLDG. 36
BLDG. 34
BLDG. 54
PH. II
PH. II
PH. IV
PH. II
NOTE:
BASEMENT LEVELS OF
BLDGS. 28 & 29 SHOWN.
NOTE:
1ST FLOOR LEVELS OF
BLDGS. 1 & 4 SHOWN
UNLESS NOTED OTHERWISE.
BLDG. 26 TUNNEL
MAIN UTULITY TUNNEL
ORG. UTILITY TUNNEL
BLDG. 4 TUNNEL
BLDG. 28 TUNNEL
SUMP PIT
SUMP PIT
F.F. TUNNEL = 93.08'
F.F. TUNNEL = 91.0'
F.F. TUNNEL = 93.4'
F.F. TUNNEL = 103.4'
PH. II
PH. II
CONTRACTOR ACCESS
MECH, ROOM ACCESS
CONTRACTOR
AND PIPE
TUNNEL ACCESS
LADDER
EXTERIOR STAIR TO BLDG.
28 MECH ROOM
CONTRACTOR ACCESS +
PIPE TUNNEL ACCESS
CONTRACTOR ACCESS TO
TUNNEL / CRAWL SPACE
BLDG. 4 CRAWL SPACE
BLDG. 29
93.5'
F.F. TUNNEL = 104.8'
F.F. CRAWL SPACE = 110.5'
FROM 78-106
(7-31-78)
F.F. 1ST FLOOR
ARCH = 117.0'
F.F. CRAWL SPACE
ARCH = 110.5'
FROM 504-026 (9-19-85)
F.F. B28 MECH ROOM
CIVIL = 3781.17', ARCH =
FROM 504-031 (5-27-88)
F.F. B29 MECH ROOM
CIVIL = 3680.77'
ARCH =
AE401
C4
AE401
F4AE401
F1
AE401
C8
BLDG. 35
BLDG. 28
BLDG. 1
BLDG. 4
BLDG. 19
BLDG. 11
BLDG. 16
2A
2A
2G
2H
2J
2K
2L
2G
2H
2I
2K
2L
2I
2K
2H
2J
2L
2G
2A
2A
2G
2H
2I
2J
2K
2L
PIPING
BASEMENT
1. PHASE I - TEMPORARY CONDITIONS AND DEMOLITION -
TEMPORARY BOILERS, BOILER REMOVAL & BOILER HEADER
REVISIONS.
2. PHASE II - INSTALLATION OF NEW EQUIPMENT - NEW
BOILERS, DEAERATOR TANK AND RELATED EQUIPMENT.
PHASE ALSO INCLUDES:
A. STEAM TUNNELS - REPLACEMENT OF CONDENSATE
LINES IN PIPE TUNNELS;
B. BLDG. 11 - REPAIR (BASE BID) AND/OR
REPLACEMENT OF ROOFING (ADD ALTERNATE);
C. BLDG. 11 - REPAIR OF CRACKS AND JOINTS AT
EXTERIOR WALLS;
D. BLDG. 11 - REPLACEMENT OF GENERATOR (ADD
ALTERNATE);
E. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF HEAT
EXCHANGER WATER HEATERS;
F. BLDGS. 1, 4, 28 & 29 - MODERNIZATION OF OF STEAM
DISTRIBUTION AND CONDENSATE PIPING;
G. BLDGS. 1 & 4 - REPLACEMENT OF PRESSURE
REDUCTION VALVES AND CONDENSATE RETURN
LINES;
H. BLDGS. 1, 4, 28 & 29 - REPLACEMENT OF DEFECTIVE
STEAM TRAPS.
3. REFER TO SHEET 11-PH101, SPECIFICATION SECTIONS 00 11
21-REQUST FOR PROPOSAL TO DESIGN BUILD AND 01 00 00-
GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
4. PHASING OF WORK TO BE COORDINATED WITH AVAHCS'
HEATING AND COOLING SEASONS TO MINIMIZE
DISRUPTIONS TO OPERATION OF THE FACILITY.
5. SHUT-DOWNS AND OUTAGES SHALL BE SCHEDULED IN
ADVANCE WITH THE COR. REFER TO SPECIFICATIONS -
GENERAL REQUIREMENTS AND GENERAL NOTES FOR
NUMBER OF DAYS' NOTICE REQUIRED PRIOR TO WORK.
REFER TO SPECIFICATIONS SEC. 01 00 00 GENERAL REQ'TS.
FOR ADD'L INFO. RE: PHASING.
PHASING NOTES:
ADD ALTERNATES ARE TO BE PROVIDED PER THE SPECIFICATIONS -
GENERAL REQUIREMENTS FOR THE FOLLOWING ITEMS.
1. REMOVE EXISTING LOOSE-LAID BALLASTED EPDM ROOFING
AND ROOF INSULATION SYSTEMS; REPLACE WITH NEW
RIGID ROOF INSULATON, TPO ROOFING, FLASHINGS,
ACCESSORIES, ETC. FOR COMPLETE INSTALLATION. SEE
ARCHITECTURAL DRAWINGS.
2. REPLACE EXISTING EMERGENCY BACKUP GENERATOR AT
BLDG. 11 WITH NEW GENERATOR. SEE MEP DRAWINGS.
ALTERNATES:
PHASE II
INSTALLATION OF
NEW EQUIPMENT
1. BOILER AND EQUIPMENT REPLACEMENT.
A. PROVIDE WALL OPENING FOR NEW BOILER AND
EQUIPMENT INSTALLATION.
B. REPLACEMENT OF FUEL-FIRED BOILERS.
C. REPLACEMENT OF DEAERATOR TANK; RUN
CONDENSATE SYSTEM IN BYPASS MODE TO
BYPASS DEAERATOR. MINIMIZE DOWNTIME.
D. REPLACEMENT OF RELATED EQUIPMENT (PUMPS,
CONTROLS, DISPLAYS, CHEMICAL FEEDERS,
WATER SOFTENER SYSTEM, ADDITIONAL
MODIFICATIONS TO EXISTING STEAM BOILER
HEADER, AD INFINITUM – SEE FPMET NARRATIVE
FOR MORE-DETAILED DESCRIPTION).
E. COMMISSIONING OF NEW SYSTEMS.
CONFIRMATION OF PROPER OPERATION AND
CONTROLS.
F. TESTING AND BALANCE OF NEW SYSTEMS.
G. REMOVAL OF TEMPORARY BOILER SYSTEMS.
2. ITEMS BELOW CAN BE PERFORMED CONCURRENTLY WITH
AND MINIMIZE STEAM SHUTDOWN QUANTITY AND
SHUTDOWNS SHALL BE PERFORMED DURING NON-
HEATING SEASON.
A. TOTAL REPLACEMENT OF CONDENSATE RETURN
LINES FROM BLDGS. 1, 4, 28 AND 29 TO BLDG. 11.
ROUTE NEW PIPING PRIOR TO REMOVING EXISTING.
B. REPAIR OF CRACKS AND RESEALING OF JOINTS IN
EXISTING EXTERIOR MASONRY WALLS.
C. REPAIR OF EXISTING ROOFING AND FLASHINGS AT
BLDG. 11 AND CONNECTING CORRIDOR (BASE BID
IF ADD ALTERNATE IS NOT ACCEPTED).
D. REPLACEMENT OF ROOFING AT BLDG. 11 AND
CONNECTING CORRIDOR TO BLDG. 19 (ADD
ALTERNATE). (SEE ROOF PLAN).
E. INSTALLATION OF FALL PROTECTION AT EXTERIOR
FIXED LADDER.
F. REPLACEMENT OF ELECTRICAL GENERATOR IN
BLDG. 11 (ADD ALTERNATE).
G. REPLACEMENT OF HEAT EXCHANGER WATER
HEATERS IN BLDGS. 1, 4, 28 AND 29. MAINTAIN
EXISTING IN OPERATION AS LONG AS POSSIBLE.
MINIMIZE DOWNTIME. (SEE MECHANICAL).
H. RECONFIGURATION AND MODERNIZATION OF
STEAM DISTRIBUTION AND CONDENSATE PIPING IN
BLDGS. 1, 4, 28 AND 29. MUST BE PERFORMED IN
NON-HEATING SEASON. (SE MECHANICAL).
I. REPLACEMENT OF PRESSURE REDUCTION VALVES
(PRVS) AND CONDENSATE RETURN LINES IN BLDGS.
1 AND 4. MUST BE PERFORMED IN NON-HEATING
SEASON. (SEE MECHANICAL).
J. REPLACEMENT OF DEFECTIVE STEAM TRAPS IN
BLDGS. 1, 4, 28 AND 29. (SEE MECHANICAL).
K. COMMISSIONING OF NEW SYSTEMS.
CONFIRMATION OF PROPER OPERATION AND
CONTROLS. (SEE MECHANICAL).
L. TESTING AND BALANCE OF NEW SYSTEMS.
(SEE MECHANICAL).
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Calvin rchitects, P.C.L 3705 North 200th Street
Elkhorn, Nebraska 68022
Phone: 402.291.6941 Fax: 402.291.9193
AH. INZ
Shaffer & Stevens 9910 North 48th Street
Omaha, Nebraska68152
Phone: 402.455.7698 Fax: 402.455.7597
504-18-119
IMEG Corp.
14755 Preston Rd., Suite 845
Dallas, TX 75254
Phone:(972) 239-6100
15% Design Submission 07/14/2020
20% Design Submission
30% Design Submission
35%/SD1 Schematic Design Submission - Request for Proposal
AMI Environmental Inc
8802 S 135th Street
Omaha, NE 68138
Phone:(402) 397-5001
08/14/2020
FOR REFERENCE
ONLY NOT FOR
CONSTRUCTION
09/08/2020
11/17/2020
C
L H
D C
\H o m e \t fi e s e lm a n
\R e v it
M o d e ls \R
-5
-1 -1
B o ile rs tf ie s e lm a n A
G Y
.r v t
/1 /2
:1
:1
A
M
00-PH103
PHASING PLAN - CAMPUS - PHASE 2
November 17, 2020
Replace Boilers & PipingSD-1 35% SUBMITTAL -
REQUEST FOR PROPOSAL
Thomas E. Creek VAMC-Amarillo,TX
N
PLAN
NORTH
N
TRUE
NORTH
1" = 30'-0"1
CAMPUS PHASING PLAN - PHASE 2
PHASING PLANS -
GENERAL NOTES:
1. SEE SHEET 11-PH101 FOR PHASNG PLAN GENERAL NOTES
X
| Sheets |
| 11-PH101 - PHASING PLANS - BOILER PLANT - PHASE 1 |
| 11-PH102 - PHASING PLANS - BOILER PLANT - PHASE 2 |
| 00-PH103 - PHASING PLAN - CAMPUS - PHASE 2 |